HRERA GurugramTemp Project Id : RERA-GRG-PROJ-578-2020
Submission Date : 14-02-2020 03:43:42 AM
Applicant Type : Company
Project Type: ONGOING




SONI INFRATECH PRIVATE LIMITED
713-713A, NARAIN MANZIL, 23, BARAKHAMBA ROAD, CONNAUGHT PLACE, NEW DELHI-110001
01141519663
9958795922 (Number Shared by Promoter in Public)
info@oriongalaxy.in
http://www.oriongalaxy.in
XXXX764J
U45400FL2007PTV163325
 
 


 
 


 
 


 
 







ORION GALAXY
VILLAGE BADSHAHPUR, SECTOR 68
GURGAON
GURUGRAM
01141519663
9958795922 (Number Shared by Promoter in Public)
info@oriongalaxy.in
ANAND SINGH
01141519663
9958795922 (Number Shared by Promoter in Public)
anandsingh@tashee.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15173329-07-2017871000HDFC BANKHRERA Gurugram







12.281 (Acre)
175%
174.90
12.281 (Acre)
67 of 2010 DATED 31.08.2010
Yes







49663.00 Lakhs
4733.00 Lakhs
29537.00 Lakhs
3635.00 Lakhs
5697.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS12005.849
3CONSTRUCTION OF ROADS8498.406
4PAVEMENTS5040.00
5PARKS AND PLAYGROUNDS0
6GREEN BELTS8211.337
7VEHICLE PARKINGS35210.00
8ELECTRICITY SUB-STATION80
9CLUB HOUSE357.794
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13SCHOOL443.118
14PODIUM AREA244.206
15EWS513.075
16FIRE STATION ALL BLOCKS808.891
17STILT AREA2665.524
18BASEMENT35086.833
Total109165.033




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDAYes
WATER SUPPLYHUDAYes
ELECTRICITYHUDAYes
SEWAGE DISPOSALHUDAYes
STORM WATER DRAINAGEHUDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS122.77YET TO BE PREPARED
2WATER SUPPLY SYSTEM6.4YET TO BE PREPARED
3STORM WATER DRAINAGE43.28YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM143.00YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL146.72YET TO BE PREPARED
6STREET LIGHTING13.20YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS9.00YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE130.00YET TO BE PREPARED
10SHOPPING AREA35.00YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER720.00YET TO BE PREPARED


02-05-2017 (date)
02-05-2017 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK102.228803
2APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY113.38242403
3APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT113.56565334
4APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+SERVENT115.29181171
5APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT116.498535
6APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT118.24464602
7APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT119.694402
8APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT121.49121113
9APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK66.94884841
10APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK74.524402
11APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK+STUDY76.70888804
12APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK76.884402
13APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT92.80666603
14APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT94.686603
15APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT94.93700700
16APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK96.4810644
17APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT97.06727206
18APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT122.776603
19APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT124.204402
20APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+SERVENT131.182020
21APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY137.532201
22APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+ST UDY137.746241
23APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT142.462201
24APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+SERVENT144.324131
25APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT144.344222
26APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+STUDY+SERVENT148.336513
27APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+STUDY+SERVENT148.706513
28APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+SERVENT166.618626
29APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+SERVENT166.6516976
30APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+STUDY+SERVENT184.882111
31APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+STUDY+SERVENT186.326241
32APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+SERVENT195.784401
33APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+STUDY+SERVENT219.422020






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
2 BHK1050%
2 BHK+STUDY8850%
3 BHK1650%
3 BHK+SERVENT16540%
3 BHK+STUDY650%
3 BHK+STUDY+SERVENT13450%
4 BHK+SERVENT2150%
4 BHK+STUDY+SERVENT1350%


13-09-2012
13-09-2014
31-12-2023
13-09-2012
0
31-12-2023
ENCLOSED
ENCLOSED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
13-09-2012
0
31-12-2023


768
44
0
194
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9214.009214.009214.009214.00
Shops0000
Plots0000

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9214.009214.009214.009214.00
Shops0000
Plots0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9378.009214.009413.009460.00
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9507.009554.009601.009648.00
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments29537.0029537.0029537.0029537.00
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments29537.0029537.0029537.0029537.00
Shops0000
Plots0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments29537.0029537.0029537.0029537.00
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other3635.003635.003635.003635.00

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other3635.003635.003635.003635.00

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other3635.003635.003635.003635.00












