HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1284-2023
Submission Date : 23-01-2023 11:59:40 AM
Applicant Type : Company
Project Type: ONGOING




MANGLAM MULTIPLEX PRIVATE LIMITED
CABIN-1, LGF, F-22, SUSHANT SHOPPING ARCADE, SUSHANT LOK PHASE - 1, GURUGRAM - 122002, HARYANA
01244732000
9711348349 (Number Shared by Promoter in Public)
multiplexmanglam@gmail.com
http://manglammultiplex.com
XXXX481G
U55101HR2003PTC044839
 
 


 
 


 
 


 
 







MIXED LAND USE (RESIDENTIAL (M3M HEIGHTS, M3M SKYCITY) & COMMERCIAL (M3M 65TH AVENUE))
SECTOR 65, GURUGRAM
BADSHAHPUR ST
GURUGRAM
01244732000
9811486979 (Number Shared by Promoter in Public)
multiplexmanglam@gmail.com
PRAVEEN SEGHAL
01244732000
8929034470 (Number Shared by Promoter in Public)
multiplexmanglam@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
137863521-01-20232057480INDUSIND BANK LIMITEDHRERA Gurugram
237863521-01-20232107460INDUSIND BANK LIMITEDHRERA Gurugram
351422030-01-20232670703ICICI BANK LIMITEDHRERA Gurugram
4470502-06-20173500000ICICI BANK LIMITED (004705)HRERA Gurugram
5468913-06-20172624400ICICI BANK LIMITED (004689)HRERA Gurugram







14.4125 (Acre)
3.79
3.61
14.4125 (Acre)
15 of 2017 dated 02.05.2017
Yes







225977.2 Lakhs
62381.31 Lakhs
85434.34 Lakhs
9256.82 Lakhs
68904.72 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7.328
3CONSTRUCTION OF ROADS2.827
4PAVEMENTS0
5PARKS AND PLAYGROUNDS1.65289
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER2.60
Total14.40789




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS GMDANo
WATER SUPPLY GMDAYes
ELECTRICITY DHBVNYes
SEWAGE DISPOSAL GMDAYes
STORM WATER DRAINAGE GMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS737.26AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM644.09AS PER PROJECT REPORT
3STORM WATER DRAINAGE143.60AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM1944.47AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL468.66AS PER PROJECT REPORT
6STREET LIGHTING55.30AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING96.70AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS300.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15HARDSCAPE AND SOFTSCAPE692.67AS PER PROJECT REPORT
16BOUNDARY 60.58AS PER PROJECT REPORT
17MAIN ENTRANCE WORK GUARD HOUSE 52.40AS PER PROJECT REPORT
18PARKING 5.00AS PER PROJECT REPORT
19STP620.00AS PER PROJECT REPORT
20UNDERGROUND TANK511.74AS PER PROJECT REPORT
21RAIN WATER HARVESTING88.00AS PER PROJECT REPORT
22ELECTRICAL SUB STATION2836.35AS PER PROJECT REPORT


16-12-2022 (date)
16-12-2022 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL011259981271
2APARTMENT/SHOPS/OTHER BUILDINGS Type RESIDENTIAL012441184606






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
COMMERCIAL998OC RECEIVED
RESIDENTIAL1184UNDER CONSTRUCTION


14-06-2017
01-05-2024
01-05-2024
14-06-2017
60
30-11-2023


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
14-06-2017
60
30-11-2023


1000
1000
1000
906
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5680.364254.113015.122528.38
Shops547.09463.48398.81472.79
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements552.95
Water Supply System354.25
Sewerage treatment & garbage disposal351.50
Electricity Supply System486.12
Storm Water Drainage107.70
Parks and Playgrounds225.00
Clubhouse/community centres0
Shopping area0
Other0
Boundary Wall45.44
Electrical sub station992.72
Firefighting services72.53
Hardscape and Softscape519.50
Main Entrance work Guard House39.30
Parking3.75
Rain water harvesting66.00
STP465.00
Street Light41.48
Underground tank383.80

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements73.73
Water Supply System144.92
Sewerage treatment & garbage disposal39.06
Electricity Supply System729.18
Storm Water Drainage17.95
Parks and Playgrounds37.50
Clubhouse/community centres0
Shopping area0
Other0
Firefighting service12.09
Electrical sub station737.45
Boundary Wall7.57
Main Entrance work Guard House6.55
Parking0.63
STP77.50
Street Light6.91
Underground tank63.97
Rain waterharvesting11.00
Hardscape and Softscape69.27












