BIRLA AURORA, LEVEL 8, UNIT A, DR ANNIE BESANT ROAD, WORLI MUMBAI - 400030 MAHARASHTRA
8828809059
8828809059 (Number Shared by Promoter in Public)
be.ncr.legal@adityabirla.com
Https://www.birlaestates.com/
XXXX831G
U70100MH2017PTC303291
BIRLA ARIKA
SECTOR 31-32A, GURUGRAM
GURGAON
GURUGRAM
8828809059 (Number Shared by Promoter in Public)
be.ncr.legal@adityabirla.com
AMAN SHARMA
8828809059 (Number Shared by Promoter in Public)
be.ncr.legal@adityabirla.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
975533
13-12-2024
2882228
HDFC BANK
HRERA Gurugram
2
192884
16-01-2025
9896478
HDFC BANK
HRERA Gurugram
11.745 (Acre)
1.87
1.87
13.275 (Acre)
116 of 2011 Dated 23.12.2011
No
Address VILLAGE JHARSA SECTOR 31 GURUGRAM HARYANA 122001
Address VILLAGE JHARSA SECTOR 31 GURUGRAM HARYANA 122001
Address VILLAGE JHARSA SECTOR 31 GURUGRAM HARYANA 122001
Annexure-B- CHANGE OF DEVELOPER, COLLABORATION AGREEMENT, POWER OF ATTORNEY
YES, REGISTERED COLLABORATION AGREEMENT WAS EXECUTED AFTER GRANT OF LICENSE
Yes
AS PER ANNEXURE
No
Yes
Yes
260325.35 Lakhs
141126.25 Lakhs
84300.14 Lakhs
8743.12 Lakhs
26155.84 Lakhs
Sr. No.
Land area under usage
Area of land (Acres)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
1.1176
3
CONSTRUCTION OF ROADS
3.0607
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
6.3875
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0.1705
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
1.0039
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0.0048
Total
11.745
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSVP
No
WATER SUPPLY
GMDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
GMDA
Yes
STORM WATER DRAINAGE
GMDA
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
190.11
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
181.54
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
49.86
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
677.84
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
15.58
AS PER PROJECT REPORT
6
STREET LIGHTING
37.4
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
362.29
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
96.61
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
5667.75
AS PER PROJECT REPORT
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
0
AS PER PROJECT REPORT
12
SCHOOL
0
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
0
AS PER PROJECT REPORT
15
ELECTRICAL SUB STATION
119.21
AS PER PROJECT REPORT
16
PARKING
31.17
AS PER PROJECT REPORT
17
HARDSCAPE
102.07
AS PER PROJECT REPORT
18
SIGNAGE
11.69
AS PER PROJECT REPORT
19
ELECTRIFICATION COST
1200
AS PER PROJECT REPORT
24-12-2024 (date)
24-12-2024 (date)
10-03-2025
09-12-2031
Plot Area(In Square Meter)
Number of plots in the project
0
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
218.26
80
2
Apartment/Shops/Other Buildings
215.45
80
2
Apartment/Shops/Other Buildings
218.89
40
1
Apartment/Shops/Other Buildings
218.06
40
1
Apartment/Shops/Other Buildings
261.56
41
1
Apartment/Shops/Other Buildings
261.41
41
1
Apartment/Shops/Other Buildings
18.60
57
1
Apartment/Shops/Other Buildings
21.02
7
1
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
1437.62
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
1206
Shops
0
0
Plots
0
0
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
546
1945
2589
3024
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
4450
3237
2759
2823
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
3216
3446
3692
4113
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
4832.65
5283.45
4370.45
4511.61
Shops
4.87
10.55
10.55
13.39
Plots
0
0
0
0
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
4599.16
3477.58
2274.58
2232.25
Shops
13.39
12.42
12.42
15.75
Plots
0
0
0
0
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
2766.25
2767.82
2487.82
2676.77
Shops
15.75
12.18
12.18
10.23
Plots
0
0
0
0
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
2111.77
791.78
469.78
0
Shops
10.23
4.22
4.22
0
Plots
0
0
0
0
Particulars
Year-2032
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
Shops
0
0
0
Plots
0
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Electrical Sub Station
0
Hardscape
0
Parking
0
Security Fire Fighting
0
Signage
0
Street Lighting
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Hardscape
0
0
0
0
Security Fire Fighting
0
0
0
0
Street Lighting
0
0
0
0
Signage
0
0
0
0
Parking
0
0
0
0
Electrical Sub Station
0
0
0
0
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Parking
0
0
0
0
Electrical Sub Station
0
0
0
0
Hardscape
0
0
0
0
Street Lighting
0
0
0
0
Signage
0
0
0
0
Security Fire Fighting
0
0
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Signage
0
0
0
0
Street Lighting
0
0
0
0
Parking
0
0
0
0
Electrical Sub Station
0
0
0
0
Hardscape
0
0
0
0
Security Fire Fighting
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Signage
0
0
0
0
Hardscape
0
0
0
0
Electrical Sub Station
0
0
0
0
Parking
0
0
0
0
Street Lighting
0
0
0
0
Security Fire Fighting
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
9.51
9.51
9.51
Water Supply System
0
9.08
9.08
9.08
Sewerage treatment & garbage disposal
0
0.78
0.78
0.78
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
2.49
2.49
2.49
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
170.03
368.40
368.40
467.59
Shopping area
0
0
0
0
Other
0
0
0
0
Signage
0
0
0
0
Parking
0
0
0
0
Electrical Sub Station
0
0
0
0
Hardscape
0
0
0
0
Security Fire Fighting
0
0
0
0
Street Lighting
0
1.87
1.87
1.87
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
19.01
19.01
19.01
19.01
Water Supply System
18.15
18.15
18.15
18.15
Sewerage treatment & garbage disposal
1.56
1.56
1.56
1.56
Electricity Supply System
0
0
33.89
101.68
Storm Water Drainage
4.99
4.99
4.99
4.99
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
467.59
433.58
433.58
549.77
Shopping area
0
0
0
0
Other
0
0
0
0
Hardscape
0
0
0
0
Signage
0
0
0
0
Street Lighting
3.74
3.74
3.74
3.74
Parking
0
0
1.56
4.67
Electrical Sub Station
0
0
5.96
17.88
Security Fire Fighting
0
0
18.11
54.34
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
19.01
19.01
19.01
9.51
Water Supply System
18.15
18.15
18.15
9.08
Sewerage treatment & garbage disposal
1.56
1.56
1.56
0.78
Electricity Supply System
101.68
101.68
101.68
101.68
Storm Water Drainage
4.99
4.99
4.99
2.49
Parks and Playgrounds
4.83
14.49
19.32
19.32
Clubhouse/community centres
549.77
425.08
425.08
357.07
Shopping area
0
0
0
0
Other
0
0
0
0
Signage
0.58
1.75
2.34
2.34
Street Lighting
3.74
3.74
3.74
1.87
Parking
4.67
4.67
4.67
4.67
Electrical Sub Station
17.88
17.88
17.88
17.88
Hardscape
15.31
15.31
20.41
20.41
Security Fire Fighting
54.34
54.34
54.34
54.34
Electrification cost
400.00
400.00
400.00
0
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
9.51
9.49
0
0
Water Supply System
9.08
9.09
0
0
Sewerage treatment & garbage disposal
0.78
0.76
0
0
Electricity Supply System
67.78
67.77
0
0
Storm Water Drainage
2.49
2.48
0
0
Parks and Playgrounds
19.32
19.33
0
0
Clubhouse/community centres
357.07
147.36
147.38
0
Shopping area
0
0
0
0
Other
0
0
0
0
