HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1281-2023
Submission Date : 24-01-2023 12:30:41 PM
Applicant Type : Company
Project Type: NEW




SIGNATURE BUILDERS PRIVATE LIMITED
1309, 13TH FLOOR, DR. GOPAL DAS BHAWAN, 28 BARAKHAMBA ROAD, NEW DELHI 110001
01244908200
9810899381 (Number Shared by Promoter in Public)
compliance@signatureglobal.in
https://www.signatureglobal.in
XXXX794K
U70101DL2011PTC220275
 
 


 
 


 
 


 
 







SIGNATURE GLOBAL CITY 93
VILLAGE WAZIRPUR, SECTOR 93, GURUGRAM, HARYANA
HARSARU ST
GURUGRAM
01244908200
9810899381 (Number Shared by Promoter in Public)
compliance@signatureglobal.in
RAVI AGGARWAL
01244908200
9250785681 (Number Shared by Promoter in Public)
compliance@signatureglobal.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15202301249629497324-01-2023728839YES BANK LTD. (RTGS REF NO.-YESBR2023012496294973)HRERA Gurugram
25202301249629497424-01-2023700864YES BANK LTD.(RTGS REF NO.-YESBR52023012496294974)HRERA Gurugram
333914122974325-01-202359UPI REF NO. 339141229743HRERA Gurugram







17.31875 (Acre)
1
1
17.31875 (Acre)
210 of 2022 Dated 22.12.2022
No
Address     128, KANKROLA, TEHSIL & DISTRICT GURUGRAM
Address     128, KANKROLA, TEHSIL & DISTRICT GURUGRAM
Address     128, KANKROLA, TEHSIL & DISTRICT GURUGRAM
Address     128, KANKROLA, TEHSIL & DISTRICT GURUGRAM
Address     128, KANKROLA, TEHSIL & DISTRICT GURUGRAM
Address     R/O 122, KANKROLA, BHANGROLA, TEHSIL & DISTRICT GURUGRAM, HARYANA-122505
Address     KANKROLA, TEHSIL & DISTRICT GURUGRAM
Address     KANKROLA, TEHSIL & DISTRICT GURUGRAM
Address     201 KANKROLA (128), TEHSIL & DISTRICT GURUGRAM,
Address     R/O 128 KANKROLA. TEHSIL & DISTRICT GURUGRAM, HARYANA-122505
Address     R/O 128 KANKROLA. TEHSIL & DISTRICT GURUGRAM, HARYANA-122505
Address     R/O 128 KANKROLA. TEHSIL & DISTRICT GURUGRAM, HARYANA-122505
Address     R/O 128 KANKROLA. TEHSIL & DISTRICT GURUGRAM, HARYANA-122505
Address     R/O HOUSE NO-100 NEAR GOVT SCHOOL, V P O SARHAUL, SECTOR-18 TEHSIL & DISTRICT GURUGRAM, HARYANA
Address     R/O 128 KANKROLA. TEHSIL & DISTRICT GURUGRAM, HARYANA-122505
Address     R/O 106, KANKROLA (128), TEHSIL & DISTRICT GURUGRAM
Address     R/O 128 KANKROLA. TEHSIL & DISTRICT GURUGRAM, HARYANA-122505
Address     C-8/1A VASANT VIHAR NEW DELHI NEW DELHI NEW DELHI DELHI 110057
Address     GROUND FLOOR, TOWER A, SIGNATURE TOWERS, SOUTH CITY 1, GURUGRAM, HARYANA – 122001
Annexure-B- PART OWNER OF THE PROJECT LAND
THE DEVELOPER IS RECORDED OWNER IN RESPECT OF LAND MEASURING 7.28 ACRES FORMING PART OF TOTAL AREA OF THE COLONY ADMESURING 17.32 ACRES SITUATED IN THE REVENUE ESTATE OF VILLAGE WAZIRPUR, SECTOR 93, DISTRICT, GURUGRAM, HARYANA. THE DEVELOPER HAS ALSO ENTERED INTO A COLLABORATION AGREEMENT WITH THE LANDOWNERS M/S YESHA DEVELOPERS LLP SH. ROHTAS SINGH, S/O SH. BASTI RAM, SH. OM PARKASH, S/O SH. BASTI RAM, SH. SATYABIR, S/O SH. BASTI RAM, SH. RAJ KUMAR, S/O SH. BASTI RAM, SH. SANTRAJ, S/O SH. BASTI RAM, SH. JAIPAL YADAV, S/O SH. BASTI RAM, SH. BIRHAM PARKASH S/O SH. BASTI RAM, SH. RAJIV YADAV S/O LATE SH. SHIV NARAYAN, SH. SATPAL S/O LATE SH. BALWANT, SMT. ASARFI D/O CHUNI LAL, SH. RAMESH KUMAR S/O SH. SHIV NARAYAN, SH. YOGESH, S/O SH. MAHENDER, SMT. MUNESH YADAV, D/O SH. SUBHASH CHAND, SH. SAHIL, S/O SH. MUKESH KUMAR, SMT. ATARO DEVI, D/O SH. BHOLARAM, SMT. RAJDULARI D/O SH. BALWANT SINGH YADAV, SMT. MEENA DEVI, D/O SH. DEEP CHAND, IN RESPECT OF LAND MEASURING 10.04 ACRES, VIDE REGISTERED COLLABORATION AGREEMENTS BEARING DEED NO. 2167, DATED 29.07.2021, DEED NO. 10322, DATED 21.03.2022 AND DEED NO. 4539, DATED 22.03.2021, DULY REGISTERED IN THE OFFICE OF SUB REGISTRAR HARSARU, DISTRICT- GURUGRAM. THE LANDOWNERS HAD ALSO GIVEN POWER OF ATTORNEY TO DEVELOPERS VIDE REGISTERED SPA/GPA BEARING DEED NO. 36, DATED 29.07.2021, DEED NO. 135, DATED 21.03.2022 AND DEED NO. 4539, DATED 22.03.2021, DULY REGISTERED IN THE OFFICE OF SUB REGISTRAR HARSARU
Yes
THE DEVELOPER IS RECORDED OWNER IN RESPECT OF LAND MEASURING 7.28 ACRES FORMING PART OF TOTAL AREA OF THE COLONY ADMESURING 17.32 ACRES SITUATED IN THE REVENUE ESTATE OF VILLAGE WAZIRPUR, SECTOR 93, DISTRICT, GURUGRAM, HARYANA. THE DEVELOPER HAS ALSO ENTERED INTO A COLLABORATION AGREEMENT WITH THE LANDOWNERS M/S YESHA DEVELOPERS LLP SH. ROHTAS SINGH, S/O SH. BASTI RAM, SH. OM PARKASH, S/O SH. BASTI RAM, SH. SATYABIR, S/O SH. BASTI RAM, SH. RAJ KUMAR, S/O SH. BASTI RAM, SH. SANTRAJ, S/O SH. BASTI RAM, SH. JAIPAL YADAV, S/O SH. BASTI RAM, SH. BIRHAM PARKASH S/O SH. BASTI RAM, SH. RAJIV YADAV S/O LATE SH. SHIV NARAYAN, SH. SATPAL S/O LATE SH. BALWANT, SMT. ASARFI D/O CHUNI LAL, SH. RAMESH KUMAR S/O SH. SHIV NARAYAN, SH. YOGESH, S/O SH. MAHENDER, SMT. MUNESH YADAV, D/O SH. SUBHASH CHAND, SH. SAHIL, S/O SH. MUKESH KUMAR, SMT. ATARO DEVI, D/O SH. BHOLARAM, SMT. RAJDULARI D/O SH. BALWANT SINGH YADAV, SMT. MEENA DEVI, D/O SH. DEEP CHAND, IN RESPECT OF LAND MEASURING 10.04 ACRES, VIDE REGISTERED COLLABORATION AGREEMENTS BEARING DEED NO. 2167, DATED 29.07.2021, DEED NO. 10322, DATED 21.03.2022 AND DEED NO. 4539, DATED 22.03.2021, DULY REGISTERED IN THE OFFICE OF SUB REGISTRAR HARSARU, DISTRICT- GURUGRAM. THE LANDOWNERS HAD ALSO GIVEN POWER OF ATTORNEY TO DEVELOPERS VIDE REGISTERED SPA/GPA BEARING DEED NO. 36, DATED 29.07.2021, DEED NO. 135, DATED 21.03.2022 AND DEED NO. 4539, DATED 22.03.2021, DULY REGISTERED IN THE OFFICE OF SUB REGISTRAR HARSARU
No
Yes
Yes







16785.65 Lakhs
8930.91 Lakhs
0 Lakhs
1620.61 Lakhs
6234.13 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD8.612
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS4.580
4PAVEMENTS0
5PARKS AND PLAYGROUNDS1.348
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0.130
9CLUB HOUSE1.732
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.111
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.112
13COMMERCIAL0.693
Total17.318




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDANo
ELECTRICITYGMDANo
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEN/ANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS412.97SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM231.5SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE125.2SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL147.05SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING39.85SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15PARKING HORTICULTURE10.5SUBMITTED TO TOWN & COUNTRY PLANNING
16MS CHARGES268.05SUBMITTED TO TOWN & COUNTRY PLANNING


23-12-2022 (date)
NA (date)
01-01-2023
30-03-2024
Plot Area(In Square Meter)Number of plots in the project
149.968129
149.99012
148.20328
137.9135
131.9505
131.56912
125.2254
121.9738
108.0021
96.39313
134.7268
117.0081
147.6902
67.6541
70.5771
2803.2691


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0
Land Cost412.75
Other cost1114.05
IDC58.56

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
IDW58.5697.66378.36227.89
Other cost450350450350
Land Cost412.75247.65412.75247.65
EDC258.43258.43
IDC192.74192.74

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Other Cost450400350450
Land Cost330.2330.2247.65412.75
EDC258.43258.43
IDW204.6268.05

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00
Other Cost350416.77
Land Cost247.65357.88
IDC516.88




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements12.5
Water Supply System7.0
Sewerage treatment & garbage disposal4.45
Electricity Supply System0
Storm Water Drainage3.79
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Parking or Horticulture0.317
Street Lighting1.2












Yes
No
ICICI BANK LTD, 005 A, UNITECH TRADE CENTRE, SECTOR ROAD, SUSHANT LOK, PHASE I, GURGOAN, HARYANA , 122002
777705031419
ICIC0000314
110229042
000314
Lalit Kumar Aggarwal (Authorised Signatory) 34, Road No.61, West Punjabi Bagh Delhi 110026 Pradeep Kumar Aggarwal (Authorised Signatory) 34, Road No.61, West Punjabi Bagh Delhi 110026
ATTACHED











Yes
Yes
Yes
No
No
No
No
No
No
No


Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE 210 OF 2022 DATED 22.12.2022ALREADY BEEN OBTAINED22-12-2022
II. FOREST NOC JN73MNUFJTALREADY BEEN OBTAINED07-10-2022
III. WATER NOC MEMO NO.EE (PROJ)/GMDA/2023/26ALREADY BEEN OBTAINED16-01-2023
IV. SEWERAGE NOC GMDA/SEW/2023/36 ALREADY BEEN OBTAINED12-01-2023
V. ELECTRICAL LOAD ASSURANCE CH.09/DRG.-PLC ALREADY BEEN OBTAINED19-01-2023
VI. ZONING MEMO NO. ZP-1709/JD(NK)/2023/1943ALREADY BEEN OBTAINED19-01-2023
VII. LAYOUT DRAWING NO.8869ALREADY BEEN OBTAINED23-12-2022
VIII. LOI MEMO NO. LC-4644+4800-JE(DS)-2022/24671ALREADY BEEN OBTAINED18-08-2022
IX. LC IV DL8547342150588UALREADY BEEN OBTAINED08-09-2022








Yes


Yes









GROUP HOUSING COLONY, SEC-107, GURUGRAM
3.00
448
0
448
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
9612.0009228
Cost of the apartments4851.2904984.67
Cost of the infrastructure458.720458.72
Others costs2516.9901999.66


9228.04 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
19-06-2021
19-06-2021




SOLERA 1
6.1250
1000
0
1000
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
16675.80018234.82
Cost of the apartments9900.00011249.40
Cost of the infrastructure000
Others costs3110.0003319.62


18234.82 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
23-01-2023
23-01-2023




ORCHARD AVENUE, SECTOR-93, VILLAGE HAYATPUR, GURUGRAM, HARYANA
5.0000
729
0
729
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
16078.78016161.70
Cost of the apartments8020.3208715.66
Cost of the infrastructure853.2300
Others costs3184.9303433.08


16161.93 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
29-09-2020
29-09-2020




ORCHARD AVENUE 2, SECT-93, VILLAGE HAYATPUR, GURUGRAM, HARYANA
5.0000
720
0
720
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17380.7208722.81
Cost of the apartments9361.8904579.72
Cost of the infrastructure637.8400
Others costs4208.1501808.30


8722.8 Lakhs
0 Lakhs
2800.00 Lakhs
2800.00 Lakhs
No
30-09-2024
30-09-2024










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEN/A
2WALL FINISHING DETAILSN/A
3KITCHEN DETAILSN/A
4BATHROOM FITTINGSN/A
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESN/A
7GLASS WORKN/A
8ELECTRIC FITTINGSN/A
9CONDUCTING AND WIRING DETAILSN/A
10CUPBOARD DETAILSN/A
11WATER STORAGEN/A
12LIFT DETAILSN/A
13EXTERNAL GLAZINGSN/A
13.1WINDOWS/GLAZINGSN/A
14DOORSN/A
14.1MAIN DOORSN/A
14.2INTERNAL DOORSN/A
15AIR CONDITIONINGN/A
16ELECTRICAL FITTINGSN/A
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMEN/A
20INTERNAL FINISHINGN/A
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORN/A
1 . 2 WALLSN/A
1 . 3 CEILINGN/A
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORN/A
2 . 2 WALLSN/A
2 . 3 CEILINGN/A
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORN/A
3 . 2 WALLSN/A
3 . 3 CEILINGN/A
3 . 4 COUNTERSN/A
3 . 5 SANITARY WARE/CP FITTINGSN/A
3 . 6 FITTING/FIXTURESN/A
4 . BED ROOMS
4 . 1 FLOORN/A
4 . 2 WALLSN/A
4 . 3 CEILINGN/A
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORN/A
5 . 2 WALLSN/A
5 . 3 CEILINGN/A
5 . 4 COUNTERSN/A
5 . 5 SANITARY WARE/CP FITTINGSN/A
5 . 6 FIXTURESN/A
6 . KITCHEN
6 . 1 FLOORN/A
6 . 2 WALLSN/A
6 . 3 CEILINGN/A
6 . 4 COUNTERSN/A
6 . 5 FIXTURESN/A
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN/A
7 . 2 WALLS & CEILINGN/A
7 . 3 TOILETN/A
7 . 4 BALCONYN/A
8 . SIT-OUTS
8 . 1 FLOORN/A
8 . 2 WALLS & CEILINGN/A
8 . 3 RAILINGSN/A
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT21-01-2023 View Document
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN21-01-2023 View Document
3SERVICE ESTIMATES21-01-2023 ------
4DEMARCATION PLAN21-01-2023 View Document
5CA CERTIFICATE FOR WHOLLY OWNED SUBSIDIARY21-01-2023 ------
6COPY OF LICENSE ALONG WITH SCHEDULE OF LAND21-01-2023 View Document
7SERVICE ESTIMATES APPLIED COPY21-01-2023 ------
8IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN21-01-2023 View Document
9DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD21-01-2023 View Document
10SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN21-01-2023 View Document
11A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS21-01-2023 View Document
12ZONING PLAN21-01-2023 View Document
13CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT24-01-2023 View Document
14DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.24-01-2023 View Document
15LANDSCAPE PLAN12-07-2023 ------
16APPROVED LAYOUT WITH SIZRA SUPERIMPOSED12-07-2023 ------
17LAND COST CA CERTIFICATE (PLOTS)12-07-2023 ------
18LAYOUT PLAN-ROAD12-07-2023 ------
19ELECTRICITY SUPPLY PLAN DWG12-07-2023 ------
20LAYOUT PLAN- STORM WATER12-07-2023 ------
21SERVICE ESTIMATES12-07-2023 ------
22CASH FLOW STATEMENT OF THE PROPOSED PROJECT12-07-2023 View Document
23COST INCURRED SIPL12-07-2023 ------
24LAYOUT PLAN- SEWERAGE12-07-2023 ------
25LAYOUT PLAN-WATER SUPPLY12-07-2023 ------