HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1135-2022
Submission Date : 06-09-2022 02:01:59 PM
Applicant Type : Company
Project Type: NEW




EMAAR INDIA LIMITED
EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR- 28, GURUGRAM - 122001
01244421155
9810697239 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
https://in.emaar.com/en/
XXXX308B
U45201DL2005PLC133161





EMAAR BUSINESS DISTRICT 75A
VILLAGE - BEGAMPUR KHATOLA, SECTOR 75A, GURUGRAM
BADSHAHPUR ST
GURUGRAM
01244421155
9953263515 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
LAV PORWAL
01244421155
9953263515 (Number Shared by Promoter in Public)
coordination.in@emaar.ae








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15373424-08-20221106500KOTAK MAHINDRA BANKHRERA Gurugram







4.55625 (Acre)
1.5
1.5
4.55625 (Acre)
129 of 2022
No
Address     EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR-28, GURUGRAM, HARYANA
Address     EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR-28, GURUGRAM, HARYANA
Annexure-B- ANNEXURE-B- COLLABORATOR
BY VIRTUE OF COLLABORATION AGREEMENT SIGNED BEFORE GRANT OF LICENSE
Yes
THE DEVELOPER SHALL BE RESPONSIBLE FOR COMPLIANCE OF ALL TERMS & CONDITIONS OF LICENCE/CLU / PROVISIONS OF THE HARYANA DEVELOPMENT AND REGULATIONS OF URBAN AREAS ACT, 1975 & RULES THEREOF OR THE PUNJAB SCHEDULED ROAD &CONTROLLED; AREA RESTRICTION OF UNREGULATED DEVELOPMENT ACT,1963 & RULES THEREOF AS THE CASE MAY BE, TILL THE GRANT OF FINAL COMPLETION CERTIFICATE TO THE COLONY OR RELIEVED OF THE RESPONSIBILITY BY THE DTCP, HARYANA OR ANY OTHER COMPETENT AUTHORITY, WHICHEVER IS EARLIER
No
Yes
Yes







8143 Lakhs
1754 Lakhs
0 Lakhs
2645 Lakhs
3744 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD1.5947
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS2.27537
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0.25205
6GREEN BELTS0
7VEHICLE PARKINGS0.33977
8ELECTRICITY SUB-STATION0.06301
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.00642
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13UGT0.00642
14TOILET0.01853
Total4.55627




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNNo
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS172AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM73AS PER PROJECT REPORT
3STORM WATER DRAINAGE65AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM129AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL59AS PER PROJECT REPORT
6STREET LIGHTING29AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING7AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS305AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15PARKING11AS PER PROJECT REPORT
16SECURITY AND FIRE FIGHTING7AS PER PROJECT REPORT
17STP118AS PER PROJECT REPORT
18UG TANK98AS PER PROJECT REPORT
19RAIN WATER HARVESTING15AS PER PROJECT REPORT
20ELECTRICAL SUB STATION AND ANCILLIARY BUILDING82AS PER PROJECT REPORT
21ELECTRICAL PANELS205AS PER PROJECT REPORT
22SIGNAGES PLOT DEMARCATION7AS PER PROJECT REPORT
23SWITCHING STATION WORKS465AS PER PROJECT REPORT
24COMMERCIAL SIGNAGES LED SCREEN25AS PER PROJECT REPORT
25EXTENSION PART233AS PER PROJECT REPORT
26CONTINGENCIES LC GST548AS PER PROJECT REPORT


25-08-2022 (date)
25-08-2022 (date)
24-09-2022
23-08-2027
Plot Area(In Square Meter)Number of plots in the project
1081
1238
161.0281
11413
901
163.3801
11413
842
1082
12313


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System0018.9
Sewerage treatment & garbage disposal019.814.8
Electricity Supply System000
Storm Water Drainage017.713.2
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Contingencies LC GST08.4514.50
Switching Station Works0
Rain Water Harvesting0
Electrical Sub Station Ancilliary Building8.5
STP8.9
UG Tank0
Sewerage0

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements042.857.065.6
Water Supply System14.19.411.814.1
Sewerage treatment & garbage disposal9.912.314.814.8
Electricity Supply System58.578.052.055.3
Storm Water Drainage8.811.013.213.2
Parks and Playgrounds18.136.336.354.4
Clubhouse/community centres0000
Shopping area0000
Other0000
Contingencies LC GST58.1988.61139.34136.80
Electrical Panels0119.7
Switching Station Works105.921.2127.1169.5
Extension Part0000
UG Tank0000
Security and Fire Fighting00
STP17.830.240.835.5
Rain Water Harvesting008.59.8
Electrical Sub Station and Ancillary Building18.618.616.912.7
Miscellaneous Works Horticulture Works Road Works MTC Repair Works6.06.0101.492.2
Parking5.310.6
Signages Plot Demarcation3.62.9
Electical Panels119.747.9
Street Light6.65.7
Security And Fire Fighting2.32.0

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements39.942.814.322.8
Water Supply System14.111.811.811.8
Sewerage treatment & garbage disposal12.312.312.30
Electricity Supply System32.522.89.816.3
Storm Water Drainage11.011.011.00
Parks and Playgrounds54.472.536.354.4
Clubhouse/community centres0000
Shopping area0000
Other0000
Extension Part0000
Parking5.373.8364.2360.28
Street Light7.41.83.53.5
Security And Fire Fighting2.68.78.76.6
STP17.83.13.12.3
UG Tank08.98.98.9
Rain Water Harvesting8.5000
Electrical Sub Station and Ancillary Building12.7000
Electical Panels95.847.900
Signages Plot Demarcation2.91.423.923.9
Switching Station Works105.903.60
Commercial Signages LED Screen035.370.670.6
Contingencies LC GST117.904.32.14.3
Miscellaneous Works Horticulture Works Road Works MTC Repair Works99.242.664.741.8

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements13.80
Water Supply System5.80
Sewerage treatment & garbage disposal00
Electricity Supply System3.96.5
Storm Water Drainage1.30
Parks and Playgrounds30.524.4
Clubhouse/community centres00
Shopping area00
Other00
STP5.95.9
Switching Station Works46.546.5
Signages Plot Demarcation0.31.4
Electical Panels20.520.5
Rain Water Harvesting0.70.7
UG Tank4.94.9
Security And Fire Fighting0.30.5
Street Light2.94.3
Extension Part23.323.3
Contingencies LC GST45.337
Commercial Signages LED Screen3.82.5
Parking1.1
Electrical Sub Station and Ancillary Building8.2












Yes
No
AXIS BANK, DLF CYBER CITY, DLF PHASE-III, GURGAON, HARYANA-122002
922020019136568
UTIB0004761
110211350
4761
Rahul Bindle E303, Park View City 1, Sector 48, Sohna, Gurugram
Attached











Yes
Yes
No
No
Yes
No
No
No
No
No


Yes
Yes
Yes
Yes
Yes
No
Yes
No
Statutory Approvals Statutory Approvals StatusDate
I. LOI VIDE MEMO NO. LC-4755-JE(VA)/2022/19299ALREADY BEEN OBTAINED07-07-2022
II. LICENSE APPROVED VIDE MEMO NO. 129 OF 2022ALREADY BEEN OBTAINED24-08-2022
III. APPROVED LAYOUT VIDE DRAWING NO. DTCP 8566ALREADY BEEN OBTAINED25-08-2022
IV. ASSURANCE OF STORM WATER CONNECTIONALREADY BEEN OBTAINED29-08-2022
V. ASSURANCE OF SEWERAGE CONNECTIONALREADY BEEN OBTAINED29-08-2022








Yes


Yes


Subject to Force Majeure and fulfillment by the Allottee(s) of all the terms and conditions of this Agreement including but not limited to timely and complete payment by the Allottee(s) of the Total Price payable in accordance with the Payment Plan, payment of stamp duty, registration and incidental charges and other charges in connection thereto due, and payable by the Allottee(s) and also subject to the Allottee(s) having complied with all formalities or documentation as prescribed by the, the Developer shall offer the possession of the Plot to the Allottee(s) on or before the date of expiry of RERA Registration Certificate i.e. Date of Completion Certificate of the Project.







PALM HEIGHTS, SECTOR-77, GURUGRAM
5.50
297
0
279
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
20000200006272
Cost of the apartments179751797513801
Cost of the infrastructure000
Others costs100410041004


4188.80 Lakhs
14343 Lakhs
1342 Lakhs
14343 Lakhs
No
31-08-2022
28-02-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT26-08-2022 View Document
2LOI26-08-2022 ------
3IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN30-08-2022 View Document
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT30-08-2022 View Document
5COPY OF LICENSE ALONG WITH SCHEDULE OF LAND30-08-2022 View Document
6DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD30-08-2022 View Document
7IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN30-08-2022 View Document
8DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.30-08-2022 View Document
9DEMARCATION PLAN31-08-2022 View Document
10DEMARCATION SUPERIMPOSED ON LAYOUT31-08-2022 ------
11ASSURANCE APPROVAL OF STORM WATER AND SEWERAGE31-08-2022 ------
12BBA DRAFT31-08-2022 ------
13STANDARD PLAN SUBMISSION-D215-06-2023 ------
14STANDARD PLAN SUBMISSION-B09 & B1115-06-2023 ------
15SIJRA & REVENUE DOCS (EBD-75A)15-06-2023 ------
16DRAINAGE SCHEME15-06-2023 ------
17FLUSHING SCHEME15-06-2023 ------
18ROAD SCHEME15-06-2023 ------
19SERVICE ESTIMATE REPORT15-06-2023 ------
20SEWERAGE SCHEME15-06-2023 ------
21WATER SUPPLY SCHEME15-06-2023 ------
22STANDARD PLAN SUBMISSION-A115-06-2023 ------
23STANDARD PLAN SUBMISSION-A2,A8,D7,D1115-06-2023 ------
24STANDARD PLAN SUBMISSION-A3,A5,A915-06-2023 ------
25STANDARD PLAN SUBMISSION-C0115-06-2023 ------
26STANDARD PLAN SUBMISSION-A4,A615-06-2023 ------
27STANDARD PLAN SUBMISSION-A7,D6,D12,D1615-06-2023 ------
28STANDARD PLAN SUBMISSION-A1015-06-2023 ------
29STANDARD PLAN SUBMISSION-B01 & C12A15-06-2023 ------
30STANDARD PLAN SUBMISSION-B02, B08, B12,C02,C04,C06,C08,C1215-06-2023 ------
31STANDARD PLAN SUBMISSION-B03, B05, C03,C5,C9,C1115-06-2023 ------
32STANDARD PLAN SUBMISSION-B04, B06 & C1015-06-2023 ------
33STANDARD PLAN SUBMISSION-B07, B12A & C0715-06-2023 ------
34STANDARD PLAN SUBMISSION-B1015-06-2023 ------
35STANDARD PLAN SUBMISSION-B1415-06-2023 ------
36STANDARD PLAN SUBMISSION-B1515-06-2023 ------
37STANDARD PLAN SUBMISSION-D115-06-2023 ------
38STANDARD PLAN SUBMISSION-D8,D10,D1415-06-2023 ------
39LAND TITLE SEARCH REPORT15-06-2023 ------
40STANDARD PLAN SUBMISSION-D315-06-2023 ------
41STANDARD PLAN SUBMISSION-D415-06-2023 ------
42STANDARD PLAN SUBMISSION-D5,D9,D12A,D1515-06-2023 ------
43CASH FLOW STATEMENT OF THE PROPOSED PROJECT15-06-2023 View Document
44STANDARD PLAN SUBMISSION-D1715-06-2023 ------
45COLLABORATION AGREEMENT-AMAR GYAN DEVELOPMENTS - UP TO 31.12.200915-06-2023 ------
46COLLABORATION AGREEMENT-SNOW WHITE BUILDCON __REGD. ON 10.06.1315-06-2023 ------
47SUPPLEMENTARY COLLABORATION AGREEMENT_75A15-06-2023 ------
48NEC- 4.56 (EBD-75A)15-06-2023 ------