Particulars Remarks, if any
i. No. of Flats/Apartments constructed470
ii. No. of Flats/ Apartments booked453
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter32900.00 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter21220.00 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter0.00 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter11680.00 Lakhs
vii. Amount invested in the project upto the date of application21500.00 Lakhs
Land cost (If any)4733.00 Lakhs
Apartments9214.00 Lakhs
Infrastructure2678.00 Lakhs
EDC/ Taxes Etc.2130.00 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession9408.00 Lakhs
(a) In respect of existing allottees11680.00 Lakhs
(b) In respect of rest of the project16777.90 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
4149.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 7649.00 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS290.000
II. WATER SUPPLY SYSTEM6.400
III. STORM WATER DRAINAGE55.800
IV. ELECTRICITY SUPPLY SYSTEM143.000
V. SEWAGE TREATMENT & GARBAGE DISPOSAL89.600
VI. CLUB HOUSE/COMMUNITY CENTRE130.000
VII. SCHOOL00
VIII. ANY OTHER797.000
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.9.000
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
HDFC BANK LTD, SARITA VIHAR ADDRESS : PLOT NO 9, H - J BLOCK, LOCAL SHOPPING CENTRE, SARITA VIHAR, NEW DELHI - 110076, DELHI
575000000057993
HDFC0000480
110240072
000480
ANAND SINGH R/O VILLAGE PANSAIN, POST MAMAIN, PS-ASARGANJ, MUNGER, BIHAR 813201
YES











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. SEWAGE TREATMENT SUPPLYALREADY BEEN OBTAINED08-08-2018
II. ENVIRNMENT CLEARANCEALREADY BEEN OBTAINED14-09-2011
III. AIRPORT AUTHORITYALREADY BEEN OBTAINED09-06-2011
IV. FORESTALREADY BEEN OBTAINED21-10-2011
V. POLLUTIONALREADY BEEN OBTAINED20-06-2018
VI. APPROVED BUILDING PLANALREADY BEEN OBTAINED02-05-2017
VII. LICENCEALREADY BEEN OBTAINED30-08-2010
VIII. MININGALREADY BEEN OBTAINED10-08-2011
IX. FIREALREADY BEEN OBTAINED02-09-2011
X. ELECTRICAL LOADALREADY BEEN OBTAINED12-07-2013
XI. HUDA CONSTRUCTION WATERALREADY BEEN OBTAINED08-08-2018
XII. DRINKING WATER SUPPLYALREADY BEEN OBTAINED08-08-2018
XIII. LICENCE RENEWAL APPLIEDAPPLIED FOR BUT YET TO RECEIVE30-08-2018








Yes


Yes


Enclosed













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE/GRANITE
2WALL FINISHING DETAILSPAINT
3KITCHEN DETAILSFLOOR TILE/GREEN MARBLE COUNTER/PAINT
4BATHROOM FITTINGSESS/ZIM
5WOOD WORK ETCFLUSH DOOR 32 MM
6DOORS AND WINDOS FRAMESAS PER DRAWINGS
7GLASS WORK4 MM PLANE AND FROSTED
8ELECTRIC FITTINGSWIRE POLYCAB
9CONDUCTING AND WIRING DETAILSPOLYCAB
10CUPBOARD DETAILSPAINT
11WATER STORAGEUGT/SINTEX
12LIFT DETAILSUPLIFT/KONE/THYSON/JOHNSON
13EXTERNAL GLAZINGSALUMINIUM JINDAL
13.1WINDOWS/GLAZINGSALUMINIUM JINDAL
14DOORSFLUSH DOOR
14.1MAIN DOORSFLUSH DOOR
14.2INTERNAL DOORSFLUSH DOOR
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSPOLYCAB
17CNG PIPE LINEEMBRANCE
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEBURGER ASIAN
20INTERNAL FINISHINGBURGER ASIAN
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORTILE
1 . 2 WALLSPAINT
1 . 3 CEILINGPAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN FLOORING
2 . 2 WALLSPAINT
2 . 3 CEILINGPAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORTILE
3 . 2 WALLSTILE/PAINT
3 . 3 CEILINGFALL CEILING
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSCERA/SOMANY
3 . 6 FITTING/FIXTURESCERA/SOMANY
4 . BED ROOMS
4 . 1 FLOORTILE
4 . 2 WALLSTILE/PAINT
4 . 3 CEILINGPAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORTILE
5 . 2 WALLSPAINT
5 . 3 CEILINGFALL CEILING
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSCERA/SOMANY
5 . 6 FIXTURESCERA/SOMANY
6 . KITCHEN
6 . 1 FLOORTILE
6 . 2 WALLSTILE/PAINT
6 . 3 CEILINGPAINT
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESCERA/SOMANY
6 . 6 KITCHEN APPLIANCESCERA/SOMANY
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILE
7 . 2 WALLS & CEILINGPAINT
7 . 3 TOILETTILE/PAINT
7 . 4 BALCONYTILE
8 . SIT-OUTS
8 . 1 FLOORTILE
8 . 2 WALLS & CEILINGTILE/PAINT
8 . 3 RAILINGSMS
8 . 4 FIXTURESCERA/SOMANY












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN14-02-2020 View Document
2ZONING PLAN14-02-2020 View Document
3CASH FLOW STATEMENT OF THE PROPOSED PROJECT14-02-2020 View Document
4IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN14-02-2020 View Document
5NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT14-02-2020 View Document
6DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.14-02-2020 View Document
7DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD14-02-2020 View Document
8CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT14-02-2020 View Document
9SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN14-02-2020 View Document
10DEMARCATION PLAN14-02-2020 View Document
11A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS14-02-2020 View Document
12COPY OF LICENSE ALONG WITH SCHEDULE OF LAND14-02-2020 View Document