HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1744-2024
Submission Date : 03-10-2024 09:08:48 PM
Applicant Type : Company
Project Type: NEW




ONE CITY INFRASTRUCTURE PVT. LTD.
8-D, HANSLAYA 15, BARAKHAMBA ROAD, NEW DELHI, DELHI-110001.
01123358616
9891500335 (Number Shared by Promoter in Public)
udit@onecity.in
http://www.onecity.in
XXXX528A
U70101DL2005PTC136628
 
 


 
 


 
 


 
 







THE SAAVIRA
SECTOR- 48, GURUGRAM, HARYANA
GURGAON
GURUGRAM
0000000000
0000000000 (Number Shared by Promoter in Public)
udit@onecity.in
MR UDIT JAIN
0000000000
9891500335 (Number Shared by Promoter in Public)
udit@onecity.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151242601-10-2024569000ICICI BANKHRERA Gurugram
293299361425-11-2024161093161093HRERA Gurugram







0.8615 (Acre)
3.62
3.6168
0.8615 (Acre)
Plot No. GH-1 vide Memo No. ZO002/EO0118/UE029/GALOT/0000001498 dated 24.01.2024 Allotted by the HSVP.
Yes







15579.96 Lakhs
6168.88 Lakhs
6739.79 Lakhs
1439.50 Lakhs
1231.79 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1399.00
3CONSTRUCTION OF ROADS1365.41
4PAVEMENTS0
5PARKS AND PLAYGROUNDS721.76
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total3486.17




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVP (ALREADY CONNECTED)No
WATER SUPPLYHSVPYes
ELECTRICITYDHVBNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS283.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM19.50AS PER PROJECT REPORT
3STORM WATER DRAINAGE15.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM500.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL40.00AS PER PROJECT REPORT
6STREET LIGHTING8.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING175.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS150.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM20.00AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15SEWERAGE SYSTEM17.00AS PER PROJECT REPORT
16 PARKING15.00AS PER PROJECT REPORT
17UNDERGROUND WATER TANK115.00AS PER PROJECT REPORT
18RAIN WATER HARVESTING12.00AS PER PROJECT REPORT
19ELECTRICAL SUB STATION70.00AS PER PROJECT REPORT


NA (date)
20-09-2024 (date)
01-01-2025
31-12-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings1741.94241
Apartment/Shops/Other Buildings1355.66481
Apartment/Shops/Other Buildings17.32511





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Others Cost0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments140.49140.39140.39140.39
Shops0000
Plots0000
Others Cost46.10000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments140.3970.2470.2470.24
Shops0000
Plots0000
Others Cost0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments282.76281.00281.00281.00
Shops0000
Plots0000
Others Cost0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments281.00281.00281.00281.00
Shops0000
Plots0000
Others Cost0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments281.00281.00281.00281.00
Shops0000
Plots0000
Others Cost0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments281.00281.00281.00276.79
Shops1.831.831.831.81
Plots0000
Others Cost0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments421.55356.32
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11.7911.7911.7911.79
Water Supply System0.810.810.810.81
Sewerage treatment & garbage disposal0.710.710.710.71
Electricity Supply System2.922.922.922.92
Storm Water Drainage0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground Water Tank4.794.794.794.79
Rain water harvesting0.500.500.500.50
Street Light0.330.330.330.33
Electrification Cost20.8320.8320.8320.83
Security and Firefighting services7.297.297.297.29
Renewable energy system0.830.830.830.83
Parking0.630.630.630.63
STP1.671.671.671.67

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11.7911.7911.7911.79
Water Supply System0.810.810.810.81
Sewerage treatment & garbage disposal0.710.710.710.71
Electricity Supply System2.922.922.922.92
Storm Water Drainage0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification Cost20.8320.8320.8320.83
Rain water harvesting0.500.500.500.50
Underground Water Tank4.794.794.794.79
STP1.671.671.671.67
Parking0.630.630.630.63
Renewable energy system0.830.830.830.83
Security and Firefighting services7.297.297.297.29
Street Light0.330.330.330.33

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11.7911.7911.7911.79
Water Supply System0.810.810.810.81
Sewerage treatment & garbage disposal0.710.710.710.71
Electricity Supply System2.922.922.922.92
Storm Water Drainage0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification Cost20.8320.8320.8320.83
Underground Water Tank4.794.794.794.79
Rain water harvesting0.500.500.500.50
Street Light0.330.330.330.33
Parking0.630.630.630.63
STP1.671.671.671.67
Renewable energy system0.830.830.830.83
Security and Firefighting services7.297.297.297.29

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11.7911.7911.7911.79
Water Supply System0.810.810.810.81
Sewerage treatment & garbage disposal0.710.710.710.71
Electricity Supply System2.922.922.922.92
Storm Water Drainage0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Clubhouse/community centres0000
Shopping area0000
Other0000
Renewable energy system0.830.830.830.83
Security and Firefighting services7.297.297.297.29
Electrification Cost20.8320.8320.8320.83
Street Light0.330.330.330.33
STP1.671.671.671.67
Rain water harvesting0.500.500.500.50
Parking0.630.630.630.63
Underground Water Tank4.794.794.794.79

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11.7911.7911.7911.79
Water Supply System0.810.810.810.81
Sewerage treatment & garbage disposal0.710.710.710.71
Electricity Supply System2.922.922.922.92
Storm Water Drainage0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Clubhouse/community centres0000
Shopping area0000
Other0000
STP1.671.671.671.67
Parking0.630.630.630.63
Renewable energy system0.830.830.830.83
Security and Firefighting services7.297.297.297.29
Electrification Cost20.8320.8320.8320.83
Street Light0.330.330.330.33
Rain water harvesting0.500.500.500.50
Underground Water Tank4.794.794.794.79

