HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2027-2025
Submission Date : 06-09-2025 04:55:02 PM
Applicant Type : Company
Project Type: NEW




SV INFRA MANAGEMENT SOLUTIONS PVT. LTD. (FORMERLY KNOWN AS SV INFRA MANAGEMENT SOLUTIONS LLP)
PLOT NO.8, SECTOR-44, GURUGRAM - 122002
01244989300
8860640088 (Number Shared by Promoter in Public)
info@satyadevelopers.com
http://www.satyagroups.in
XXXX479K
U39000DL2025PTC447215
 
 


 
 


 
 


 
 


 
 


 
 







LEVANTE RESIDENCES
REVENUE ESTATE OF VILLAGE DHANWAPUR SECTOR 104,GURUGRAM
KADIPUR ST
GURUGRAM
9821685163
9821685163 (Number Shared by Promoter in Public)
amit.parmar@satyadevelopers.com
AMIT PARMAR
9821685163
9821685163 (Number Shared by Promoter in Public)
amit.parmar@satyadevelopers.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
17879806-09-20254386160HDFC BANK LIMITEDHRERA Gurugram
27879906-09-2025906850HDFC BANK LIMITEDHRERA Gurugram







4.65625 (Acre)
4.82
4.82
4.65625 (Acre)
140 of 2024 dated 11.11.2024 Valid up 10.11.2029
Yes







114210.84 Lakhs
19952.13 Lakhs
50108.14 Lakhs
11630.31 Lakhs
32520.26 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.930
3CONSTRUCTION OF ROADS 1.047
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 1.34525
6GREEN BELTS 0
7VEHICLE PARKINGS 0.111
8ELECTRICITY SUB-STATION 0.11
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13RWH 0.113
Total4.65625




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVP / GMDA No
WATER SUPPLYGMDA Yes
ELECTRICITYDHBVNL No
SEWAGE DISPOSALHSVP / GMDA Yes
STORM WATER DRAINAGEGMDA Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS611.67AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM425.03AS PER PROJECT REPORT
3STORM WATER DRAINAGE75.22AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM2075.76AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL56.41AS PER PROJECT REPORT
6STREET LIGHTING25.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING115.09AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS135.62AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM56.5AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER227.72AS PER PROJECT REPORT
15PARKING7298.46AS PER PROJECT REPORT
16STP100.00AS PER PROJECT REPORT
17UNDERGROUND WATER TANK95.00AS PER PROJECT REPORT
18RAIN WATER HARVESTING30.00AS PER PROJECT REPORT
19ELECTRICAL SUB STATION292.83AS PER PROJECT REPORT
20COST OF CONSTRUCTION OF TWENTY FOUR MTR WIDE ROAD10.0AS PER PROJECT REPORT


27-08-2025 (date)
27-08-2025 (date)
01-12-2025
31-03-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings7718.47683
Apartment/Shops/Other Buildings7198.55683
Apartment/Shops/Other Buildings11207.52843
Apartment/Shops/Other Buildings11207.52843
Apartment/Shops/Other Buildings6504.32383
Apartment/Shops/Other Buildings6504.32383
Apartment/Shops/Other Buildings5608.71423
Apartment/Shops/Other Buildings5608.70423
Apartment/Shops/Other Buildings615.1543
Apartment/Shops/Other Buildings615.1543
Apartment/Shops/Other Buildings1090.3463
Apartment/Shops/Other Buildings1025.1363
Apartment/Shops/Other Buildings354.6123
Apartment/Shops/Other Buildings332.6023
Apartment/Shops/Other Buildings2542.8150





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments177.25
Shops0
Plots0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments413.581181.651477.061794.52
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2333.912450.224054.34778.3681
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5393.804877.802823.612430.29
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2467.062239.971833.971668.87
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1233.751317.471570.731363.30
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments908.13742.22576.310
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other00.500
Construction of road0.522.770.50.5
Boundary Wall11.3922.7734.1645.54

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Boundary Wall40.9929.6022.7720.49
Construction of road0.50.50.50.5
Fire Fighting Services001.882.26

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0002.82
Electricity Supply System0000
Storm Water Drainage0003.76
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Construction of road0.50.50.50.5
Security Fire fighting2.632.633.013.38

