304, SOUTHERN PARK SAKET DISTRICT CENTRE, SAKET, NEW DELHI 110017
01142654265
8826464161 (Number Shared by Promoter in Public)
Jatin.kumar@ashianahousing.com
https://www.ashianahousing.com/
XXXX093P
L70109WB1986PLC040864
ASHIANA AMARAH PHASE 3 & 3A
REVENUE ESTATE OF VILLAGE- WAZIRPUR, SECTOR 93, DISTT. GURUGRAM, HARYANA
HARSARU ST
GURUGRAM
01142654265
8826464161 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com
JATIN KUMAR
01142654265
8826464161 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
500051
19-12-2023
883685
ICICI BANK
HRERA Gurugram
2
526665
19-02-2024
3200000
ICICI BANK
HRERA Gurugram
4.5143 (Acre)
184
182.976
22.344 (Acre)
41 of 2010 (7-06-2010)
Yes
22851.36 Lakhs
1439 Lakhs
6951.86 Lakhs
2454 Lakhs
12006.50 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
2953.684
3
CONSTRUCTION OF ROADS
4475
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
6598.394
6
GREEN BELTS
0
7
VEHICLE PARKINGS
4102.84
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
13
STREETLIGHTING
3.51
14
STROMWATERDRAINAGE
135.30
Total
18268.728
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSVP
Yes
WATER SUPPLY
GMDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
GMDA
Yes
STORM WATER DRAINAGE
GMDA
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
507
YET TO BE PREPARED
2
WATER SUPPLY SYSTEM
164
YET TO BE PREPARED
3
STORM WATER DRAINAGE
112
YET TO BE PREPARED
4
ELECTRICITY SUPPLY SYSTEM
211
YET TO BE PREPARED
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
141
YET TO BE PREPARED
6
STREET LIGHTING
31
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
104
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
8
YET TO BE PREPARED
9
CLUB HOUSE/COMMUNITY CENTRE
0
YET TO BE PREPARED
10
SHOPPING AREA
0
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
11
YET TO BE PREPARED
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
15
CONSTRUCTION AND ROAD CIRCULATION
366
YET TO BE PREPARED
16
ELECTRICITY SUBSTATION
201
YET TO BE PREPARED
17
PARKING
574
YET TO BE PREPARED
18
RAIN WATER HARVESTING
24
YET TO BE PREPARED
09-02-2024 (date)
09-02-2024 (date)
15-04-2024
16-10-2028
Plot Area(In Square Meter)
Number of plots in the project
0
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
22943.14
224
4
Apartment/Shops/Other Buildings
1625.64
92
1
Apartment/Shops/Other Buildings
161.46
13
1
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Other
0
0
0
0
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
155.38
330.38
483.44
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
473.90
484.61
589.81
720.51
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
957.56
820.26
564.48
556.47
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
528.69
270.71
15.66
0
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
0
Plots
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
70
71
Electricity Supply System
0
0
31
0
Storm Water Drainage
0
0
0
56
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Electrical Sub Station
0
0
0
22
Rain Water Harvesting
0
0
0
12
Street Light
0
0
31
0
Security and Firefighting Services
0
0
0
14
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
384
123
0
Water Supply System
164
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
42
94
Storm Water Drainage
56
0
0
0
Parks and Playgrounds
0
1
3
3
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Construction of Circulation Road
0
366
0
0
Parking
574
0
0
0
Electrical Sub Station
66
66
47
0
Renewable Energy
0
0
0
8
Rain Water Harvesting
12
0
0
0
Security and Firefighting Services
0
45
0
45
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
44
Storm Water Drainage
0
Parks and Playgrounds
1
Clubhouse/community centres
0
Shopping area
0
Other
0
Renewable Energy
3
Yes
No
ICICI BANK LIMITED AND PREET VIHAR, DELHI
777705227095
ICIC0000037
110229006
000037
Varun Gupta (Whole Time Director)
N-5, Second Floor, Panchsheel Park, New Delhi.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. ENVIRONMENTAL CLEARANCE
ALREADY BEEN OBTAINED
26-11-2021
II. FOREST NOC
ALREADY BEEN OBTAINED
29-12-2021
III. PORTABLE WATER ASSURANCE
ALREADY BEEN OBTAINED
04-08-2021
IV. AIRPORT AUTHORITY OF INDIA NOC
ALREADY BEEN OBTAINED
16-08-2021
V. CONSTRUCTION WATER NOC
ALREADY BEEN OBTAINED
23-07-2021
VI. LICENSE OF 41 OF 2010
ALREADY BEEN OBTAINED
07-06-2010
VII. ELECTRIFICATION PLAN
ALREADY BEEN OBTAINED
11-12-2023
Yes
Yes
ASHIANA ANMOL PHASE-1
3
300
0
300
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
11823.05
0
11285.86
Cost of the apartments
7465.36
0
6183.79
Cost of the infrastructure
1926.44
0
2422.33
Others costs
2431.25
0
2679.74
23173.30 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
30-10-2020
30-10-2020
ASHIANA ANMOL PLAZA-1
0.339
76
0
76
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
216.28
0
216.28
Cost of the apartments
137.92
0
137.92
Cost of the infrastructure
26.26
0
26.26
Others costs
52.1
0
52.1
180.18 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019
ASHIANA AMARAH PHASE-1 & 1A
5.041
224
0
224
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
14520.61
0
2585.93
Cost of the apartments
7087
0
423.21
Cost of the infrastructure
1718.61
0
22.98
Others costs
5715
0
1933.83
5764.18 Lakhs
19710.59 Lakhs
4000 Lakhs
4000 Lakhs
No
15-01-2027
15-01-2027
ASHIANA ANMOL PHASE-2
2.49
180
0
180
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
10876.26
0
4319.42
Cost of the apartments
4822.65
0
1640.86
Cost of the infrastructure
634.05
0
99.21
Others costs
5419.57
0
2579.35
6784.92 Lakhs
10536.84 Lakhs
0 Lakhs
0 Lakhs
No
30-04-2026
30-04-2026
ASHIANA ANMOL PHASE-3 & PLAZA PHASE II
6.7879
370
0
300
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
17555.57
0
4535.57
Cost of the apartments
7371.7
0
5.02
Cost of the infrastructure
1006.43
0
156.61
Others costs
9177.45
0
4373.94
2710.57 Lakhs
15121.27 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2028
31-12-2028
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
LIVING/DINING, ENTRANCE FOYER, CORRIDOR LEADING TO BEDROOMS: VITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800X1600), BEDROOMS AND STUDY ROOM: VITRIFIED TILES OR WOODEN TEXTURE TILE,(145 X 600) (600X600) OR (800X800) OR (600X1200),OPEN TERRACE: KOTA STONE/OTHER LOCAL STONE/CERAMIC TILES OF APPROPRIATE QUALITY/STONE MOSAIC FLOOR, STAIRCASE :CERAMIC TILES OR KOTA STONE OR COMBINATION LOCAL STONE OF APPROPRIATE SIZE.
2
WALL FINISHING DETAILS
DRAWING/DINING/BEDROOMS: SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
3
KITCHEN DETAILS
1 STAINLESS STEEL SINK WITH ONE BOWL AND A DRAIN BOARD, 1 SWIVEL TYPE SINK MIXER, 2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER, 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO, NO TAP IS PROVIDED BELOW SINK, PROVISION FOR PIPED LPG GAS WITH LPG METER WILL BE PROVIDED,KITCHEN CABINETS WITH HOB, CHIMNEY, DISHWASHER. GEYSER & EXHAUST FAN.
4
BATHROOM FITTINGS
SANITARY WARES: HINDWARE/ROCA/KOHLER/JAQUAR/AMERICAN STANDARD RAK/VITRA OR EQUIVALENT
BATH FITTINGS: BASIN MIXER, WALL MIXER AND SHOWER OF JAQUAR/ROCA/AMERICAN STANDARD/ GROHE OR EQUIVALENT, OTHER ANGLE VALVE EITHER OF CP OR PTMT OF STANDARD MAKE LIKE JAL/CONTINENTAL/PRAYAG OR EQUIVALENT.
5
WOOD WORK ETC
NOT APPLICABLE.
6
DOORS AND WINDOS FRAMES
MAIN DOOR FRAME IN MS ARE EITHER ENAMEL PAINTED/POWDER COATED. AND OTHER MS DOOR FRAMES ARE ENAMEL PAINTED OR POWDER COATED .
7
GLASS WORK
NOT APPLICABLE.
8
ELECTRIC FITTINGS
ALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS AND PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN.
MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/PANASONIC/NORTH WEST/LEGRAND OR EQUIVALENT,
9
CONDUCTING AND WIRING DETAILS
NOT APPLICABLE.
10
CUPBOARD DETAILS
NOT APPLICABLE.
11
WATER STORAGE
NOT APPLICABLE.
12
LIFT DETAILS
NOT APPLICABLE.
13
EXTERNAL GLAZINGS
CEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR EMULSION PAINT FINISH.
13.1
WINDOWS/GLAZINGS
BEDROOMS, DRAWING/DINING AND KITCHEN: 2 TO 3 TRACK ALUMINUM/UPVC FRAMED WINDOW, WITH 2 TO 3 SLIDING PANELS DEPENDING UPON SIZE WITH 6MM TOUGHENED GLASS AND PROVISION FOR FLY MESH SHUTTER.
ALL BATHROOMS/POWDER ROOM: TOP HUNG/LOUVERED WITH FROSTED GLASS/PIN HEAD NO FLY MESH SHUTTER IS BEING PROVIDED.
14
DOORS
MAIN ENTRANCE: 1 HOUR FIRE RATED MS/ WOODEN / MS IN WOODEN FINISH SHUTTER WITH HANDLE AND LOCK SYSTEM
BEDROOMS, STUDY ROOM, MASTER AND ALL OTHER TOILETS: PAINTED FLUSH DOOR OR FLUSH DOOR WITH LAMINATE OR MOULDED SKIN DOORS.
14.1
MAIN DOORS
MAIN ENTRANCE: 1 HOUR FIRE RATED MS/ WOODEN / MS IN WOODEN FINISH SHUTTER WITH HANDLE AND LOCK SYSTEM
14.2
INTERNAL DOORS
BEDROOMS, STUDY ROOM, MASTER AND ALL OTHER TOILETS: PAINTED FLUSH DOOR OR FLUSH DOOR WITH LAMINATE OR MOULDED SKIN DOORS.
15
AIR CONDITIONING
NOT APPLICABLE.
16
ELECTRICAL FITTINGS
ALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS AND PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN.
MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/PANASONIC/NORTH WEST/LEGRAND OR EQUIVALENT.
17
CNG PIPE LINE
NOT APPLICABLE.
18
PROVISION OF WIFI AND BROADBAND FACILITY
NOT APPLICABLE.
19
EXTERNAL FINISHING/COLOUR SCHEME
CEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR EMULSION PAINT FINISH.
20
INTERNAL FINISHING
GRANITE AND/OR MARBLE AND/OR QUARTZ STONE AND /VITRIFIED TILES AND/OR CERAMIC TILES AND/OR CEMENT SAND PLASTER AND/OR OTHER LOCAL STONE AND/OR COMBINATION OF ANY TWO OR MORE ITEMS WITH EMULSION PAINT FINISH (WHEREVER APPLICABLE).
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
VITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800X1600).
1 . 2
WALLS
SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
1 . 3
CEILING
PLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM.
PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY. COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
WOODEN TEXTURE VITRIFIED TILES.(196 X 1200) OR (200 X 1000).
2 . 2
WALLS
WALLS OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCKS/HOLLOW CONCRETE BLOCKS. SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
2 . 3
CEILING
PLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM
PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
2 . 4
MODULAR WARDROBES
NOT APPLICABLE
3 . MASTER TOILET
3 . 1
FLOOR
CERAMIC TILES (300X300) OR (300X600) OTHER SIZES UP TO 600X600) AND/OR COMBINATION, OR WOODEN TEXTURE TILE .(196 X 1200),(200 X 1000)
3 . 2
WALLS
CERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
3 . 3
CEILING
PLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM
PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
3 . 4
COUNTERS
NOT APPLICABLE
3 . 5
SANITARY WARE/CP FITTINGS
NOT APPLICABLE
3 . 6
FITTING/FIXTURES
1 WASH BASIN FITTED UNDER/OVER /ABOVE ON MARBLE/GRANITE /QUARTZ/ VITRIFIED TILE SLAB COUNTER OR 1 SEMI RECESSED WASH BASIN FACTORY MOULDED WITH SAME COUNTER LEDGES MENTIONED.
1 FLOOR MOUNTED EWC/ WALL HUNG EWC ALSO WITH 6 LITER CAPACITY DUAL FLUSH TYPE VITRIFIED /CONCEALED CISTERN WITH SEAT AND SEAT COVER. A GLASS PARTITION AS PER DESIGN OF THE ARCHITECT IN MASTER BATHROOM & GUEST BATHROOM ONLY. FACILITY OF VANITY BELOW WASHBASIN COUNTER IN MASTER TOILET ONLY, ETC.
4 . BED ROOMS
4 . 1
FLOOR
VITRIFIED TILES OR WOODEN TEXTURE TILE,(145 X 600) (600X600) OR (800X800) OR (600X1200).
4 . 2
WALLS
WALLS OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCKS/HOLLOW CONCRETE BLOCKS. SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
4 . 3
CEILING
PLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM
PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
4 . 4
WARDROBES
NOT APPLICABLE.
5 . TOILET
5 . 1
FLOOR
CERAMIC TILES (300X300) OR (300X600) OTHER SIZES UP TO 600X600) AND/OR COMBINATION, OR WOODEN TEXTURE TILE .(196 X 1200),(200 X 1000)
5 . 2
WALLS
CERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
5 . 3
CEILING
PLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM
PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
5 . 4
COUNTERS
NOT APPLICABLE.
5 . 5
SANITARY WARE/CP FITTINGS
NOT APPLICABLE.
5 . 6
FIXTURES
1 WASH BASIN FITTED UNDER/OVER /ABOVE ON MARBLE/GRANITE /QUARTZ/ VITRIFIED TILE SLAB COUNTER OR 1 SEMI RECESSED WASH BASIN FACTORY MOULDED WITH SAME COUNTER LEDGES MENTIONED.
1 FLOOR MOUNTED EWC/ WALL HUNG EWC ALSO WITH 6 LITER CAPACITY DUAL FLUSH TYPE VITRIFIED /CONCEALED CISTERN WITH SEAT AND SEAT COVER. A GLASS PARTITION AS PER DESIGN OF THE ARCHITECT IN MASTER BATHROOM & GUEST BATHROOM ONLY. FACILITY OF VANITY BELOW WASHBASIN COUNTER IN MASTER TOILET ONLY, ETC.
6 . KITCHEN
6 . 1
FLOOR
VITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800 X 1600).
6 . 2
WALLS
CERAMIC TILES 0.60 METER FROM COUNTERTOP. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
6 . 3
CEILING
PLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM
PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
6 . 4
COUNTERS
NOT APPLICABLE.
6 . 5
FIXTURES
1 STAINLESS STEEL SINK WITH ONE BOWL AND A DRAIN BOARD, 1 SWIVEL TYPE SINK MIXER, 2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER, 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO, NO TAP IS PROVIDED BELOW SINK, PROVISION FOR PIPED LPG GAS WITH LPG METER WILL BE PROVIDED,KITCHEN CABINETS WITH HOB, CHIMNEY, DISHWASHER. GEYSER & EXHAUST FAN.
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT