HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1474-2023
Submission Date : 10-11-2023 03:58:18 PM
Applicant Type : Company
Project Type: NEW




EMAAR INDIA LIMITED
EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR -28, GURUGRAM-122001
01244421155
9876888338 (Number Shared by Promoter in Public)
coordination.IN@emaar.ae
https://in.emaar.com/en/
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 


 
 


 
 


 
 







EMAAR BUSINESS DISTRICT 83
VILLAGE KHERKI DAULA, SECTOR 83, GURUGRAM, HARYANA
BADSHAHPUR ST
GURUGRAM
01244421155
9717776439 (Number Shared by Promoter in Public)
coordination.IN@emaar.ae
MANOJ SHARMA
01244421155
9717776439 (Number Shared by Promoter in Public)
coordination.IN@emaar.ae








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
129977030-10-20232212000HSBC BANKHRERA Gurugram







9.10625 (Acre)
1.5
1.5
9.10625 (Acre)
241 of 2023 dated 09.11.2023
No
Address     ADDRESS 306- 308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     ADDRESS 306- 308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     ADDRESS 306- 308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     ADDRESS 306- 308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     ADDRESS 306- 308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     ADDRESS 306- 308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Annexure-B- COLLABORATOR
BY VIRTUE OF COLLABORATION AGREEMENT SIGNED BEFORE GRANT OF LICENSE
No
THE DEVELOPER SHALL BE RESPONSIBLE FOR THE DEVELOPMENT OF THE SAID LAND, SUBSEQUENT TO THE GRANT OF THE LICENSE.IT UNDERTAKES TO OBTAIN ALL REQUISITE APPROVALS AND SANCTIONS SUCH AS BUILDING PLANS, DESIGNS, DRAWINGS, ETC FOR THE DEVELOPMENT OF SAID LAND, AT ITS OWN COST AND EXPENSE AND IN ACCORDANCE WITH THE APPLICABLE BYE-LAWS, RULES, AND/OR GUIDELINES AS IN FORCE BY THE STATUTORY BODIES AND AUTHORITES IN THIS REGARD.
No
Yes
Yes







17641.87 Lakhs
6654.93 Lakhs
0 Lakhs
6089 Lakhs
4897.94 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD3.18719
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS4.21879
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0.30147
6GREEN BELTS0
7VEHICLE PARKINGS0.57143
8ELECTRICITY SUB-STATION0.08649
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.07048
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.53708
13TOILET0.02076
14UGT0.06315
15RAINWATER0.04942
Total9.10626




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS482AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM196AS PER PROJECT REPORT
3STORM WATER DRAINAGE219AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM964AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL144AS PER PROJECT REPORT
6STREET LIGHTING226AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING15AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS424AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP275AS PER PROJECT REPORT
16UGT134AS PER PROJECT REPORT
17RAIN WATER HARVESTING39AS PER PROJECT REPORT
18ELECTRICAL SUB STATION64AS PER PROJECT REPORT
19ELECTRICAL PANELS482AS PER PROJECT REPORT
20MISCELLANEOUS PLOT DEMARCATION COMMERCIAL SIGNAGES EXTENSION PART ROAD HORTICULTURE WORKS 503AS PER PROJECT REPORT
21SITE INFRA COST AND SOFT COST591AS PER PROJECT REPORT
22CONTINGENCIES LC GST1213AS PER PROJECT REPORT
23PARKING54AS PER PROJECT REPORT
24TOILET BLOCK64AS PER PROJECT REPORT


10-11-2023 (date)
11-01-2024 (date)
01-11-2023
31-12-2028
Plot Area(In Square Meter)Number of plots in the project
11438
12326
10825
122.404
8415
104.406
130.091
1621


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0024.124.1
Water Supply System009.89.8
Sewerage treatment & garbage disposal7.27.214.47.2
Electricity Supply System06.131.425.3
Storm Water Drainage4.46.6021.9
Parks and Playgrounds0008.5
Clubhouse/community centres0000
Shopping area0000
Other0000
Contingencies LC GST47.352.058.666.5
Electrical Sub Station1.31.91.3
UGT2.74.06.7
STP5.58.213.7
Site Infra Cost and Soft Cost178.5178.5117117
Toilet Block1.31.91.3
Electrical Panel9.614.5
Parking1.11.6
Rain Water Harvesting1.22.7
Miscellaneous Plot Demarcation Commercial Signages Extension Part Road Horticulture Works7.1
Street Light4.5
Security and Fire Fighting0.3

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements24.124.124.124.1
Water Supply System9.89.819.69.8
Sewerage treatment & garbage disposal7.27.27.27.2
Electricity Supply System25.353.763.461.4
Storm Water Drainage10.927.310.910.9
Parks and Playgrounds16.916.921.221.2
Clubhouse/community centres0000
Shopping area0000
Other0000
Toilet Block1.93.23.23.2
Electrical Sub Station1.93.23.23.2
Rain Water Harvesting1.91.91.9
UGT13.46.76.76.7
STP27.513.713.713.7
Security and Fire Fighting0.90.61.20.8
Street Light13.69.018.111.3
Parking2.72.72.7
Miscellaneous Plot Demarcation Commercial Signages Extension Part Road Horticulture Works14.917.335.438.6
Contingencies LC GST47.147.466.262.2
Electrical Panel14.59.633.733.7

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements24.124.19.614.5
Water Supply System9.89.89.89.8
Sewerage treatment & garbage disposal7.214.414.42.9
Electricity Supply System3561.43535
Storm Water Drainage10.910.921.921.9
Parks and Playgrounds21.242.421.242.4
Clubhouse/community centres0000
Shopping area0000
Other0000
Parking2.72.72.71.1
Security and Fire Fighting1.50.80.80.8
Street Light22.611.311.311.3
Contingencies LC GST54.266.852.654.6
Miscellaneous Plot Demarcation Commercial Signages Extension Part Road Horticulture Works25.425.425.425.4
Electrical Panel28.924.124.124.1
Toilet Block3.29.66.43.2
Electrical Sub Station9.66.43.2
Rain Water Harvesting1.91.93.9
UGT6.76.76.76.7
STP13.713.713.713.7

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements14.59.648.224.1
Water Supply System9.89.89.89.8
Sewerage treatment & garbage disposal4.37.27.27.2
Electricity Supply System28.463.439.175.1
Storm Water Drainage4.46.621.910.9
Parks and Playgrounds21.242.421.221.2
Clubhouse/community centres0000
Shopping area0000
Other0000
UGT6.76.76.76.7
Contingencies LC GST44.464.372.268.7
Miscellaneous Plot Demarcation Commercial Signages Extension Part Road Horticulture Works25.437.450.647.3
Electrical Panel24.124.148.224.1
Toilet Block3.21.91.31.3
Electrical Sub Station3.21.91.31.3
Rain Water Harvesting3.93.93.93.9
STP13.713.713.713.7
Security and Fire Fighting0.80.80.8
Street Light11.311.311.322.6
Parking4.32.75.45.4

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements9.614.572.372.3
Water Supply System19.69.819.60
Sewerage treatment & garbage disposal7.27.200
Electricity Supply System81.281.281.281.2
Storm Water Drainage10.910.900
Parks and Playgrounds12.742.429.721.2
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light11.311.311.322.6
STP13.727.527.50
Contingencies LC GST60.679.686.964.3
Miscellaneous Plot Demarcation Commercial Signages Extension Part Road Horticulture Works47.347.329.86.6
Electrical Panel9.638.548.248.2
Toilet Block5.16.46.40
Electrical Sub Station5.16.46.40
Rain Water Harvesting0000
UGT6.713.413.40
Security and Fire Fighting0.80.80.81.5
Parking2.75.4












Yes
No
AXIS BANK LTD., DLF CYBER CITY BRANCH, UNIT 2G, BUILDING NO. 10, TOWER C, GURGAON-122002
922020019151651
UTIB0004761
110211350
4761
Rahul Bindle E303, Park View City 1, Sector 48, Sohna, Gurugram
Attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. APPROVAL OF LICENSEALREADY BEEN OBTAINED09-11-2023
II. APPROVAL OF LAYOUTALREADY BEEN OBTAINED10-11-2023
III. APPROVAL OF STANDARD DESIGNALREADY BEEN OBTAINED11-01-2024
IV. APPROVAL OF SERVICE PLAN ESTIMATESALREADY BEEN OBTAINED19-01-2024








Yes


Yes


As per draft prescribed by RERA Authority.







EMAAR BUSINESS DISTRICT 99 (EBD 99), SECTOR 99, GURUGRAM, HARYANA
3.26875
0
35
0
26
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
548785057744
Cost of the apartments000
Cost of the infrastructure128412841031
Others costs420372216713


124 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
17-08-2026
17-08-2026




EMAAR BUSINESS DISTRICT 114 (EBD 114), SECTOR 114, GURUGRAM, HARYANA
6.40625
0
86
0
86
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
9463112869579
Cost of the apartments000
Cost of the infrastructure345328222678
Others costs601084646901


25032 Lakhs
976 Lakhs
0 Lakhs
9362 Lakhs
No
11-03-2026
11-03-2026




EMAAR BUSINESS DISTRICT 75A, SECTOR 75, GURUGRAM, HARYANA
4.55625
0
55
0
33
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
814382804927
Cost of the apartments000
Cost of the infrastructure26453261630
Others costs549850194297


2748 Lakhs
905 Lakhs
0 Lakhs
1885.01 Lakhs
No
23-08-2027
23-08-2027




EMAAR BUSINESS DISTRICT 89 (EBD 89), SECTOR 89, GURUGRAM, HARYANA
3.70625
0
52
0
52
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
7289.3167775777
Cost of the apartments000
Cost of the infrastructure2091.6725521807
Others costs5197.6442253970


1368 Lakhs
513 Lakhs
0 Lakhs
5271 Lakhs
No
17-08-2026
17-08-2026




EMAAR BUSINESS DISTRICT 89NXT (EBD 89NXT), SECTOR 89, GURUGRAM, HARYANA
2.99375
0
32
0
31
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
446153334967
Cost of the apartments000
Cost of the infrastructure141814181174
Others costs304339153793


2421 Lakhs
655 Lakhs
0 Lakhs
4360 Lakhs
No
17-08-2026
17-08-2026




EMAAR BUSINESS DISTRICT 99 NXT (EBD 99 NXT), SECTOR 99, GURUGRAM, HARYANA
3.59375
0
39
0
39
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
939791757417
Cost of the apartments000
Cost of the infrastructure1922.423101067
Others costs7474.668656350


485 Lakhs
964 Lakhs
0 Lakhs
3790 Lakhs
No
17-08-2026
17-08-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1DEMARCATION PLAN02-11-2023 View Document
2ZONING PLAN02-11-2023 View Document
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT02-11-2023 View Document
4DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.02-11-2023 View Document
5COPY OF LICENSE ALONG WITH SCHEDULE OF LAND10-11-2023 View Document
6IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN10-11-2023 View Document
7CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT10-11-2023 View Document
8IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN10-11-2023 View Document
9BUILDING PLAN-123-05-2024 ------
10BUILDING PLAN-523-05-2024 ------
11APPROVAL OF STANDARD DESIGN23-05-2024 ------
12SERVICE PLAN ESTIMATE DRAWING 223-05-2024 ------
13BUILDING PLAN-1923-05-2024 ------
14BUILDING PLAN-2023-05-2024 ------
15SERVICE ESTIMATE REPORT23-05-2024 ------
16SERVICE PLAN ESTIMATE DRAWING 123-05-2024 ------
17BUILDING PLAN-423-05-2024 ------
18BUILDING PLAN-723-05-2024 ------
19BUILDING PLAN-1023-05-2024 ------
20BUILDING PLAN-1223-05-2024 ------
21JAMABANDI, MUTATION AND SHAJRA23-05-2024 ------
22BUILDING PLAN-923-05-2024 ------
23BUILDING PLAN-2123-05-2024 ------
24BUILDING PLAN-2223-05-2024 ------
25BUILDING PLAN-1123-05-2024 ------
26BUILDING PLAN-1823-05-2024 ------
27SERVICE PLAN ESTIMATE DRAWING 323-05-2024 ------
28SERVICE PLAN ESTIMATE DRAWING 523-05-2024 ------
29EBD LAND TITLE SEARCH REPORT23-05-2024 ------
30BUILDING PLAN-1523-05-2024 ------
31BUILDING PLAN-823-05-2024 ------
32BUILDING PLAN-1623-05-2024 ------
33BUILDING PLAN-223-05-2024 ------
34BUILDING PLAN-323-05-2024 ------
35NEC FOR RERA23-05-2024 ------
36BUILDING PLAN-623-05-2024 ------
37SERVICE PLAN ESTIMATE DRAWING 423-05-2024 ------
38BUILDING PLAN-1323-05-2024 ------
39BUILDING PLAN-1423-05-2024 ------
40BUILDING PLAN-1723-05-2024 ------
41APPROVAL OF SERVICE PLAN ESTIMATE FROM DTCP23-05-2024 ------
42SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN23-05-2024 View Document