HRERA GurugramTemp Project Id : RERA-GRG-PROJ-428-2019
Submission Date : 06-02-2020 03:45:43 AM
Applicant Type : Company
Project Type: ONGOING




RAHEJA DEVELOPERS LTD.
RAHEJA DEVELOPERS LTD. W4D,2O4/5, KESHAV KUNJ, WESTERN AVENUE, CARIAPPA MARG, SAINIK FARMS, NEW DETHI- 110062
9971091937 (Number Shared by Promoter in Public)
compliances@raheja.com
http://raheja.com
XXXX468E
U45400DL1990PLC042200
 
 


 
 


 
 


 
 







GROUP HOUSING PROJECT ( TOWER A,B,C, D AND E)
RAHEJA MAHESHWARA SECTOR-11 AND 14, SOHNA, GURUGRAM
GURGAON
GURUGRAM
9971091904 (Number Shared by Promoter in Public)
compliances@raheja.com
AJAY MOHANTY
9971091904 (Number Shared by Promoter in Public)
ajay.mohanty@raheja.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150339003-07-2017798000ICICI BANKHRERA Gurugram







3.752 (Acre)
16.15
6.90
107.85 (Acre)
25 of 2012
No
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Address     VILLAGE RAIPUR, TEHSIL SOHNA, GURUGRAM, HARYANA
Annexure-B- DEVELOPMENT AGREEMENT AND GPA
BEFORE GRANT OF LICENSE
No
YES
Yes
Yes
Yes







16712 Lakhs
5523 Lakhs
4078 Lakhs
1597 Lakhs
5513 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.59
3CONSTRUCTION OF ROADS0.51
4PAVEMENTS1.07
5PARKS AND PLAYGROUNDS0.62
6GREEN BELTS0.06
7VEHICLE PARKINGS2.87
8ELECTRICITY SUB-STATION0.20
9CLUB HOUSE0.02
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.195
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13CONVENIENT0.02
14EWS0.06
Total6.215




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA/GMDANo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNNo
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS250SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM342.71SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE42.96SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM347AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL84SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING12.52SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING33SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE127.26AS PER PROJECT REPORT
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED


NA (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER A TYPE 1-(2BHK)89.712110
2APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER A TYPE 2-(3BHK)05426280
3APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER B TYPE 1-(2BHK))06042180
4APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER B TYPE 2-(3BHK)102.791010
5APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER B TYPE 3-(PENT HOUSE)152.832200
6APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER C TYPE 1-(2BHK))06026340
7APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER C TYPE 2-(3BHK)102.791010
8APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER C TYPE 3-(PENT HOUSE)152.832020
9APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER D TYPE 1-(2BHK)06411530
10APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER D TYPE 2-(3BHK)102.791010
11APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER D TYPE 3-(PENT HOUSE)130.612020
12APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER E TYPE 1-(3BHK)0254210
13APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER E TYPE 2-(PENT HOUSE)02110






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
00


21-11-2017
14-06-2021
04-04-2023
21-11-2017
0
04-04-2023


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
21-07-2017
0
04-04-2023


0
0
531
152
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments5874
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar












Particulars Remarks, if any
i. No. of Flats/Apartments constructed276
ii. No. of Flats/ Apartments booked112
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter5930.70 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter1796.04 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter4134.66 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter565.03 Lakhs
vii. Amount invested in the project upto the date of application5874 Lakhs
Land cost (If any)5796 Lakhs
Apartments58.92 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.19.49 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession10838 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
10000 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 4600 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS2500
II. WATER SUPPLY SYSTEM342.710
III. STORM WATER DRAINAGE42.960
IV. ELECTRICITY SUPPLY SYSTEM3470
V. SEWAGE TREATMENT & GARBAGE DISPOSAL840
VI. CLUB HOUSE/COMMUNITY CENTRE127.260
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM100
X. CLUBHOUSE127.260
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.104.330
XIII. COVERED PARKING1266.880
XIV. OPEN PARKING49.380
XV. GARAGES00
XVI. SECURITY SYSTEM330
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
PUNJAB NATIONAL BANK, KHANPUR, NEW DELHI
1514002100038481
PUNB0151400
110024056
151400
Navin M. Raheja











No
No
Yes
Yes
Yes
Yes
No
Yes
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 25 OF 2012ALREADY BEEN OBTAINED29-03-2012
II. CTE EXTENSIONALREADY BEEN OBTAINED13-06-2016
III. MINING PERMISSIONALREADY BEEN OBTAINED17-02-2017
IV. FOREST NOCALREADY BEEN OBTAINED17-02-2014
V. WATER NOCALREADY BEEN OBTAINED24-09-2014
VI. CONSTRUCTION ACTIVITY NOCALREADY BEEN OBTAINED02-11-2012








Yes


Yes









RAHEJA ARANYA PHASE-II, SECTOR-11 & 14, SOHNA, MEWAT, GURUGRAM, HARYANA
45.803
0
402
0
164
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
236282362813038
Cost of the apartments000
Cost of the infrastructure000
Others costs000


11460 Lakhs
1385 Lakhs
9000 Lakhs
9000 Lakhs
Yes
01-10-2016
27-08-2022




KRISHNA HOUSING SCHEME, SECTOR-14, SOHNA, GURUGRAM, HARYANA
10
1644
0
1509
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
21189211898935
Cost of the apartments000
Cost of the infrastructure000
Others costs000


15932 Lakhs
3679 Lakhs
5500 Lakhs
3300 Lakhs
Yes
31-07-2019
09-03-2020




TRINITY-I, SECTOR-84, GURUGRAM, HARYANA
2.281
245
0
116
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
803080301840
Cost of the apartments000
Cost of the infrastructure000
Others costs000


2644 Lakhs
182 Lakhs
6800 Lakhs
6800 Lakhs
Yes
19-06-2019
31-12-2022




VANYA, TOWER A- GULMOHAR, SECTOR-99A, GURUGRAM, HARYANA
2.28
140
0
92
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
857685762210
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1749 Lakhs
405 Lakhs
12000 Lakhs
6150 Lakhs
No
29-11-2022
31-12-2022




VANYA, TOWER B- AMALTAS, SECTOR-99A, GURUGRAM, HARYANA
2.21
139
0
92
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
832283222145
Cost of the apartments000
Cost of the infrastructure000
Others costs000


645 Lakhs
102 Lakhs
12000 Lakhs
6150 Lakhs
Yes
08-12-2022
31-12-2022




VANYA, TOWER C-PALASH, SECTOR- 99A, GURUGRAM, HARYANA
2.28
140
0
80
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
857685761639
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1466 Lakhs
411 Lakhs
12000 Lakhs
6150 Lakhs
No
08-12-2020
31-12-2022










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENA
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSCOPPER ELECTRICAL WIRING THROUGHOUT IN CONCEALED CONDUIT WITH PROVISION FOR LIGHT POINTS, POWER POINTS, TV AND TELEPHONE SOCKETS WITH PROTECTIVE MCB'S
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSCOPPER ELECTRICAL WIRING THROUGHOUT IN CONCEALED CONDUIT WITH PROVISION FOR LIGHT POINTS, POWER POINTS, TV AND TELEPHONE SOCKETS WITH PROTECTIVE MCB'S
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEALL WEATHER TEXTURED PAINT WITH STONE/ALUMINIUM COMPOSITE CLADDING AND GRIT WORK AT SELECTED AREAS
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED MARBLE TEXTURED VITRIFIED TILES/WOODEN LAMINATED FLOORING
1 . 2 WALLSAPPROPRIATE SURFACE TREATMENT WITH EMULSION PAINT OF PLEASING SHADES
1 . 3 CEILINGWHITE EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED/WOOD TEXTURED FLOORINGS/IMPORTED MARBLE TEXTURED VITRIFIED TILES
2 . 2 WALLSAPPROPRIATE SURFACE TREATMENT WITH EMULSION PAINT OF PLEASING SHADES
2 . 3 CEILINGWHITE EMULSION PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORGRANITE/MARBLE/DESIGNER TILES
3 . 2 WALLSAPPROPRIATE CERAMIC/GRANITE/STONE TILES UPTO 2100 MM
3 . 3 CEILINGWHITE EMULSION PAINT
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSMASTER TOILET, SINGLE LEVER CP FITTINGS, APPROPRIATE SANITARY FIXTURES, GRANITE/COUNTER WITH CONCEALED HOT WATER SUPPLY
3 . 6 FITTING/FIXTURESMASTER TOILET, SINGLE LEVER CP FITTINGS, APPROPRIATE SANITARY FIXTURES, GRANITE/COUNTER WITH CONCEALED HOT WATER SUPPLY
4 . BED ROOMS
4 . 1 FLOORLAMINATED/WOOD TEXTURED FLOORINGS/IMPORTED MARBLE TEXTURED VITRIFIED TILES
4 . 2 WALLSAPPROPRIATE SURFACE TREATMENT WITH EMULSION PAINT OF PLEASING SHADES
4 . 3 CEILINGWHITE EMULSION PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORGRANITE/MARBLE/DESIGNER TILES
5 . 2 WALLSAPPROPRIATE CERAMIC/GRANITE/STONE TILES UPTO 2100 MM
5 . 3 CEILINGWHITE EMULSION PAINT
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSMASTER TOILET, SINGLE LEVER CP FITTINGS, APPROPRIATE SANITARY FIXTURES, GRANITE/COUNTER WITH CONCEALED HOT WATER SUPPLY
5 . 6 FIXTURESMASTER TOILET, SINGLE LEVER CP FITTINGS, APPROPRIATE SANITARY FIXTURES, GRANITE/COUNTER WITH CONCEALED HOT WATER SUPPLY
6 . KITCHEN
6 . 1 FLOORGRANITE/MARBLE/APPROPRIATE TILES
6 . 2 WALLSAPPROPRIATE CERAMIC TILES UPTO 2' ABOVE THE COUNTER
6 . 3 CEILINGWHITE EMULSION PAINT
6 . 4 COUNTERSNA
6 . 5 FIXTURESGRANITE COUNTER, STAINLESS STEEL SINK AND DRAIN BOARD, FLEXIBLE STAINLESS STEEL FITTINGS WITH WITH CONCEALED HOT WATER SUPPLY
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES/MARBLE
7 . 2 WALLS & CEILINGOBD OR EQUIVALENT EMULSION
7 . 3 TOILETNA
7 . 4 BALCONYANTI SKID GRANITE/MARBLE FINISHED TILES MS RAILING SELECTED STEEL FINISH RAILING WEATHERCOAT EMULSION
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND31-01-2020 View Document
2SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN31-01-2020 View Document
3DEMARCATION PLAN06-02-2020 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN06-02-2020 View Document
5ZONING PLAN06-02-2020 View Document
6CASH FLOW STATEMENT OF THE PROPOSED PROJECT06-02-2020 View Document
7A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS06-02-2020 View Document
8IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN06-02-2020 View Document
9DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.06-02-2020 View Document
10NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT06-02-2020 View Document
11DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD06-02-2020 View Document