HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1570-2024
Submission Date : 22-02-2024 04:31:59 PM
Applicant Type : Company
Project Type: NEW




M/S DECENT BUILDHOMES PVT LTD
301, 3RD FLOOR, INDRA PRAKASH BUILDING, BARAKHAMBA ROAD, NEW DELHI
01143605560
9560266915 (Number Shared by Promoter in Public)
vdil_05@rediffmail.com
XXXX680P
U70109DL2020PTC367571
 
 


 
 


 
 


 
 


 
 


 
 







AMBROSIA
SECTOR - 70
BADSHAHPUR ST
GURUGRAM
01143605560
9810386669 (Number Shared by Promoter in Public)
csdecentbuildhomes@gmail.com
SANJAY GARG
01143605560
9810386669 (Number Shared by Promoter in Public)
csdecentbuildhomes@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
144186716-02-20241290000KOTAK MAHINDRA BANKHRERA Gurugram
244186816-02-2024443350KOTAK MAHINDRA BANKHRERA Gurugram







4.0375 (Acre)
2.7
2.7
4.0375 (Acre)
LICENSE NO 40 OF 2022
No
Address     AS PER LICENSE
Address     AS PER LICENSE
Address     301, 3RD FLOOR, INDRA PRAKASH BUILDING, BARAKHAMBA ROAD, CONNAUGHT PLACE, NEW DELHI - 110001
Annexure-B- AS A PROMOTER
BY VIRTUE OF COLLABORATION AGREEMENT
Yes
AS ATTACHED
No
Yes
Yes







40578.79 Lakhs
792.63 Lakhs
28667.78 Lakhs
3644.09 Lakhs
7474.29 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.0290
3CONSTRUCTION OF ROADS1.5485
4PAVEMENTS0
5PARKS AND PLAYGROUNDS1.2600
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.200
Total4.0375




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSCONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS105.06SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM287.51SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE68.98SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM1200.45SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL86.48SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING15.48SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING636.11SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS23.15SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING
15STP125.40SUBMITTED TO TOWN & COUNTRY PLANNING
16UGT91.39SUBMITTED TO TOWN & COUNTRY PLANNING
17RAIN WATER HARVESTING25.00SUBMITTED TO TOWN & COUNTRY PLANNING
18ELECTRIC SUB STATION 850SUBMITTED TO TOWN & COUNTRY PLANNING
19PLANTATION4.19SUBMITTED TO TOWN & COUNTRY PLANNING
20MAINTENANCE CHARGES118.40SUBMITTED TO TOWN & COUNTRY PLANNING


03-11-2023 (date)
03-11-2023 (date)
01-02-2024
31-12-2030
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings467079.302683
Apartment/Shops/Other Buildings3334.59711





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Conversion Charges38.39
External Development Charges400.43
Infrastructure Development Charges276.04
Land Cost403.75
License Fee350.49

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments980.76980.76980.76980.76
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments980.76980.76980.76980.76
Shops139.14139.14139.14139.14
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments980.76980.76980.76980.76
Shops139.14139.14139.14139.14
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments980.76980.76980.76980.76
Shops139.14139.14139.14139.14
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments980.76980.76980.76980.76
Shops139.14139.14139.14139.14
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments980.76980.76980.76980.76
Shops139.14139.14139.14139.14
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments980.76980.76
Shops139.14139.14
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.951.951.951.95
Water Supply System5.645.645.645.64
Sewerage treatment & garbage disposal1.701.701.701.70
Electricity Supply System0000
Storm Water Drainage1.351.351.351.35
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Plantation0000
Underground Water Tank1.791.791.791.79
Security and Firefighting12.4712.4712.4712.47
Rain water harvesting0.490.490.490.49
Electrical Sub Station0000
Maintenance Charges2.192.192.192.19
STP2.462.462.462.46
Street Lighting0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.951.951.951.95
Water Supply System5.645.645.645.64
Sewerage treatment & garbage disposal1.701.701.701.70
Electricity Supply System0000
Storm Water Drainage1.351.351.351.35
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Plantation0000
Maintenance Charges2.192.192.192.19
Security and Firefighting12.4712.4712.4712.47
Rain water harvesting0.490.490.490.49
Electrical Sub Station0000
STP2.462.462.462.46
Street Lighting0000
Underground Water Tank1.791.791.791.79

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.951.951.951.95
Water Supply System5.645.645.645.64
Sewerage treatment & garbage disposal1.701.701.701.70
Electricity Supply System00057.16
Storm Water Drainage1.351.351.351.35
Parks and Playgrounds00.860.860.86
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Firefighting12.4712.4712.4712.47
Electrical Sub Station00040.48
Plantation0000.20
Maintenance Charges2.192.192.192.19
Underground Water Tank1.791.791.791.79
STP2.462.462.462.46
Street Lighting0000.74
Rainwater Harvesting0.49
Rain water harvesting0.490.490.49

