HRERA GurugramTemp Project Id : RERA-GRG-PROJ-491-2019
Submission Date : 17-01-2020 12:31:02 PM
Applicant Type : Company
Project Type: ONGOING




VATIKA LIMITED
VATIKA TRIANGLE, 4TH FLOOR, SUSHANT LOK, PHASE-I, BLOCK-A, M. G. ROAD, GURUGRAM-122 002.
01244177777
9810566938 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
http://www.vatikagroup.com
XXXX647G
U74899HR1998PLC054821
 
 


 
 


 
 


 
 


 
 







LIFESTYLE HOMES (BLOCK A)
SECTOR-83, VILLAGE SIHI
MANESAR
GURUGRAM
0000000000
8800772626 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
ARUP KUMAR DAS
0000000000
8800772626 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15694128-07-2017107000HDFC BANK LIMITEDHRERA Gurugram







12.83 (Acre)
175
168.331
12.83 (Acre)
License No. 113 of 2008 dated 01.06.2008, License No. 71 of 2010 dated 15.09.2010 and 62 of 2011 dated 02.07.2011.
No
Address     VATIKA TRIANGLE, 4TH FLOOR, SUSHANT LOK, PHASE-I, BLOCK-A, M. G. ROAD, GURUGRAM-122 002
Address     FLAT NO. 224A, 2ND FLOOR DEVIKA TOWER, 6, NEHRU PLACE NEW DELHI SOUTH DELHI - 110019
Address     FLAT NO. 224A, 2ND FLOOR DEVIKA TOWER, 6, NEHRU PLACE NEW DELHI SOUTH DELHI - 110019
Address     FLAT NO. 224A, 2ND FLOOR DEVIKA TOWER, 6, NEHRU PLACE NEW DELHI SOUTH DELHI - 110019
Annexure-B- COLLABORATION AGREEMENT, REVENUE RECORD, ETC.
BEFORE GRANT OF LICENSE
No
PROVIDED
No
Yes
Yes







3983.00 Lakhs
296.00 Lakhs
2430.00 Lakhs
270.00 Lakhs
987.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD809.36
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS10733.442
3CONSTRUCTION OF ROADS12842
4PAVEMENTS0
5PARKS AND PLAYGROUNDS7964.691
6GREEN BELTS0
7VEHICLE PARKINGS6375
8ELECTRICITY SUB-STATION0
9CLUB HOUSE354.617
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER12841.975
Total51921.085




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA/HSVPNo
WATER SUPPLYHUDA/HSVPNo
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDA/HSVPNo
STORM WATER DRAINAGEHUDA/HSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS72.90AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM21.60AS PER PROJECT REPORT
3STORM WATER DRAINAGE27.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM40.50AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL24.30AS PER PROJECT REPORT
6STREET LIGHTING16.20AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING5.40AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS13.50AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP16.20YET TO BE PREPARED
16RAIN WATER HARVESTING5.40YET TO BE PREPARED
17ELECTRICAL SUB STATION27.00YET TO BE PREPARED


23-02-2012 (date)
23-02-2012 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEX1069.686244181






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
ANNEX440


25-02-2012
31-01-2018
31-01-2018
25-02-2012
88
30-01-2018
PROVIDED
PROVIDED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NOT APPLICABLE
25-02-2012
0
31-01-2018
NOT APPLICABLE
NOT APPLICABLE


72
0
0
23
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments2160.00
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments50.0090.00
Shops00
Plots00

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments130.00
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements64.80
Water Supply System19.20
Sewerage treatment & garbage disposal21.60
Electricity Supply System36.00
Storm Water Drainage24.00
Parks and Playgrounds12.00
Clubhouse/community centres0
Shopping area0
Other0
Electrical Sub station24.00
Rain Water Harvesting4.80
Security and fire fighting4.80
STP14.40
Street lighting14.40

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.702.70
Water Supply System0.800.80
Sewerage treatment & garbage disposal0.900.90
Electricity Supply System0.501.50
Storm Water Drainage0.501.00
Parks and Playgrounds00.50
Clubhouse/community centres00
Shopping area00
Other00
Electrical Sub station01.00
Street lighting0.100.60
Security and fire fighting0.200.20
STP0.100.60
Rain Water Harvesting0.200.20

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3.700
Water Supply System0.800
Sewerage treatment & garbage disposal0.900
Electricity Supply System2.500
Storm Water Drainage1.500
Parks and Playgrounds1.000
Clubhouse/community centres00
Shopping area00
Other00
Electrical Sub station2.000
Street lighting1.100
Security and fire fighting0.200
STP1.100
Rain Water Harvesting0.200












Particulars Remarks, if any
i. No. of Flats/Apartments constructed62To be Constructed
ii. No. of Flats/ Apartments booked44
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter5452.95 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter5014.97 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter5014.97 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter437.98 Lakhs
vii. Amount invested in the project upto the date of application3539.14 Lakhs
Land cost (If any)296.00 Lakhs
Apartments2160.00 Lakhs
Infrastructure240.00 Lakhs
EDC/ Taxes Etc.443.86 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession443.86 Lakhs
(a) In respect of existing allottees315.00 Lakhs
(b) In respect of rest of the project128.86 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
300 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 256.09 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS72.9064.80
II. WATER SUPPLY SYSTEM21.6019.20
III. STORM WATER DRAINAGE27.0024.00
IV. ELECTRICITY SUPPLY SYSTEM40.5036.00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL16.2021.60
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.13.5012.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM5.404.80
XVII. OTHER FACILITIES AS PER PROJECT REPORT72.9057.60









Yes
Yes
HDFC BANK LTD. FIP, MG ROAD, GURUGRAM HARYANA-122001
57500000181626
HDFC0000280
110240037
0280
1.Mr. Anil Bhalla Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030 2.Mr. Gautam Bhalla LCG05 PHB, The Laburnam, Nathupur (67),Nathupur Gurgaon,Gurgaon, Haryana 122002 3. Mr. K V George Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075 4. Mrs Veena Bhomia C1/577B,Rear Block,1st Floor, Near Euro Kids School,Palam Vihar,Choma (62), Gurgaon, Haryana 122017
Uploaded











Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LAY OUT PLANALREADY BEEN OBTAINED23-02-2012
II. ZONING PLANALREADY BEEN OBTAINED09-09-2011
III. BUILDING PLANALREADY BEEN OBTAINED23-02-2012
IV. FLOOR PLANALREADY BEEN OBTAINED23-02-2012
V. APARTMENT PLANSALREADY BEEN OBTAINED23-02-2012
VI. ELEVATION SECTIONALREADY BEEN OBTAINED23-02-2012
VII. SERVICE ESTIMATEALREADY BEEN OBTAINED04-08-2014








Yes


Yes


Provided







“TURNING POINT” (PHASE - I) SECTOR 88B, VILLAGE HARSARU, SUB-TEHSIL HARSARU, DISTRICT GURUGRAM, STATE HARYANA
93588.71
703
0
99
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
33415.0033415.004081.38
Cost of the apartments25200.0025200.00453.31
Cost of the infrastructure2800.002800.0050.00
Others costs5415.005415.003578.07


975.94 Lakhs
7752.46 Lakhs
15000.00 Lakhs
15000.00 Lakhs
No
30-01-2025
30-01-2025




“TOWN SQUARE” (BLOCK-D) SECTOR 82A, VILLAGE SHIKOHPUR, TEHSIL MANESAR, DISTRICT GURUGRAM, STATE HARYANA
13809.560
187
0
16
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10586.0010586.009646.93
Cost of the apartments4500.004500.003835.50
Cost of the infrastructure500.00500.00426.00
Others costs5586.005586.005385.43


486.26 Lakhs
798.92 Lakhs
14600.00 Lakhs
14600.00 Lakhs
No
30-07-2018
30-07-2018




SOVEREIGN NEXT (PHASE - I) SECTOR-82A, VILLAGE SHIKOHPUR, TEHSIL MANESAR, DISTRICT GURUGRAM, STATE HARYANA
34519.201
151
0
81
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
18175.0018175.009849.29
Cost of the apartments10350.0010350.005266.00
Cost of the infrastructure1150.001150.00585.00
Others costs6675.006675.003998.29


