HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2348-2026
Submission Date : 05-10-2026 03:21:03 PM
Applicant Type : Company
Project Type: NEW




EXPERION DEVELOPERS PRIVATE LIMITED
F- 9, FIRST FLOOR, MANISH PLAZA 1, PLOT NO. 7, MLU, SECTOR10, DWARKA, NEW DELHI -110075
01246281630
9560454296 (Number Shared by Promoter in Public)
accounts@experion.net.in
Http://www.experion.co
XXXX138L
U70109DL2006FTC151343
 
 


 
 


 
 


 
 


 
 


 
 


 
 







EXPERION EMERELLE RESERVE
VILLAGE HARSARU, SECTOR-88A, GURUGRAM, HARYANA
HARSARU ST
GURUGRAM
01246281630
9711204570 (Number Shared by Promoter in Public)
narendra.hore@experion.net.in
NARENDRA HORE
01246281630
9711204570 (Number Shared by Promoter in Public)
narendra.hore@experion.net.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques/Online Banking:-

Drafts/ Banker’s Cheques

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1572501-10-20262845780HDFC BANKHRERA Gurugram
25202610287814702328-10-2026220876ONLINEHRERA Gurugram

Online Banking








7.095715 (Acre)
3.62
3.50
7.81875 (Acre)
135 of 2024 dated 04.11.2024
Yes







114591.10 Lakhs
19943.91 Lakhs
72701.82 Lakhs
3748.31 Lakhs
18197.06 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.129
3CONSTRUCTION OF ROADS 0.970
4PAVEMENTS 1.021
5PARKS AND PLAYGROUNDS 1.116
6GREEN BELTS 0
7VEHICLE PARKINGS 1.315
8ELECTRICITY SUB-STATION 0.083
9CLUB HOUSE 0.363
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0.026
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 1.072715
Total7.095715




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTEDNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS1100.85AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM247.54AS PER PROJECT REPORT
3STORM WATER DRAINAGE79.49AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM2553.81AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL47.58AS PER PROJECT REPORT
6STREET LIGHTING64.63AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING316.67AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS1100.85AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE7018.53AS PER PROJECT REPORT
10SHOPPING AREA142.43AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM33.32AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP171.36AS PER PROJECT REPORT
16UNDERGROUND WATER TANK107.10AS PER PROJECT REPORT
17RAIN WATER HARVESTING37.49AS PER PROJECT REPORT
18ELECTRICAL SUB STATION674.73AS PER PROJECT REPORT


01-10-2026 (date)
01-10-2026 (date)
01-04-2027
30-09-2034
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings90.0762
Apartment/Shops/Other Buildings90.0722
Apartment/Shops/Other Buildings104.6862
Apartment/Shops/Other Buildings107.14742
Apartment/Shops/Other Buildings123.17822
Apartment/Shops/Other Buildings124.951522
Apartment/Shops/Other Buildings146.52782
Apartment/Shops/Other Buildings19.621461
Apartment/Shops/Other Buildings31.9431
Apartment/Shops/Other Buildings30.7011
Apartment/Shops/Other Buildings18.4111
Apartment/Shops/Other Buildings32.8911
Apartment/Shops/Other Buildings39.1211
Apartment/Shops/Other Buildings16.8511
Apartment/Shops/Other Buildings20.7711
Apartment/Shops/Other Buildings21.0511
Apartment/Shops/Other Buildings10.3211
Apartment/Shops/Other Buildings39.8011
Apartment/Shops/Other Buildings39.3511





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments166.33486.66160.17
Shops000
Plots000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1539.922695.813389.551912.88
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3336.742906.492347.551334.47
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2510.942787.362794.531496.64
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2763.942870.532806.451556.60
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2725.912781.232400.811074.98
Shops0000
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1548.34847.90378.535325.12
Shops0000
Plots0000

ParticularsYear-2034
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments149.495061.711033.400
Shops0000
Plots0000

ParticularsYear-2035
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
EWS0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
EWS0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
EWS0000
Underground water tank7.0414.0814.087.94
STP00

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System017.2847.0823.84
Sewerage treatment & garbage disposal008.934.58
Electricity Supply System000162.23
Storm Water Drainage05.5515.127.65
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
STP10.9711.2611.415.78
EWS0000
Underground water tank1.99

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0140.45206.71209.36
Water Supply System45.8914.9000
Sewerage treatment & garbage disposal8.826.3000
Electricity Supply System657.97666.0151.230
Storm Water Drainage14.734.7800
Parks and Playgrounds049.69258.38261.70
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and fire fighting73.0582.5834.940
STP11.1211.2610.400
Renewable energy system3.639.121.290
EWS0000
Electrical sub station076.45110.86
Rain water harvesting4.656.844.30
Street Light7.970

ParticularsYear-2034
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements106.00000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds92.76000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light14.280.58
EWS00

ParticularsYear-2035
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0








Cash Flow in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
New Sales0
Installments0
Disbursement of loan0
Funds to be infused by the Promoter0












Yes
No
Account Details
HSBC BANK, JMD REGENT SQUARE, DLF PHASE-II, MG ROAD, GURUGRAM, HARYANA 122002
057388779001
HSBC0110005
110039005
HSBCINBB
1. Suneet Puri R/o E-013 Richmond Park, DLF Phase IV, Gurgaon, Haryana-122009 2. BASAVARADDI KRISHNARADDI MALAGI R/o WB 04 301 Experion Windchants, Sector-112, Dwarka Expressway, Choma 62, Gurgaon-122017, Haryana 3. Vaibhav Kumar Shivhare R/o Flat No. 404/Tower WT 07, Windchants Dwarka Expressway, Sector 112, Choma(62), Gurgaon-122017, Haryana 4. Gaurav Maheshwari R/o 996, Sector-9, Faridabad, Haryana 121006 5. SANJAY KUMAR BAKLIWAL R/o K-51 DLF City Phase-2, SikanderpurGhosi (68) Gurugram Haryana 122002
Attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. SALE DEED NO.4895ALREADY BEEN OBTAINED02-07-2024
II. LICENSE NO. 135 OF 2024ALREADY BEEN OBTAINED04-11-2024
III. REVISED BUILDING PLAN BR-III ALREADY BEEN OBTAINED01-10-2026
IV. REVISED PHASING PLANALREADY BEEN OBTAINED30-09-2026
V. REVISED ZONINGPLANALREADY BEEN OBTAINED11-12-2025








Yes


Yes


As per HRERA norms







HUB 108,SECTOR 108, GURUGRAM, HARYANA
1.15
0
18
0
18
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
845.46845.46740.44
Cost of the apartments000
Cost of the infrastructure340.39340.39235.37
Others costs505.07505.07505.07


361.86 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
05-05-2024
05-05-2024




WESTERLIES PHASE-4,SECTOR 108, GURUGRAM, HARYANA
16.03125
0
172
0
115
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2985.332985.333005.01
Cost of the apartments000
Cost of the infrastructure927.26927.26488.38
Others costs2058.072058.072516.63


7306.77 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-01-2024
30-01-2024




WESTERLIES PHASE-1,SECTOR 108, GURUGRAM, HARYANA
46.2570
0
487
0
219
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
8791.608791.608791.60
Cost of the apartments000
Cost of the infrastructure2408.922408.922408.92
Others costs6382.686382.686382.68


52721.36 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
11-09-2024
11-09-2024




WESTERLIES PHASE-2,SECTOR 108, GURUGRAM, HARYANA
44.1780
0
203
0
203
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
7703.217703.217703.21
Cost of the apartments000
Cost of the infrastructure2300.652300.652300.65
Others costs5402.565402.565402.56


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
11-09-2024
11-09-2024




WINDCHANTS PHASE C,SECTOR 112 GURUGRAM
1.1965
65
0
20
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17147.2917147.292919.80
Cost of the apartments11398.6711398.67831.36
Cost of the infrastructure1625.331625.330
Others costs1856.721856.720


3353.18 Lakhs
14648.20 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2030
31-03-2030




ONE42 GOLF COURSE ROAD,SECTOR 42, GURUGRAM
3.426
110
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
105565.14105565.140
Cost of the apartments53489.8353489.830
Cost of the infrastructure13372.5813372.580
Others costs4194.94194.90


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2034
31-12-2034




THE TRILLION,SECTOR 48, GURUGRAM
5.496
540
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
158609.72158609.720
Cost of the apartments77412.6677412.660
Cost of the infrastructure15096.9415096.940
Others costs8901.478901.470


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2032
31-12-2030










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED MARBLE, LAMINATED WOODEN FLOORING, ANTISKID VITRIFIED TILES, CERAMIC TILE, BRICK BAT KOBA
2WALL FINISHING DETAILSVITRIFIED TILE UPTO FALSE CEILING, VITRIFIED TILES 2' ABOVEKITCHEN COUNTER, REST OF WALLS IN ACRYLIC EMULSIONPAINT
3KITCHEN DETAILSANTI SKID VITRIFIED TILES
4BATHROOM FITTINGSVITRIFIED TILE UPTO FALSE CEILING AS PER
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMAIN DOOR TO FLAT - HARDWOOD FRAME / VENEERED FLUSHDOOR, PREFABRICATED MODULAR DOOR WITH FRAME ORFLUSH DOOR WITH LAMINATE / PAINT AND HARDWOOD FRAME,ALUMINIUM/ UPVC
7GLASS WORKDOUBLE GLAZED/SINGLE GLAZED PERFORMANCE
8ELECTRIC FITTINGSPVC CONDUIT, MODULAR SWITCHES, 1.1 KV GRADE COPPERFLEXIBLEWIRE, GI BOX, 300MM DIA IN COMMON AREA ONLY,LED LIGHTS (IN COMMON AREA ONLY
9CONDUCTING AND WIRING DETAILS1.1 KV GRADE COPPER FLEXIBLEWIRE
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILS5 LIFTS PER TOWER
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSALUMINIUM UPVC GIAZING- PERFORMANCE GLASS
14DOORSHARDWOOD FRAME - PREFABRICATED MODULAR DOOR WITHFRAME OR FLUSH DOOR WITH LAMINATE / PAINT ANDHARDWOOD FRAME
14.1MAIN DOORSMAIN DOOR TO FLAT - HARDWOOD FRAME WITH GLASSPANELS / VENEERED FLUSH DOOR
14.2INTERNAL DOORSPREFABRICATED MODULAR DOOR WITH FRAME OR FLUSHDOOR WITH LAMINATE / PAINT AND HARDWOOD
15AIR CONDITIONINGHI-WALL IDU
16ELECTRICAL FITTINGSAS PER DESIGN
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYAS PER DESIGN
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGACRYLIC EMULSION PAINT, PAINT AND EXTERIOR
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED MARBLE
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTI SKID VITRIFIED TILES
3 . 2 WALLSVITRIFIED TILE UPTO FALSE CEILING
3 . 3 CEILINGMOISTURE RESISTANT FALSE CEILING ACRYLIC
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSAS PER DESIGN PREMIUM CP & SANITARY MIXTURE
3 . 6 FITTING/FIXTURESAS PER DESIGN
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT ACRYLIC PREMIUM
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI SKID VITIRFIED TILES
5 . 2 WALLSVITRIFIED TILE UPTO FALSE CEILING
5 . 3 CEILINGMOISTURE RESISTANT FALSE CEILING WITH ACRYLICEMULSION PAINT
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSAS PER DESIGN
5 . 6 FIXTURESAS PER DESIGN
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSVITRIFIED TILES 2' ABOVE KITCHEN COUNTER, REST OFWALLS IN ACRYLIC EMULSION PAINT
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSNA
6 . 5 FIXTURESAS PER DESIGN
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES
7 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT
7 . 3 TOILETAS PER DESIGN
7 . 4 BALCONYALUMINIUM / UPVC GLAZING WITH PERFORMANCE
8 . SIT-OUTS
8 . 1 FLOORCERAMIC TILES
8 . 2 WALLS & CEILINGEXTERIOR GRADE TEXTURE PAINT
8 . 3 RAILINGSNA
8 . 4 FIXTURESAS PER DESIGN












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 04-10-2026 View Document
2 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 04-10-2026 View Document
3 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 04-10-2026 View Document
4 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 04-10-2026 View Document
5 ZONING PLAN 04-10-2026 View Document
6 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 04-10-2026 View Document
7 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 04-10-2026 View Document
8 DEMARCATION PLAN 04-10-2026 View Document
9 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 04-10-2026 View Document
10 LATEST MUTATION 05-11-2026 View Document
11 AKS SHIJRA 05-11-2026 View Document
12 CONVEYANCE DEED_SECTOR 88A 05-11-2026 View Document
13 LATEST SITE PLAN_COMPRESSED 05-11-2026 View Document
14 NEC 12-11-2026 View Document
15 AFFIDAVIT FOR TREE CUTTING NCZ AND FOREST LAND DIVERSION 05-11-2026 View Document
16 MUTATION LAND TRANFER TO GOV.. HR 05-11-2026 View Document
17 SITE PLAN COMPARISON IN TABULAR FORM 05-11-2026 View Document
18 MOA AND AOA 05-11-2026 View Document
19 AFFIDAVIT FOR ROAD ACCESS PERMISSION AND REVISED AAI NOC 05-11-2026 View Document
20 BASEMENT & PODIUM_COMPRESSED 05-11-2026 View Document
21 PERT CHART 05-11-2026 View Document
22 ELECTRICAL LOAD AVAILABILITY CONNECTION 05-11-2026 View Document
23 ROAD LAYOUT_88A_COMPRESSED 05-11-2026 View Document
24 ESCROW AGREEMENT WITH BANK 05-11-2026 View Document
25 LOAN SANCTION LETTER_COMPRESSED 05-11-2026 View Document
26 LATEST JAMABANDI 05-11-2026 View Document
27 BR FOR AUTHORIZED SIGNATORY 05-11-2026 View Document
28 BANK UNDERTAKING 05-11-2026 View Document
29 SECTION PLAN 1 & 2_COMPRESSED 05-11-2026 View Document
30 LICENSE 135 OF 2024_COMPRESSED 05-11-2026 View Document
31 REVISED DEMARCATION CUM ZONING PLAN LETTER 05-11-2026 View Document
32 SITE PLAN - GREEN AREA_COMPRESSED 05-11-2026 View Document
33 STILT FLOOR PLAN_COMPRESSED 05-11-2026 View Document
34 SUPERIMPOSED APPROVED SITE PLAN - SHAJRA LATEST_COMPRESSED 05-11-2026 View Document
35 CHG CERTIFICATE 05-11-2026 View Document
36 REPAYMENT SCHEDULE 05-11-2026 View Document
37 PAYMENT PLAN 05-11-2026 View Document
38 REVISED PHASING PLAN LETTER 05-11-2026 View Document
39 APPLICATION FORM 05-11-2026 View Document
40 CA CERTIFICATE FOR NON DEFAULT 05-11-2026 View Document
41 ROC 05-11-2026 View Document
42 LENDER NOC 05-11-2026 View Document
43 INFORMATION TO REVENUE DEPARTMENT 05-11-2026 View Document
44 FLOOR PLAN 2 TO 12A, 15 TO 22, 24 TO 31, 33 TO 40 TOWER-2_COMPRESSED 05-11-2026 View Document
45 CA CERTIFICATE FOR COST INCURRED AND TO BE INCURRED 05-11-2026 View Document
46 REVISED DEMARCATION CUM ZONING PLAN_COMPRESSED 05-11-2026 View Document
47 ALLOTMENT LETTER 05-11-2026 View Document
48 COMBINED 1ST FLOOR PLAN TOWER-1& 2 05-11-2026 View Document
49 GIFT DEED IN FAVER OF GOV. OF HR 05-11-2026 View Document
50 BBA 05-11-2026 View Document
51 LOI_COMPRESSED 05-11-2026 View Document
52 ASSURANCE OF SEWERAGE 05-11-2026 View Document
53 REP II AFFIDAVIT 05-11-2026 View Document
54 CA CERTIFICATE FOR FEMA AND RBI 05-11-2026 View Document
55 FLOOR PLAN 2 TO 12A, 15 TO 22, 24 TO 31, 33 TO 40 TOWER-1_COMPRESSED 05-11-2026 View Document
56 ASSURANCE OF DRINKING WATER SUPPLY 05-11-2026 View Document
57 STORM WATER DRAINAGE LAYOUT_88A_COMPRESSED 05-11-2026 View Document
58 ADDRESS PROOF OF THE COMPANY 05-11-2026 View Document
59 SALE DEED 1_COMPRESSED 05-11-2026 View Document
60 PROJECT REPORT 05-11-2026 View Document
61 SEWERAGE LAYOUT_88A_COMPRESSED 05-11-2026 View Document
62 FIRE FIGHTING LAYOUT_88A_COMPRESSED 05-11-2026 View Document
63 REVISED PHASING PLAN_COMPRESSED 05-11-2026 View Document
64 FLOOR PLAN REFUGE TOWER 1 & 2_COMPRESSED 05-11-2026 View Document
65 REVISED PHASING PLAN LETTER 05-11-2026 View Document
66 AAI NOC AND REVISED AAI APPLICATION 05-11-2026 View Document
67 AFFIDAVIT FOR MINNING 05-11-2026 View Document
68 ASSURANCE OF STORM WATER 05-11-2026 View Document
69 BUILDING PLAN APPROVAL LETTER-BR-III 05-11-2026 View Document
70 ENVIRONMENT CLEARANCE APPLIED ACK 05-11-2026 View Document
71 LC-IV_COMPRESSED 05-11-2026 View Document
72 FIRE SCHEME APPLICATION ACK. 05-11-2026 View Document
73 FOREST NOC 05-11-2026 View Document
74 GMDA CONSTRUCTION WATER NOC 05-11-2026 View Document
75 POWER LINE SHIFTING NOC 05-11-2026 View Document
76 PRESCRIBED FORM ROC 05-11-2026 View Document
77 REVISED DEMARCATION CUM ZONING PLAN LETTER 05-11-2026 View Document
78 TITLE SEARCH REPORT-SECTOR 88A_COMPRESSED 05-11-2026 View Document
79 SERVICE PLANS APPLIED ACK 05-11-2026 View Document
80 SIZRA 05-11-2026 View Document
81 FLOOR PLAN 14,23 & 32 TOWER-1 & 2 05-11-2026 View Document
82 GROUND COVERAGE PLAN 05-11-2026 View Document
83 WATER SUPPLY LAYOUT_88A_COMPRESSED 05-11-2026 View Document
84 BR FOR BANK OPERATION 05-11-2026 View Document
85 BROCHURE - 88A - FINAL VERSION 05-11-2026 View Document
86 CA CERTIFICATE FOR FINANCIAL & INVENTORY & OTHER 05-11-2026 View Document
87 DEMAND DRAFT OF REG FEE 05-11-2026 View Document
88 PROMOTER AFFIDAVIT 05-11-2026 View Document