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.951.951.951.95
Water Supply System5.645.645.645.64
Sewerage treatment & garbage disposal1.701.701.701.70
Electricity Supply System57.1657.1657.1657.16
Storm Water Drainage1.351.351.351.35
Parks and Playgrounds0.860.860.860.86
Clubhouse/community centres0000
Shopping area0000
Other0000
Maintenance Charges2.192.192.192.19
Electrical Sub Station40.4840.4840.4840.48
Plantation0.200.200.200.20
Street Lighting0.740.740.740.74
Security and Firefighting12.4712.4712.4712.47
Rain Water Harvesting0.49
Underground Water Tank1.791.791.791.79
STP2.462.462.462.46
Rain water harvesting0.490.490.49

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.951.9500
Water Supply System5.64000
Sewerage treatment & garbage disposal1.70000
Electricity Supply System57.1657.1600
Storm Water Drainage1.35000
Parks and Playgrounds0.860.8600
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrical Sub Station40.4840.4800
Rain water harvesting0.49000
Security and Firefighting12.47000
Street Lighting0.740.7400
STP2.46000
Underground Water Tank1.79000
Plantation0.200.2000
Maintenance Charges2.192.1900












Yes
No
ICICI BANK BARAKHAMBA ROAD NEW DELHI
777705226358
ICIC0001359
110229143
01359
A) YASH JAIN B) SANDEEP JAIN C) HARSHIT MITTAL D) VINEET MITTAL
UPLOADED











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO 40 OF 2022ALREADY BEEN OBTAINED12-04-2022
II. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED09-11-2023
III. FIRE SCHEMEALREADY BEEN OBTAINED10-01-2024
IV. SERVICE ESTIMATESALREADY BEEN OBTAINED23-01-2024
V. MININGALREADY BEEN OBTAINED30-11-2023
VI. ASSURANCE FOR SEWERAGE CONNECTIONALREADY BEEN OBTAINED21-08-2023
VII. ARAVALI NOCALREADY BEEN OBTAINED18-09-2023
VIII. APPROVAL OF BUILDING PLANALREADY BEEN OBTAINED03-11-2023








Yes


Yes


ANNEXED AS PER RERA ACT 2016 AND HRERA RULES 2017













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIPS FLOORING/ TILES/ MARBLES/GRANITE/ LAMINATED WOODEN FLOORING
2WALL FINISHING DETAILSOBD/ACRYLIC EMULSION
3KITCHEN DETAILSAS PER INDUSTRY STANDARD
4BATHROOM FITTINGSCP FITTINGS AND SANITARY WARE
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESMS/AI/WOODEN/UPVC
7GLASS WORKCLEAR FROSTED GLASS
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSPVC CONDUITS FRLS WIRING
10CUPBOARD DETAILSN/A
11WATER STORAGEOHT AND UGT WATER TANKS
12LIFT DETAILSBRANDED
13EXTERNAL GLAZINGSGLAZED WINDOW WITH UPVC/ AL MS FRAMES
13.1WINDOWS/GLAZINGSGLAZED WINDOW WITH UPVC/ AL MS FRAMES
14DOORSAS PER 14.1 AND 14.2
14.1MAIN DOORSFLUSH DOORS/UPVC DOORS/MS
14.2INTERNAL DOORSFLUSH DOOR
15AIR CONDITIONINGVRV SYSTEM
16ELECTRICAL FITTINGSNA
17CNG PIPE LINEPROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
19EXTERNAL FINISHING/COLOUR SCHEMECEMENT GRADE EXTERIOR GRADE PAINT
20INTERNAL FINISHINGOBD/ACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE AS PER DESIGN
1 . 2 WALLSASIAN/BERGER/JOTUN/KENSAI NAROLAC/ DULEX OR EQUIVALENT MAKE
1 . 3 CEILINGASIAN/BERGER/JOTUN/KENSAI NAROLAC/ DULEX OR EQUIVALENT MAKE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION
2 . 3 CEILINGACRYLIC EMULSION
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORTILES / MARBLE / GRANITE
3 . 2 WALLSCOMBINATION OF TILES /MARBLE/ACRYLIC EMUSION PAINT & MIRROR
3 . 3 CEILINGACRYLIC EMULSION
3 . 4 COUNTERSN/A
3 . 5 SANITARY WARE/CP FITTINGSNCP FITTINGS (BASIN, MIXER, FAUCET, SHOWER, DIVERTOR, ANGLEM VALVES ETC.
3 . 6 FITTING/FIXTURESCP FITTINGS (BASIN, MIXER, FAUCET, SHOWER, DIVERTOR, ANGLEM VALVES ETC.
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION
4 . 3 CEILINGACRYLIC EMULSION
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORTILES / MARBLE / GRANITE
5 . 2 WALLSCOMBINATION OF TILES /MARBLE/ACRYLIC EMUSION PAINT & MIRROR
5 . 3 CEILINGACRYLIC EMULSION
5 . 4 COUNTERSN/A
5 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS (BASIN, MIXER, FAUCET, SHOWER, DIVERTOR, ANGLEM VALVES ETC.
5 . 6 FIXTURESCP FITTINGS (BASIN, MIXER, FAUCET, SHOWER, DIVERTOR, ANGLEM VALVES ETC.
6 . KITCHEN
6 . 1 FLOORTILES / GRANITE
6 . 2 WALLSTILE UP-TO 2 ABOVE COUNTER & EMULSION PAINT IN BALANCE AREA
6 . 3 CEILINGACRYLIC EMULSION PAINTS
6 . 4 COUNTERSN/A
6 . 5 FIXTURESN/A
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILE
7 . 2 WALLS & CEILINGOBD/SEMI ACRYLIC / TILES
7 . 3 TOILETN/A
7 . 4 BALCONYN/A
8 . SIT-OUTS
8 . 1 FLOORN/A
8 . 2 WALLS & CEILINGN/A
8 . 3 RAILINGSN/A
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT22-02-2024 View Document
2IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN22-02-2024 View Document
3IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN22-02-2024 View Document
4ZONING PLAN22-02-2024 View Document
5COPY OF LICENSE ALONG WITH SCHEDULE OF LAND22-02-2024 View Document
6NEC05-06-2024 ------
7REFUGE AREA PLAN05-06-2024 ------
8STILT FLOOR PLAN05-06-2024 ------
91ST FLOOR PLAN TOWER 105-06-2024 ------
10SECTION X TOWER 205-06-2024 ------
11LANDSCAPE PLAN05-06-2024 ------
12TERRACE FLOOR PLAN COMMERCIAL05-06-2024 ------
13MUTATION05-06-2024 ------
14FIRST FLOOR PLAN COMMERCIAL05-06-2024 ------
15FIRST FLOOR PLAN COMMUNITY HALL05-06-2024 ------
16TYPICAL FLOOR PLAN ODD05-06-2024 ------
17ELEVATION - TOWER 105-06-2024 ------
18STORM WATER LAYOUT MAP05-06-2024 ------
19ELEVATION B TOWER 105-06-2024 ------
20ELEVATION C TOWER 205-06-2024 ------
21SECTION TOWER 105-06-2024 ------
22TERRACE FLOOR PLAN TOWER 105-06-2024 ------
23AFFIDAVIT MASTER05-06-2024 ------
24ROAD MAP05-06-2024 ------
25UNDERTAKING FOREST LAND05-06-2024 ------
26TYPICAL FLOOR PLAN EVEN05-06-2024 ------
27COLLABRATION AGREEMENT05-06-2024 ------
28DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD05-06-2024 View Document
29SECTION Z TOWER 205-06-2024 ------
30ELEVATION B TOWER 205-06-2024 ------
31PENTHOUSE TOWER 205-06-2024 ------
32ELEVATION C TOWER 105-06-2024 ------
33BANK UNDERTAKING05-06-2024 ------
34BR III05-06-2024 ------
35TYPICAL PLAN TOWER 205-06-2024 ------
36UNDERTAKING POWER LINE05-06-2024 ------
37ASSURANCE FOR 160KLD STP TREATED WATER05-06-2024 ------
38FLOOR PLAN EWS05-06-2024 ------
39GROUND FLOOR PLAN COMMUNITY HALL05-06-2024 ------
40ENVIROMENT CLEARANCE05-06-2024 ------
41REFUGE AREA TOWER 205-06-2024 ------
42COMBINED TOWER TYPICAL PLAN05-06-2024 ------
43CHANGE ROOM PLAN05-06-2024 ------
44GROUND FLOOR PLAN COMMERCIAL05-06-2024 ------
45PENT HOUSE FLOOR PLAN05-06-2024 ------
46SECTION Y TOWER 205-06-2024 ------
47UNDERTAKING NCZ ZONE05-06-2024 ------
48AIRPORT NOC05-06-2024 ------
49PENT HOUSE FLOOR PLAN -UPPER LEVEL05-06-2024 ------
50ELEVATION AND SECTION EWS05-06-2024 ------
51FIRE SCHEME05-06-2024 ------
52TYPICL FLOOR PLAN 205-06-2024 ------
53ELEVATION A TOWER 205-06-2024 ------
54MINING PERMISSION05-06-2024 ------
55DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.05-06-2024 View Document
56BASEMENT PLAN05-06-2024 ------
57UNDERTAKING TREE CUTTING05-06-2024 ------
58ELECTRICITY MAP05-06-2024 ------
59ELEVATION AND SECTION COMMERCIAL05-06-2024 ------
60FOREST NOC05-06-2024 ------
61SECOND AND 17TH FLOOR PLAN TOWER 205-06-2024 ------
62TERRACE PLAN TOWER 205-06-2024 ------
63SECTION 105-06-2024 ------
64SECTION 205-06-2024 ------
65SERVICE ESTIMATE APPROVAL05-06-2024 ------
66SEWAR LAYOUT MAP05-06-2024 ------
67SITE WATER SUPPLY MAP05-06-2024 ------