Particulars Remarks, if any
i. No. of Flats/Apartments constructed2369
ii. No. of Flats/ Apartments booked2182
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter360486.05 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter248309.91 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter112176.13 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter112176.13 Lakhs
vii. Amount invested in the project upto the date of application159740.15 Lakhs
Land cost (If any)36961.29 Lakhs
Apartments68438.64 Lakhs
Infrastructure4707.02 Lakhs
EDC/ Taxes Etc.49633.19 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession21545.49 Lakhs
(a) In respect of existing allottees21545.49 Lakhs
(b) In respect of rest of the project21545.49 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
40000 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 33017 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS737.26552.95
II. WATER SUPPLY SYSTEM644.09354.25
III. STORM WATER DRAINAGE143.60107.70
IV. ELECTRICITY SUPPLY SYSTEM1944.47486.12
V. SEWAGE TREATMENT & GARBAGE DISPOSAL468.66351.50
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.300.00225.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
INDUSIND BANK LIMITED , SHOP NO. 2 , SUNCITY BUSINESS TOWER , SECTOR 54 , GOLF COURSE ROAD , GURUGRAM
252510090900
INDB0000401
110234037
000401
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 Arera Colony Bhopal M.P. 462016 2) Ms. Amarjot Kaur Sahni-3/66 Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi- House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon, Haryana- 122002 4) Ms. Surbhi- Flat No-3-905, 9th floor, Sector-103, grandiva, Daultabad, Gurgaon, Haryana-122006 5) Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad, Haryana- 121001 6) Mr. Pratap Singh-10A Pocket 2 Mayur Vihar East Delhi 110096 7) Mr. Pradeep Kumar Katiyar- 357, Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, Uttar Pradesh
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENT CLEARANCE ALREADY BEEN OBTAINED17-11-2022
II. BUILDING PLAN APPROVALALREADY BEEN OBTAINED16-11-2022
III. ASSURANCE CONSTRUCTION WATER ALREADY BEEN OBTAINED11-05-2017
IV. ASSURANCE STROM WATER ALREADY BEEN OBTAINED08-04-2022
V. ASSURANCE DRINKING WATER ALREADY BEEN OBTAINED26-03-2022








Yes


Yes









M3M ROUTE65, SECTOR 65, GURUGRAM
4.00
727
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
19546195460
Cost of the apartments11748.4911748.490
Cost of the infrastructure1130.451130.450
Others costs6667.066667.060


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
28-02-2027
28-02-2027










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSE RCC SLAB/TILE
2WALL FINISHING DETAILSPAINTED/WHITE WASH MASONRY WALL/PARTITION
3KITCHEN DETAILS N.A.
4BATHROOM FITTINGSSTANDARD CHINAWARE, CP FITTINGS, WITH/ WITHOUT WASH BASIN COUNTER
5WOOD WORK ETC N.A.
6DOORS AND WINDOS FRAMESPOWDER COATED ALUMINIUM FRAME/WOODEN FRAME
7GLASS WORK GLASS THICKNESS VARIES FROM 5 TO 12MM
8ELECTRIC FITTINGS PUBLIC AREAS & TOILETS TO BE PROVIDED WITH LED LIGHT FIXTURES.
9CONDUCTING AND WIRING DETAILS IS APPROVED CONDUITS & WIRES
10CUPBOARD DETAILS N.A.
11WATER STORAGE RCC TANK
12LIFT DETAILS SCHINDLER / THYSSENKRUPP / FUJITEC / KONE
13EXTERNAL GLAZINGSPOWDER COATED ALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
13.1WINDOWS/GLAZINGSPOWDER COATED ALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
14DOORSALUMINIUM DOORS / GLASS DOORS
14.1MAIN DOORSALUMINIUM DOORS / GLASS DOORS
14.2INTERNAL DOORS MS/ALUMINIUM/WOODEN
15AIR CONDITIONING CHILLED WATER AC SYSTEM UPTO TAP OFF FOR MULTIPLEX/CINEMA & FOOD COURT. PROVISION FOR WATER COOLED DX SYSTEM UP TO TAP OFF INSIDE THE SHOP. AIR COOLED DX SPLIT AC SYSTEM FOR RESIDENTIAL BLOCK
16ELECTRICAL FITTINGSPROVISION OF WIRE / CABLE UP TO DISTRIBUTION BOARD ISI /BIS APPROVED
17CNG PIPE LINE N.A.
18PROVISION OF WIFI AND BROADBAND FACILITY PROVISION OF ONT BOX ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEPAINT/GLASS/ACP
20INTERNAL FINISHINGANTISKID TILES/IPS ON FLOOR, PAINT/WHITE WASH FINISH ON WALL & CEILING IN PUBLIC AREAS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOOR MARBLE/ WOODEN FLOORING / ANTI-SKID TILES
1 . 2 WALLS PLASTER WITH PAINT
1 . 3 CEILING PLASTER WITH PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORENGINEERED WOODEN FLOORING/ ANTI- SKID TILES
2 . 2 WALLSPLASTER WITH PAINT
2 . 3 CEILINGPLASTER WITH PAINT
2 . 4 MODULAR WARDROBES N.A.
3 . MASTER TOILET
3 . 1 FLOOR ANTI-SKID TILES
3 . 2 WALLS TILES
3 . 3 CEILING PAINT FINISH
3 . 4 COUNTERSWITH/ WITHOUT WASH BASIN COUNTER
3 . 5 SANITARY WARE/CP FITTINGS STANDARD MAKE CHINAWARE & CP FITTINGS
3 . 6 FITTING/FIXTURESSTANDARD MAKE FITTING /FIXTURES
4 . BED ROOMS
4 . 1 FLOOR ENGINEERED WOODEN FLOORING/ ANTI- SKID TILES
4 . 2 WALLS PLASTER WITH PAINT
4 . 3 CEILING PLASTER WITH PAINT
4 . 4 WARDROBES NA
5 . TOILET
5 . 1 FLOOR ANTI-SKID TILES
5 . 2 WALLS TILES
5 . 3 CEILING PAINT FINISH
5 . 4 COUNTERSWITH/ WITHOUT WASH BASIN COUNTER
5 . 5 SANITARY WARE/CP FITTINGS STANDARD MAKE CHINAWARE & CP FITTINGS
5 . 6 FIXTURES STANDARD MAKE FITTING /FIXTURES
6 . KITCHEN
6 . 1 FLOOR ANTI-SKID TILES
6 . 2 WALLSTILES UP TO 2 FEET ABOVE THE COUNTER AND PLASTER WITH PAINT
6 . 3 CEILINGPAINT
6 . 4 COUNTERS STONE TOP COUNTER
6 . 5 FIXTURESSINK AND CP FITTINGS OF STANDARD MAKE & MODEL
6 . 6 KITCHEN APPLIANCESKITCHEN CABINETRY WITH HOB AND CHIMNEY, COUNTER TOP WITH SINK AND STANDARD CP FITTINGS
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOOR ANTI-SKID TILES
7 . 2 WALLS & CEILING PLASTER WITH PAINT
7 . 3 TOILET WALLS: TILES FLOOR: TILES CEILING: PAINT
7 . 4 BALCONY ANTI-SKID TILES
8 . SIT-OUTS
8 . 1 FLOOR ANTI-SKID TILES
8 . 2 WALLS & CEILING DURABLE EXTERIOR GRADE PAINT
8 . 3 RAILINGS1.0 MTR. HIGH M.S. RAILING
8 . 4 FIXTURES N.A.












