HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1390-2023
Submission Date : 13-07-2023 02:58:58 PM
Applicant Type : Company
Project Type: NEW




EMAAR INDIA LIMITED
EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR -28, GURUGRAM-122001
01244421155
9876888338 (Number Shared by Promoter in Public)
coordination.IN@emaar.ae
https://in.emaar.com/en/
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 







URBAN OASIS - PHASE 1 & 2
VILLAGE - MAIDAWAS AND NANGLI UMARPUR, SECTOR - 62 & 65,, GURGAON
BADSHAHPUR ST
GURUGRAM
01244421155
9891199300 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
MANOJ SONI
01244421155
9891199300 (Number Shared by Promoter in Public)
coordination.IN@emaar.ae








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
129894006-07-20231443000HSBC BANKHRERA Gurugram
229903527-07-2023542894HSBC BANKHRERA Gurugram
36498801-08-20233AXIS BANK (30DQ14B64988)HRERA Gurugram







6.64 (Acre)
1.87
1.87
177.8625 (Acre)
License No. 10 of 2009 dated 21.05.2009, License No. 113 of 2011 dated 22.12.2011 and License No. 117 of 2022 dated 12.08.2022
No
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Annexure-B- COLLABORATOR
BY VIRTUE OF COLLABORATION AGREEMENT SIGNED BEFORE GRANT OF LICENSE
Yes
THE DEVELOPER SHALL BE RESPONSIBLE FOR COMPLIANCE OF ALL TERMS & CONDITIONS OF LICENCE/CLU / PROVISIONS OF THE HARYANA DEVELOPMENT AND REGULATIONS OF URBAN AREAS ACT,1975 & RULESTHEREOF OR THE PUNJAB SCHEDULED ROAD &CONTROLLED; AREA RESTRICTION OF UNREGULATED DEVELOPMENT ACT,1963 & RULES THEREOF AS THE CASE MAY BE, TILL THE GRANT OF FINAL COMPLETION CERTIFICATE TO THE COLONY OR RELIEVED OF THE RESPONSIBILITY BY THE DTCP, HARYANA OR ANY OTHER COMPETENT AUTHORITY, WHICHEVER IS EARLIER
No
Yes
Yes







82559 Lakhs
2090.24 Lakhs
71847.78 Lakhs
2272 Lakhs
6348.98 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.8330
3CONSTRUCTION OF ROADS 1.9633
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0.997
6GREEN BELTS 0.362
7VEHICLE PARKINGS 0.0929
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0.1415
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 2.2503
Total6.64




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA-ALREADY CONNECTEDNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS395AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM412AS PER PROJECT REPORT
3STORM WATER DRAINAGE47AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM91AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL76AS PER PROJECT REPORT
6STREET LIGHTING85AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING71AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS92AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15UNDERGROUND WATER TANK99AS PER PROJECT REPORT
16ELECTRICAL SUBSTATION369AS PER PROJECT REPORT
17PARKING285AS PER PROJECT REPORT
18STP190AS PER PROJECT REPORT
19RAIN WATER HARVESTING60AS PER PROJECT REPORT


12-08-2022 (date)
12-07-2023 (date)
01-10-2023
30-09-2028
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings124.788490
Apartment/Shops/Other Buildings124.955490
Apartment/Shops/Other Buildings132.1820
Apartment/Shops/Other Buildings132.513480
Apartment/Shops/Other Buildings144.49420
Apartment/Shops/Other Buildings167.604480
Apartment/Shops/Other Buildings233.34510
Apartment/Shops/Other Buildings212.90760
Apartment/Shops/Other Buildings258.5150
Apartment/Shops/Other Buildings117.09520
Apartment/Shops/Other Buildings117.5381020
Apartment/Shops/Other Buildings117.6541040
Apartment/Shops/Other Buildings206.11520
Apartment/Shops/Other Buildings194.37740





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments574386118633036
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4522459945496009
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments6009826082667496
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments7524452245493036
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments154955111
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements39.579.0
Water Supply System20.620.6
Sewerage treatment & garbage disposal3.83.8
Electricity Supply System4.54.5
Storm Water Drainage2.42.4
Parks and Playgrounds4.64.6
Clubhouse/community centres00
Shopping area00
Other00
Security and fire fighting3.63.6
Electrification Cost10.631.7
Electrical sub station18.455.3
Rain water harvesting3.09.1
Underground water tank5.014.9
STP9.528.5
Parking14.214.2
Street Lighting4.24.2

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements59.219.739.539.5
Water Supply System20.620.620.620.6
Sewerage treatment & garbage disposal3.83.83.83.8
Electricity Supply System4.54.54.54.5
Storm Water Drainage2.42.42.42.4
Parks and Playgrounds4.64.64.64.6
Clubhouse/community centres0000
Shopping area0000
Other0000
STP9.59.59.519.0
Electrical sub station18.418.418.436.9
Electrification Cost10.610.610.621.1
Rain water harvesting3.03.03.06.0
Parking14.214.214.214.2
Underground water tank5.05.05.09.9
Street Lighting4.24.24.24.2
Security and fire fighting3.63.63.63.6

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System20.620.620.620.6
Sewerage treatment & garbage disposal3.83.83.83.8
Electricity Supply System1.82.74.59.1
Storm Water Drainage2.42.42.42.4
Parks and Playgrounds1.82.84.69.2
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification Cost21.14.26.310.6
Rain water harvesting6.01.21.83.0
Underground water tank9.92.03.05.0
STP19.03.85.79.5
Parking5.78.514.228.5
Security and fire fighting1.42.13.67.1
Street Lighting1.72.54.28.5
Electrical sub station36.97.411.118.4

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System20.620.600
Sewerage treatment & garbage disposal3.83.800
Electricity Supply System9.19.113.64.5
Storm Water Drainage2.42.400
Parks and Playgrounds9.29.213.94.6
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification Cost4.26.36.34.2
Street Lighting8.58.512.74.2
Security and fire fighting7.17.110.73.6
Parking28.528.542.714.2
STP3.85.75.73.8
Underground water tank2.03.03.02.0
Rain water harvesting1.21.81.81.2
Electrical sub station7.411.111.17.4












Yes
Yes
EMAAR URBAN OASIS MASTER A/C, HSBC BANK, BIRLA TOWERS, 25, BARAKHAMBA ROAD MARG, CONNAUGHT PLACE, NEW DELHI-110001
166276584927
HSBC0110002
110039002
000003
Rahul Bindle E 303, PARK VIEW CITY 1, SECTOR 48, SOHNA ROAD, GURUGRAM
Attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENCE NO. 113 OF 2011 ALREADY BEEN OBTAINED22-12-2011
II. LICENCE NO. 117 OF 2022 ALREADY BEEN OBTAINED12-08-2022
III. AAI NOCALREADY BEEN OBTAINED12-05-2023
IV. ZONING PLAN ALREADY BEEN OBTAINED21-03-2023
V. APPROVED LAYOUT PLANALREADY BEEN OBTAINED12-08-2022
VI. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED12-05-2023
VII. APPROVAL OF BUILDING PLAN BR-LLLALREADY BEEN OBTAINED12-07-2023
VIII. MINING PERMISSIONALREADY BEEN OBTAINED18-07-2023








Yes


Yes


The Company shall complete the development of the Project and apply for grant of Occupation Certificate to the competent authorities by and/or such extended period as may be granted by the Authority.







PALM HEIGHTS, SECTOR-77, GURUGRAM
5.5
297
0
297
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
200012000117408
Cost of the apartments179931799315238
Cost of the infrastructure808080
Others costs9869861149


