SOBHA LIMITED, SARJAPUR-MARATHAHALLI, OUTER RING ROAD (ORR), DEVARABISANAHALLI, BELLANDUR POST, BANGALORE KA 560103
01244855555
1244855555 (Number Shared by Promoter in Public)
haryana.rera@sobha.com
https://www.sobha.com/
XXXX723E
L45201KA1995PLC018475
SOBHA CITY, PHASE-6
REVENUE ESTATE OF BABUPUR VILLAGE, VILLAGE BABUPUR, SECTOR-108, GURUGRAM, HARYANA
GURGAON
GURUGRAM
01244855555
8800389988 (Number Shared by Promoter in Public)
haryana.rera@sobha.com
JOBY FRANCIS
01244855555
8800389988 (Number Shared by Promoter in Public)
joby.francis@sobha.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
22126
06-09-2022
1597552
AXIS BANK LIMITED
HRERA Gurugram
2
22129
06-09-2022
912887
AXIS BANK LIMITED
HRERA Gurugram
3
22127
06-09-2022
26654
AXIS BANK LIMITED
HRERA Gurugram
4
22130
06-09-2022
7616
AXIS BANK LIMITED
HRERA Gurugram
5
22233
17-10-2022
6496824
AXIS BANK LIMITED
HRERA Gurugram
16.3995 (Acre)
1.75
1.7366
39.375 (Acre)
107 of 2008 dated 27.05.2008 valid upto 26.05.2025
No
Address A-11, KAILASH COLONY, NEW DELHI-110048
Address A-11, KAILASH COLONY, NEW DELHI-110048
Address A-11, KAILASH COLONY, NEW DELHI-110048
Address A-11, KAILASH COLONY, NEW DELHI-110048
Address 44, GOLF LINKS, NEW DELHI-110003
Address 44, GOLF LINKS, NEW DELHI-110003
Address 44, GOLF LINKS, NEW DELHI-110003
Address 44, GOLF LINKS, NEW DELHI-110003
Annexure-B- BIP HOLDER
JDA AND POWER OF ATTORNEY WERE EXECUTED AFTER GRANT OF LICENCE
Yes
THIS IS REVENUE SHARING AGREEMENT WITH LAND OWNERS
No
Yes
Yes
116844.82 Lakhs
44496.34 Lakhs
42656.60 Lakhs
718.85 Lakhs
28973.03 Lakhs
Sr. No.
Land area under usage
Area of land (Acres)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
1.0380
3
CONSTRUCTION OF ROADS
3.7288
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
3.0351
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0.2501
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0.38307
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0.0761
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
6.234
13
COMMERCIAL
0.1880
14
SCHOOL
1.4042
15
RAIN
0.0622
Total
16.39957
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
GMDA
Yes
WATER SUPPLY
GMDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
GMDA
Yes
STORM WATER DRAINAGE
GMDA
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
204.03
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
235.46
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
96.68
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
0
YET TO BE PREPARED
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
131.08
AS PER PROJECT REPORT
6
STREET LIGHTING
44.78
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
0
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
6.82
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
YET TO BE PREPARED
10
SHOPPING AREA
0
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
0
YET TO BE PREPARED
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
27-09-2022 (date)
27-09-2022 (date)
01-03-2023
31-12-2028
Plot Area(In Square Meter)
Number of plots in the project
0
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
148.35
205
4
Apartment/Shops/Other Buildings
125.73
10
4
Apartment/Shops/Other Buildings
124.860
4
4
Apartment/Shops/Other Buildings
146.940
68
4
Apartment/Shops/Other Buildings
177.60
36
2
Apartment/Shops/Other Buildings
176.55
36
2
Apartment/Shops/Other Buildings
125.25
34
2
Apartment/Shops/Other Buildings
102.51
2
2
Apartment/Shops/Other Buildings
132.57
1
1
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Other Cost including EDC IDC Registration Cost etc
2471.23
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Other Cost including Taxes Share and Marketing Cost etc
0
0
0
1085.56
Other Cost including EDC IDC Registration Cost etc
0
0
0
0
Land Cost
0
0
0
161.26
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
213.28
213.28
319.92
Shops
0
0
0
0
Plots
0
0
0
0
Other Cost including Taxes Share and Marketing Cost etc
1165.93
1265.04
1378.22
1429.46
Land Cost
624.38
1274.81
2053.99
2552.11
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
319.92
426.57
426.57
703.83
Shops
0
0
0
0
Plots
0
0
0
0
Land Cost
3240.69
3678.26
3961.58
4715.54
Other Cost including Taxes Share and Marketing Cost etc
1533.93
1578.69
1608.16
1737.79
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
2350.38
2772.68
2789.74
2751.35
Shops
0
0
0
0
Plots
0
0
0
0
Other Cost including Taxes Sales and Marketing Cost etc
1806.52
1468.49
1265.62
1403.19
Land Cost
5296.37
3726.28
2208.36
1280.66
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
2947.57
3007.29
2998.76
3028.62
Shops
0
0
0
0
Plots
0
0
0
0
Land Cost
1002.35
918.86
893.81
886.30
Other Cost including Taxes Sales and Marketing Cost etc
674.94
679.15
678.55
680.65
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
2546.60
2444.22
2128.56
1945.14
Shops
0
0
0
0
Plots
0
0
0
0
Land Cost
884.04
883.37
883.17
883.10
Other Cost including Taxes Sales and Marketing Cost etc
646.70
639.49
617.26
604.34
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
1518.57
3160.85
3642.87
0
Shops
0
0
0
0
Plots
0
0
0
0
Other Cost including Taxes Sales and Marketing Cost etc
574.30
689.97
944.41
687.84
Land Cost
883.09
883.08
264.92
113.54
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
7.30
7.08
Water Supply System
0
0
8.43
8.17
Sewerage treatment & garbage disposal
0
0
4.69
4.55
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
3.46
3.35
Parks and Playgrounds
0
0
0.24
0.24
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Light
0
0
1.60
1.55
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
9.75
10.55
11.81
12.18
Water Supply System
11.26
12.17
13.63
14.06
Sewerage treatment & garbage disposal
6.27
6.78
7.59
7.83
Electricity Supply System
0
0
0
0
Storm Water Drainage
4.62
5.00
5.60
5.75
Parks and Playgrounds
0.33
0.35
0.39
0.41
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Light
2.14
2.32
2.59
2.67
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.12
11.34
11.57
12.38
Water Supply System
12.83
13.09
13.35
14.29
Sewerage treatment & garbage disposal
7.14
7.29
7.43
7.96
Electricity Supply System
0
0
0
0
Storm Water Drainage
5.27
5.38
5.48
5.87
Parks and Playgrounds
0.37
0.38
0.39
0.41
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Light
2.44
2.49
2.54
2.72
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
13.61
13.83
11.81
12.02
Water Supply System
15.71
15.96
13.63
13.87
Sewerage treatment & garbage disposal
8.74
8.89
7.59
7.72
Electricity Supply System
0
0
0
0
Storm Water Drainage
6.45
6.55
5.06
5.69
Parks and Playgrounds
0.45
0.46
0.39
0.40
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Light
2.99
3.04
2.59
2.64
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.57
11.79
11.34
12.96
Water Supply System
13.35
13.61
13.09
14.95
Sewerage treatment & garbage disposal
7.43
7.58
7.29
8.32
Electricity Supply System
0
0
0
0
Storm Water Drainage
5.48
5.59
5.38
6.14
Parks and Playgrounds
0.39
0.39
0.38
0.43
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Light
2.54
2.59
2.49
2.84
Yes
No
AXIS BANK LIMITED, 9, MG ROAD, ESQUIRE CENTRE, BANGALORE-560001
922020045117364
UTIB0000009
560211002
000009
Mr. Yogesh Bansal (Chief Financial Officer) Mr. Vigneshwar G Bhat
(Company Secretary) Mr. Ramesh Babu K (Vice President
– Finance) Mr. M Radhakrishnan (General Manager-Finance)
Mr. Chandrashekhar Gowda (Senior Manager II – Finance)
Ms. Lakshmi Anand (Deputy General Manager II- Internal Audit)
Attached
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. LICENCE
ALREADY BEEN OBTAINED
27-05-2008
II. FOREST NOC
ALREADY BEEN OBTAINED
23-10-2013
III. ELECTRICAL CONNECTION APPROVAL
ALREADY BEEN OBTAINED
15-11-2019
IV. HUDA CONNECTION WATER NOC
ALREADY BEEN OBTAINED
13-05-2022
V. AIRPORT HEIGHT CLEARANCE
ALREADY BEEN OBTAINED
18-07-2018
VI. FOREST NOC
ALREADY BEEN OBTAINED
23-10-2013
VII. ENVIRONMENT CLEARANCE
ALREADY BEEN OBTAINED
29-08-2017
VIII. FIRE SCHEME APPROVAL
APPLIED FOR BUT YET TO RECEIVE
07-09-2022
IX. SERVICE ESTIMATES PLAN
APPLIED FOR BUT YET TO RECEIVE
04-10-2022
Yes
Yes
Possession Date: 31.12.2028
SOBHA CITY, PHASE-1, PART-1, SECTOR-108, GURUGRAM
12.88495
240
0
240
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
27061
0
25420
Cost of the apartments
13299
0
13167
Cost of the infrastructure
343
0
198
Others costs
13419
0
12055
40639 Lakhs
411 Lakhs
0 Lakhs
0 Lakhs
No
30-10-2021
30-04-2022
SOBHA CITY, PHASE-1, PART-2, SECTOR-108, GURUGRAM
0.76635
240
0
239
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
28559
0
22967
Cost of the apartments
13299
0
11388
Cost of the infrastructure
343
0
120
Others costs
14917
0
11459
36182 Lakhs
8724 Lakhs
0 Lakhs
0 Lakhs
No
01-05-2022
30-10-2022
SOBHA CITY, PHASE-2, PART-1, SECTOR-108, GURUGRAM
0.7906
96
0
95
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
13333
0
8744
Cost of the apartments
6172
0
3824
Cost of the infrastructure
159
0
25
Others costs
7002
0
4895
15219 Lakhs
6395 Lakhs
0 Lakhs
0 Lakhs
No
30-10-2022
