8-D, HANSLAYA 15, BARAKHAMBA ROAD, NEW DELHI, DELHI-110001.
01123358616
9891500335 (Number Shared by Promoter in Public)
udit@onecity.in
http://www.onecity.in
XXXX528A
U70101DL2005PTC136628
THE SAAVIRA
SECTOR- 48, GURUGRAM, HARYANA
GURGAON
GURUGRAM
0000000000
0000000000 (Number Shared by Promoter in Public)
udit@onecity.in
MR UDIT JAIN
0000000000
9891500335 (Number Shared by Promoter in Public)
udit@onecity.in
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
512426
01-10-2024
569000
ICICI BANK
HRERA Gurugram
2
932993614
25-11-2024
161093
161093
HRERA Gurugram
0.8615 (Acre)
3.62
3.6168
0.8615 (Acre)
Plot No. GH-1 vide Memo No. ZO002/EO0118/UE029/GALOT/0000001498 dated 24.01.2024 Allotted by the HSVP.
Yes
15579.96 Lakhs
6168.88 Lakhs
6739.79 Lakhs
1439.50 Lakhs
1231.79 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
1399.00
3
CONSTRUCTION OF ROADS
1365.41
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
721.76
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
Total
3486.17
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSVP (ALREADY CONNECTED)
No
WATER SUPPLY
HSVP
Yes
ELECTRICITY
DHVBN
Yes
SEWAGE DISPOSAL
HSVP
Yes
STORM WATER DRAINAGE
HSVP
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
283.00
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
19.50
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
15.00
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
500.00
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
40.00
AS PER PROJECT REPORT
6
STREET LIGHTING
8.00
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
175.00
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
150.00
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
AS PER PROJECT REPORT
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
20.00
AS PER PROJECT REPORT
12
SCHOOL
0
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
0
AS PER PROJECT REPORT
15
SEWERAGE SYSTEM
17.00
AS PER PROJECT REPORT
16
PARKING
15.00
AS PER PROJECT REPORT
17
UNDERGROUND WATER TANK
115.00
AS PER PROJECT REPORT
18
RAIN WATER HARVESTING
12.00
AS PER PROJECT REPORT
19
ELECTRICAL SUB STATION
70.00
AS PER PROJECT REPORT
NA (date)
20-09-2024 (date)
01-01-2025
31-12-2031
Plot Area(In Square Meter)
Number of plots in the project
0
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
1741.94
24
1
Apartment/Shops/Other Buildings
1355.66
48
1
Apartment/Shops/Other Buildings
17.325
1
1
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Others Cost
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
140.49
140.39
140.39
140.39
Shops
0
0
0
0
Plots
0
0
0
0
Others Cost
46.10
0
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
140.39
70.24
70.24
70.24
Shops
0
0
0
0
Plots
0
0
0
0
Others Cost
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
282.76
281.00
281.00
281.00
Shops
0
0
0
0
Plots
0
0
0
0
Others Cost
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
281.00
281.00
281.00
281.00
Shops
0
0
0
0
Plots
0
0
0
0
Others Cost
0
0
0
0
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
281.00
281.00
281.00
281.00
Shops
0
0
0
0
Plots
0
0
0
0
Others Cost
0
0
0
0
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
281.00
281.00
281.00
276.79
Shops
1.83
1.83
1.83
1.81
Plots
0
0
0
0
Others Cost
0
0
0
0
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
421.55
356.32
Shops
0
0
Plots
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.79
11.79
11.79
11.79
Water Supply System
0.81
0.81
0.81
0.81
Sewerage treatment & garbage disposal
0.71
0.71
0.71
0.71
Electricity Supply System
2.92
2.92
2.92
2.92
Storm Water Drainage
0.63
0.63
0.63
0.63
Parks and Playgrounds
6.25
6.25
6.25
6.25
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Underground Water Tank
4.79
4.79
4.79
4.79
Rain water harvesting
0.50
0.50
0.50
0.50
Street Light
0.33
0.33
0.33
0.33
Electrification Cost
20.83
20.83
20.83
20.83
Security and Firefighting services
7.29
7.29
7.29
7.29
Renewable energy system
0.83
0.83
0.83
0.83
Parking
0.63
0.63
0.63
0.63
STP
1.67
1.67
1.67
1.67
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.79
11.79
11.79
11.79
Water Supply System
0.81
0.81
0.81
0.81
Sewerage treatment & garbage disposal
0.71
0.71
0.71
0.71
Electricity Supply System
2.92
2.92
2.92
2.92
Storm Water Drainage
0.63
0.63
0.63
0.63
Parks and Playgrounds
6.25
6.25
6.25
6.25
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Electrification Cost
20.83
20.83
20.83
20.83
Rain water harvesting
0.50
0.50
0.50
0.50
Underground Water Tank
4.79
4.79
4.79
4.79
STP
1.67
1.67
1.67
1.67
Parking
0.63
0.63
0.63
0.63
Renewable energy system
0.83
0.83
0.83
0.83
Security and Firefighting services
7.29
7.29
7.29
7.29
Street Light
0.33
0.33
0.33
0.33
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.79
11.79
11.79
11.79
Water Supply System
0.81
0.81
0.81
0.81
Sewerage treatment & garbage disposal
0.71
0.71
0.71
0.71
Electricity Supply System
2.92
2.92
2.92
2.92
Storm Water Drainage
0.63
0.63
0.63
0.63
Parks and Playgrounds
6.25
6.25
6.25
6.25
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Electrification Cost
20.83
20.83
20.83
20.83
Underground Water Tank
4.79
4.79
4.79
4.79
Rain water harvesting
0.50
0.50
0.50
0.50
Street Light
0.33
0.33
0.33
0.33
Parking
0.63
0.63
0.63
0.63
STP
1.67
1.67
1.67
1.67
Renewable energy system
0.83
0.83
0.83
0.83
Security and Firefighting services
7.29
7.29
7.29
7.29
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.79
11.79
11.79
11.79
Water Supply System
0.81
0.81
0.81
0.81
Sewerage treatment & garbage disposal
0.71
0.71
0.71
0.71
Electricity Supply System
2.92
2.92
2.92
2.92
Storm Water Drainage
0.63
0.63
0.63
0.63
Parks and Playgrounds
6.25
6.25
6.25
6.25
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Renewable energy system
0.83
0.83
0.83
0.83
Security and Firefighting services
7.29
7.29
7.29
7.29
Electrification Cost
20.83
20.83
20.83
20.83
Street Light
0.33
0.33
0.33
0.33
STP
1.67
1.67
1.67
1.67
Rain water harvesting
0.50
0.50
0.50
0.50
Parking
0.63
0.63
0.63
0.63
Underground Water Tank
4.79
4.79
4.79
4.79
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.79
11.79
11.79
11.79
Water Supply System
0.81
0.81
0.81
0.81
Sewerage treatment & garbage disposal
0.71
0.71
0.71
0.71
Electricity Supply System
2.92
2.92
2.92
2.92
Storm Water Drainage
0.63
0.63
0.63
0.63
Parks and Playgrounds
6.25
6.25
6.25
6.25
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
STP
1.67
1.67
1.67
1.67
Parking
0.63
0.63
0.63
0.63
Renewable energy system
0.83
0.83
0.83
0.83
Security and Firefighting services
7.29
7.29
7.29
7.29
Electrification Cost
20.83
20.83
20.83
20.83
Street Light
0.33
0.33
0.33
0.33
Rain water harvesting
0.50
0.50
0.50
0.50
Underground Water Tank
4.79
4.79
4.79
4.79
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.79
11.79
11.79
11.79
Water Supply System
0.81
0.81
0.81
0.81
Sewerage treatment & garbage disposal
0.71
0.71
0.71
0.71
Electricity Supply System
2.92
2.92
2.92
2.84
Storm Water Drainage
0.63
0.63
0.63
0.63
Parks and Playgrounds
6.25
6.25
6.25
6.25
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Light
0.33
0.33
0.33
0.33
Electrification Cost
20.83
20.83
20.83
20.83
Security and Firefighting services
7.29
7.29
7.29
7.29
Renewable energy system
0.83
0.83
0.83
0.91
Parking
0.63
0.63
0.63
0.51
STP
1.67
1.67
1.67
1.59
Underground Water Tank
4.79
4.79
4.79
4.83
Rain water harvesting
0.50
0.50
0.50
0.50
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
Water Supply System
0
0
0
Sewerage treatment & garbage disposal
0
0
0
Electricity Supply System
0
0
0
Storm Water Drainage
0
0
0
Parks and Playgrounds
0
0
0
Clubhouse/community centres
0
0
0
Shopping area
0
0
0
Other
0
0
0
Yes
No
ICICI BANK
777705876492
ICIC0001352
110229137
001352
1. Mr. Sunil Kumar Jain
2. Mr. Udit Jain
3. Mr. Apoorv Jain
Address : C - 479, Defence Colony, Lajpat Nagar, S.O, South Delhi, Delhi - 110024.
Provided
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. ALLOTMENT LETTER - PLOT NO. GH-1 VIDE MEMO NO. ZO002/EO0118/UE029/GALOT/0000001498, ALLOTTED BY THE HSVP.