24605 Lakhs
9477 Lakhs
0 Lakhs
0 Lakhs
No
28-02-2023
28-02-2024










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES/MARBLE/WOODEN FLOORING
2WALL FINISHING DETAILSTILES/PAINT
3KITCHEN DETAILSTILES, PAINT, SINK SS
4BATHROOM FITTINGSFLOOR TILES - GOOD QUALITY ,STANDARD MAKE
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORTILES/MARBLE/WOODEN FLOORING
1 . 2 WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
1 . 3 CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORTILES/WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
2 . 3 CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORTILES
3 . 2 WALLSTILES/ PAINT
3 . 3 CEILINGPAINT/FALSE CEILING
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSWASH BASIN - INDIAN STANDARD
3 . 6 FITTING/FIXTURESINDIAN STANDARD
4 . BED ROOMS
4 . 1 FLOORTILES/WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
4 . 3 CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORTILES
5 . 2 WALLSTILES/ PAINT
5 . 3 CEILINGPAINT/FALSE CEILING
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSSINK SS, TAPS & FITTINGS - INDIAN STANDARD
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORTILES
6 . 2 WALLSPAINT/TILES
6 . 3 CEILINGPAINT
6 . 4 COUNTERSNA
6 . 5 FIXTURESSINK SS, WASH BASIN INDIAN STANDARD, TAPS & FITTINGS - INDIA STANDARD
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES
7 . 2 WALLS & CEILINGPAINT
7 . 3 TOILETNA
7 . 4 BALCONYTAPS & FITTINGS - INDIA STANDARD
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 15-06-2023 View Document
2 ZONING PLAN 19-06-2023 View Document
3 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 20-06-2023 View Document
4 DEMARCATION PLAN 20-06-2023 View Document
5 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 13-07-2023 View Document
6 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 13-07-2023 View Document
7 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 12-07-2023 View Document
8 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 11-08-2023 View Document
9 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 11-08-2023 View Document
10 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 11-08-2023 View Document
11 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 11-08-2023 View Document
12 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 11-08-2023 View Document
13 AIRPORT HEIGHT NOC 11-08-2023 View Document
14 APPLICATION FIRE FIGHTING SCHEME 11-08-2023 View Document
15 APPLICATION OF SERVICE PLAN ESTIMATES 11-08-2023 View Document
16 BANK UNDERTAKING 11-08-2023 View Document
17 CA CERTIFICATE COST EXPENSE 11-08-2023 View Document
18 CONSTRUCTION WATER NOC 11-08-2023 View Document
19 MINING PERMIT URBAN OASIS 11-08-2023 View Document
20 NON ENCUMBRANCE CERTIFICATE 11-08-2023 View Document
21 PERT CHART 11-08-2023 View Document
22 PROJECT REPORT 11-08-2023 View Document
23 SUPERIMPOSED DRAWING ON LAYOUT PLAN 11-08-2023 View Document
24 TREE CUTTING PERMISSION 11-08-2023 View Document
25 EXTERNAL FIRE LAYOUT 11-08-2023 View Document
26 EXTERNAL LIGHTING LAYOUT 11-08-2023 View Document
27 ROAD LAYOUT 11-08-2023 View Document
28 SERVICE PLAN & ESTIMATES REPORT APPLIED 11-08-2023 View Document
29 SEWERAGE LAYOUT 11-08-2023 View Document
30 STORM LAYOUT 11-08-2023 View Document
31 WATER SUPPLY LAYOUT 11-08-2023 View Document
32 APPROVED_PHASIS PLAN_9.53 ACRES 11-08-2023 View Document
33 BASEMENT 1 & 2 AREA CALCULATION 11-08-2023 View Document
34 TOWER 1 SECTION BB & 2 11-08-2023 View Document
35 BASEMENT 1 & 2 11-08-2023 View Document
36 BASEMENT 1 AREA CALCULATION 11-08-2023 View Document
37 BASEMENT 1 SERVICE 11-08-2023 View Document
38 CLUB GROUND TO TERRACE PLAN 11-08-2023 View Document
39 COMMUNITY BUILDING EWS & TOILET DETAIL 11-08-2023 View Document
40 CONVENIENT SHOPPING GROUND TO TERRACE PLAN 11-08-2023 View Document
41 ELEVATION C&D TOWER 4 11-08-2023 View Document
42 ENT GATE FLOOR PLAN AND SECTION ELEVATION 11-08-2023 View Document
43 EWS & CLUB SCHEMATIC DRAWING 11-08-2023 View Document
44 EWS ELEVATION C&D 11-08-2023 View Document
45 ORGANIZED OPEN SPACE 11-08-2023 View Document
46 SECTION AA TOWER 2 11-08-2023 View Document
47 SECTION AA TOWER 4 11-08-2023 View Document
48 SECTION BB & YY TOWER 4 11-08-2023 View Document
49 SECTION BB YY TOWER 2 11-08-2023 View Document
50 SITE PLAN FOR SERVICES 11-08-2023 View Document
51 TOWER 1 2 3 4 TOILET DETAILS 11-08-2023 View Document
52 TOWER 1 22 23 24 25 FLOOR PLAN 11-08-2023 View Document
53 TOWER 1 TERRACE AND FLOOR PLAN 11-08-2023 View Document
54 TOWER 2 & 4 AREA CALCULATION 11-08-2023 View Document
55 TOWER 2 ELEVATION A & B 11-08-2023 View Document
56 TOWER 2 ELEVATION C & D 11-08-2023 View Document
57 TOWER 3 SCHEMATIC DRAWING 11-08-2023 View Document
58 TOWER 1 27 TO 30 AREA FLOOR PLAN 11-08-2023 View Document
59 TOWER 1 ELEVATION A&B 11-08-2023 View Document
60 TOWER 1 ELEVATION C&D 11-08-2023 View Document
61 TOWER 1 SCHEMATIC DRAWING 11-08-2023 View Document
62 TOWER 1 SECTION AA 11-08-2023 View Document
63 TOWER 2 & 4 18 26 27 TERRACE FLOOR PLAN 11-08-2023 View Document
64 TOWER 2 SCHEMATIC DRAWING 11-08-2023 View Document
65 TOWER 3 & 4 RAMP 1 SECTION DETAILS 11-08-2023 View Document
66 TOWER 3 SECTION AA 11-08-2023 View Document
67 TOWER 3 22 23 24 25 FLOOR PLAN 11-08-2023 View Document
68 TOWER 3 22 TO 25 AREA CALCULATION 11-08-2023 View Document
69 TOWER 3 ELEVATION A & B 11-08-2023 View Document
70 TOWER 3 GROUND TO 21ST FLOOR PLAN 11-08-2023 View Document
71 TOWER 3 ELEVATION C & D 11-08-2023 View Document
72 TOWER 3 TERRACE AND ROOF PLAN 11-08-2023 View Document
73 TOWER 4 ELEVATION A & B 11-08-2023 View Document
74 TOWER 4 SCHEMATIC DRAWING 11-08-2023 View Document
75 TOWER 4 TERRACE AND ROOF PLAN 11-08-2023 View Document