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11.7911.7911.7911.79
Water Supply System0.810.810.810.81
Sewerage treatment & garbage disposal0.710.710.710.71
Electricity Supply System2.922.922.922.84
Storm Water Drainage0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light0.330.330.330.33
Electrification Cost20.8320.8320.8320.83
Security and Firefighting services7.297.297.297.29
Renewable energy system0.830.830.830.91
Parking0.630.630.630.51
STP1.671.671.671.59
Underground Water Tank4.794.794.794.83
Rain water harvesting0.500.500.500.50

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000












Yes
No
ICICI BANK
777705876492
ICIC0001352
110229137
001352
1. Mr. Sunil Kumar Jain 2. Mr. Udit Jain 3. Mr. Apoorv Jain Address : C - 479, Defence Colony, Lajpat Nagar, S.O, South Delhi, Delhi - 110024.
Provided











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ALLOTMENT LETTER - PLOT NO. GH-1 VIDE MEMO NO. ZO002/EO0118/UE029/GALOT/0000001498, ALLOTTED BY THE HSVP.ALREADY BEEN OBTAINED24-01-2024
II. BUILDING PLAN BEARING MEMO NO. CTP/DTP(AM)/SB/255086ALREADY BEEN OBTAINED20-09-2024
III. ZONING PLAN DRAWING NO. D.T.P. (G) 2626 / 2023ALREADY BEEN OBTAINED08-05-2023
IV. AIRPORT NOC BEARING NO. AAI/RHQ/NR/ATAM/NOC/2024/186/690-93ALREADY BEEN OBTAINED19-03-2024
V. FIRE SCHEME APPROVALALREADY BEEN OBTAINED15-06-2024
VI. ENVIRONMENT CLEARANCEAPPLIED FOR BUT YET TO RECEIVE25-06-2024








Yes


Yes


As per RERA norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING ROOM / DINING FAMILY LOUNGE - ITALIAN/ IMPORTED MARBLE BED ROOM-LAMINATED WOODEN FLOOR KITCHEN-TILES BATHROOMS - TILES BALCONIES / TERRACES- TILES SERVANT ROOM & TOILET-TILES APARTMENT LIFT LOBBIES (PRIVATE).-ITALIAN/ IMPORTED MARBLE
2WALL FINISHING DETAILS WALLS - LOW VOC ACRYLIC EMULSION PAINT , CERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA ,VITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER ,M S HANDRAIL LOW VOC ACRYLIC EMULSION PAINT
3KITCHEN DETAILSCERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA,CEILING - LOW VOC ACRYLIC EMULSION PAINT AND PART POP
4BATHROOM FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESDOORS - WOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES,UPVC FRAMED SINGLE GLAZING UNIT,WOODEN FRAME WITH FLUSH DOOR WITH BOTH SIDE LAMINATED FINISH & ARCHITRAVE
7GLASS WORKUPVC FRAMED SINGLE GLAZING
8ELECTRIC FITTINGSHEAVY DUTY/ MEDIUM DUTY
9CONDUCTING AND WIRING DETAILSFIRE RESISTANT
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSHIGH SPEED ELEVATORS
13EXTERNAL GLAZINGSFULL POINT WINDOW UPUC
13.1WINDOWS/GLAZINGSUPVC FRAMED SINGLE GLAZING
14DOORSFLASH DOOR
14.1MAIN DOORSFLASH DOOR
14.2INTERNAL DOORSFLASH DOOR
15AIR CONDITIONINGSPLIT AC'S
16ELECTRICAL FITTINGSMODULAR
17CNG PIPE LINEPROVISIONAL
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISIONAL
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT FINISH
20INTERNAL FINISHINGLOW VOC ACRYLIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORITALIAN/ IMPORTED MARBLE
1 . 2 WALLSLOW VOC ACRYLIC EMULSION PAINT
1 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOOR
2 . 2 WALLSLOW VOC ACRYLIC EMULSION PAINT
2 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILES
3 . 2 WALLSVITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
3 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN
3 . 4 COUNTERSGRANITE ON THE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
3 . 6 FITTING/FIXTURESKOHLER, GROHA& ROCA OR EQUIVALENT
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOOR
4 . 2 WALLSLOW VOC ACRYLIC EMULSION PAINT
4 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI-SKID VITRIFIED TILES
5 . 2 WALLSVITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
5 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN
5 . 4 COUNTERSGRANITE ON THE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
5 . 6 FIXTURESKOHLER, GROHA& ROCA OR EQUIVALENT
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA
6 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT & PART POP
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT OF APPROVED MAKE
7 . 3 TOILETNA
7 . 4 BALCONYM S HANDRAIL
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1ASSURANCE FOR WATER SUPPLY03-10-2024 ------
2DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD30-09-2024 View Document
3BUILDING PLAN BR-III03-10-2024 ------
4ZONING PLAN30-09-2024 View Document
5IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN30-09-2024 View Document
6IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN30-09-2024 View Document
7ASSURANCE FOR SEWERAGE03-10-2024 ------
8DEMARCATION PLAN30-09-2024 View Document
9A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS30-09-2024 View Document
10AIRPORT HEIGHT CLEARANCE03-10-2024 ------
11COPY OF LICENSE ALONG WITH SCHEDULE OF LAND30-09-2024 View Document
12LOI03-10-2024 ------
13ALLOTMENT LETTER03-10-2024 ------
14DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.03-10-2024 View Document
15NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT03-10-2024 View Document
16SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN03-10-2024 View Document
17ASSURANCE FOR STORM WATER03-10-2024 ------