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements30.5830.5861.1773.40
Water Supply System42.5097.7685.01106.26
Sewerage treatment & garbage disposal5.648.468.4611.28
Electricity Supply System000622.72
Storm Water Drainage7.5211.2811.2815.04
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Parking729.851021.781167.751459.69
Security Fire fighting3.763.383.383.01
Construction of road0.40.40.40.4
Rain water0009.0

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements110.1079.5273.4061.17
Water Supply System63.7529.7500
Sewerage treatment & garbage disposal14.105.6400
Electricity Supply System830.30622.7200
Storm Water Drainage18.817.5200
Parks and Playgrounds20.3427.1236.6228.48
Clubhouse/community centres0000
Shopping area0000
Other0000
Renewable Energy System016.9522.6016.95
STP104545
Rain water harvesting129
Underground Water tank9.542.7542.750
Street Light12.512.5
Security Fire fighting2.6325.8732.8724.37
Electric Sub Station146.42146.42
Parking1094.761021.78802.83
Construction of road0.40.40.50.4

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements36.7030.5824.470
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds9.496.786.780
Clubhouse/community centres0000
Shopping area0000
Other0000
Construction of road0.30.20.20

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Construction of road0000












Yes
Yes
HDFC BANK, PLOT NO-1, BLOCK A-2, COMMERCIAL COMPLEX, SECTOR-110, NOIDA-201304 UTTAR PRADESH
57500001826474
HDFC0000930
110240127
930
Manish Agarwal-03, Silver Oak Avenue, Westend Greens, Rajokari, New Delhi-110038
Yes











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENCEALREADY BEEN OBTAINED11-11-2024
II. NOC FOR HEIGHT CLEARANCE ALREADY BEEN OBTAINED03-09-2024
III. ZONING PLAN ALREADY BEEN OBTAINED20-06-2025
IV. ARAVALI/NCZ ALREADY BEEN OBTAINED09-10-2024
V. FOREST NOCALREADY BEEN OBTAINED12-09-2024
VI. CONSTRUCTION WATER NOC ALREADY BEEN OBTAINED31-01-2025








Yes


Yes


Attached













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILE
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT
3KITCHEN DETAILSTILE FLOORING & GRANITE COUNTER
4BATHROOM FITTINGSWC, WASH BASIN ,TAP AND FIXTURES FITTING(SS FINISH)
5WOOD WORK ETCENGINEERED WOOD
6DOORS AND WINDOS FRAMESALUMINUM
7GLASS WORKHIGH PERFORMANCE GLASS
8ELECTRIC FITTINGSMODULAR SWITCH SOCKETS
9CONDUCTING AND WIRING DETAILSPVC CONDUITS, FRLS WIRE
10CUPBOARD DETAILSN.A.
11WATER STORAGECENTRALIZED
12LIFT DETAILS24 PAX LIFT, 3.0 MPS
13EXTERNAL GLAZINGSALUMINIUM FRAMING WITH HIGH PERFORMANCE GLASS
13.1WINDOWS/GLAZINGSALUMINUM FRAMING WITH HIGH PERFORMANCE GLASS
14DOORSVENEER FINISH SHUTTER
14.1MAIN DOORSVENEER FINISH SHUTTER
14.2INTERNAL DOORSVENEER FINISH SHUTTER
15AIR CONDITIONING"VARIABLE RATE FLOW SYSTEM/ SPLIT UNITS/ OR EQUIVALENT"
16ELECTRICAL FITTINGSISI MARKED OR EQUIVALENT
17CNG PIPE LINEAS PER AVAILABILITY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT/ OR EQUIVALENT
20INTERNAL FINISHINGEMULSION PAINT OR EQUIVALENT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOOR 800MMX 1600MM VITRIFIED TILE
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOOR - AC4 GRADE
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESN.A.
3 . MASTER TOILET
3 . 1 FLOOR600MMX 1200MM VITRIFIED TILE
3 . 2 WALLSVITRIFIED TILE UPTO FALSE CEILING 2400MM HIGH
3 . 3 CEILINGMR BOARD FALSE CEILING + ACRYLIC EMULSION PAINT
3 . 4 COUNTERSSTONEX
3 . 5 SANITARY WARE/CP FITTINGSWC, WASH BASIN ,TAP AND FIXTURES FITTING(SS FINISH)
3 . 6 FITTING/FIXTURES KOHLER/EQUIVALENT
4 . BED ROOMS
4 . 1 FLOOR800MMX 1600MM VITRIFIED TILE
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOOR600MMX 1200MM VITRIFIED TILE
5 . 2 WALLSVITRIFIED TILE UPTO FALSE CEILING 2400MM HIGH
5 . 3 CEILINGMR BOARD FALSE CEILING + ACRYLIC EMULSION PAINT
5 . 4 COUNTERSSTONEX
5 . 5 SANITARY WARE/CP FITTINGSWC, WASH BASIN ,TAP AND FIXTURES FITTING(SS FINISH)
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOOR800MMX 1600MM VITRIFIED TILE
6 . 2 WALLSPREMIUM TILE UP TO 600MM HIGH ABOVE COUNTER
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE STONE
6 . 5 FIXTURESKOHLER/EQUIVALENT
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN CABINET INCLUDING DRAWER WITH PVC CUTLERY TRAY, CHIMNEY AND HOB (REFRIGERATOR- DOUBLE DOOR, OVEN, MICROWAVE, DISHWASHER, WASHING MACHINE)
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI-SKID VITRIFIED TILES
7 . 2 WALLS & CEILINGOIL BOUND DISTEMPER
7 . 3 TOILETANTI-SKID VITRIFIED TILES
7 . 4 BALCONYUTILITY ROOM/UTILITY TOILET/UTILITY BALCONY
8 . SIT-OUTS
8 . 1 FLOORANTI-SKID VITRIFIED TILES
8 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT
8 . 3 RAILINGSALUMINIUM RAILING WITH 12MM THICK CLEAR TOUGHENED GLASS
8 . 4 FIXTURESALUMINIUM RAILING WITH 12MM THICK CLEAR TOUGHENED GLASS












