HRERA GurugramTemp Project Id : RERA-GRG-PROJ-466-2019
Submission Date : 09-01-2020 11:26:22 AM
Applicant Type : Company
Project Type: ONGOING




VATIKA SOVEREIGN PARK PRIVATE LIMITED (FORMERLY KNOWN AS PLANET EARTH ESTATES PVT. LTD.)
FLAT NO. 224A, 2ND FLOOR, DEVIKA TOWERS, 6, NEHRU PLACE, NEW DELHI - 110019
01244177777
9810566938 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
http://www.vatikagroup.com
XXXX383D
U70109DL2011PTC215498
 
 


 
 


 
 


 
 







SOVEREIGN PARK (PHASE-I)
SECTOR-99, VILLAGE KHERKI MAJRA DHANKOT,
KADIPUR ST
GURUGRAM
0000000000
8800772626 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
ARUP KUMAR DAS
0000000000
8800772626 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15694828-07-2017448000HDFC BANK LIMITEDHRERA Gurugram







21717.00 (Sqr/mtrs)
175
174.95
42214.00 (Sqr/mtrs)
License No. 119 of 2012 dated 06.12.2012 and License No. 65 of 2013 dated 20.07.2013.
Yes







36819.00 Lakhs
6133.00 Lakhs
16308.86 Lakhs
691.14 Lakhs
13686.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3126.23
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS3350.67
6GREEN BELTS476.16
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER14763.97
Total21717.03




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA/HSVPNo
WATER SUPPLYHUDA/HSVPNo
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDA/HSVPNo
STORM WATER DRAINAGEHUDA/HSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS186.61AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM55.29AS PER PROJECT REPORT
3STORM WATER DRAINAGE69.11AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM103.67AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL62.20AS PER PROJECT REPORT
6STREET LIGHTING41.47AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING13.82AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS34.56AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP41.47YET TO BE PREPARED
16RAINWATER HARVESTING13.82YET TO BE PREPARED
17ELECTRIC SUBSTATION69.11YET TO BE PREPARED


22-10-2014 (date)
22-10-2014 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEX DETAILS3806.94165451206






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
ANNEX DETAILS45ANNEXURE-20 (DETAILS OF UNITS WITH CONSTRUCTION STAGE)


26-10-2014
30-03-2021
30-03-2021
11-07-2018
36
30-03-2021
PROVIDED
PROVIDED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NOT APPLICABLE
11-07-2018
0
30-03-2021
NOT APPLICABLE
NOT APPLICABLE


301
0
0
19
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments7230.80
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments300.00400.00
Shops00
Plots00

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments500.00550.00600.00679.90
Shops0000
Plots0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments17.0995.4626.52100.00
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments200.00400.00992.121537.36
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2679.61
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements115.37
Water Supply System0
Sewerage treatment & garbage disposal19.23
Electricity Supply System26.21
Storm Water Drainage42.73
Parks and Playgrounds21.36
Clubhouse/community centres0
Shopping area0
Other0
Electrical Sub station0
Rain Water Harvesting6.90
Security and fire fighting0
STP38.46
Street Light0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2.003.00
Water Supply System00
Sewerage treatment & garbage disposal1.002.00
Electricity Supply System1.501.50
Storm Water Drainage1.002.00
Parks and Playgrounds1.101.10
Clubhouse/community centres00
Shopping area00
Other00
Rain Water Harvesting0.200.20
Street lighting00
Electrical Sub station00
Security and fire fighting00
STP0.200.20

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.346.747.3412.62
Water Supply System0000
Sewerage treatment & garbage disposal2.762.764.004.04
Electricity Supply System1.501.501.501.50
Storm Water Drainage2.354.042.352.35
Parks and Playgrounds1.571.572.511.57
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrical Sub station0000
STP0.200.200.200
Security and fire fighting0000
Street lighting0000
Rain Water Harvesting0.290.200.110

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2.803.3515.774.27
Water Supply System0000
Sewerage treatment & garbage disposal0.470.562.040.71
Electricity Supply System0.660.465.662.92
Storm Water Drainage1.041.244.541.58
Parks and Playgrounds0.520.620.200
Clubhouse/community centres0000
Shopping area0000
Other0000
Street lighting0000
Security and fire fighting0000
Electrical Sub station0000
STP0.661.120.020.02
Rain Water Harvesting0.410.500.500.50

