HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1719-2024
Submission Date : 21-08-2024 04:17:02 PM
Applicant Type : Company
Project Type: NEW




NORTH STAR TOWERS PRIVATE LIMITED
PLOT NO. 77, SS HOUSE, SECTOR 44, GURUGRAM (HARYANA)-122003
01244335100
9811092713 (Number Shared by Promoter in Public)
ssgroup.gurgaon@gmail.com
https://www.ssgroup-india.com/
XXXX976P
U74899HR1995PTC068947
 
 


 
 


 
 


 
 







SS CAMASA
SECTOR 90, VILLAGE BADHA & NAWADA FATEHPUR
MANESAR
GURUGRAM
01244335100
9811454047 (Number Shared by Promoter in Public)
ssgroup.gurgaon@gmail.com
VIJAY PAL SINGH
01244335100
9811454047 (Number Shared by Promoter in Public)
vijaypal@ssgroup-india.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15202408170091323817-08-20243954904KOTAK MAHINDRA BANKHRERA Gurugram







5.0456 (Acre)
3.62
3.48
6.4166 (Acre)
265 of 2023(19-12-2023)
No
Address     PLOT NO 77 SECTOR 44 GURUGRAM HARYANA
Address     PLOT NO 77 SECTOR 44 GURUGRAM HARYANA
Annexure-B- COLLABORATOR
AGREEMENT WAS MADE BEFORE GRANT OF LICENSE.
Yes
DOCUMENT NO. 6462 DT 6.9.2023 ANNEXED
No
Yes
Yes







63826.68 Lakhs
1401.08 Lakhs
34356.12 Lakhs
8180.17 Lakhs
19889.31 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.739
3CONSTRUCTION OF ROADS1.745
4PAVEMENTS0
5PARKS AND PLAYGROUNDS1.80
6GREEN BELTS0
7VEHICLE PARKINGS0.312
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13COMMERCIAL0.35
14EWS0.10
Total5.046




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDANo
ELECTRICITYDHVBNNo
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS506AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM289AS PER PROJECT REPORT
3STORM WATER DRAINAGE144AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM722AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL1112AS PER PROJECT REPORT
6STREET LIGHTING144AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING72AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS578AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15UNDERGROUND PARKING4113AS PER PROJECT REPORT
16ELECTRIFICATION COST UPTO PROJECT SITE500AS PER PROJECT REPORT


12-08-2024 (date)
12-08-2024 (date)
01-12-2024
30-09-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings137.955124





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments6.73
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments337
Shops0
Plots0

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1031171817181718
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1718171817181718
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1718171817181718
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1718171817181718
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments171817183779
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.11
Water Supply System28.89
Sewerage treatment & garbage disposal111.22
Electricity Supply System36.11
Storm Water Drainage14.44
Parks and Playgrounds57.77
Clubhouse/community centres0
Shopping area0
Other0
Street Lighting14.44
Electrification Cost0
Parking Cost41.13

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.1110.1110.1110.11
Water Supply System28.8928.8928.8928.89
Sewerage treatment & garbage disposal111.22111.22111.22111.22
Electricity Supply System36.1136.1136.1136.11
Storm Water Drainage14.4414.4414.4414.44
Parks and Playgrounds57.7757.7757.7757.77
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Lighting14.4414.4414.4414.44
Parking Cost123.38205.63205.63205.63

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.1110.1110.1110.11
Water Supply System28.8928.8928.8928.89
Sewerage treatment & garbage disposal111.22111.22111.22111.22
Electricity Supply System36.1136.1136.1136.11
Storm Water Drainage14.4414.4414.4414.44
Parks and Playgrounds57.7757.7728.8928.89
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting7.227.227.227.22
Parking Cost205.63205.63205.63205.63
Street Lighting14.4414.447.227.22

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.1110.1110.1150.55
Water Supply System28.89000
Sewerage treatment & garbage disposal111.22000
Electricity Supply System361.09000
Storm Water Drainage14.44000
Parks and Playgrounds11.5511.5511.5511.55
Clubhouse/community centres0000
Shopping area0000
Other0000
Parking Cost205.63205.63205.63205.63
Street Lighting2.892.892.892.89
Security and Fire Fighting7.227.227.227.22

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements50.5550.5550.5550.55
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System14.44000
Storm Water Drainage0000
Parks and Playgrounds11.5511.5511.5511.55
Clubhouse/community centres0000
Shopping area0000
Other7.227.2200
Parking Cost205.63205.63205.63205.63
Street Lighting2.892.892.892.89

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements50.5550.5530.33
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System0021.67
Storm Water Drainage000
Parks and Playgrounds11.5511.550
Clubhouse/community centres000
Shopping area000
Other000
Parking Cost205.63205.63452.38
Street Lighting2.892.89












Yes
No
STATE BANK OF INDIA, SME BRANCH, NARAINA IND. AREA, PH-I, 1ST FLOOR, 59 COMMUNITY CENTRE, NEW DELHI
43276256630
SBIN0003786
110002206
03786
Ashok Singh Jaunapuria and Sushil Singh Jaunapuria, B-4-43 2nd Floor Safdarjung Enclave New Delhi-110029
Uploaded











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLANALREADY BEEN OBTAINED12-08-2024
II. ZONING PLANALREADY BEEN OBTAINED05-06-2024
III. LICENSE FROM TOWN & COUNTRY PLANNING HARYANAALREADY BEEN OBTAINED19-12-2023
IV. PHASING PLAN APPROVALALREADY BEEN OBTAINED17-07-2024
V. FIRE SCHEME APPROVALALREADY BEEN OBTAINED17-10-2024








Yes


Yes


Provisions of agreement are in accordance with RERA model agreement













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE
2WALL FINISHING DETAILSOIL BOUND DISTEMPER
3KITCHEN DETAILSSTONE COUNTER WITH SINGLE LEVER CP FITTINGS AND SINK
4BATHROOM FITTINGSSTONE COUNTER TOP WITH SINGLE LEVER CP FITTINGS ,WASH BASIN, WALL HUNG WC
5WOOD WORK ETCSHALL NOT BE PROVIDED BY PROMOTER
6DOORS AND WINDOS FRAMESEXTERNAL- UPVC FRAMES WITH SLIDING GLASS SHUTTERS INTERNAL - MARANDI WOOD FRAMES
7GLASS WORKSHALL NOT BE PROVIDED BY PROMOTER
8ELECTRIC FITTINGSISI MARKED FITTINGS
9CONDUCTING AND WIRING DETAILSPVC CONDUITING WITH ISI MARKED WIRING
10CUPBOARD DETAILSSHALL NOT BE PROVIDED BY PROMOTER
11WATER STORAGECOMMON TANK
12LIFT DETAILSEACH TOWER HAS BEEN PROVIDED 03 NOS PASSANGER LIFTS AND 01 SERVICE LIFT
13EXTERNAL GLAZINGSUPVC FRAMES WITH SLIDING GLASS SHUTTERS
13.1WINDOWS/GLAZINGSUPVC FRAMES WITH SLIDING GLASS SHUTTERS
14DOORSMARANDI WOOD DOOR FRAME WITH ENAMEL PAINT SHUTTER
14.1MAIN DOORSMARANDI WOOD DOOR FRAME WITH ENAMEL PAINT SHUTTER
14.2INTERNAL DOORSMARANDI WOOD DOOR FRAME WITH ENAMEL PAINT SHUTTER
15AIR CONDITIONINGSPLIT AIR-CONDITIONERS IN LIVING ROOM AND BED ROOMS
16ELECTRICAL FITTINGSISI MARKED FITTINGS
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURED PAINT
20INTERNAL FINISHINGOIL BOUND DISTEMPER
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOOR VITRIFIED TILES
1 . 2 WALLSOIL BOUND DISTEMPER
1 . 3 CEILINGOIL BOUND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES
2 . 2 WALLSOIL BOUND DISTEMPER
2 . 3 CEILINGOIL BOUND DISTEMPER
2 . 4 MODULAR WARDROBESMODULAR WARDROBES SHALL NOT BE PROVIDED BY PROMOTER
3 . MASTER TOILET
3 . 1 FLOORANTISKID TILES
3 . 2 WALLSCERAMIC TILE
3 . 3 CEILINGOIL BOUND DISTEMPER
3 . 4 COUNTERSSTONE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTINGS
3 . 6 FITTING/FIXTURESWASH BASIN, WALL HUNG WC
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSOIL BOUND DISTEMPER
4 . 3 CEILINGOIL BOUND DISTEMPER
4 . 4 WARDROBESWARDROBES SHALL NOT BE PROVIDED BY PROMOTER
5 . TOILET
5 . 1 FLOORANTISKID TILES
5 . 2 WALLSCERAMIC TILES
5 . 3 CEILINGOIL BOUND DISTEMPER
5 . 4 COUNTERSSTONE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTINGS
5 . 6 FIXTURESWASH BASIN, WALL HUNG WC
6 . KITCHEN
6 . 1 FLOOR ANTISKID TILES
6 . 2 WALLSOIL BOUND DISTEMPER / CERAMIC TILE
6 . 3 CEILINGOIL BOUND DISTEMPER
6 . 4 COUNTERSSTONE COUNTER
6 . 5 FIXTURESSINGLE LEVER CP FITTINGS WITH SINK
6 . 6 KITCHEN APPLIANCESSHALL NOT BE PROVIDED BY PROMOTER
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI SKID TILES
7 . 2 WALLS & CEILINGOIL BOUND DISTEMPER
7 . 3 TOILETTILES IN FLOORING / CERAMIC TILES ON WALLS
7 . 4 BALCONYANTI SKID TILES
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS17-08-2024 View Document
2SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN17-08-2024 View Document
3SITE PLAN-PHASING PLAN21-08-2024 ------
4BALANCE SHEET 31.3.202121-08-2024 ------
5BALANCE SHEET 31.03.202221-08-2024 ------
6BALANCE SHEET 31.03.202321-08-2024 ------
7IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN21-08-2024 View Document
8CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT21-08-2024 View Document
9ELEVATION B & D10-02-2025 ------
10COURTYARD AREA DETAIL10-02-2025 ------
11BASEMENT PLAN-0210-02-2025 ------
12ROAD ACCESS APPROVAL LETTER 10-02-2025 ------
13DEMARCATION PLAN10-02-2025 View Document
14SITE PLAN_GREEN AREA CALCULATION10-02-2025 ------
15TYPICAL FLOOR PLAN 01 TO 32 (EXCEPT 19 & 28) _T-1 TO T-410-02-2025 ------
16WATER SUPPLY SCHEMATIC DIAGRAM10-02-2025 ------
17NOC - AAI - AIRPORT HEIGHT10-02-2025 ------
18AFFIDAVIT - TREE POWER NATURAL CONSERVATION10-02-2025 ------
19SECOND FLOOR AREA PLAN10-02-2025 ------
2019TH & 28TH FLOOR PLAN10-02-2025 ------
21ASSURANCE - SEWERAGE CONNECTION10-02-2025 ------
22REVISED ZONING PLAN10-02-2025 ------
23COPY OF LICENSE ALONG WITH SCHEDULE OF LAND10-02-2025 View Document
24SECTION 1 & 210-02-2025 ------
25ASSURANCE - DRINKING WATER10-02-2025 ------
26ELVATION A & B _COMMUNITY10-02-2025 ------
27STILT FLOOR PLAN_EWS10-02-2025 ------
28TERRACE FLOOR PLAN_EWS10-02-2025 ------
29STILT FLOOR PLAN_T-310-02-2025 ------
30PHASING PLAN - PLAN APPROVAL10-02-2025 ------
31STILT FLOOR PLAN_T-110-02-2025 ------
32AK SIZRA10-02-2025 ------
33TSR CAMASA10-02-2025 ------
34ZONING PLAN10-02-2025 View Document
35DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.10-02-2025 View Document
36ASSURANCE - ELECTRIC LOAD10-02-2025 ------
37NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT10-02-2025 View Document
38IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN10-02-2025 View Document
39PHASING PLAN - APPROVAL LETTER10-02-2025 ------
40ELEVATION A & C10-02-2025 ------
41BR-III10-02-2025 ------
42DRAFT AGREEMENT FOR SALE - SS CAMASA10-02-2025 ------
43SITE PLAN - LAYOUT PLAN10-02-2025 ------
44ASSURANCE - CONSTRUCTION WATER10-02-2025 ------
45COLLABORATION10-02-2025 ------
46FIRST FLOOR AREA PLAN10-02-2025 ------
47DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD10-02-2025 View Document
48TYPICAL FLOOR PLAN_EWS10-02-2025 ------
49DRAFT ALLOTMENT LETTER - SS CAMASA10-02-2025 ------
50ELVATION C & D _COMMUNITY10-02-2025 ------
51GROUND FLOOR PLAN10-02-2025 ------
52SECTION _COMMUNITY10-02-2025 ------
53CASH FLOW STATEMENT OF THE PROPOSED PROJECT10-02-2025 View Document
54TERRACE PLAN10-02-2025 ------
55SECTION_EWS10-02-2025 ------
56STILT FLOOR PLAN_T-410-02-2025 ------
57TERRACE PLAN 110-02-2025 ------
58BASEMENT PLAN-0110-02-2025 ------
59DRAFT APPLICATION FORM- SS CAMASA10-02-2025 ------
60LC-IV10-02-2025 ------
61LOI10-02-2025 ------
62PROJECT REPORT OF SS CAMASA10-02-2025 ------
63STILT FLOOR PLAN_T-210-02-2025 ------