Sr. No.Document DescriptionDate of Document UploadView Document
1T6A-6B SECTION19-01-2023 ------
2 T4-5 SECTION 119-01-2023 ------
3COPY OF LICENSE ALONG WITH SCHEDULE OF LAND19-01-2023 View Document
4 T4-5 FLOOR 25-48 FLOOR PLANS19-01-2023 ------
5T6A-6B TERRACE FLOOR PLAN19-01-2023 ------
6ROAD LAYOUT PLAN20-01-2023 ------
7 T1A-1B FLOOR 20-35 FLOOR PLAN19-01-2023 ------
8T4-5 REFUGE FLOOR PLAN19-01-2023 ------
9T6A-6B 10-17 & 18 FLOOR PLAN19-01-2023 ------
10LGF & GF FLOOR PLAN (RETAIL)19-01-2023 ------
11T1A-1B ELEVATION19-01-2023 ------
12IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN19-01-2023 View Document
13FIRST FLOOR PLAN19-01-2023 ------
14STORM WATER DRAINAGE PLAN20-01-2023 ------
15 2ND FLOOR PLAN (RETAIL)19-01-2023 ------
16T1A-1B FLOOR 3-8 & 12-18 FLOOR PLAN19-01-2023 ------
17 T2-3 FLOOR 28-48 FLOOR PLAN19-01-2023 ------
18 T4-5 TERRACE PLAN19-01-2023 ------
19SITE PLAN AREA CHART19-01-2023 ------
20ZONING PLAN19-01-2023 View Document
21 T1A-1B 9-19 FLOOR PLAN19-01-2023 ------
22 T2-3 FLOOR 24-47 FLOOR PLAN19-01-2023 ------
23 T4-5 23-18 FLOOR PLAN19-01-2023 ------
24T1A-1B 28 REFUGE AREA FLOOR PLAN19-01-2023 ------
25 T4-5 SECTION 4-519-01-2023 ------
26BASEMENT 1 FLOOR PLAN (RETAIL)19-01-2023 ------
27T1A-1B SECTION19-01-2023 ------
28SITE PLAN19-01-2023 ------
29ELECTRICITY SUPPLY PLAN20-01-2023 ------
30T4-5 SECTION 2-319-01-2023 ------
31ELECTRIC LOAD ASSURANCE 19-01-2023 ------
32WATER SUPPLY PLAN20-01-2023 ------
33 T2-3 FLOOR 18-23 FLOOR PLAN19-01-2023 ------
34SEWERAGE PLAN20-01-2023 ------
35 T2 & 3 FLOOR 3-17 & 19-22 FLOOR PLAN19-01-2023 ------
36T4-5 ELEVATION 219-01-2023 ------
37 T6A-6B FLOOR 3-9 FLOOR PLAN19-01-2023 ------
38STREET LIGHT PLAN20-01-2023 ------
39T4-5 3RD FLOOR19-01-2023 ------
40UPPER GROUND FLOOR PLAN (RETAIL)19-01-2023 ------
41T6A-6B 19-35 FLOOR PLAN19-01-2023 ------
42T6A-6B 28-37 FLOOR PLAN19-01-2023 ------
43T2-3 ELEVATION 119-01-2023 ------
44ARAVALLI NOC19-01-2023 ------
45T2-3 ELEVATION19-01-2023 ------
46T4-5 ELEVATION19-01-2023 ------
47PARKING PLAN19-01-2023 ------
48T2-3 SECTION19-01-2023 ------
49T2-3 SECTION119-01-2023 ------
50FOREST NOC19-01-2023 ------
51IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN19-01-2023 View Document
52CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT22-01-2023 View Document
53NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT22-01-2023 View Document
54STRUCTURAL PLAN22-01-2023 ------
55STRUCTURAL PLAN -222-01-2023 ------
56STRUCTURAL PLAN -322-01-2023 ------
57 1 FF- 18TH & 19TH FLOOR PLAN (TOWER-6A-6B ) FIRE22-01-2023 ------
58 1 FF- 3RD FLOOR PLAN (TOWER - 4 & 5) FIRE22-01-2023 ------
591 FF- 3RD TO 17TH & 19TH TO 22ND FLOOR PLAN ( (TOWER - 2 & 3) FIRE22-01-2023 ------
60LANDSCAPE PLAN 22-01-2023 ------
61DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.23-01-2023 View Document
62AAI NOC31-01-2023 ------
63ENVIRONMENT CLEARANCE31-01-2023 ------
64SUPERIMPOSED DEMARCATION PLAN31-01-2023 ------
65PERT CHART31-01-2023 ------
66DEMARCATION PLAN31-01-2023 View Document
67APPLIED SERVICE ESTIMATES31-01-2023 ------
68APPLIED FIRE SCHEME31-01-2023 ------
69DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD31-01-2023 View Document
70LOI & TDR CERTIFICATE31-01-2023 ------
71BR-III ISSUED- MANGLAM- 14.4125 ACRES- REVISED BP'S31-01-2023 ------
72CASH FLOW STATEMENT OF THE PROPOSED PROJECT31-01-2023 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 Occupation Certificate 10-04-2024 View Document
2 Occupation Certificate 10-04-2024 View Document
3 OC uploaded 20-11-2024 View Document