7602.94 Lakhs
4179.31 Lakhs
15000.00 Lakhs
15000.00 Lakhs
No
31-07-2022
31-07-2022










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEREFER SECTION BELOW
2WALL FINISHING DETAILSREFER SECTION BELOW
3KITCHEN DETAILSREFER SECTION BELOW
4BATHROOM FITTINGSREFER SECTION BELOW
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESALUMINUM OR UPVC FRAME
7GLASS WORKALUMINUM OR UPVC FRAME WINDOWS WITH CLEAR GLASS
8ELECTRIC FITTINGSIS COMPLIANT MODULAR SWITCHES / SOCKETS, SWITCHGEAR AND DISTRIBUTION BOXES FROM STANDARD MAKES AND BRAND
9CONDUCTING AND WIRING DETAILSIS COMPLIANT COPPER WIRING IN CONCEALED CONDUITS. ADEQUATE PROVISION FOR LIGHT POINTS, FAN POINTS, RECEPTACLES AND POWER POINTS IN ALL ROOMS
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGEOHT &UG; TANKS
12LIFT DETAILSSPACIOUS ELEVATORS WITH PLEASING INTERIORS
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSALUMINUM OR UPVC FRAME WINDOWS WITH CLEAR GLASS
14DOORSNA
14.1MAIN DOORSPOLISHED VENEER DOOR WITH POLISHED HARDWOOD FRAME
14.2INTERNAL DOORSPAINTED HARDWOOD FRAMES AND FLUSH DOORS
15AIR CONDITIONINGAIR-CONDITIONING THROUGH A COMBINATION OF SPLITS AND WINDOW AC’S IN ALL BEDROOMS AND LIVING ROOMS
16ELECTRICAL FITTINGSMENTIONED IN POINT NO.8 ABOVE
17CNG PIPE LINEPROVISION FOR SUPPLY OF PIPED NATURAL GAS / LPG SUPPLY TO THE KITCHEN
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE ANTI FUNGAL / ANTI ALGAL PAINT FROM REPUTED MAKES AND BRANDS
20INTERNAL FINISHINGMENTIONED IN DETAIL IN SECTION BELOW.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORPOLISHED LAPATO OR MATT FINISHED VITRIFIED TILES OF REPUTED MAKE AND BRAND
1 . 2 WALLSEMULSION PAINT ON SMOOTH PLASTERED WALLS.
1 . 3 CEILINGOBD ON PLASTER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSEMULSION PAINT ON SMOOTH PLASTERED WALLS
2 . 3 CEILINGOBD ON PLASTE
2 . 4 MODULAR WARDROBESNOT PROVIDED
3 . MASTER TOILET
3 . 1 FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES OF A REPUTED MAKE AND BRAND
3 . 2 WALLSMATT FINISHED WALL TILES UP TO DADO LEVEL. OIL BOUND DISTEMPER ON PLASTERED SURFACES ABOVE DADO LEVEL
3 . 3 CEILINGFALSE CEILING
3 . 4 COUNTERSGRANITE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS
3 . 6 FITTING/FIXTURESSINGLE LEVER BASIN MIXER, CONCEALED SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSEMULSION PAINT ON SMOOTH PLASTERED WALLS
4 . 3 CEILINGOBD ON PLASTER
4 . 4 WARDROBESNOT PROVIDED
5 . TOILET
5 . 1 FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES OF A REPUTED MAKE AND BRAND
5 . 2 WALLSMATT FINISHED WALL TILES UP TO DADO LEVEL. OIL BOUND DISTEMPER ON PLASTERED SURFACES ABOVE DADO LEVEL
5 . 3 CEILINGFALSE CEILING
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS
5 . 6 FIXTURESSINGLE LEVER BASIN MIXER, CONCEALED SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
6 . KITCHEN
6 . 1 FLOORMATT FINISHED CERAMIC TILES
6 . 2 WALLS2’ HIGH PREMIUM CERAMIC TILES DADO ABOVE COUNTER. OIL BOUND DISTEMPER ON PLASTER IN REMAINING AREAS
6 . 3 CEILINGOBD ON PLASTER
6 . 4 COUNTERSGRANITE COUNTER TOP
6 . 5 FIXTURESA DOUBLE BOWL SINK, MIXER,
6 . 6 KITCHEN APPLIANCESCOOK TOP & CHIMNEY INSTALLATION
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORMATT FINISHED CERAMIC TILES
7 . 2 WALLS & CEILINGPAINT ON PLASTER
7 . 3 TOILETMATT FINISHED CERAMIC TILES ON FLOOR
