HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1242-2022
Submission Date : 20-12-2022 02:02:41 PM
Applicant Type : Company
Project Type: NEW




LOON LAND DEVELOPMENT LIMITED
OFFICE NO. 1221-A, DEVIKA TOWER, 12TH FLOOR, 6, NEHRU PLACE, NEW DELHI DL 110019 IN
01244732000
9711348349 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com
https://loonlanddevelopment.com/
XXXX705A
U70109DL2014PLC267465
 
 


 
 


 
 


 
 


 
 







M3M ANTALYA HILLS PHASE 1
SECTOR 79, GURUGRAM
MANESAR
GURUGRAM
01244732000
9711348349 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com
SHISHIR KUMAR
01244732000
8376848355 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150072716-12-20221471100ICICI BANK LIMITED HRERA Gurugram
250073016-12-2022557300ICICI BANK LIMITED HRERA Gurugram







8.7111 (Acre)
2.64
2.61
8.7111 (Acre)
194 of 2022 dated 29.11.2022
Yes







38823.00 Lakhs
8876.82 Lakhs
19053.57 Lakhs
2823.96 Lakhs
6482.19 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS5.215
3CONSTRUCTION OF ROADS2.3971
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0.6530
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.0980
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.348
Total8.7111




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS417.63AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM208.89AS PER PROJECT REPORT
3STORM WATER DRAINAGE79.47AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM497.67AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL237.23AS PER PROJECT REPORT
6STREET LIGHTING33.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING81.43AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS5.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER478.43AS PER PROJECT REPORT
15PARKING6.36AS PER PROJECT REPORT
16SEWERAGE TREATMENT PLANT63.75AS PER PROJECT REPORT
17UNDERGROUND WATER TANK50.00AS PER PROJECT REPORT
18RAIN WATER HARVESTING 39.20AS PER PROJECT REPORT
19ELECTRICAL SUB STATION 625.90AS PER PROJECT REPORT


29-11-2022 (date)
20-12-2022 (date)
01-01-2023
31-12-2025
Plot Area(In Square Meter)Number of plots in the project
21106.161159


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings50047.946360





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
EDC449.96
Land7323.90
Other257.22

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments529.62807.921303.911849.67
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2652.442815.202729.542708.12
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2221.331435.810
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements25.0641.76
Water Supply System12.5320.89
Sewerage treatment & garbage disposal14.2323.72
Electricity Supply System34.8449.77
Storm Water Drainage5.567.95
Parks and Playgrounds0.350.50
Clubhouse/community centres00
Shopping area00
Other00
Rain Water Harvesting1.963.92
Electrical sub station62.59
Sewage Treatment plant6.38
Underground Water Tank5.00
Street Light3.30
Electrical Sub Station62.59

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements83.5383.5383.5341.76
Water Supply System41.7841.7841.7820.89
Sewerage treatment & garbage disposal47.4547.4547.4523.72
Electricity Supply System74.6599.5374.6559.72
Storm Water Drainage11.9215.8911.9211.92
Parks and Playgrounds0.751.00.750.75
Clubhouse/community centres0000
Shopping area0000
Other0095.6995.69
Security and Fire Fighting00024.43
Underground Water Tank5.00000
Parking001.591.59
Rain Water Harvesting3.927.847.847.84
Sewage Treatment Plant6.380012.75
Street Light3.303.306.606.60
Electrical sub station62.5900125.18

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements33.4125.06
Water Supply System16.7112.53
Sewerage treatment & garbage disposal18.9814.23
Electricity Supply System59.7244.79
Storm Water Drainage8.745.56
Parks and Playgrounds0.550.35
Clubhouse/community centres00
Shopping area00
Other95.69143.53
Parking1.591.59
Sewage Treatment Plant19.1319.13
Electrical sub station125.18187.77
Street Light6.603.30
Rain Water Harvesting3.921.96
Security and Fire Fighting24.4332.57
Underground Water Tank15.0015.00












Yes
No
ICICI BANK , TEE POINT , SEC 65 , GURUGRAM
777705670555
ICIC0007242
110229338
007242
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 AreraColony Bhopal M.P. 462016 2) MS. Amarjot Kaur Sahni-3/66Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi-House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon,Haryana- 122002 4) Ms. Surbhi- Flat No-3-905, 9th floor,Sector-103, grandiva, Daultabad, Gurgaon, Haryana-1220065) Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad,Haryana- 121001 6) Mr. Pratap Singh-10A Pocket 2 MayurVihar East Delhi 110096 7) Mr. Pradeep Kumar Katiyar- 357,Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, UP
Yes











Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED07-12-2022
II. FOREST NOCALREADY BEEN OBTAINED15-03-2022
III. ASSURANCE WATER SUPPLYALREADY BEEN OBTAINED11-11-2022
IV. ASSURANCE SEWAGE DISPOSALALREADY BEEN OBTAINED27-10-2022
V. ASSURANCE STORM WATER DRAINAGEALREADY BEEN OBTAINED24-11-2022
VI. BUILDING PLAN APPROVALALREADY BEEN OBTAINED20-12-2022








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATE WOODEN FOR BEDROOM ; ANTISKID CERAMIC TILES FOR TOILET
2WALL FINISHING DETAILSPLASTER AND OBD
3KITCHEN DETAILSVITRIFIED TILES, PLASTER AND OBD
4BATHROOM FITTINGSAS PER APPROVED MAKE
5WOOD WORK ETCFLUSH DOOR FOR ENTRANCE AND INTERNAL DOORS, FINISHED WITH LAMINATE/VENEER
6DOORS AND WINDOS FRAMESUPVC / ALUMINIUM POWDER COATED FOR EXTERNAL
7GLASS WORKEXTERNAL DOORS AND WINDOWS, RAILINGS AS PER DESIGN
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSWOODEN WITH LAMINATE/VENEER
11WATER STORAGEPVC TANK; UGT
12LIFT DETAILS4 TO 6 PASSENGER LIFTS AS PER NORMS
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSALUMINUM GLAZING / UPVC GLAZING
14DOORSWOODEN WITH LAMINATE/VENEER
14.1MAIN DOORSWOODEN WITH LAMINATE/VENEER
14.2INTERNAL DOORSWOODEN WITH LAMINATE/VENEER
15AIR CONDITIONINGPROVISION ONLY
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINEPROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEAS PER APPROVED DESIGN
20INTERNAL FINISHINGPLASTER AND OBD
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES / LAMINATE WOODEN / CERAMIC TILE
1 . 2 WALLSPLASTER WITH OBD
1 . 3 CEILINGOBD AND PUTTY
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES / LAMINATE WOODEN
2 . 2 WALLSPLASTER AND OBD
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESWOODEN WITH LAMINATE/VENEER
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER AND DADO
3 . 3 CEILINGGRID FALSE CEILING / OBD
3 . 4 COUNTERSAS PER APPROVED MAKE
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES / LAMINATE WOODEN
4 . 2 WALLSPLASTER AND OBD
4 . 3 CEILINGOBD
4 . 4 WARDROBESWOODEN WITH LAMINATE/VENEER
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER AND DADO
5 . 3 CEILINGOBD
5 . 4 COUNTERSAS PER APPROVED MAKE
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER AND DADO ABOVE COUNTER
6 . 3 CEILINGOBD
6 . 4 COUNTERSAS PER APPROVED MAKE
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCESAS PER APPROVED MAKE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTISKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPLASTER AND PAINT
7 . 3 TOILETANTISKID CERAMIC TILES
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 FOREST NOC16-12-2022 ------
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN20-12-2022 View Document
3APPROVED BUILDING PLAN TYPE-A2 (LCP)19-12-2022 ------
4APPROVED BUILDING PLAN TYPE-P819-12-2022 ------
5ASSURANCE STORM WATER19-12-2022 ------
6COPY OF LICENSE ALONG WITH SCHEDULE OF LAND16-12-2022 View Document
7 ASSURANCE SEWAGE CONNECTION16-12-2022 ------
8APPROVED BUILDING PLAN TYPE-P119-12-2022 ------
9ASSURANCE DRINKING WATER16-12-2022 ------
10APPROVED BUILDING PLAN TYPE-C ()19-12-2022 ------
11APPROVED BUILDING PLAN TYPE-A (LCP)19-12-2022 ------
12APPROVED BUILDING PLAN TYPE-A1 (LCP)19-12-2022 ------
13APPROVED BUILDING PLAN TYPE-B (LCP)19-12-2022 ------
14APPROVED BUILDING PLAN TYPE-C (LMP)19-12-2022 ------
15APPROVED BUILDING PLAN TYPE-A (LCP)19-12-2022 ------
16SEWAGE LAYOUT PLAN16-12-2022 ------
17APPROVED BUILDING PLAN TYPE-P219-12-2022 ------
18APPROVED BUILDING PLAN TYPE-B (LCP)19-12-2022 ------
19NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT16-12-2022 View Document
20IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN16-12-2022 View Document
21 LANDSCAPE PLAN16-12-2022 ------
22APPROVED BUILDING PLAN TYPE-B (LCP)19-12-2022 ------
23SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN19-12-2022 View Document
24STORM WATER DRAINAGE LAYOUT PLAN20-12-2022 ------
25CASH FLOW STATEMENT OF THE PROPOSED PROJECT22-12-2022 View Document
26PERT CHART22-12-2022 ------
27DEMARCATION PLAN16-12-2022 View Document
28ZONING PLAN16-12-2022 View Document
29LOI16-12-2022 ------
30 ROAD LAYOUT PLAN16-12-2022 ------
31ENVIRONMENT CLEARANCE16-12-2022 ------
32ELECTRIC LOAD ASSURANCE16-12-2022 ------
33ASSURANCE CONSTRUCTION WATER16-12-2022 ------
34ARAVALI NOC16-12-2022 ------
35 WATER SUPPLY PLAN16-12-2022 ------
36APPROVED BUILDING PLAN TYPE-A2 (LCP)19-12-2022 ------
37APPROVED BUILDING PLAN TYPE-A2 (LCP)19-12-2022 ------
38APPROVED BUILDING PLAN TYPE-P419-12-2022 ------
39APPROVED BUILDING PLAN TYPE-P1020-12-2022 ------
40BRIII- ALL TYPES23-12-2022 ------
41APPROVED BUILDING PLAN TYPE-A (LCP)19-12-2022 ------
42APPROVED BUILDING PLAN TYPE-B (LCP)19-12-2022 ------
43APPROVED BUILDING PLAN TYPE-B1 (LCP)19-12-2022 ------
44APPROVED BUILDING PLAN TYPE-B1 (LCP)19-12-2022 ------
45APPROVED BUILDING PLAN TYPE-D (LMP)19-12-2022 ------
46APPROVED BUILDING PLAN TYPE-P619-12-2022 ------
47DTP MAILS- ALL PLOT TYPES 23-12-2022 ------
48APPROVED BUILDING PLAN TYPE-P1120-12-2022 ------
49DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD19-12-2022 View Document
50APPROVED BUILDING PLAN TYPE-C (LCP)19-12-2022 ------
51APPROVED BUILDING PLAN TYPE-P319-12-2022 ------
52APPROVED BUILDING PLAN TYPE-P919-12-2022 ------
53DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.20-12-2022 View Document
54ELECTRICITY LAYOUT PLAN20-12-2022 ------
55APPROVED BUILDING PLAN TYPE-P719-12-2022 ------
56APPROVED BUILDING PLAN TYPE-A (LCP)19-12-2022 ------
57APPROVED BUILDING PLAN TYPE-A1 (LCP)19-12-2022 ------
58APPROVED BUILDING PLAN TYPE-A2 (LCP)19-12-2022 ------
59APPROVED BUILDING PLAN TYPE-B1 (LCP)19-12-2022 ------
60APPROVED BUILDING PLAN TYPE-B1 (LCP)19-12-2022 ------
61APPROVED BUILDING PLAN TYPE-D (RMP)19-12-2022 ------
62APPROVED BUILDING PLAN TYPE-P519-12-2022 ------
63A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS20-12-2022 View Document
64APPROVED BUILDING PLAN TYPE-P1220-12-2022 ------
65CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT20-12-2022 View Document
66DTP MAIL23-12-2022 ------
67SUPERIMPOSED DEMARCATION ON APPROVED LAYOUT PLAN22-12-2022 ------