HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1141-2022
Submission Date : 06-09-2022 01:15:04 PM
Applicant Type : Company
Project Type: NEW




M/S ORCHID INFRASTRUCTURE DEVELOPERS PVT. LTD.
LEVEL-II GLOBAL ARCADE, MEHRAULI GURUGRAM ROAD, GURUGRAM, HARYANA
01244590000
9310088046 (Number Shared by Promoter in Public)
Legal@oidpl.com
https://www.oidpl.com
XXXX370M
U40102DL1993PTC052875
 
 


 
 


 
 







ORCHID IVY- 2
M-BLOCK, SECTOR-51, GURUGRAM
GURGAON
GURUGRAM
01244590000
9310088104 (Number Shared by Promoter in Public)
legal@oidpl.com
DEEPAK KUMAR
01244590000
9818482207 (Number Shared by Promoter in Public)
D.kumar@oidpl.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
11985231-08-2022401000HDFCHRERA Gurugram







4387.69 (Sqr/mtrs)
11160.08
256
4387.69 (Sqr/mtrs)
N/A
No
Address     N/A
Annexure-B- ANNEXURE-B- BY VIRTUE OF SUIT FOR DECLARATION FOR CONSEQUENTIAL RELIEF FOR PERMANENT INJUNCTION BY WAY OF COURT DECREE DATED 12.04.2022.
N/A
No
N/A
Yes
No
Yes







10818.11 Lakhs
1456.11 Lakhs
5908 Lakhs
0 Lakhs
3454 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS4387.69
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total4387.69




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY LAID AND EXISTING ROADS AND INFRASTRUCTURE WORKSYes
WATER SUPPLYALREADY LAID AND EXISTING WATER SUPPY AND INFRASTRUCTURE WORKSYes
ELECTRICITYALREADY LAID AND EXISTING ELECTRICITY AND INFRASTRUCTURE WORKSYes
SEWAGE DISPOSALALREADY LAID AND EXISTING SEWAGE AND INFRASTRUCTURE WORKSYes
STORM WATER DRAINAGEALREADY LAID AND EXISTING STORM WATER DRAINAGE AND INFRASTRUCTURE WORKSYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM0AS PER PROJECT REPORT
3STORM WATER DRAINAGE0AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL0AS PER PROJECT REPORT
6STREET LIGHTING0AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT


24-10-2017 (date)
13-05-2022 (date)
15-10-2022
31-12-2026
Plot Area(In Square Meter)Number of plots in the project
208.754
223.598
293.996


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings9955.337218





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments375
Shops0
Plots0

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments425625625725
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments725625625525
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments625625525525
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments525400300150.88
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2026)
Apr-JuneJuly-SepOct-DecJan-Mar












Yes
No
ICICI BANK, ADDRESS- UNIT NO. 2, SOLITAIRE PLAZA, DLF PHASE-3, M.G.ROAD, GURUGRAM
777705001662
ICICI0002451
110229222
2451
MR. AJAY GOEL (DIRECTOR) ADDRESS- H.NO. D-146, SECTOR-27, BLOCK-D NOIDA UTTAR PRADESH & MR. ANIL BEHL (EXECUTIVE DIRECTOR) ADDRESS- H.NO.240, SECTOR-16A, KHERI KALAN FARIDABAD, HARYANA
YES











Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLAN M-746ALREADY BEEN OBTAINED03-05-2022
II. BUILDING PLAN M-747ALREADY BEEN OBTAINED03-05-2022
III. BUILDING PLAN M-748ALREADY BEEN OBTAINED03-05-2022
IV. BUILDING PLAN M-749ALREADY BEEN OBTAINED03-05-2022
V. BUILDING PLAN M-750ALREADY BEEN OBTAINED03-05-2022
VI. BUILDING PLAN M-751ALREADY BEEN OBTAINED03-05-2022
VII. BUILDING PLAN M-752ALREADY BEEN OBTAINED03-05-2022
VIII. BUILDING PLAN M-753ALREADY BEEN OBTAINED03-05-2022
IX. BUILDING PLAN M-754ALREADY BEEN OBTAINED19-10-2021
X. BUILDING PLAN M-755ALREADY BEEN OBTAINED03-05-2022
XI. BUILDING PLAN M-756ALREADY BEEN OBTAINED03-05-2022
XII. BUILDING PLAN M-757ALREADY BEEN OBTAINED03-05-2022
XIII. BUILDING PLAN M-794ALREADY BEEN OBTAINED13-05-2022
XIV. BUILDING PLAN M-795ALREADY BEEN OBTAINED13-05-2022
XV. BUILDING PLAN M-796ALREADY BEEN OBTAINED19-10-2021
XVI. BUILDING PLAN M-797ALREADY BEEN OBTAINED13-05-2022
XVII. BUILDING PLAN M-798ALREADY BEEN OBTAINED13-05-2022
XVIII. BUILDING PLAN M-799ALREADY BEEN OBTAINED13-05-2022








Yes


Yes


AS PER RERA SAMPLE













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE /VITRIFIED TILES/MATT FINISH TILES/ ANTI SKID CERAMIC TILES
2WALL FINISHING DETAILSPOP PUNNING FINISH WITH PLASTIC /ACRYLIC EMULSION PAINT/OBD
3KITCHEN DETAILSMODULAR KITCHEN WITH SS SKIP AND C.P FITTING, CERAMIC TILES IN DDO 2FT. ABOVE GRANITE COUNTER
4BATHROOM FITTINGSSUPERIOR CHINAWARE AND C.P FITTINGS
5WOOD WORK ETCSEASONED WOOD DOOR FRAMES
6DOORS AND WINDOS FRAMESWINDOWS FRAMES IN POWDER COATED ALUMINIUM OR EQUIVALENT /UPVC AND DOOR FRAMES IN MARANDI/ HARDWOOD
7GLASS WORK4-6 MM THICK GLASS WORK IN WINDOWS FLAZING
8ELECTRIC FITTINGSSUPERIOR ISI APPROVED/ EQUIVALENT FITTINGS
9CONDUCTING AND WIRING DETAILSPVC CONDUIT AND COPPER WIRING
10CUPBOARD DETAILSN/A
11WATER STORAGEAS PER DESIGN
12LIFT DETAILSPASSENGER ELEVATOR -08 PERSONS
13EXTERNAL GLAZINGSPOWDER COATED AL/UPVC WITH 4-6 MM THICK GLASS
13.1WINDOWS/GLAZINGS4-6 MM THICK GLASS
14DOORSFLUSH DOOR SHUTTERS
14.1MAIN DOORSMODULAR FLUSH DOOR/ PANELE DOOR
14.2INTERNAL DOORSFLUSH DOORS/ LAMINATED FLUSH DOORS
15AIR CONDITIONINGSPILT INVERTER ACS
16ELECTRICAL FITTINGSALL MODULAR SWITCHES, SOCKETS AND FIXTURES
17CNG PIPE LINEPROVISION TO BE LEFT
18PROVISION OF WIFI AND BROADBAND FACILITYTO BE PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEMEWPC/TEXTTURED PAINT
20INTERNAL FINISHINGACRYLIC/PLASTIC EMULSION PAINT/ OBD
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOOR18 MM IMPORTED MARBLE / EQUIVALENT MARBLE
1 . 2 WALLSPOP PUNNING WITH PLASTIC / ACRYLIC EMULSION PAINT
1 . 3 CEILINGPOP PUNNING WITH OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOOR18 MM IMPORTED MARBLE/ EQUIVALENT MARBLE
2 . 2 WALLSPOP PUNNING WITH PLASTIC / ACRYLIC EMULSIPON PAINT
2 . 3 CEILINGPOP PUNNING WITH OBD
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORMATT FINISH TILES 2FT. X 2FT.
3 . 2 WALLSCERAMIC/PORCELAN TILES 2FT. X 1FT. UPTO 7 FT. HIGH
3 . 3 CEILINGM R PAINTED FALSE CEILING WITH TRAP DOOR FOR SERVICING
3 . 4 COUNTERSGRANITE / EQUIVALENT STONE
3 . 5 SANITARY WARE/CP FITTINGSBRANDED SANITART WARE AND C.P FITTINGS
3 . 6 FITTING/FIXTURESREPUTED BRANDS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES 2FT. X 2FT. WITH 3FT. HIGH SKIRTING
4 . 2 WALLSPOP P[UNNING WITH PLASTIC /ACRYLIC EMULSION PAINT
4 . 3 CEILINGPOP PUNNING WITH OBD PAINT
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORMATT FINISH TILES 2FT. X 2FT.
5 . 2 WALLSCERAMIC/PORCELAIN TILES 2FT. X 1FT. UPTO 7FT. HIGH
5 . 3 CEILINGM R PAINTED FALSE CELING WITH SERVICE TRAP DOOR
5 . 4 COUNTERSGRANITE/EQUIVALENT STONE
5 . 5 SANITARY WARE/CP FITTINGSREPUTED BRAND
5 . 6 FIXTURESREPUTED BRAND
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES FLOORING SAME TILE SKIRTING 3FT. HIGH
6 . 2 WALLSPORCELAIN/CERAMIC TILES 2FT. ABOVE COUNTER TOP, REST IN POP PUNNING WITH EMULSION PAINT
6 . 3 CEILINGPOP PUNNING WITH OBD PAINT
6 . 4 COUNTERSGRANITE COUNTER WITH SS DOUBLE BOWL SKIN WITH FIXTURE AND FITTED WITH MODULAR KITCHEN
6 . 5 FIXTURESREPUTED BRAND
6 . 6 KITCHEN APPLIANCESHOB AND CHIMENY
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI SKID CERAMIC TILE WITH 4 FT. HIGH SKIRTING
7 . 2 WALLS & CEILINGPOP WITH OBD PAINT
7 . 3 TOILETPLAIN CERAMIC TILE UPTO 4 FT. HIGH AND REST IN POP PUNNING WITH OBD PAINT
7 . 4 BALCONYANTI SKID CERAMIC TILES WITH M.S/ TOUGHENED GLASS METAL RAILING
8 . SIT-OUTS
8 . 1 FLOORANTI SKID CERAMIC TILES WITH 4 FT. HIGH SKIRTING
8 . 2 WALLS & CEILINGEXTERNAL TEXTURE PAINT POP PUNNING WITH OBD
8 . 3 RAILINGSM.S METAL /GLASS
8 . 4 FIXTURESREPUTED BRAND