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.001.002.002.00
Water Supply System2.005.003.0020.00
Sewerage treatment & garbage disposal0.402.132.135.69
Electricity Supply System2.021.782.0017.82
Storm Water Drainage1.100.700.700.70
Parks and Playgrounds0.080.200.600.60
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrical Sub station1.0010.0010.0024.00
Rain Water Harvesting1.000.510.890.61
STP0000.20
Security and fire fighting1.002.762.762.00
Street lighting0.405.925.926.38

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.03
Water Supply System25.29
Sewerage treatment & garbage disposal12.27
Electricity Supply System35.15
Storm Water Drainage0.70
Parks and Playgrounds0.94
Clubhouse/community centres0
Shopping area0
Other0
Rain Water Harvesting1.00
Security and fire fighting5.30
Electrical Sub station24.11
Street lighting22.85
STP0












Particulars Remarks, if any
i. No. of Flats/Apartments constructed165To be Constructed
ii. No. of Flats/ Apartments booked45
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter9731.85 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter3461.59 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter6270.26 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter6270.26 Lakhs
vii. Amount invested in the project upto the date of application22347.89 Lakhs
Land cost (If any)6133.00 Lakhs
Apartments7230.80 Lakhs
Infrastructure270.26 Lakhs
EDC/ Taxes Etc.8713.83 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession14471.11 Lakhs
(a) In respect of existing allottees3946.67 Lakhs
(b) In respect of rest of the project10524.44 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
22500.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 18430.70 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS186.61115.37
II. WATER SUPPLY SYSTEM55.290
III. STORM WATER DRAINAGE69.1142.73
IV. ELECTRICITY SUPPLY SYSTEM103.6726.21
V. SEWAGE TREATMENT & GARBAGE DISPOSAL41.4719.23
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.34.5621.36
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM13.820
XVII. OTHER FACILITIES AS PER PROJECT REPORT186.6145.36









Yes
Yes
STANDARD CHARTARED BANK, DLF, BUILDING NO-7A, DLF CYBER CITY, SECTOR-24/25/25A, GURUGRAM HARYANA-122001.
52206008704
SCBL0036025
110036006
036025
Mr. Anill Bhalla-Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030 Mr. Gautam Bhalla-LCG05 PHB, The Laburnam, Nathupur (67),Nathupur Gurgaon,Gurgaon, Haryana 122002 Mr. K.V. Gerorge-Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075 MS. Veena Bhoomia-C1/577B,Rear Block,1st Floor, Near Euro Kids School,Palam Vihar,Choma (62), Gurgaon, Haryana 122017
Uploaded











Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LAY OUT PLANALREADY BEEN OBTAINED22-10-2014
II. ZONING PLANALREADY BEEN OBTAINED22-07-2013
III. BUILDING PLANALREADY BEEN OBTAINED22-10-2014
IV. SITE PLANALREADY BEEN OBTAINED22-10-2014
V. FLOOR PLANALREADY BEEN OBTAINED22-10-2014
VI. APARTMENT PLANSALREADY BEEN OBTAINED22-10-2014
VII. ELEVATION SECTIONALREADY BEEN OBTAINED22-10-2014








Yes


Yes


Provided







NIL - THIS IS THE FRIST PROJECT OF THE COMPANY
0
0
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2021
31-03-2021










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEREFER SECTION BELOW
2WALL FINISHING DETAILSREFER SECTION BELOW
3KITCHEN DETAILSREFER SECTION BELOW
4BATHROOM FITTINGSREFER SECTION BELOW
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESREFER SECTION 14
7GLASS WORKREFER SECTION 13
8ELECTRIC FITTINGSIS COMPLIANT MODULAR SWITCHES / SOCKETS, SWITCH GEAR AND DISTRIBUTION BOXES FROM STANDARD MAKES AND BRAND.
9CONDUCTING AND WIRING DETAILSIS COMPLIANT COPPER WIRING IN CONCEALED CONDUITS. ADEQUATE PROVISION FOR LIGHT POINTS, FAN POINTS, RECEPTACLES AND POWER POINTS IN ALL ROOMS.
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGEOVERHEAD & UNDERGROUND TANKS
12LIFT DETAILSSPACIOUS ELEVATORS WITH PLEASING INTERIORS. HIGH SPEED ELEVATORS FOR HIGH RISE TOWERS.
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSALUMINUM OR UPVC FRAME WINDOWS WITH CLEAR GLASS.
14DOORSNA
14.1MAIN DOORSPOLISHED VENEER DOOR WITH POLISHED HARDWOOD FRAME.
14.2INTERNAL DOORSTALL INTERNAL DOOR OPENINGS (APPROXIMATELY 8’-0”) WITH PAINTED HARDWOOD FRAMES AND FLUSH DOORS.
15AIR CONDITIONINGINTELLIGENT AIR-CONDITIONING THROUGH ENERGY EFFICIENT VRV / VRF SYSTEMS IN ALL BEDROOMS AND LIVING ROOMS.
16ELECTRICAL FITTINGSIS COMPLIANT MODULAR SWITCHES / SOCKETS, SWITCHGEAR AND DISTRIBUTION BOXES FROM STANDARD MAKES AND BRAND.
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE ANTI FUNGAL / ANTI ALGAL PAINT FROM REPUTED MAKES AND BRANDS.
20INTERNAL FINISHINGREFER SECTION BELOW
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORPOLISHED IMPORTED MARBLE
1 . 2 WALLSPREMIUM EMULSION PAINT ON PLASTERED WALL WITH PUNNING OR PUTTY FOR LEVEL AND SMOOTHNESS.
1 . 3 CEILINGOBD ON PLASTER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORHIGH QUALITY WOODEN FLOORING IN ALL BEDROOMS.
2 . 2 WALLSPREMIUM EMULSION PAINT ON PLASTERED WALL WITH PUNNING OR PUTTY FOR LEVEL AND SMOOTHNESS.
2 . 3 CEILINGOBD ON PLASTER
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES
3 . 2 WALLSMATT FINISHED WALL TILES UP TO DADO LEVEL. PREMIUM EMULSION ON PLASTERED SURFACES ABOVE DADO LEVEL
3 . 3 CEILINGOBD ON PLASTER
3 . 4 COUNTERSGRANITE COUNTERTOP
3 . 5 SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS.
3 . 6 FITTING/FIXTURESSINGLE LEVER BASIN MIXER, CONCEALED SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
4 . BED ROOMS
4 . 1 FLOORHIGH QUALITY WOODEN FLOORING IN ALL BEDROOMS.
4 . 2 WALLSPREMIUM EMULSION PAINT ON PLASTERED WALL WITH PUNNING OR PUTTY FOR LEVEL AND SMOOTHNESS.
4 . 3 CEILINGOBD ON PLASTER
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES
5 . 2 WALLSMATT FINISHED WALL TILES UP TO DADO LEVEL. PREMIUM EMULSION ON PLASTERED SURFACES ABOVE DADO LEVEL
5 . 3 CEILINGFALSE CEILING
5 . 4 COUNTERSGRANITE COUNTERTOP
5 . 5 SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS.
5 . 6 FIXTURESSINGLE LEVER BASIN MIXER, CONCEALED SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
6 . KITCHEN
6 . 1 FLOORMATT FINISHED CERAMIC TILES.
6 . 2 WALLS2’ HIGH CERAMIC TILES DADO ABOVE COUNTER LEVEL. PREMIUM EMULSION ON PLASTER IN REMAINING AREAS.
6 . 3 CEILINGOBD ON PLASTER
6 . 4 COUNTERSGRANITE COUNTERTOP
6 . 5 FIXTURESDOUBLE BOWL SINK, MIXER.
6 . 6 KITCHEN APPLIANCESCOOK TOP & A CHIMNEY INSTALLATION
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORMATT FINISHED CERAMIC TILES.
7 . 2 WALLS & CEILINGPAINT ON PLASTER.
7 . 3 TOILETFLOORING - MATT FINISHED CERAMIC TILES. WALL FINISHES - DADO OF GLAZED / MATT FINISHED CERAMIC WALL TILES. (PAINT ON PLASTERED SURFACES ABOVE DADO LEVEL FOR REMAINING AREAS). SANITARY WARE - WASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF STANDARD MAKES. C.P. FITTINGS AND ACCESSORIES - BIB COCK, PILLAR COCK, ABLUTION TAP ALONG WITH NECESSARY ANGLE VALVES ETC. OF STANDARD MAKES AND BRANDS.
7 . 4 BALCONYFLOORING - MATT FINISHED / ANTI SKID CERAMIC TILES. WALL FINISHES - EXTERIOR GRADE PAINT ON PLASTER.
8 . SIT-OUTS
8 . 1 FLOORMATT FINISHED / ANTI SKID CERAMIC TILES.
8 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT ON PLASTER.
8 . 3 RAILINGSMS RAILING
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1LOI20-02-2020 ------
2ENVIRONMENTAL CLEARANCE20-02-2020 ------
3IDW REPORTS20-02-2020 ------
4FIRE SCHEME20-02-2020 ------
5LICENSES NO 119 OF 2012 AND 65 OF 201320-02-2020 ------
6CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT20-02-2020 View Document
7DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD20-02-2020 View Document
8BUILDING PLAN (BR-III)20-02-2020 ------
9LC-IV20-02-2020 ------
10REGISTRATION CERTIFICATE SOVEREIGN PARK20-02-2020 ------
11ZONING PLAN20-02-2020 View Document
12AIRPORT NOC20-02-2020 ------
13DETAILS OF AUTHORISED SIGNATORY20-02-2020 ------
14CASH FLOW STATEMENT OF THE PROPOSED PROJECT20-02-2020 View Document
15DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.20-02-2020 View Document
16DETAILS OF SEPARATE BANK ACCOUNT04-03-2020 ------
17APPROVAL OF SERVICE ESTIMATE GH04-03-2020 ------
18IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN14-12-2019 View Document
19A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS12-12-2019 View Document
20IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN14-12-2019 View Document
21SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN14-12-2019 View Document
2217 TIME PERIOD COMMITED TO ALLOTTEE31-12-2019 ------
2326 HRERA AFS RESIDENTIAL APARTMENT FINAL31-12-2019 ------
249 PROJECT DESCRIPTION AND COST30-12-2019 ------
2512 REVENUE RECORDS SALE DEED ETC30-12-2019 ------
2611 BLOCK EGL SECTION YY08-01-2020 ------
274 MOA AOA30-12-2019 ------
286 LIST OF DIRECTORS30-12-2019 ------
2911 AKS SHEJRA WITH LAND DETAILS30-12-2019 ------
3020 ENCUMBRANCES31-12-2019 ------
31T A B C 1ST 2ND 4TH 6TH 7TH 8TH 10TH 12TH 14TH 16TH 18TH FLOOR PLAN31-12-2019 ------
3214 BLOCK AC ELEVATION 3 408-01-2020 ------
33BLOCK E G L 11 TH TO 12TH MACHINE ROOM ROOF PLAN31-12-2019 ------
3420 TIOLET DETAIL ALL BLOCK08-01-2020 ------
35DETAIL OF UNIT09-01-2020 ------
3630 PROJECT REPORT09-01-2020 ------
375 BALANCE SHEET30-12-2019 ------
3821 BLOCK M ELEVATION 4 SEC XX AND YY08-01-2020 ------
392 REGISTRATION CERTIFICATE30-12-2019 ------
4017 ARCHITECT AND ENGINEER CERTIFICATE31-12-2019 ------
4122 SCHECMATIC DIGRAM ABC BLOCK08-01-2020 ------
4223 BLOCK M ELEVATION 1 2 308-01-2020 ------
4325 SCHECMATIC DIGRAM EG AND L BLOCK08-01-2020 ------
448 RESOLUTION30-12-2019 ------
4524 BLOCK H GF TO 10TH FLOOR PLAN08-01-2020 ------
46T A B C 3 RD 5TH 9TH 11TH 13TH 15TH 17TH 19TH 2OTH 21ST FLOOR PLAN31-12-2019 ------
4716 BLOCK AC SECTION YY08-01-2020 ------
4826 BLOCK F GF TO 8TH FLOOR PLAN08-01-2020 ------
4933 BLOCK B ELEVATION 1 208-01-2020 ------
5010 LOCATION PLAN30-12-2019 ------
5127 BLOCK K ELEVATION 1 2 308-01-2020 ------
5242 BLOCK A AND C ELEVATION 1 208-01-2020 ------
5328 BLOCK EGL SECTION XX08-01-2020 ------
5438 UPPER BASEMENT CELING PLAN08-01-2020 ------
5529 BLOCK K SECTION XX AND YY08-01-2020 ------
5645 BLOCK H SECTION XX AND YY08-01-2020 ------
5719 EWS GF TO 5TH FLOOR PLAN AREA CALCULATION08-01-2020 ------
5830 EWS ELEVATION AD SECTION08-01-2020 ------
5924 BOOKING APPLICATION FORM RESIDENTIAL FINAL31-12-2019 ------
6027 CONVEYANCE DEED RESIDENTIAL FINAL31-12-2019 ------
61BLOCK J GF TO 10TH FLOOR PLAN31-12-2019 ------
6231 BLOCK D ALL ELEVATION AND SECTION08-01-2020 ------
6310 BLOCK B SECTION YY08-01-2020 ------
6419 COLLECTION STATEMENT31-12-2019 ------
6532 LOWER UPPER BASEMENT PLAN08-01-2020 ------
6634 BLOCK F ELEVATION 1 2 3 408-01-2020 ------
6735 BLOCK K GF TO 10TH FLOOR PLAN AREA CALCULATION08-01-2020 ------
6836 BLOCK B ELEVATION 3 408-01-2020 ------
6937 BLOCK D GF TO 10TH FLOOR PLAN08-01-2020 ------
701 REP I30-12-2019 ------
719 MKJ HFD SCHEMATIC DIGRAM08-01-2020 ------
7239 BLOCK EGL ELEVATION 1 AND 208-01-2020 ------
7329 ANNEXURE 3308-01-2020 ------
747 SHAREHOLDERS30-12-2019 ------
7540 BLOCK D ALL FLOOR AREA CALCULATION08-01-2020 ------
7641 TOWER ABC AND CB 1 ALL FLOOR AND AREA CALULATION08-01-2020 ------
773 PAN CARD30-12-2019 ------
7843 BLOCK H ELEVATION 1 2 3 408-01-2020 ------
7944 BLOCK H AREA CALCULATION ALL FLOOR08-01-2020 ------
8046 BLOCK J ELEVATION 1 2 AND 408-01-2020 ------
8147 BLOCK EGL ALL FLOOR AREA CALCULATION08-01-2020 ------
8248 BLOCK F AREA CALCILATION ALL FLOOR08-01-2020 ------
8328 SANCTION LETTER HOME LOAN TIE UPS31-12-2019 ------
8413 APPROVAL OF SERVICE ESTIMATE GH08-01-2020 ------
85COPY OF LICENSE ALONG WITH SCHEDULE OF LAND08-01-2020 View Document
8617 BLOCK AC SECTION ZZ08-01-2020 ------
8722 DEVELOPMENT WORK PLAN31-12-2019 ------
8812 AREA CALCULATION UPPER LOWER BASEMENT08-01-2020 ------
8918 BLOCK K TERRACE PLAN08-01-2020 ------
9021 LIST OF ARCHITECT ENGINEER ETC31-12-2019 ------
9115 BLOCK J SECTION XX AND YY ELEVATION 308-01-2020 ------
9225 ALLOTTMENT LETTER RESIDENTIAL31-12-2019 ------
93BLOCK M GF TO 10TH FLOOR PLAN31-12-2019 ------
9418 CA CERTIFICATE31-12-2019 ------
9510 SECTORIAL MAP30-12-2019 ------
96BLOCK J CUMUNITY BUILDING 2 AREA CALCULATION31-12-2019 ------
97BLOCK E G L GF TO 10TH FLOOR PLAN31-12-2019 ------
9818 CA CERTIFICATE -NON DEFAULT31-12-2019 ------
9913 BLOCK B SECTION XX08-01-2020 ------
10016 DETAIL OF PARKING30-12-2019 ------
101ADVERTISEMENT31-12-2019 ------
102BLOCK M ALL FLOOR AREA CALCULATION31-12-2019 ------
103NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT20-02-2020 View Document
104FOREST NOC20-02-2020 ------
105SITE PLAN20-02-2020 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 PROJECT CONTINUATION- RC/REP/HARERA/GGM/285 OF 2017/7(3)/38/2023/15 DATED 18.09.2023 12-12-2023 View Document