30-04-2023
SOBHA CITY, PHASE-3, SECTOR-108, GURUGRAM
0.754
96
0
96
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
13266
0
4968
Cost of the apartments
6361
0
1868
Cost of the infrastructure
159
0
8
Others costs
6746
0
3092
10091 Lakhs
11908 Lakhs
0 Lakhs
0 Lakhs
No
30-10-2023
30-04-2024
SOBHA CITY, PHASE-4, SECTOR-108, GURUGRAM
2.6778
288
0
234
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
28565
0
7891
Cost of the apartments
14262
0
3713
Cost of the infrastructure
368
0
0
Others costs
13935
0
4178
13816 Lakhs
26869 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2024
30-06-2025
SOBHA CITY, PHASE-5, SECTOR-108, GURUGRAM
5.10183
192
0
192
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
17125
0
3191
Cost of the apartments
14118
0
2132
Cost of the infrastructure
443
0
0
Others costs
2564
0
1059
10822 Lakhs
34599 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2026
31-12-2026
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
NATURAL / ENGINEERED STONE FLOORING AND SKIRTING/ LAMINATED WOODEN FLOORING AND SKIRTING / VITRIFIED TILE FLOORING AND SKIRTING /CERAMIC TILE
2
WALL FINISHING DETAILS
FOR INTERNAL WALLS, PLASTIC EMULSION PAINT / CERAMIC WALL TILING WHEREVER APPLICABLE & TEXTURED PAINT FOR EXTERNAL WALLS
FRAME – TIMBER FRAME & SHUTTERS – WITH BOTH SIDE MASONITE SKIN
7
GLASS WORK
-
8
ELECTRIC FITTINGS
FITTING OF REPUTED MAKE APPROVED BY ISI & IS SPECIFICATION
9
CONDUCTING AND WIRING DETAILS
PVC CONDUITS AND COPPER CABLES OF REPUTED MAKE AS PER ISI AND IS SPECIFICATION
10
CUPBOARD DETAILS
-
11
WATER STORAGE
-
12
LIFT DETAILS
3 LIFTS IN EACH TOWER
13
EXTERNAL GLAZINGS
HEAVY-DUTY ALUMINIUM GLAZED SLIDING WINDOWS & FRENCH WINDOWS MADE FROM SPECIALLY DESIGNED AND MANUFACTURED SECTIONS
13.1
WINDOWS/GLAZINGS
HEAVY-DUTY ALUMINIUM GLAZED SLIDING WINDOWS & FRENCH WINDOWS MADE FROM SPECIALLY DESIGNED AND MANUFACTURED SECTIONS
14
DOORS
• FRAME – TIMBER.
SHUTTERS – WITH BOTH SIDE MASONITE SKIN
14.1
MAIN DOORS
• FRAME – TIMBER.
SHUTTERS – WITH BOTH SIDE MASONITE SKIN
14.2
INTERNAL DOORS
MAIN DOOR & BEDROOM DOORS
• FRAME – TIMBER.
• SHUTTERS – WITH BOTH SIDE MASONITE SKIN.
TOILET DOOR
• FRAME – TIMBER
SHUTTERS –WITH OUTSIDE MASONITE AND INSIDE LAMINATE
15
AIR CONDITIONING
-
16
ELECTRICAL FITTINGS
FITTING OF REPUTED MAKE APPROVED BY ISI & IS SPECIFICATION
17
CNG PIPE LINE
-
18
PROVISION OF WIFI AND BROADBAND FACILITY
CONDUIT PROVISION FOR DEDICATED INTERNET CONNECTION MADE AVAILABLE WITH RJ-45 SOCKET OUTLET IN ONE OF THE BEDROOMS
19
EXTERNAL FINISHING/COLOUR SCHEME
ALL WALLS PAINTED IN TEXTURED PAINT
20
INTERNAL FINISHING
PLASTIC EMULSION PAINT FOR WALLS & CEILING
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
NATURAL / ENGINEERED STONE FLOORING AND SKIRTING/ LAMINATED WOODEN FLOORING AND SKIRTING / VITRIFIED TILE FLOORING AND SKIRTING /CERAMIC TILE
1 . 2
WALLS
PLASTIC EMULSION PAINT FOR WALLS
1 . 3
CEILING
PLASTIC EMULSION PAINT FOR CEILING
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
NATURAL / ENGINEERED STONE FLOORING AND SKIRTING/ LAMINATED WOODEN FLOORING AND SKIRTING / VITRIFIED TILE FLOORING AND SKIRTING /CERAMIC TILE/LAMINATED WOODEN FLOORING AND SKIRTING
2 . 2
WALLS
PLASTIC EMULSION PAINT FOR WALLS
2 . 3
CEILING
PLASTIC EMULSION PAINT FOR CEILING
2 . 4
MODULAR WARDROBES
-
3 . MASTER TOILET
3 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING
3 . 2
WALLS
SUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING
3 . 3
CEILING
FALSE CEILING
3 . 4
COUNTERS
NATURAL/ENGINEERED STONE VANITY COUNTERS
3 . 5
SANITARY WARE/CP FITTINGS
EUROPEAN WATER CLOSET WALL HUNG,
COUNTER TOP WASH BASIN
3 . 6
FITTING/FIXTURES
CHROMIUM PLATED FITTINGS :-
S/L DIVERTER
BATH SPOUT WITH BUTTON
OVERHEAD SHOWER
TELEPHONIC SHOWER
S/ L BASIN MIXER
ANGULAR STOP COCK
HEALTH FAUCET
CP P-TRAP
WASTE COUPLING
METRO POLE FLUSH VALVE
COCKROACH TRAP
GEYSER – HORIZONTAL OF 25 LTR CAPACITY
4 . BED ROOMS
4 . 1
FLOOR
NATURAL / ENGINEERED STONE FLOORING AND SKIRTING/ LAMINATED WOODEN FLOORING AND SKIRTING / VITRIFIED TILE FLOORING AND SKIRTING /CERAMIC TILE
4 . 2
WALLS
PLASTIC EMULSION PAINT FOR WALLS
4 . 3
CEILING
PLASTIC EMULSION PAINT FOR CEILING
4 . 4
WARDROBES
-
5 . TOILET
5 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING
5 . 2
WALLS
SUPERIOR QUALITY CERAMIC WALL TILING UP TO
FALSE CEILING
5 . 3
CEILING
FALSE CEILING WITH GRID PANELS
5 . 4
COUNTERS
NATURAL / ENGINEERED STONE VANITY COUNTERS
5 . 5
SANITARY WARE/CP FITTINGS
NATURAL / ENGINEERED STONE VANITY COUNTERS
5 . 6
FIXTURES
CHROMIUM PLATED FITTINGS :- S/L DIVERTER BATH
SPOUT OVERHEAD SHOWER S/ L BASIN MIXER
ANGULAR STOP COCK HEALTH FAUCET CP P-TRAP
WASTE COUPLING METRO POLE FLUSH VALVE
COCKROACH TRAP GEYSER – HORIZONTAL OF 25
LTR CAPACITY
6 . KITCHEN
6 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING
6 . 2
WALLS
SUPERIOR QUALITY CERAMIC TILING UP TO CEILING
6 . 3
CEILING
PLASTIC EMULSION PAINT FOR CEILING
6 . 4
COUNTERS
-
6 . 5
FIXTURES
SINK MIXER (WALL MOUNTED) SINGLE BOWL SINGLE
DRAIN SS SINK IN UTILITY 2 IN 1 BIB COCK IN UTILITY
ANGULAR STOP COCK COCKROACH TRAP BIB COCK
WITH NOZZLE IN LIVING / DINING SIT OUT (WHEREVER
APPLICABLE)
6 . 6
KITCHEN APPLIANCES
-
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING
7 . 2
WALLS & CEILING
SUPERIOR QUALITY CERAMIC TILE FLOORING
7 . 3
TOILET
SUPERIOR QUALITY CERAMIC TILE FLOORING. •
SUPERIOR QUALITY CERAMIC WALL TILING UP TO
FALSE CEILING. • NATURAL / ENGINEERED STONE
VANITY COUNTERS. FALSE CEILING WITH GRID
PANELS
7 . 4
BALCONY
SUPERIOR QUALITY CERAMIC TILE FLOORING AND
SKIRTING. • NATURAL / ENGINEERED STONE COPING
FOR PARAPET/MS HANDRAIL AS PER DESIGN. •
PLASTIC EMULSION PAINT FOR CEILING. ALL WALLS
PAINTED IN TEXTURED PAINT
8 . SIT-OUTS
8 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING AND
SKIRTING
8 . 2
WALLS & CEILING
PLASTIC EMULSION PAINT FOR CEILING. ALL WALLS
PAINTED IN TEXTURED PAINT
8 . 3
RAILINGS
NATURAL / ENGINEERED STONE COPING FOR
PARAPET/MS HANDRAIL AS PER DESIGN
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT