HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1406-2023
Submission Date : 17-11-2023 03:20:35 PM
Applicant Type : Company
Project Type: NEW




DLF LIMITED
1ST FLOOR, DLF GATEWAY TOWER, R BLOCK, DLF CITY, PHASE III, GURUGRAM 122002
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
https://www.dlf.in
XXXX494N
L70101HR1963PLC002484
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







DLF PRIVANA SOUTH
SECTOR 76/77
MANESAR
GURUGRAM
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
YUDHVEER SINGH
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152272110-11-202311043000ICICI BANK LIMITEDHRERA Gurugram







25.148 (Acre)
1.25 (For the entire 116.29625 Acres)
1.25
116.296 (Acre)
219 of 2023 25-10-2023 valid up to 24-10-2028
No
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     416, 4TH FLOOR, DLF QUTUB PLAZA COMPLEX, DLF CITY PHASE-I, GURUGRAM- 122002
Address     VILLAGE KHERKI DHAULA
Address     VILLAGE KHERI DHAULA, TEHSIL MANESAR, DISTRICT GURUGRAM
Address     VILLAGE KHERI DHAULA, TEHSIL MANESAR, DISTRICT GURUGRAM
Address     VILLAGE WAZIRABAD TEHSIL DISTRICT GURUGRAM
Address     VILLAGE WAZIRABAD TEHSIL DISTRICT GURUGRAM
Address     VILLAGE WAZIRABAD TEHSIL DISTRICT GURUGRAM
Address     VILLAGE WAZIRABAD TEHSIL DISTRICT GURUGRAM
Address     VILLAGE WAZIRABAD TEHSIL DISTRICT GURUGRAM
Address     VILLAGE KHERI DHAULA, TEHSIL MANESAR, DISTRICT GURUGRAM
Address     VILLAGE WAZIRABAD TEHSIL DISTRICT GURUGRAM
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     VILLAGE KHERI DHAULA, TEHSIL MANESAR, DISTRICT GURUGRAM
Address     SCO-11-12, SECTOR-15, PART II, GURGAON -122001
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     VILLAGE SHIKHOPUR TEHSIL MANESAR
Address     VILLAGE WAZIRABAD TEHSIL DISTRICT GURUGRAM
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE-I, DLF CITY GURUGRAM 122002
Address     416, 4TH FLOOR, DLF QUTUB PLAZA COMPLEX, DLF CITY PHASE-I, GURUGRAM- 122002
Address     SUMMERLEAS NO. 19, GADAIPURBANDH ROAD NEW DELHI 110030
Annexure-B- ANNEXURE -B
YES
Yes
AS PER ANNEXURE
No
Yes
Yes







374277 Lakhs
32726.97 Lakhs
303742.54 Lakhs
15986 Lakhs
21821.49 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS9911.61
3CONSTRUCTION OF ROADS8913.87
4PAVEMENTS14364.42
5PARKS AND PLAYGROUNDS15314.54
6GREEN BELTS0
7VEHICLE PARKINGS525
8ELECTRICITY SUB-STATION1750
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY965
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES2023.43
12ANY OTHER48002.13
Total101770




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDAYes
ELECTRICITYGMDANo
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS2404AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM832AS PER PROJECT REPORT
3STORM WATER DRAINAGE809AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM2921AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL846AS PER PROJECT REPORT
6STREET LIGHTING349AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS3073AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER934AS PER PROJECT REPORT
15EARTH WORKS846AS PER PROJECT REPORT
16SEWERAGE SYSTEM1602AS PER PROJECT REPORT
17UGT761AS PER PROJECT REPORT
18RAINWATER HARVESTING 609AS PER PROJECT REPORT


13-12-2023 (date)
13-12-2023 (date)
01-03-2024
30-06-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings198.47510997
Apartment/Shops/Other Buildings330.881147