Sr. No.Document DescriptionDate of Document UploadView Document
1 LC IV 22-08-2025 ------
2 LOI 22-08-2025 ------
3 TREATED WATER NOC FOR CONSTRUCTION 22-08-2025 ------
4 TOD APPROVAL 23-08-2025 ------
5 WATER NOC 22-08-2025 ------
6 ZONING PLAN 22-08-2025 View Document
7 FOREST NOC 22-08-2025 ------
8 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 22-08-2025 View Document
9 CHANGE OF COMPANY NAME 22-08-2025 ------
10 ARAVALI NOC 22-08-2025 ------
11 SALEDEED 22-08-2025 ------
12 ASSURANCE OF SEWERAGE CONNECTION 22-08-2025 ------
13 HEIGHT NOC 22-08-2025 ------
14 BOARD RESOLUTION 23-08-2025 ------
15 BUILDING PLAN APPROVAL BR-III 01-09-2025 ------
16 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 02-09-2025 View Document
17 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 01-09-2025 View Document
18 MUTATION 06-09-2025 ------
19 SERVICE PLAN ESTIMATE APPLIED 03-09-2025 ------
20 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 02-09-2025 View Document
21 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 02-09-2025 View Document
22 EC APPLIED 03-09-2025 ------
23 FIRE SCHEME APPLIED 03-09-2025 ------
24 C1 SUPERIMPOSED KHASRA NO 18-11-2025 ------
25 C13_COMMUNITY & MLCP ELEVATION 18-11-2025 ------
26 C21_ TOWER-02 ELEVATIONS-A&C 18-11-2025 ------
27 ASSURANCE STORM WATER 18-11-2025 ------
28 C14_COMMUNITY & MLCP SECTION 18-11-2025 ------
29 AFFIDAVIT AUTO CREDIT 10% 18-11-2025 ------
30 C11_SECOND TO FOURTH LEVEL PODIUM 18-11-2025 ------
31 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 18-11-2025 View Document
32 C26_TOWERS-03,TYPICAL FLOOR 18-11-2025 ------
33 C29_TOWERS-03,26TH.(REFUGE)UPPER DUPLEX FLOOR 18-11-2025 ------
34 C22_TOWER-02 TYPICAL FLOOR 18-11-2025 ------
35 LENDER DETAILS AND LIST OF SHAREHOLDERS 18-11-2025 ------
36 AFFIDAVIT 4(2)(L)(D) 18-11-2025 ------
37 C33_ EWS STILT -GROUND FLOOR 18-11-2025 ------
38 DD FOR RERA 18-11-2025 ------
39 DRAFT ALLOTMENT LETTER 18-11-2025 ------
40 C23_TOWER-02 REFUGE(17TH,34TH43RD) TYPICAL FLOOR 18-11-2025 ------
41 C37 EWS_SECTIONS-1,1&2,2 18-11-2025 ------
42 C24_TOWER-02 REFUGE 26TH FLOOR 18-11-2025 ------
43 CONSENT AND NOC FOR THIRD PARTY RIGHTS 18-11-2025 ------
44 C32_TOWERS(T-01-T-02 &T-03) TERRACE& MUMTY 18-11-2025 ------
45 BANK UNDERTAKING 18-11-2025 ------
46 ELECTRICAL LOAD AVAILABILITY APPLIED 18-11-2025 ------
47 UNDERTAKING FOR ROAD ACCESS, MINING PERMISSION AND NO LITIGATION 18-11-2025 ------
48 C31_TOWER-03- SECTIONS-1,1&2,2 18-11-2025 ------
49 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 18-11-2025 View Document
50 C39_TOWER-1,2,3 & EWS WATER SUPPLY SCHEMATIC DIAGR 18-11-2025 ------
51 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 18-11-2025 View Document
52 CA CERTIFICATE FOR LAND PREMIUM 18-11-2025 ------
53 C7_BASEMENT-01 18-11-2025 ------
54 CA CERTIFICATE OF ESTIMATE COST AND FINANCIAL INVENTORY 18-11-2025 ------
55 C18_TOWER-01 26 TH.(REFUGE)UPPER DUPLEX FLOOR 18-11-2025 ------
56 C25_TOWER-02 SECTIONS-1,1&2,2 18-11-2025 ------
57 C10_FIRST FLOOR LEVEL PODIUM 18-11-2025 ------
58 C20 _TOWER-01 SECTIONS-1,1&2,2 18-11-2025 ------
59 C36 EWS_ELEVATIONS A & B 18-11-2025 ------
60 AKS SAJRA 18-11-2025 ------
61 C9_GROUND FLOOR PLAN 18-11-2025 ------
62 C19 TOWER-01 ELEVATIONS -A,B&C 18-11-2025 ------
63 C30_ TOWER-03 ELEVATION-AC&D A0 18-11-2025 ------
64 C35_ EWS TYPICAL & 7TH.FLOOR 18-11-2025 ------
65 DEMARCATION PLAN 18-11-2025 View Document
66 NEC 18-11-2025 ------
67 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 18-11-2025 View Document
68 NATURAL CONSERVATION ZONE NOC 18-11-2025 ------
69 C16_TOWER-01 DUPLEX LOWER(16TH,25,33TH&43ND;) FLOOR 18-11-2025 ------
70 C17_TOWER-01 TYPICAL(REFUGE)17TH,34&43RD;-UPPER DUP 18-11-2025 ------
71 C34_ EWS TERRACE& MUMTY 18-11-2025 ------
72 JAMABANDI 18-11-2025 ------
73 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 18-11-2025 View Document
74 BR FOR BANK OPERATION 18-11-2025 ------
75 CA CERTIFICATE NET WORTH 18-11-2025 ------
76 DRAFT CONVEYANCE DEED 18-11-2025 ------
77 C28_TOWERS-03,TYPICAL (REFUGE) UPPER DUPLEX FLOOR 18-11-2025 ------
78 DRAFT APP FORM 18-11-2025 ------
79 DRAFT BBA 18-11-2025 ------
80 TITLE SEARCH REPORT NEW 18-11-2025 ------
81 C3 MLU REV APP ZON 18-11-2025 ------
82 C6_SITE PLAN WITH GREEN AREA CAL 18-11-2025 ------
83 C15_TOWER-01 TYPICAL FLOOR 18-11-2025 ------
84 C8_BASEMENT-02 18-11-2025 ------
85 C12_FIFTH (SERVICE) FLOOR 18-11-2025 ------
86 C38 EWS_ELEVATIONS C & D 18-11-2025 ------
87 C27_TOWERS-03,LOWER DUPLEX FLOOR 18-11-2025 ------
88 AFFIDAVIT FOR NON APPLICABILITY OF NCZ , TREE CUTTING, POWERLINE, FOREST LAND 18-11-2025 ------