HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1571-2024
Submission Date : 27-02-2024 03:08:22 PM
Applicant Type : Company
Project Type: NEW




KEYSTONE WORLD PVT LTD
504 5TH FLOOR MVL I PARK, PART II, CHANDER NAGAR, SECTOR 15, GURUGRAM, HARYANA 122001
1244003999
9899061025 (Number Shared by Promoter in Public)
admin@keystone.work
https://www.keystone.work
XXXX322F
U67120DL2010PTC207831
 
 


 
 


 
 







SEASONS
SECTOR 77, GURUGRAM
GURGAON
GURUGRAM
9899061025 (Number Shared by Promoter in Public)
admin@keystone.work
SIBASIS BHATTACHARYA
0000000000
9899061025 (Number Shared by Promoter in Public)
admin@keystone.work








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
12743827-02-2024728000HDFC BANKHRERA Gurugram
22766530-04-20242591017HDFC BANK HRERA Gurugram
3171405574825-04-202427754HDFC BANKHRERA Gurugram







4.0350 (Acre)
1.78
1.78
16.5400 (Acre)
67 of 2011 dated 16-07-2011 valid till 15-07-2026
No
Address     FLAT NO 41 AUROBINDO APPARTMENT, ARDHOCHINI, NEW DELHI -110016
Annexure-B- BIP PERMISSION FROM DTCP MEMO NO ENDST. NO. LC-2384-JE(SB)-2023/39284 DATED 16/11/2023
YES- ATTACHED
Yes
DEVELOPMENT AND MARKETING AGREEMENT WITH JANPRIYA BUILD ESTATE PVT. LTD , UMANG REALTECH PVT. LTD & UPPAL HOUSING PVT. LTD ON DATED 29/05/2023 AND REGISTRATION NO. 2563
No
Yes
Yes







24579.79 Lakhs
2839.58 Lakhs
13009.99 Lakhs
2557 Lakhs
6173.22 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1628.268
3CONSTRUCTION OF ROADS 4033.17
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 2703.92
6GREEN BELTS 0
7VEHICLE PARKINGS 461.81
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 784.92
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 311.83
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 6280.362
13SOLID WASTE MANAGEMENT PLANT 18
14RAIN WATER HARVESTING SYSTEM 106.72
Total16329




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS162.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM236.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE72.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM100.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL65.00AS PER PROJECT REPORT
6STREET LIGHTING22.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING450.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS200.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE750AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM100.00AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15PARKING 10.00AS PER PROJECT REPORT
16STP100.00AS PER PROJECT REPORT
17 UNDER GROUND WATER TANK 50.00AS PER PROJECT REPORT
18RAIN WATER HARVESTING40.00AS PER PROJECT REPORT
19ELECTRIFICATION COST 200.00AS PER PROJECT REPORT


NA (date)
13-02-2024 (date)
01-04-2024
30-09-2029
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings106.37251
Apartment/Shops/Other Buildings106.16251
Apartment/Shops/Other Buildings106.38251
Apartment/Shops/Other Buildings106.15251
Apartment/Shops/Other Buildings105.78251
Apartment/Shops/Other Buildings139.13501





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0390.30390.30585.45
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments715.55390.30390.30813.12
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments813.12813.12813.12813.12
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments943.22943.22943.22943.22
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments422.82585.45325.25325.25
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments325.25325.25
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements32.4032.40
Water Supply System47.2059.00
Sewerage treatment & garbage disposal13.0013.00
Electricity Supply System20.0025.00
Storm Water Drainage14.4018.00
Parks and Playgrounds40.0040.00
Clubhouse/community centres150150
Shopping area00
Other00
Underground Water Tank15.0015.00
Street Light4.408.80
Security and Firefighting90.0090.00
Renewable Energy System25.0050.00
Parking2.002.50
STP25.0025.00
Rain Water Harvesting12.0016.00
Electrification Cost50.0050.00












Yes
Yes
STATE BANK OF INDIA, BRANCH -SOUTH CITY II GURGAON S 3, 4 & 5 B BLOCK, COMMERCIAL MARKET SOUTH CITY II, GUR
42724130912
SBIN0011444
110002461
11444
Vaibhav Tapdiya and Neha Tapdiya, Address 504 5th Floor MVL I Park, Part II, Chander Nagar, Sector 15, Gurugram, Haryana 122001
YES











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLAN ALREADY BEEN OBTAINED13-02-2024
II. AAIALREADY BEEN OBTAINED01-09-2023
III. ELECTRICAL LOAD NOCALREADY BEEN OBTAINED04-01-2021
IV. FOREST NOCALREADY BEEN OBTAINED27-08-2013
V. WATER ASSURANCEALREADY BEEN OBTAINED16-08-2023
VI. SEWERAGE ASSURANCE ALREADY BEEN OBTAINED18-08-2023
VII. STROM WATER ASSURANCE ALREADY BEEN OBTAINED16-02-2024
VIII. FIRE SCHEME APPROVALALREADY BEEN OBTAINED22-03-2024








Yes


Yes


As per RERA Norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING ROOM / DINING FAMILY LOUNGE - ITALIAN/ IMPORTED MARBLE BED ROOM-LAMINATED WOODEN FLOOR KITCHEN-TILES BATHROOMS - TILES BALCONIES / TERRACES- TILES SERVANT ROOM & TOILET-TILES APARTMENT LIFT LOBBIES (PRIVATE).-ITALIAN/ IMPORTED MARBLE
2WALL FINISHING DETAILSWALLS - LOW VOC ACRYLIC EMULSION PAINT , CERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA ,VITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER ,M S HANDRAIL LOW VOC ACRYLIC EMULSION PAINT
3KITCHEN DETAILSCERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA,CEILING - LOW VOC ACRYLIC EMULSION PAINT AND PART POP
4BATHROOM FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESDOORS - WOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES,UPVC FRAMED SINGLE GLAZING UNIT,WOODEN FRAME WITH FLUSH DOOR WITH BOTH SIDE LAMINATED FINISH & ARCHITRAVE
7GLASS WORKUPVC FRAMED SINGLE GLAZING
8ELECTRIC FITTINGSHEAVY DUTY/ MEDIUM DUTY
9CONDUCTING AND WIRING DETAILSFIRE RESISTANT
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSHIGH SPEED ELEVATORS
13EXTERNAL GLAZINGSFULL POINT WINDOW UPUC
13.1WINDOWS/GLAZINGSUPVC FRAMED SINGLE GLAZING
14DOORSFLASH DOOR
14.1MAIN DOORSFLASH DOOR
14.2INTERNAL DOORSFLASH DOOR
15AIR CONDITIONINGSPLIT AC'S
16ELECTRICAL FITTINGSMODULAR
17CNG PIPE LINEPROVISIONAL
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISIONAL
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT FINISH
20INTERNAL FINISHINGLOW VOC ACRYLIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORITALIAN/ IMPORTED MARBLE
1 . 2 WALLSLOW VOC ACRYLIC EMULSION PAINT
1 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOOR
2 . 2 WALLSLOW VOC ACRYLIC EMULSION PAINT
2 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILES
3 . 2 WALLSVITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
3 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN
3 . 4 COUNTERSGRANITE ON THE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
3 . 6 FITTING/FIXTURESKOHLER, GROHA& ROCA OR EQUIVALENT
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOOR
4 . 2 WALLSLOW VOC ACRYLIC EMULSION PAINT
4 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI-SKID VITRIFIED TILES
5 . 2 WALLSVITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
5 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN
5 . 4 COUNTERSGRANITE ON THE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
5 . 6 FIXTURESKOHLER, GROHA& ROCA OR EQUIVALENT
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA
6 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT & PART POP
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOOR VITRIFIED TILES
7 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT OF APPROVED MAKE
7 . 3 TOILETNA
7 . 4 BALCONYM S HANDRAIL
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 24-02-2024 View Document
2 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 24-02-2024 View Document
3 PARKING PLAN 26-02-2024 ------
4 DEMARCATION PLAN 26-02-2024 View Document
5 ZONING PLAN 26-02-2024 View Document
6 ELEVATION PLAN 26-02-2024 ------
7 BRIII 26-02-2024 ------
8 SECTION PLAN 26-02-2024 ------
9 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 26-02-2024 View Document
10 WATER ASSURANCE 26-02-2024 ------
11 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 03-05-2024 View Document
12 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 03-05-2024 View Document
13 COMMUNITY BUILDING ROOF PLAN 07-06-2024 ------
14 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 07-06-2024 View Document
15 COPY OF ARCHITECTURAL AND PLUMBING - PLAN - SITE PLAN 07-06-2024 ------
16 COPY OF ARCHITECTURAL AND PLUMBING - PLAN - BASEMENT 1 07-06-2024 ------
17 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 07-06-2024 View Document
18 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 07-06-2024 View Document
19 COMMUNITY BUILDING FLOOR PLAN 07-06-2024 ------
20 COST INCURRED ON PROJECT CA 07-06-2024 ------
21 FIRE APPROVAL - FIRE FIGHTING SCHEMATIC DIAGRAM LAYOUT 07-06-2024 ------
22 FIRE APPROVAL -COMMUNITY BUILDING GROUND FLOOR FIRE & VENTILATION LAYOUT 07-06-2024 ------
23 BANK UNDERTAKING 07-06-2024 ------
24 SEWERAGE NOC 07-06-2024 ------
25 LOI 07-06-2024 ------
26 STORM WATER ASSURANCE 07-06-2024 ------
27 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 07-06-2024 View Document
28 ARAWALI CLEARANCE 07-06-2024 ------
29 ELECTRICAL LOAD AVAILABILITY 07-06-2024 ------
30 LC IV 07-06-2024 ------
31 BIP - KEYSTONE 07-06-2024 ------
32 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 07-06-2024 View Document
33 NON ENCUMBRANCE CERTIFICATE 07-06-2024 ------
34 CERTIFICATE FOR UNITS 07-06-2024 ------
35 FIRE APPROVAL -ELETRICAL SITE PLAN WITH LIGHTING PROTECTION SYSTEM 07-06-2024 ------
36 APPROVED FIRE QUESTIONNAIRE 07-06-2024 ------
37 ASSURANCES - STP TREATED WATER, DRINKING WATER AND SEWAGE 07-06-2024 ------
38 AIRPORT HEIGHT CLEARANCE NOC 07-06-2024 ------
39 SITE OVERLAP WITH KHASARA (3)-MODEL 07-06-2024 ------
40 FIRE SCHME APPROVAL 07-06-2024 ------
41 FLOOR PLAN 07-06-2024 ------
42 FOREST NOC 07-06-2024 ------