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments07993143889592
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments80198019801910628
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments15002183111710313794
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments11789152951449417103
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1309311286104849084
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9881727758238577
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments12007531563793189
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments11800000
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System00042
Sewerage treatment & garbage disposal00127211
Electricity Supply System0146292292
Storm Water Drainage00040
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0093140
Earth Work211423
UGT114190
Sewerage System160

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements240361601601
Water Supply System428383125
Sewerage treatment & garbage disposal12785127169
Electricity Supply System292292292292
Storm Water Drainage408181121
Parks and Playgrounds307461768768
Clubhouse/community centres0000
Shopping area0000
Other2342342340
Earth Works1274242
Rain Water Harvesting6130152122
Street Lighting87878787
UGT11476114152
Sewerage System160160240160

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements601000
Water Supply System83125125125
Sewerage treatment & garbage disposal0000
Electricity Supply System292292146146
Storm Water Drainage81121121121
Parks and Playgrounds768000
Clubhouse/community centres0000
Shopping area0000
Other0000
Sewerage System160160160240
Rain Water Harvesting122122

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System146
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
No
ICICI BANK LTD, K6/7 ,K12 KB12, QUTUB PLAZA, DLF PHASE 1, GURGAON, GURGAON, HARYANA, 122002;
017705014192
ICIC0000177
110229030
000177
01. Mr. Vivek Anand (E1001, Palm Springs, Golf Course Road,opposite IBIS Hotel, Sector 54,Gurgaon, Haryana 122002) 02.Mr. Puneet Rakheja (H.No. 386, Sector 31, Faridabad, Haryana121003)03. Mr. Pankaj Jain (C701, Apex Acacia Valley, Sector 3,Ghaziabad, Uttar Pradesh 201010) 04. Mr.Saurabh Kumar Gupta(1116, Vikas Kunj, Vikaspuri, Delhi 110018) 05. Mr. Gaurav Arora(A-33, NearMehfil Banquet Hall, Mahendru Enclave, GT KarnalRoad, Delhi 110009) 06. Ms. Sandhya Singla(NeelanchalApartments, Plot No. 3, Sector 4, Dwarka, Delhi 110075) 07. Mr.Ashok Nanda (A255, SuryaNagar, Chander Nagar, Ghaziabad,Uttar Pradesh 201011) 08. Mr. Rajeev Singhal (Flat No. 14,TowerNo. 4, Raj Nagar Extension, Signature Homes, Ghaziabad,Uttar Pradesh 201001) 09. Mr. Sujeet KumarSinha (C-061, DLFNew Town Heights, IMT Manesar, Sector 91, Gurgaon, Haryana122505) 10. Mr.Pankaj Kumar (A3, Rajcottage 1/18, RajendraNagar, Ghaziabad, Uttar Pradesh 201005).
Uploaded











Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LOI ALREADY BEEN OBTAINED08-09-2023
II. LICENSEALREADY BEEN OBTAINED25-10-2023
III. ZONNING PLANALREADY BEEN OBTAINED26-10-2023








Yes


Yes


As per RERA Act







INDEPENDENT FLOORS AT DLF CITY PHASE – I, GURUGRAM
0.621
28
0
28
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
334137712469
Cost of the apartments313135612275
Cost of the infrastructure000
Others costs210210193


10258 Lakhs
2012 Lakhs
0 Lakhs
2425 Lakhs
No
28-02-2024
28-02-2024




INDEPENDENT FLOORS, DLF CITY PHASE - IV, GURUGRAM
1.625
60
15
60
15
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
689881923669
Cost of the apartments651378873396
Cost of the infrastructure000
Others costs385305273


18463 Lakhs
10244 Lakhs
0 Lakhs
2968 Lakhs
No
15-05-2025
15-05-2025




INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92
0.969
72
18
72
18
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
484757474237.53
Cost of the apartments411354924007.07
Cost of the infrastructure000
Others costs442255230.47


7418 Lakhs
1261 Lakhs
0 Lakhs
2779.12 Lakhs
No
20-06-2024
31-10-2023




INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92
1.096
52
13
52
13
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
613363303734.42
Cost of the apartments453553202735.34
Cost of the infrastructure000
Others costs4221010999.0823656


7352 Lakhs
2810 Lakhs
0 Lakhs
3591.23 Lakhs
No
19-11-2024
24-11-2024




INDEPENDENT FLOORS AT DLFGARDENCITY SECTOR 91/92
2.246
124
31
124
31
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
12800121245843
Cost of the apartments10000114805218
Cost of the infrastructure000
Others costs2800644625


11284 Lakhs
12093 Lakhs
0 Lakhs
6227.58 Lakhs
No
31-03-2025
31-03-2025




GARDENCITY ARCADE, GURGAON
1.42
99
1
99
1
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
630854322538
Cost of the apartments416246582084
Cost of the infrastructure000
Others costs2146774454


1501 Lakhs
7249 Lakhs
0 Lakhs
447.00 Lakhs
No
29-04-2025
29-04-2025




DLF GARDENCITY ENCLAVE, GURGAON
26.91875
0
367
0
367
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
119994026245
Cost of the apartments03241232
Cost of the infrastructure473800
Others costs726178512


2602 Lakhs
12876 Lakhs
0 Lakhs
0 Lakhs
No
29-03-2024
29-03-2024




INDEPENDENT FLOORS AT DLFGARDENCITY ENCLAVE, GURGAON
3.5698
388
97
375
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
23468273366456.52
Cost of the apartments1834525873.541755984.499021
Cost of the infrastructure136700
Others costs30451462472.02492


3302 Lakhs
38386 Lakhs
0 Lakhs
3331 Lakhs
No
19-08-2027
19-08-2027




DLF GARDENCITY ENCLAVE PH2
5.0105
544
136
496
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
40606370063398
Cost of the apartments30890353843082
Cost of the infrastructure300200
Others costs67141622316


17031 Lakhs
59769 Lakhs
0 Lakhs
0 Lakhs
No
30-10-2030
30-10-2030




DLF GARDENCITY, GURGAON
16.25
0
109
0
109
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
143921291506
Cost of the apartments020991544.53
Cost of the infrastructure141900
Others costs203020.99


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
27-06-2023
27-06-2023




SUMMIT PLAZA SECTOR-54, GURUGRAM
2.65
311
1
311
1
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
249563199111945
Cost of the apartments18530291189887
Cost of the infrastructure000
Others costs642628732058


3309 Lakhs
125915 Lakhs
0 Lakhs
2594 Lakhs
No
01-09-2021
01-06-2026




THE GROVE DLF 5, GURUGRAM
5.3073
292
73
292
73
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
493555111116766
Cost of the apartments167664923915273
Cost of the infrastructure000
Others costs881418721494


71120 Lakhs
117189 Lakhs
0 Lakhs
19974 Lakhs
No
01-02-2022
01-12-2025










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES/MARBLE/GRANITE/LAMINATED WOOD
2WALL FINISHING DETAILSOBD/SEMI ACRYLIC/ACRYLIC EMULSION/TILES
3KITCHEN DETAILSMODULAR KICTHEN WITH APPLIANCES AS PER POINT 6.6 CABINETRY AND SS SINK
4BATHROOM FITTINGSCP FITTINGS, WASH BASIN, WC WITH ACCESSORIES
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESMS/UPVC/ALWOOD/COMPOSITION MATERIAL
7GLASS WORKCLEAR/TINTED/COATED/FROSTEGLASS AS PER POINT NUMBER 12
8ELECTRIC FITTINGSSWITCH BOX AND SOCKETS
9CONDUCTING AND WIRING DETAILSPVC CONDUCTS, FR WIRING
10CUPBOARD DETAILSMODULAR WARDROBES
11WATER STORAGEOHT & UGT WATER TANKS
12LIFT DETAILSBRANDED MAKE
13EXTERNAL GLAZINGSUPVC/ALUMUNIUM
13.1WINDOWS/GLAZINGSSAME AS POINT 13
14DOORSMAIN DOOR INTERNAL DOORS
14.1MAIN DOORSWOODEN FIRE RESISTANT FLUSH DOOR
14.2INTERNAL DOORSWOODEN FLUSH DOOR
15AIR CONDITIONINGIN LIVING, DINING & BEDROOMS
16ELECTRICAL FITTINGSSAME AS POINT 8
17CNG PIPE LINEGAS PIPE LINE PROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADED PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE /TILES
1 . 2 WALLSACRYLIC EMULSION / OBD
1 . 3 CEILINGACRYLIC EMULSION / OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING/MARBLE /TILES
2 . 2 WALLSACRYLIC EMULSION / OBD
2 . 3 CEILINGACRYLIC EMULSION / OBD
2 . 4 MODULAR WARDROBESMODULAR WARDROBES
3 . MASTER TOILET
3 . 1 FLOORTILES / MARBLE / GRANITE
3 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & MIRROR
3 . 3 CEILINGACRYLIC EMULSION PAINT
3 . 4 COUNTERSMARBLE / GRANITE / SYNTHETIC STONE
3 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC, TOWEL RAIL/RING, TOILET PAPER HOLDER
3 . 6 FITTING/FIXTURESEXHAUST FAN, GEYSER
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING/MARBLE/TILE
4 . 2 WALLSACRYLIC EMULSION PAINT / OBD
4 . 3 CEILINGACRYLIC EMULSION PAINT / OBD
4 . 4 WARDROBESMODULAR WARDROBES
5 . TOILET
5 . 1 FLOORMARBLE / GRANITE / TILES
5 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT
5 . 3 CEILINGACRYLIC EMULSION PAINT
5 . 4 COUNTERSGRANITE / MARBLE / SYNTHETIC STONE
5 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC, TOWEL RAIL/RING, TOILET PAPER HOLDER
5 . 6 FIXTURESEXHAUST FAN, GEYSER
6 . KITCHEN
6 . 1 FLOORTILES/GRANITE
6 . 2 WALLSTILES UP-TO 2’ ABOVE COUNTER & EMULSION PAINT IN BALANCE AREA
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSMARBLE / GRANITE /SYNTHETIC STONE
6 . 5 FIXTURESCP FITTINGS, SS SINK, EXHAUST FAN
6 . 6 KITCHEN APPLIANCESHOB, CHIMNEY, OVEN,MICROWAVE, DISHWASHER,REFRIDGERATOR, GEYSER, WASHING MACHINE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES
7 . 2 WALLS & CEILINGOBD/SEMI ACRYLIC/TILES
7 . 3 TOILETCP FITTINGS, WASH BASIN, WC
7 . 4 BALCONYTILES/CEMENT BASED EXTERIOR GRADE PAINT
8 . SIT-OUTS
8 . 1 FLOORTILES
8 . 2 WALLS & CEILINGEXTERIOR GRADE PAINTS
8 . 3 RAILINGSMS/SS/AL/GLASS
8 . 4 FIXTURESCEILLING LIGHTS












Sr. No.Document DescriptionDate of Document UploadView Document
1DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD08-11-2023 View Document
2COPY OF LICENSE ALONG WITH SCHEDULE OF LAND08-11-2023 View Document
3SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN08-11-2023 View Document
4ZONING PLAN08-11-2023 View Document
5DEMARCATION PLAN15-11-2023 View Document
6CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT16-11-2023 View Document
7NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT16-11-2023 View Document
8ASSURANCE CERTIFICATE - STORM WATER CONNECTION16-04-2024 ------
9ASSURANCE CERTIFICATE-ELECTRIC LOAD16-04-2024 ------
10ELEVATION-B&D (TOWER-C)16-04-2024 ------
11AREA CALCULATION OF BASEMENT-03 (PART-2&3), TOWER-E,F,G16-04-2024 ------
12BASEMENT-03 (PART-01) TOWER-A,B,C,D16-04-2024 ------
13NON-ENCUMBRANCE LATEST SHIKHOPUR16-04-2024 ------
14SCHEMATIC DRAWING16-04-2024 ------
15TYPICAL REFUSE SECTION-C (TOWER-A,B,C,E&G) & TYPICAL TOILET VENTILATION PART PLAN & SECTION-116-04-2024 ------
16AAI POCKET 4 NOC16-04-2024 ------
17NCZ UNDERTAKING16-04-2024 ------
18TOWER SECTIONS SECTION AA'& BB' (TOWER-A)16-04-2024 ------
19ASSURANCE CERTIFICATE - WATER SUPPLY16-04-2024 ------
20ELEVATION-0316-04-2024 ------
21DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.16-04-2024 View Document
22AAI POCKET 1 NOC16-04-2024 ------
23AAI POCKET 7 NOC16-04-2024 ------
24BILATERAL AGREEMENT (LC-IV)16-04-2024 ------
25ELEVATION -A&C (TOWER-A)16-04-2024 ------
26ELEVATION-A&C (TOWER-C)16-04-2024 ------
27ELEVATION-B&D (TOWER-D)16-04-2024 ------
28SCHEMATIC DIAGRAM-216-04-2024 ------
29IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN16-04-2024 View Document
3041ST PENTHOUSE FLOOR, TERRACE, MACHINE ROOM, WATER TANK, ROOF PLAN (TOWER-D)16-04-2024 ------
31AREA CALCULATION OF BASEMENT-02 (PART-1), TOWER-A,B,C,D16-04-2024 ------
32TOWER SECTIONS SECTIONS AA'&BB;' (TOWER-B)16-04-2024 ------
33AREA CALCULATION OF BASEMENT-03 (PART-1), TOWER-A,B,C,D16-04-2024 ------
34GF,STILT,PART OF COMMUNITY & TYPICAL(1ST TO 40TH FLOOR), 17TH,26TH & 35TH REFUGE FLOOR PLAN TOWER-D16-04-2024 ------
35SUPER IMPOSED PLAN16-04-2024 ------
36TOWER SECTIONS SECTIONS AA'&BB;' (TOWER-C)16-04-2024 ------
37BASEMENT-03 (PART-2&3), TOWER-E,F,G16-04-2024 ------
3841ST PENTHOUSE FLOOR, TERRACE, MACHINE ROOM & ROOF PLAN (TOWER-A,B,C,E&G)16-04-2024 ------
3941ST PENTHOUSE FLOOR, TERRACE, MACHINE ROOM16-04-2024 ------
40AAI POCKET 2 NOC16-04-2024 ------
41AFFIDAVIT 4(2)(L)(D)16-04-2024 ------
42AREA CALCULATION OF BASEMENT-02 (PART-2&3), TOWER-E,F,G16-04-2024 ------
43HUDA CONSTRUCTION WATER16-04-2024 ------
44AAI POCKET 3 NOC16-04-2024 ------
45AAI POCKET 5 NOC16-04-2024 ------
46AAI POCKET 6 NOC16-04-2024 ------
47ACCESS PERMISSION SUBMISSION16-04-2024 ------
48AFFIDAVIT TREE CUTTING16-04-2024 ------
49CA CERTIFICATE NO DUES16-04-2024 ------
50GF,STILT,PART OF COMMUNITY FLOOR PLAN(TOWER-A,B,C&G)16-04-2024 ------
51LETTER OF INTENT (LC-III)16-04-2024 ------
52AIRPORT HEIGHT CLEARANCE POCKET 1 NOC16-04-2024 ------
53AREA CALCULATION OF BASEMENT-01 (PART-01) TOWER-A,B,C,D16-04-2024 ------
54AREA CALCULATION OF BASEMENT-01 (PART-2&3), TOWER-E,F,G16-04-2024 ------
55ASSURANCE CERTIFICATE - SEWERAGE16-04-2024 ------
56BASEMENT -3 (PART-2) TOWER-E & F, BASEMENT-3 (PART-3) TOWER-G16-04-2024 ------
57CA CERTIFICATE INCURRED16-04-2024 ------
58LAYOUT SUPER IMPOSED ON DEMARCATION16-04-2024 ------
59BASEMENT-01 (PART-01), TOWER-A,B,C,D16-04-2024 ------
60BASEMENT-01 (PART-2,3), TOWER-E,F,G16-04-2024 ------
61BASEMENT-02 (PART-01), TOWER-A,B,C,D16-04-2024 ------
62BASEMENT-02 (PART-02) & (PART-03), TOWER-E,F,G16-04-2024 ------
63ELEVATION A&C (TOWER-G)16-04-2024 ------
64ELEVATION DRAWING16-04-2024 ------
65ELEVATION-0216-04-2024 ------
66FOREST NOC (KHERKI DAULA)_10.788 ACRES16-04-2024 ------
67GREEN AREA CALCULATION16-04-2024 ------
68ELEVATION-0116-04-2024 ------
69ELEVATION-A&C (TOWER-B)16-04-2024 ------
70ELEVATION-B& D (TOWER-A)16-04-2024 ------
71LETTER FOR EDC 10% AUTO CREDIT16-04-2024 ------
72ELEVATION-A&C (TOWER-E)16-04-2024 ------
73ELEVATION-A&C(TOWER-F)16-04-2024 ------
74ELEVATION-B&D (TOWER-F)16-04-2024 ------
75ELEVATION-B&D(TOWER-B)16-04-2024 ------
76FAR AREA CALCULATION OF (1ST TO 40TH FLOOR PLAN) 41ST PENTHOUSE & MUMTY), ELECTRICAL BATTERY AREA (TOWER-A,B,C,D,E,F & G16-04-2024 ------
77FAR AREA CALCULATION OF GROUND COVERAGE (TOWER-A,B,C,D,E,F&G) & STILT FLOOR (TOWER-A,B,C,D,E,F&G)16-04-2024 ------
78FOREST LAND DIVERSION UNDERTAKING16-04-2024 ------
79FOREST NOC (KHERKI DAULA)_38.70 ACRES16-04-2024 ------
80ACKNOWLEDGMENT- PRIVANA TERMS OF REFERENCE AND DD APPLICATION16-04-2024 ------
81FOREST NOC (SHIKOHPUR)_64.45 ACRES16-04-2024 ------
82GF,STILT,PART OF COMMUNITY & TYPICAL(1ST TO 40TH FLOOR), 17TH,26TH & 35TH REFUGE FLOOR PLAN TOWER-F16-04-2024 ------
83GF,STILT,PART OF COMMUNITY & TYPICAL, REFUGE &17TH; REFUGE FLOOR PLAN TOWER-A,B,C,E&G16-04-2024 ------
84MINING & HUDA CONSTRUCTION WATER AFFIDAVIT16-04-2024 ------
85NON-ENCUMBRANCE LATEST KHERKI DHAULA16-04-2024 ------
86OVERALL GF,STILT,PART OF COMMUNITY FLOOR PLAN (ROAD LAYOUT), TOWER-A,B,C,D,E,F&G16-04-2024 ------
87CASH FLOW STATEMENT OF THE PROPOSED PROJECT16-04-2024 View Document
88ROAD ACCESS PERMISSION LOI16-04-2024 ------
89SITE PLAN-FIRE, SEWERAGE, WATER & IRRIGATION16-04-2024 ------
90TOTAL COST16-04-2024 ------
91TOWER SECTIONS SECTIONS AA'&BB;' (TOWER-D)16-04-2024 ------
92TOWER SECTIONS SECTIONS AA'&BB;' (TOWER-E)16-04-2024 ------
93TOWER SECTIONS SECTIONS AA'&BB;' (TOWER-F)16-04-2024 ------
94TYPICAL REFUSE SECTION-C (TOWER-A,B,C,E&G) & TYPICAL TOILET VENTILATION PART PLAN & SECTION-216-04-2024 ------
95TYPICAL TOILET DETAIL16-04-2024 ------
96IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN16-04-2024 View Document
97A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS16-04-2024 View Document