7 . 4 BALCONYMATT FINISHED / ANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORMATT FINISHED / ANTI SKID CERAMIC TILES
8 . 2 WALLS & CEILINGPAINT ON PLASTER
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1LOI20-02-2020 ------
2SITE PLAN20-02-2020 ------
3DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.20-02-2020 View Document
414 IDW DESIGN AND COST ESTIMATES20-02-2020 ------
5NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT20-02-2020 View Document
6CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT20-02-2020 View Document
7DETAIL OF AUTHORISED SIGNATORY20-02-2020 ------
8DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD20-02-2020 View Document
9LICENSE NO 113 OF 2008 71 OF 2010 62 OF 201120-02-2020 ------
10LC-IV20-02-2020 ------
11AIRPORT HEIGHT CLEARANCE NOC20-02-2020 ------
12BUILDING PLAN (BR III)20-02-2020 ------
13FIRE FIGHTING SCHEME20-02-2020 ------
14FOREST NOC20-02-2020 ------
15A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS16-12-2019 View Document
16DEMARCATION PLAN16-12-2019 View Document
17IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN16-12-2019 View Document
18SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN16-12-2019 View Document
1918 CA CERTIFICATE14-01-2020 ------
20OCCUPATON CERTIFICATE16-01-2020 ------
21TOWER A ELEVATION 16-01-2020 ------
2228 SANCTION LETTER HOME LOAN TIE UPS14-01-2020 ------
236 LIST OF DIRECTORS14-01-2020 ------
24IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN16-12-2019 View Document
25COPY OF LICENSE ALONG WITH SCHEDULE OF LAND17-01-2020 View Document
2610 LOCATION PLAN14-01-2020 ------
2720 ENCUMBRANCES14-01-2020 ------
284 MOA AOA14-01-2020 ------
291 REP I14-01-2020 ------
30TOWER A ELEVATION16-01-2020 ------
312 REGISTRATION CERTIFICATE14-01-2020 ------
328 RESOLUTION14-01-2020 ------
3322 DEVELOPMENT WORK PLAN14-01-2020 ------
3425 ALLOTTMENT LETTER RESIDENTIAL14-01-2020 ------
353 PAN CARD14-01-2020 ------
3610 SECTORIAL MAP14-01-2020 ------
37TOWER-A 17 TO 18 TERRACE AND TOILET FLOOR PLAN14-01-2020 ------
3819 PROJECT REPORT16-01-2020 ------
399 PROJECT DESCRIPTION AND COST14-01-2020 ------
4026 HRERA AFS RESIDENTIAL APARTMENT FINAL14-01-2020 ------
4111 AKS SHEJRA WITH LAND DETAILS14-01-2020 ------
4213 APPROVAL OF SERVICE PLAN OR ESTIMATE FOR GH14-01-2020 ------
4315 DETAIL OF UNITS17-01-2020 ------
4417 TIME PERIOD COMMITED TO ALLOTTEE14-01-2020 ------
4529 ADVERTISEMENT14-01-2020 ------
46TOWER A AREA CALCULATION ALL FLOOR PLAN16-01-2020 ------
4721 LIST OF ARCHITECT ENGINEER ETC14-01-2020 ------
48TOWER A SECTIONS16-01-2020 ------
4924 BOOKING APPLICATION FORM RESIDENTIAL FINAL14-01-2020 ------
5029 CASH FLOOW STATMENT16-01-2020 ------
515 BALANCE SHEET14-01-2020 ------
5216 DETAIL OF PARKING14-01-2020 ------
53TOWER A GF TO 16 FLOOR PLAN14-01-2020 ------
547 SHAREHOLDERS14-01-2020 ------
5527 CONVEYANCE DEED RESIDENTIAL FINAL14-01-2020 ------
5621 ANNEXURE 3 317-01-2020 ------
5717 ARCHITECT AND ENGINEER CERTIFICATE14-01-2020 ------
5819 COLLECTION STATEMENT14-01-2020 ------
5912 REVENUE RECORDS SALE DEED ETC16-01-2020 ------
60ZONING PLAN20-02-2020 View Document
61CASH FLOW STATEMENT OF THE PROPOSED PROJECT20-02-2020 View Document
62REGISTRATION CERTIFICATE LIFESTYLE HOMES (BLOCK-A)20-02-2020 ------