Security Fire Fighting
36.23
36.25
0
0
Street Lighting
1.87
1.87
0
0
Parking
3.12
3.14
0
0
Electrical Sub Station
11.92
11.93
0
0
Hardscape
15.31
15.32
0
0
Signage
2.34
2.34
0
0
Particulars
Year-2032
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Street Lighting
0
Electrical Sub Station
0
Hardscape
0
Security Fire Fighting
0
Signage
0
Parking
0
Yes
No
ICICI BANK LIMITED, TIME TOWER MG ROAD GURGAON
777705950100
ICIC0001143
110229199
1143
Keyur Shah, Narender Joshi, Harish Jhanwer
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. LAYOUT PLAN/SITE PLAN
ALREADY BEEN OBTAINED
24-12-2024
II. ENVIRONMENT CLAREARANCE
ALREADY BEEN OBTAINED
13-11-2024
III. BUILDING PLAN
ALREADY BEEN OBTAINED
24-12-2024
IV. AIRPORT HEIGHT CLEARANCE
ALREADY BEEN OBTAINED
27-12-2018
V. FOREST NOC
ALREADY BEEN OBTAINED
30-07-2024
Yes
Yes
Attached
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
VITRIFIED TILES/LAMINATE WOODEN FLOORING/MARBLE FLOORING AND EQUIVALENT; ACRYLIC EMULSION/ OIL BOUND DISTEMPER AND EQUIVALENT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
MARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES AND EQUIVALENTS
1 . 2
WALLS
ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
1 . 3
CEILING
ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
MARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES AND EQUIVALENTS
2 . 2
WALLS
ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
2 . 3
CEILING
ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
2 . 4
MODULAR WARDROBES
NA
3 . MASTER TOILET
3 . 1
FLOOR
STONE/ VITRIFIED TILES/ANTI SKID TILES AND EQUIVALENTS
3 . 2
WALLS
STONE/TILES, ACRYLIC EMULSION PAINT/OBD AND EQUIVALENT
3 . 3
CEILING
GRID CEILING/POP
3 . 4
COUNTERS
MARBLE/GRANITE/ ENGINEERED STONE/VITRONITE TILES AND EQUIVALENT
3 . 5
SANITARY WARE/CP FITTINGS
STANDARD CP FITTINGS, WASH BASIN, WC
3 . 6
FITTING/FIXTURES
ALL PROVIDED OF STANDARD COMPANY MAKE
4 . BED ROOMS
4 . 1
FLOOR
MARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES AND EQUIVALENTS
4 . 2
WALLS
ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
4 . 3
CEILING
ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
4 . 4
WARDROBES
NA
5 . TOILET
5 . 1
FLOOR
STONE/ VITRIFIED TILES/ANTI SKID TILES AND EQUIVALENTS
5 . 2
WALLS
STONE/TILES, ACRYLIC EMULSION PAINT/OBD AND EQUIVALENT
5 . 3
CEILING
GRID CEILING/POP
5 . 4
COUNTERS
MARBLE/GRANITE/ ENGINEERED STONE/VITRONITE TILES AND EQUIVALENT
5 . 5
SANITARY WARE/CP FITTINGS
STANDARD CP FITTINGS, WASH BASIN, WC
5 . 6
FIXTURES
ALL PROVIDED OF STANDARD COMPANY MAKE
6 . KITCHEN
6 . 1
FLOOR
MARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES AND EQUIVALENTS
6 . 2
WALLS
TILE DADO/ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
6 . 3
CEILING
ACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT AND EQUIVALENT
6 . 4
COUNTERS
GRANITE/MARBLES/ENGINEERED STONE/VITRONITE TILES AND EQUIVALENT
6 . 5
FIXTURES
CP FITTINGS, SS SINK
6 . 6
KITCHEN APPLIANCES
MODULAR KITCHEN
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
TILES AND EQUIVALENTS
7 . 2
WALLS & CEILING
ACRYLIC EMULSION PAINT/OBD
7 . 3
TOILET
ACRYLIC EMULSION PAINT/OBD
7 . 4
BALCONY
VITRIFIED/ANTI-SKID TILES AND EQUIVALENTS
8 . SIT-OUTS
8 . 1
FLOOR
TILES/ANTI SKID TILES AND EQUIVALENTS
8 . 2
WALLS & CEILING
ACRYLIC EMULSION PAINT/OBD/EXTERNAL GRADE PAINT AND EQUIVALENT
8 . 3
RAILINGS
SS/MS/ALUMINUM/GLASS AND EQUIVALENT
8 . 4
FIXTURES
NA
Sr. No.
Document Description
Date of Document Upload
View Document
1
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT