HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2052-2025
Submission Date : 25-09-2025 03:18:47 PM
Applicant Type : Company
Project Type: NEW




EMAAR INDIA LIMITED
EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR -28, GURUGRAM-122001
01244421155
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
https://in.emaar.com/en/
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 


 
 


 
 


 
 


 
 







SERENITY HILLS (PHASE-1)
SECTOR 86, GURUGRAM, HARYANA
MANESAR
GURUGRAM
01244421155
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
MANOJ SHARMA
01244421155
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar.ae








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
193291318-09-20251697000HSBC BANKHRERA Gurugram







8.004 (Acre)
1.41
1.41
25.90 (Acre)
License No. 10 of 2025 dated 16.01.2025 validity up to 15.01.2030 and License No. 75 of 2025 dated 23.05.2025 validity upto 21.05.2030
No
Address     H-38, GROUND FLOOR, M2K, WHITE HOUSE, SECTOR 57, GURUGRAM, HARYANA
Address     306-308, SQUARE-ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE-ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE-ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE-ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Annexure-B- DEVELOPER
BY VIRTUE OF COLLABORATION AGREEMENT
Yes
THE DEVELOPER SHALL PERFORM ITS OBLIGATIONS IN A TIMELY AND ORDERLY MANNER IN ACCORDANCE WITH THE TERMS OF THIS AGREEMENT AND SHALL ENSURE MATERIAL COMPLIANCE WITH ALL APPLICABLE LAWS AND REGULATIONS INCLUDING THE RERA ACT, THE HRERA RULES AND IN THE PERFORMANCE OF ITS OBLIGATIONS UNDER THIS AGREEMENT AND THEREAFTER, UNLESS SUB PERFORMANCE IS HINDERED FOR REASONS ATTRIBUTABLE TO PIPL.
No
Yes
Yes







159661.39 Lakhs
76043.37 Lakhs
65615.66 Lakhs
2247.03 Lakhs
15755.33 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.59
3CONSTRUCTION OF ROADS 1.83
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 4.65
6GREEN BELTS 0
7VEHICLE PARKINGS 0.27
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13CIRCULATIONROADS 0.27
14METERROOMANDHSDYARD 0.273
15BOUNDARYWALL 0.04
16TOWERDROPOOFS 0.07
17GATEHOUSEANDGUARDROOM 0.001
Total7.994




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA No
WATER SUPPLYGMDA Yes
ELECTRICITYDHBVN No
SEWAGE DISPOSALGMDA Yes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS357.28AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM372.84AS PER PROJECT REPORT
3STORM WATER DRAINAGE42.70AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM82.32AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL68.84AS PER PROJECT REPORT
6STREET LIGHTING76.82AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING64.35AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS83.55AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15PARKING257.62AS PER PROJECT REPORT
16STP171.76AS PER PROJECT REPORT
17UNDERGROUND WATER TANK89.89AS PER PROJECT REPORT
18RAIN WATER HARVESTING54.67AS PER PROJECT REPORT
19ELECTRICAL SUBSTATION333.46AS PER PROJECT REPORT
20ELECTRIFICATION COST190.95AS PER PROJECT REPORT
21GST ESCALATION CONTINGENCY0.00AS PER PROJECT REPORT


25-09-2025 (date)
25-09-2025 (date)
01-10-2025
30-09-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings113.3984
Apartment/Shops/Other Buildings113.391194
Apartment/Shops/Other Buildings113.3444
Apartment/Shops/Other Buildings88.03364
Apartment/Shops/Other Buildings88.0554
Apartment/Shops/Other Buildings88.091094
Apartment/Shops/Other Buildings87.9944
Apartment/Shops/Other Buildings88.03684
Apartment/Shops/Other Buildings88.09784
Apartment/Shops/Other Buildings88.03364
Apartment/Shops/Other Buildings88.0554
Apartment/Shops/Other Buildings88.091094





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0001611.95
Shops0000
Plots0000
Land290.240616.312544.73

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3804.81135.522308.44564.87
Shops0000
Plots0000
Land6430.612269.621134.8111348.14

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4731.482445.73751.864741.96
Shops0000
Plots0000
Land018913.5700

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3119.763105.075461.042260.6
Shops0000
Plots0000
Land0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3115.572572.754877.021267.54
Shops0000
Plots0000
Land0018913.570

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1953.941594.081273.851564.7
Shops0000
Plots0000
Land0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments353.78707.6698.651000.19
Shops0000
Plots0000
Land00015130.85

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments17.0626.700
Shops0000
Plots0000
Land0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
RAIN WATER HARVESTING3
STP9
UNDERGROUND WATER TANK4
ELECTRICAL SUB STATION17
ELECTRIFICATION COST10

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements001836
Water Supply System00056
Sewerage treatment & garbage disposal00010
Electricity Supply System0000
Storm Water Drainage0006
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
RAIN WATER HARVESTING5245
UNDERGROUND WATER TANK9369
STP1751217
ELECTRICAL SUB STATION33101717
ELECTRIFICATION COST1961010

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11253618
Water Supply System11263719
Sewerage treatment & garbage disposal2573
Electricity Supply System02184
Storm Water Drainage1342
Parks and Playgrounds02184
Clubhouse/community centres0000
Shopping area0000
Other0000
STP9999
UNDERGROUND WATER TANK4444
RAIN WATER HARVESTING3333
ELECTRICAL SUB STATION17171717
PARKING642613
SECURITY AND FIRE FIGHTING1663
STREET LIGHTING1984
ELECTRIFICATION COST10101010

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements18181818
Water Supply System19191919
Sewerage treatment & garbage disposal3333
Electricity Supply System4444
Storm Water Drainage2222
Parks and Playgrounds4444
Clubhouse/community centres0000
Shopping area0000
Other0000
STREET LIGHTING4444
SECURITY AND FIRE FIGHTING3333
PARKING13131313
STP992217
UNDERGROUND WATER TANK44129
RAIN WATER HARVESTING3375
ELECTRICAL SUB STATION17171717
ELECTRIFICATION COST10101010

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements18463614
Water Supply System19483715
Sewerage treatment & garbage disposal3973
Electricity Supply System41183
Storm Water Drainage2642
Parks and Playgrounds41183
Clubhouse/community centres0000
Shopping area0000
Other0000
STREET LIGHTING41083
SECURITY AND FIRE FIGHTING3863
PARKING13332610
STP759
UNDERGROUND WATER TANK434
RAIN WATER HARVESTING223
ELECTRICAL SUB STATION17171717
ELECTRIFICATION COST10101010

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1118
Water Supply System1119
Sewerage treatment & garbage disposal23
Electricity Supply System24
Storm Water Drainage12
Parks and Playgrounds34
Clubhouse/community centres00
Shopping area00
Other00
ELECTRIFICATION COST1013
PARKING813
ELECTRICAL SUB STATION1723
STREET LIGHTING24
SECURITY AND FIRE FIGHTING23












Yes
Yes
HSBC JMD REGENT SQUARE, DLF PHASE II, GURGAON MEHRAULI ROAD, GURGAON
057122129908
HSBC0110005
110039005
110005
Rahul Bindle, Emaar Business Park MG Road Sikanderpur Sector 28 Gurugram Haryana











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 75 OF 2025ALREADY BEEN OBTAINED23-05-2025
II. LICENSE NO. 10 OF 2025ALREADY BEEN OBTAINED16-01-2025
III. APPROVAL OF ZONING PLANALREADY BEEN OBTAINED06-08-2025
IV. APPROVAL OF BUILDING PLANALREADY BEEN OBTAINED25-09-2025
V. ASSURANCE OF SEWERAGE CONNECTIONALREADY BEEN OBTAINED08-09-2025
VI. ASSURANCE FOR STORM CONNECTIONALREADY BEEN OBTAINED05-09-2025
VII. NO OBJECTION CERTIFICATE FOR HEIGHT CLEARANCE ALREADY BEEN OBTAINED04-08-2025
VIII. FOREST NOCALREADY BEEN OBTAINED02-09-2025
IX. ASSURANCE OF WATER SUPPLYALREADY BEEN OBTAINED08-09-2025








Yes


Yes


As per Draft







MARBELLA PHASE 2, SECTOR 65& 66, GURUGRAM
66.059
0
501
0
137
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
43432042880
Cost of the apartments000
Cost of the infrastructure000
Others costs653265326224


16462 Lakhs
858 Lakhs
0 Lakhs
42880 Lakhs
No
31-12-2027
31-12-2027




EMAAR BUSINESS DISTRICT 99, SECTOR 99, GURUGRAM, HARYANA
3.26875
0
35
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
946394637177
Cost of the apartments000
Cost of the infrastructure18311831773
Others costs287628761671


3683 Lakhs
10319 Lakhs
0 Lakhs
7177 Lakhs
No
17-08-2026
17-08-2026




EMMAR BUSINESS DISTRICT 83
9.10625
116
0
95
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10987182455295
Cost of the apartments000
Cost of the infrastructure60895438737
Others costs4898182454558


1007 Lakhs
1759 Lakhs
0 Lakhs
6390 Lakhs
No
31-12-2028
31-12-2028




AMARIS, SECTOR-61, GURUGRAM, HARAYAN
6.118
522
0
519
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10465110437418171
Cost of the apartments859179205210142
Cost of the infrastructure000
Others costs18734123228029


9855 Lakhs
15865 Lakhs
0 Lakhs
15479 Lakhs
No
30-10-2030
30-10-2030




URBAN OASIS PHASE 4
1.62
101
0
95
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
24581257875295
Cost of the apartments10687222693433
Cost of the infrastructure000
Others costs1389535181862


0 Lakhs
0 Lakhs
0 Lakhs
4750 Lakhs
No
30-09-2029
30-09-2029




THE 88
1.58
88
0
84
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
956994982902
Cost of the apartments382384411749
Cost of the infrastructure000
Others costs574610571153


637 Lakhs
875 Lakhs
0 Lakhs
2625 Lakhs
No
31-03-2029
31-03-2029




URBAN OASIS PHASE 1 AND 2
6.64
424
0
424
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
804696841414047
Cost of the apartments71848591769107
Cost of the infrastructure000
Others costs862192384940


6243 Lakhs
15108 Lakhs
0 Lakhs
12570 Lakhs
No
30-09-2028
30-09-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSESTONE /LAMINATED WOODEN FLOORING/ANTISKID VITRIFIED FILE
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT
3KITCHEN DETAILSMODULAR KITCHEN WITH CHIMNEY + HOBB , SS SINK, GEYSER & BRANDED CP
4BATHROOM FITTINGSWASHBASIN , WC , MIRROR , SHOWER
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGVRF WITH HIGH WALL UNITS IN BEDROOMS, LIVING & DINING & KITCHEN
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORSTONE
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID VITRIFIED TILE
3 . 2 WALLSVITRIFIED TILES/ CERAMIC TILES/ACRYLIC EMULSION PAINT
3 . 3 CEILINGMOISTURE RESISTANT GYPSUM BOARD CEILING
3 . 4 COUNTERSGRANITE/MARBLE
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESWASH BASIN, WC,MIRROR,SHOWER,PARTITION
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID VITRIFIED TILE
5 . 2 WALLSVITRIFIED TILES, OIL BOND DISTEMPER
5 . 3 CEILINGVITRIFIED TILES/CERAMIC TILES/OIL BOND DISTEMPER
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESCP FITTINGS AND CHINAWARE
6 . KITCHEN
6 . 1 FLOORANTISKID VITRIFIED TILES
6 . 2 WALLSVITRIFIED TILES
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSQUARTZ/GRANITE/ARTIFICAL STONE
6 . 5 FIXTURESMODULAR KITCHEN WITH CHIMNEY + HOBB , SS SINK, GEYSER & BRANDED CP
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTISKID VITRIFIED TILES
7 . 2 WALLS & CEILINGOIL BOND DISTEMPER
7 . 3 TOILETCP FITTINGS AND CHINAWARE
7 . 4 BALCONYMETAL RAILING WITH LAMINATED GLASS
8 . SIT-OUTS
8 . 1 FLOORANTISKID VITRIFIED TILES
8 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 19-09-2025 View Document
2 DEMARCATION PLAN 17-09-2025 View Document
3 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 25-09-2025 View Document
4 ASSURANCE FOR SEWERAGE CONNECTION 31-10-2025 ------
5 ASSURANCE FOR STORM WATER CONNECTION 31-10-2025 ------
6 BUILDING PLAN APPROVAL LETTER BR III 31-10-2025 ------
7 BASEMENT 2 PLAN 31-10-2025 ------
8 BASEMENT 2 AREA DETAIL & AREA DIAGRAM 31-10-2025 ------
9 BASEMENT 1 STILTGROUND 1ST 31-10-2025 ------
10 BASEMENT 1 PLAN 31-10-2025 ------
11 BASEMENT 1 AREA DETAIL AND AREA DIAGRAM 31-10-2025 ------
12 BANK UNDERTAKING 31-10-2025 ------
13 ASSURANCE FOR WATER SUPPLY 31-10-2025 ------
14 CA CERTIFICATE FOR COST INCURRED 31-10-2025 ------
15 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 31-10-2025 View Document
16 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 31-10-2025 View Document
17 COD ORDER 31-10-2025 ------
18 COLLABORATION AGREEMENT 31-10-2025 ------
19 CONSTRUCTION WATER NOC 31-10-2025 ------
20 HEIGHT CLEARANCE 31-10-2025 ------
21 FOREST NOC 31-10-2025 ------
22 DRAFT SCHEDULE OF PAYMENT 31-10-2025 ------
23 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 31-10-2025 View Document
24 JAMABANDI 31-10-2025 ------
25 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 31-10-2025 View Document
26 REGISTRATION FEES DEMAND DRAFT 31-10-2025 ------
27 PHASING PLAN 31-10-2025 ------
28 NON-ENCUMBERANCE CERTIFICATE 31-10-2025 ------
29 MUTATION 31-10-2025 ------
30 LOI 31-10-2025 ------
31 SITE PLAN STILT LEVEL PLAN 31-10-2025 ------
32 SITE PLAN WITH EXTERNAL SERVICE 31-10-2025 ------
33 SITE PLAN WITH GREEN AREA 31-10-2025 ------
34 SITE PLAN 31-10-2025 ------
35 SIZRA 31-10-2025 ------
36 TOWER B1 18,19,20 31-10-2025 ------
37 TOWER B1 34 &35; FLOOR LEVEL 31-10-2025 ------
38 TOWER B1 35 TERRACE LEVEL 31-10-2025 ------
39 TOWER B1 C&D 31-10-2025 ------
40 TOWER B1 ELEVATION A&B 31-10-2025 ------
41 TOWER B2 34,35,36 31-10-2025 ------
42 TOWER B2 ELEVATION C&D 31-10-2025 ------
43 TOWER B2 ELEVATION 31-10-2025 ------
44 TOWER B2 SECTON 1 31-10-2025 ------
45 TOWER B2 TYPICAL 31-10-2025 ------
46 TOWER C1 TYPICAL 31-10-2025 ------
47 TOWER C1 STILT GROUND 31-10-2025 ------
48 TOWER B3 TYPICAL 31-10-2025 ------
49 TOWER B3 STILT GROUND 31-10-2025 ------
50 TOWER B3 SECTOR 1&3 31-10-2025 ------
51 TOWER B3 ELEVATION 31-10-2025 ------
52 TOWER B3 ELEVATION A&B 31-10-2025 ------
53 TOWER B3 36 TERRACE LEVEL 31-10-2025 ------
54 TOWER B3 34 AND 35 31-10-2025 ------
55 TOWER B3 18,20,19TH 31-10-2025 ------
56 ZONING PLAN 31-10-2025 View Document
57 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 06-11-2025 View Document
58 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 06-11-2025 View Document
59 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 06-11-2025 View Document