Sr. No.Document DescriptionDate of Document UploadView Document
1755, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
2IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN30-08-2022 View Document
3794, SITE PLAN & FLOOR PLANS31-08-2022 ------
4746, BASEMENT & FLOOR PLANS31-08-2022 ------
5797, SITE PLAN & FLOOR PLANS31-08-2022 ------
6747, FRONT ELEVATION & FLOOR PLANS31-08-2022 ------
7757, SECTION & REAR ELEVATION31-08-2022 ------
8798, REAR ELEVATION & SECTION31-08-2022 ------
9SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN30-08-2022 View Document
10748, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
11796, FRONT ELEVATION & 4TH FLOOR, BASEMENT, TERRACE PLANS31-08-2022 ------
12798, FRONT ELEVATION & FLOOR PLANS31-08-2022 ------
13COPY OF LICENSE ALONG WITH SCHEDULE OF LAND30-08-2022 View Document
14DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD30-08-2022 View Document
15IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN30-08-2022 View Document
16DEMARCATION PLAN30-08-2022 View Document
17747, SECTION & REAR ELEVATION31-08-2022 ------
18752, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
19754, SITE PLAN & STILT TO 3RD FLOOR31-08-2022 ------
20794 REAR ELEVATION & SECTION31-08-2022 ------
21ZONING PLAN30-08-2022 View Document
22A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS30-08-2022 View Document
23746, SECTION & REAR ELEVATION30-08-2022 ------
24746, SITE PLAN & FLOOR PLANS31-08-2022 ------
25747, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR )31-08-2022 ------
26748, SECTION & REAR ELEVATION31-08-2022 ------
27748, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR )31-08-2022 ------
28749, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
29749, SECTION & REAR ELEVATION31-08-2022 ------
30749, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR)31-08-2022 ------
31750, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
32750, SECTION & REAR ELEVATION31-08-2022 ------
33750, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR )31-08-2022 ------
34751, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
35751, SECTION & REAR ELEVATION31-08-2022 ------
36751, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR )31-08-2022 ------
37752, SECTION & REAR ELEVATION31-08-2022 ------
38752, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR )31-08-2022 ------
39753, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
40753, SECTION & REAR ELEVATION31-08-2022 ------
41753, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR31-08-2022 ------
42754, FRONT ELEVATION & 4TH FLOOR, BASEMENT, TERRACE PLANS31-08-2022 ------
43754, REAR ELEVATION & SECTIONS31-08-2022 ------
44755, SECTION & REAR ELEVATION31-08-2022 ------
45755, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR )31-08-2022 ------
46756, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
47756, SECTION & REAR ELEVATION31-08-2022 ------
48756, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR )31-08-2022 ------
49757, BASEMENT, 4TH FLOOR, TERRACE & FRONT ELEVATION31-08-2022 ------
50757, SITE PLAN & FLOOR PLANS ( STILT TO 3RD FLOOR31-08-2022 ------
51794 FRONT ELEVATION & FOURTH FLOOR PLAN31-08-2022 ------
52795, FRONT ELEVATION & FLOOR PLANS31-08-2022 ------
53795, GROUND AND ELEVATION PLAN31-08-2022 ------
54795, REAR ELEVATION & SECTION31-08-2022 ------
55796, REAR ELEVATION & SECTIONS31-08-2022 ------
56796, SITE PLAN & STILT TO 3RD FLOOR PLANS31-08-2022 ------
57797, FRONT ELEVATION & FLOOR PLANS31-08-2022 ------
58797, REAR ELEVATION & SECTION31-08-2022 ------
59798, SITE PLAN & FLOOR PLANS31-08-2022 ------
60799, FRONT ELEVATION & FLOOR PLAN31-08-2022 ------
61799, REAR ELEVATION & SECTION31-08-2022 ------
62799, SITE PLAN & FLOOR PLANS31-08-2022 ------
63DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.01-09-2022 View Document
64CASH FLOW STATEMENT OF THE PROPOSED PROJECT06-09-2022 View Document
65NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT03-10-2022 View Document
66CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT03-10-2022 View Document
67COURT DECREE- ORCHID03-10-2022 ------
68CARPET AREA & BALCONY DETAILS SIGNED BY PROMOTER03-10-2022 ------
69CARPET AREA & BALCONY DETAILS-ARCHITECT03-10-2022 ------