HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1153-2022
Submission Date : 14-09-2022 01:24:01 PM
Applicant Type : Company
Project Type: NEW




UNION BUILDMART PRIVATE LIMITED
6TH FLOOR, M3M TEE POINT, NORTH BLOCK, SECTOR-65, GURUGRAM, HARYANA 122101
01244732000
9711348349 (Number Shared by Promoter in Public)
unionbuildmart0207@gmail.com
http://unionbuildmart.com
XXXX843M
U70100HR2012PTC089615
 
 


 
 


 
 


 
 







M3M CAPITAL PHASE -2
SECTOR -113, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA.
GURGAON
GURUGRAM
01244732000
9711348349 (Number Shared by Promoter in Public)
unionbuildmart0207@gmail.com
LALIT TYAGI
01244732000
9711348349 (Number Shared by Promoter in Public)
unionbuildmart0207@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150100014-09-20222464150ICICI BANKHRERA Gurugram
250099814-09-20221485100ICICI BANKHRERA Gurugram
35010014-09-202267650FEE ADJUSTED TO PROJECT TEMP ID. 1157-2022HRERA Gurugram
450099814-09-202226100FEE ADJUSTED TO PROJECT TEMP ID. 1157-2022HRERA Gurugram







7.7139 (Acre)
3.812
2.406
15.03125 (Acre)
106 of 2021 dated16.12.2021
No
Address     CABIN-2,LGF,F-22,SUSHANT SHOPPING ARCADE, SUSHANT LOK PHASE-1,GURUGRAM-122002 HARYANA
Address     CABIN-2,LGF,F-22,SUSHANT SHOPPING ARCADE, SUSHANT LOK PHASE-1,GURUGRAM-122002 HARYANA
Address     6TH FLOOR, M3M TEE POINT, NORTH BLOCK, SECTOR- 65,GURUGRAM GURGAON HR 122101 IN
Annexure-B- COLLABORATOR VIDE DEVELOPMENT RIGHTSAGREEMENT 7322 DATED 07.10.2019
BEFORE GRANT OF LICENCE
Yes
AS ATTACHED IN FOLDER A
No
Yes
Yes







144896.81 Lakhs
44058.54 Lakhs
71820.38 Lakhs
3897.82 Lakhs
25120.06 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.42
3CONSTRUCTION OF ROADS 3.44
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0.47
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0.4
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13AREAUNDERCOMMERCIALUNITS 2.98
Total7.71




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS443.0AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM230.86AS PER PROJECT REPORT
3STORM WATER DRAINAGE101.73AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM548.53AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL429.55AS PER PROJECT REPORT
6STREET LIGHTING59.84AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING464.48AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS547.0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP OTHER THAN STRUCTURAL WORKS260.23AS PER PROJECT REPORT
16UNDERGROUND TANK OTHER THAN STRUCTURAL WORKS196.47AS PER PROJECT REPORT
17RAIN WATER HARVESTING8.26AS PER PROJECT REPORT
18ELECTRICAL SUB STATION OTHER THAN STRUCTURAL WORKS607.87AS PER PROJECT REPORT


08-07-2022 (date)
12-09-2022 (date)
01-10-2022
31-12-2026
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings118441.1917607





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1167.742335.49
Shops00
Plots00

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2481.463066.675824.134550.55
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4140.064633.567321.316985.01
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9190.257339.498028.134756.54
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
No
ICICI BANK LTD, SECTOR -54, SUNCITY, GURUGRAM
777705551661
ICIC0000399
110229060
000399
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 Arera Colony Bhopal M.P. 462016 2) Ms. Amarjot Kaur Sahni-3/66 Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi- House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon, Haryana- 122002 4) Ms. Surbhi- Flat No-3-905, 9th floor, Sector-103, grandiva, Daultabad, Gurgaon, Haryana-122006 5) Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad, Haryana- 121001 6) Mr. Pratap Singh-10A Pocket 2 Mayur Vihar East Delhi 110096 7) Mr. Pradeep Kumar Katiyar- 357, Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, Uttar Pradesh
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ZONING ALREADY BEEN OBTAINED15-04-2022
II. FOREST NOCALREADY BEEN OBTAINED07-08-2018
III. ARAVALI NOCALREADY BEEN OBTAINED04-01-2017
IV. HEIGHT NOCALREADY BEEN OBTAINED24-01-2022
V. BUILDING PLANALREADY BEEN OBTAINED12-09-2022
VI. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED16-07-2021
VII. LICENCEALREADY BEEN OBTAINED16-12-2021
VIII. ENVIRONMENT CLEARANCE - EXPANSION APPLICATIONAPPLIED FOR BUT YET TO RECEIVE04-04-2022








Yes


Yes


AS PER HARERA NORMS













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSERETAIL (TYPICAL FLOOR)- RCC BASE SLAB OFFICE (LOBBY)FINISHED GRND FLOOR LOBBY & RCC BASE SLAB FOR TYPICLFLOOR LOBBIES. OFFICE (UNIT FLOOR FINISH) RCC BASE SLAB
2WALL FINISHING DETAILSRAW WALL/ PARTITIONS
3KITCHEN DETAILSN.A.
4BATHROOM FITTINGSRETAIL- FINISHED COMMON TOILETS WITH MODERN FITTING &FIXTURES; OFFICE : PROVISION OF SERVICES WILL BEPROVIDED AND TO BE FINISHED BY ALLOTTEE(S).
5WOOD WORK ETCN.A.
6DOORS AND WINDOS FRAMESALUMINIUM FRAME
7GLASS WORKGLASS THICKNESS VARIES FROM 6 TO 10 MM
8ELECTRIC FITTINGSCOMMON AREAS & TOILETS TO BE PROVIDED WITH LED LIGHTFIXTURES.
9CONDUCTING AND WIRING DETAILSISI APPROVED CONDUITS & WIRES
10CUPBOARD DETAILSN.A.
11WATER STORAGERCC TANK
12LIFT DETAILSSTANDARD MAKE ELEVATORS
13EXTERNAL GLAZINGSALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
13.1WINDOWS/GLAZINGSALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
14DOORSALUMINIUM / GLASS DOORS
14.1MAIN DOORSALUMINIUM / GLASS DOORS
14.2INTERNAL DOORSMS/ALUMINIUM/WOODEN DOORS
15AIR CONDITIONINGCHILLED WATER AC SYSTEM FOR OFFICE & PROVISION FORWATER COOLED DX SYSTEM UPTO TAP OFF INSIDE SHOP
16ELECTRICAL FITTINGSPROVISION OF CABLE UP TO DISTRIBUTION BOARD ISI /BISAPPROVED
17CNG PIPE LINEN.A.
18PROVISION OF WIFI AND BROADBAND FACILITYN.A.
19EXTERNAL FINISHING/COLOUR SCHEMEN.A.
20INTERNAL FINISHINGPAINT/GLASS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER OBD
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
2 . 2 WALLSPLASTER & OBD
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESN.A.
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER & DADO
3 . 3 CEILINGGRID FALSE CEILING/OBD
3 . 4 COUNTERSN.A.
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
4 . 2 WALLSPLASTER & OBD
4 . 3 CEILINGOBD
4 . 4 WARDROBESN.A.
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER & DADO
5 . 3 CEILINGGRID FALSE CEILING/OBD
5 . 4 COUNTERSN.A.
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER & DADO
6 . 3 CEILINGOBD
6 . 4 COUNTERSSTONE/MARBLE
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCESN.A.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTISKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPLASTER & PAINT
7 . 3 TOILETANTISKID CERAMIC TILES
7 . 4 BALCONYANTISKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORN.A.
8 . 2 WALLS & CEILINGN.A.
8 . 3 RAILINGSN.A.
8 . 4 FIXTURESN.A.












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 07-09-2022 View Document
2 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 07-09-2022 View Document
3 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 07-09-2022 View Document
4 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 07-09-2022 View Document
5 LOI 07-09-2022 View Document
6 NON- ENCUMBRANCE CERTIFICATE 07-09-2022 View Document
7 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 13-09-2022 View Document
8 ZONING PLAN 13-09-2022 View Document
9 ENVIRONMENT CLEARANCE 14-09-2022 View Document
10 DEMARCATION PLAN 14-09-2022 View Document
11 BR-III APPROVED BUILDING PLAN 14-09-2022 View Document
12 ENTRY OF LICENSE IN REVENUE RECORDS 14-09-2022 View Document
13 DEMAND DRAFTS 14-09-2022 View Document
14 PROJECT REPORT 14-09-2022 View Document
15 ROAD PLAN 14-09-2022 View Document
16 SEWER PLAN 14-09-2022 View Document
17 DRAINGE PLAN 14-09-2022 View Document
18 SUPERIMPOSED DEMARCATION ON SITE PLAN 14-09-2022 View Document
19 FLOOR PLANS 4A-4B 14-09-2022 View Document
20 SECTION PLAN 14-09-2022 View Document
21 FLOOR PLANS 5A-5B 14-09-2022 View Document
22 UPPER BASEMENT PLAN FIRE LAYOUT PLAN 30-09-2022 View Document
23 WATER LAYOUT 28-09-2022 View Document
24 SITE PLAN WITH FIRE FIGHTING LAYOUT 30-09-2022 View Document
25 TOWER 5A (TERRACE) 30-09-2022 View Document
26 TOWER 5A (20TH & 30TH) 30-09-2022 View Document
27 TOWER 5C 2ND LEVEL 28-09-2022 View Document
28 TOWER 5C TERRACE MUMTY & OH TANK 28-09-2022 View Document
29 STRUCTURAL DRAWING-1 28-09-2022 View Document
30 STRUCTURAL DRAWING-2 28-09-2022 View Document
31 PARKING PLAN 28-09-2022 View Document
32 ELECTRICITY & STREET LIGHT PLAN 28-09-2022 View Document
33 LANDSCAPE PLAN 28-09-2022 View Document
34 SOLID WASTE MANAGEMENT PLAN 28-09-2022 View Document
35 SUPER-IMPOSED KHASRA ON LAYOUT 28-09-2022 View Document
36 TOWER 5C 1ST LEVEL 28-09-2022 View Document
37 TOWER 5C 3RD TO 5TH LEVEL 28-09-2022 View Document
38 TOWER 5C 20TH & 30TH REFUGE 28-09-2022 View Document
39 TOWER 5C STILT LEVEL 28-09-2022 View Document
40 TOWER 5C TYPICAL LEVEL 28-09-2022 View Document
41 TOWER 6A 1ST LEVEL 28-09-2022 View Document
42 TOWER 6A 2ND LEVEL 28-09-2022 View Document
43 TOWER 6A 3RD TO 5TH LEVEL 28-09-2022 View Document
44 TOWER 6A 20TH & 30TH REFUGE 28-09-2022 View Document
45 TOWER 6A TERRACE MUMTY OH TANK 28-09-2022 View Document
46 TOWER 6A TYPICAL LEVEL 28-09-2022 View Document
47 TOWER 5C (3RD TO 5TH LEVEL) 30-09-2022 View Document
48 TOWER 6A STILT LEVEL 28-09-2022 View Document
49 ELEVATION 1 T-4 A & B 28-09-2022 View Document
50 ELEVATION 2 T-5A 28-09-2022 View Document
51 ELEVATION 4 T-5C 28-09-2022 View Document
52 ELEVATION-1 & 3 T-6A 28-09-2022 View Document
53 ELEVATION-1 & 3, T-5C 28-09-2022 View Document
54 ELEVATION-2 & 4 T-6A 28-09-2022 View Document
55 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 28-09-2022 View Document
56 TOWER 5A (STILT LEVEL) 30-09-2022 View Document
57 COMMERCIAL 1ST FLOOR PLANS FIRE LAYOUT PLAN 30-09-2022 View Document
58 COMMERCIAL 2ND FLOOR PLANS FIRE LAYOUT PLAN 30-09-2022 View Document
59 COMMERCIAL GROUND FLOOR PLANS FIRE LAYOUT PLAN 30-09-2022 View Document
60 COMMERCIAL LOWER GROUND PLANS FIRE LAYOUT PLAN 30-09-2022 View Document
61 TOWER 4(A&B) 5TH LEVEL LAYOUT 30-09-2022 View Document
62 TOWER 4(A&B) TYPICAL LAYOUT 30-09-2022 View Document
63 TOWER 5A (1ST LEVEL) 30-09-2022 View Document
64 COMMERCIAL TERRACE PLAN FIRE LAYOUT PLAN 30-09-2022 View Document
65 LOWER BASEMENT PLAN WITH FIRE FIGHTING LAYOUT 30-09-2022 View Document
66 TOWER (4 A& B) 6TH LEVEL LAYOUT 30-09-2022 View Document
67 TOWER 4(A&B) 1ST LEVEL LAYOUT 30-09-2022 View Document
68 TOWER 4(A&B) 2-4TH LEVEL LAYOUT 30-09-2022 View Document
69 TOWER 4(A&B) REFUGE LEVEL 30-09-2022 View Document
70 TOWER 4(A&B) STILT LEVEL 30-09-2022 View Document
71 TOWER 4(A&B) TERRACE 30-09-2022 View Document
72 TOWER 5A (2ND TO 5TH) 30-09-2022 View Document
73 TOWER 5A (TYPICAL) 30-09-2022 View Document
74 TOWER 5B (1ST LEVEL) 30-09-2022 View Document
75 TOWER 5B (2ND TO 5TH) 30-09-2022 View Document
76 TOWER 5B (STILT LEVEL) 30-09-2022 View Document
77 TOWER 5B (TERRACE LEVEL) 30-09-2022 View Document
78 TOWER 5B (TERRACE) 30-09-2022 View Document
79 TOWER 5B (TYPICAL LEVEL) 30-09-2022 View Document
80 TOWER 5C (1ST LEVEL) 30-09-2022 View Document
81 TOWER 5C (2ND LEVEL) 30-09-2022 View Document
82 TOWER 5C (20TH & 30TH LEVEL) 30-09-2022 View Document
83 TOWER 5C (STILT LEVEL) 30-09-2022 View Document
84 TOWER 5C (TERRACE) 30-09-2022 View Document
85 TOWER 5C (TYPICAL) 30-09-2022 View Document
86 TOWER 6A 30-09-2022 View Document
87 UPPER BASEMENT 30-09-2022 View Document
88 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 01-10-2022 View Document