ALREADY BEEN OBTAINED
24-01-2024
II. BUILDING PLAN BEARING MEMO NO. CTP/DTP(AM)/SB/255086
ALREADY BEEN OBTAINED
20-09-2024
III. ZONING PLAN DRAWING NO. D.T.P. (G) 2626 / 2023
ALREADY BEEN OBTAINED
08-05-2023
IV. AIRPORT NOC BEARING NO. AAI/RHQ/NR/ATAM/NOC/2024/186/690-93
ALREADY BEEN OBTAINED
19-03-2024
V. FIRE SCHEME APPROVAL
ALREADY BEEN OBTAINED
15-06-2024
VI. ENVIRONMENT CLEARANCE
APPLIED FOR BUT YET TO RECEIVE
25-06-2024
Yes
Yes
As per RERA norms
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
WALLS - LOW VOC ACRYLIC EMULSION PAINT , CERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA ,VITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER ,M S HANDRAIL LOW VOC ACRYLIC EMULSION PAINT
3
KITCHEN DETAILS
CERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA,CEILING - LOW VOC ACRYLIC EMULSION PAINT AND PART POP
4
BATHROOM FITTINGS
KOHLER, GROHA& ROCA OR EQUIVALENT
5
WOOD WORK ETC
NA
6
DOORS AND WINDOS FRAMES
DOORS - WOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES,UPVC FRAMED SINGLE GLAZING UNIT,WOODEN FRAME WITH FLUSH DOOR WITH BOTH SIDE LAMINATED FINISH & ARCHITRAVE
7
GLASS WORK
UPVC FRAMED SINGLE GLAZING
8
ELECTRIC FITTINGS
HEAVY DUTY/ MEDIUM DUTY
9
CONDUCTING AND WIRING DETAILS
FIRE RESISTANT
10
CUPBOARD DETAILS
NA
11
WATER STORAGE
NA
12
LIFT DETAILS
HIGH SPEED ELEVATORS
13
EXTERNAL GLAZINGS
FULL POINT WINDOW UPUC
13.1
WINDOWS/GLAZINGS
UPVC FRAMED SINGLE GLAZING
14
DOORS
FLASH DOOR
14.1
MAIN DOORS
FLASH DOOR
14.2
INTERNAL DOORS
FLASH DOOR
15
AIR CONDITIONING
SPLIT AC'S
16
ELECTRICAL FITTINGS
MODULAR
17
CNG PIPE LINE
PROVISIONAL
18
PROVISION OF WIFI AND BROADBAND FACILITY
PROVISIONAL
19
EXTERNAL FINISHING/COLOUR SCHEME
EXTERNAL GRADE PAINT FINISH
20
INTERNAL FINISHING
LOW VOC ACRYLIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
ITALIAN/ IMPORTED MARBLE
1 . 2
WALLS
LOW VOC ACRYLIC EMULSION PAINT
1 . 3
CEILING
LOW VOC ACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
LAMINATED WOODEN FLOOR
2 . 2
WALLS
LOW VOC ACRYLIC EMULSION PAINT
2 . 3
CEILING
LOW VOC ACRYLIC EMULSION PAINT
2 . 4
MODULAR WARDROBES
NA
3 . MASTER TOILET
3 . 1
FLOOR
VITRIFIED TILES
3 . 2
WALLS
VITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
3 . 3
CEILING
LOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN
3 . 4
COUNTERS
GRANITE ON THE COUNTER
3 . 5
SANITARY WARE/CP FITTINGS
KOHLER, GROHA& ROCA OR EQUIVALENT
3 . 6
FITTING/FIXTURES
KOHLER, GROHA& ROCA OR EQUIVALENT
4 . BED ROOMS
4 . 1
FLOOR
LAMINATED WOODEN FLOOR
4 . 2
WALLS
LOW VOC ACRYLIC EMULSION PAINT
4 . 3
CEILING
LOW VOC ACRYLIC EMULSION PAINT
4 . 4
WARDROBES
NA
5 . TOILET
5 . 1
FLOOR
ANTI-SKID VITRIFIED TILES
5 . 2
WALLS
VITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
5 . 3
CEILING
LOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN
5 . 4
COUNTERS
GRANITE ON THE COUNTER
5 . 5
SANITARY WARE/CP FITTINGS
KOHLER, GROHA& ROCA OR EQUIVALENT
5 . 6
FIXTURES
KOHLER, GROHA& ROCA OR EQUIVALENT
6 . KITCHEN
6 . 1
FLOOR
VITRIFIED TILES
6 . 2
WALLS
CERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA
6 . 3
CEILING
LOW VOC ACRYLIC EMULSION PAINT & PART POP
6 . 4
COUNTERS
NA
6 . 5
FIXTURES
NA
6 . 6
KITCHEN APPLIANCES
NA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
VITRIFIED TILES
7 . 2
WALLS & CEILING
EXTERIOR GRADE PAINT OF APPROVED MAKE
7 . 3
TOILET
NA
7 . 4
BALCONY
M S HANDRAIL
8 . SIT-OUTS
8 . 1
FLOOR
NA
8 . 2
WALLS & CEILING
NA
8 . 3
RAILINGS
NA
8 . 4
FIXTURES
NA
Sr. No.
Document Description
Date of Document Upload
View Document
1
ASSURANCE FOR WATER SUPPLY
03-10-2024
------
2
DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD