HRERA GurugramTemp Project Id : RERA-GRG-PROJ-337-2019
Submission Date : 16-01-2020 10:18:52 AM
Applicant Type : Company
Project Type: NEW




SILVERGLADES INFRASTRUCTURE PRIVATE LIMITED
404, NIRMAL TOWER, 26, BARAKHAMBA ROAD, NEW DELHI-110001
01244550300
9899987678 (Number Shared by Promoter in Public)
cs@silverglades.com
http://www.silverglades.com/
XXXX157A
U45201DL2005PTC138897
 
 


 
 


 
 


 
 







HIGHTOWN
REVENUE ESTATE OF VILLAGE SUKHRALI, SECTOR 28
GURGAON
GURUGRAM
01244550300
9810297757 (Number Shared by Promoter in Public)
cs@silverglades.com
VIKAS AGGARWAL
01244550300
9810297757 (Number Shared by Promoter in Public)
cs@silverglades.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15376914-01-2020921000OBC BANKHRERA Gurugram
245568101-09-2020905000OBC BANKHRERA Gurugram
345568201-09-20202423000OBC BANKHRERA Gurugram
45377014-01-2020711000OBC BANKHRERA Gurugram







19627.174 (Sqr/mtrs)
362
362
19627.174 (Sqr/mtrs)
110 of 2013
No
Address     VILLAGE SUKHRALI, GURUGRAM
Address     VILLAGE SUKHRALI, GURUGRAM
Address     VILLAGE SUKHRALI, GURUGRAM
Address     VILLAGE SUKHRALI, GURUGRAM
Address     VILLAGE SUKHRALI, GURUGRAM
Address     VILLAGE SUKHRALI, GURUGRAM
Annexure-B- COLLABORATOR
APPLICANT IS APPLYING BY VIRTUE OF COLLABORATION AGREEMENT.
Yes
COLLABORATION AGREEMENT 3/4/2013 AREA SHARE AGREEMENT NON REFUNDABLE DEPOSIT PAID BY DEVELOPER
No
No
Yes







52361.14 Lakhs
6598 Lakhs
30365 Lakhs
5102 Lakhs
10296.14 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7100.558
3CONSTRUCTION OF ROADS7930.4296
4PAVEMENTS0
5PARKS AND PLAYGROUNDS2947.7299
6GREEN BELTS0
7VEHICLE PARKINGS276.00
8ELECTRICITY SUB-STATION0
9CLUB HOUSE1292.505
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER80.00
Total19627.2225




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSN/ANo
WATER SUPPLYEE HSVP, DIV III, GURUGRAMYes
ELECTRICITYEE, DHBVN, GURUGRAMNo
SEWAGE DISPOSALCOMMISSIONER, MCGYes
STORM WATER DRAINAGECOMMISSIONER, MCG (APPLIED)No
ELECTRICAL LOAD AVAILABILITYDHBVN, GURUGRAMYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS57.90SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM352.13SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE39.31SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM911.18SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL236.80SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING7.45SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING60SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS150SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE1544SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM80SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15PARKING570SUBMITTED TO TOWN & COUNTRY PLANNING
16UNDERGROUND WATER TANK250SUBMITTED TO TOWN & COUNTRY PLANNING
17ELECTRICAL SUB STATION500SUBMITTED TO TOWN & COUNTRY PLANNING
18STP200SUBMITTED TO TOWN & COUNTRY PLANNING
19RAIN WATER HARVESTING62SUBMITTED TO TOWN & COUNTRY PLANNING
20PLANTATION OF ROAD SIDE TRESS2.65SUBMITTED TO TOWN & COUNTRY PLANNING
21SERVICES AND RESURFACING OF ROADS78.58SUBMITTED TO TOWN & COUNTRY PLANNING


12-10-2020 (date)
12-10-2020 (date)
15-10-2020
11-10-2025
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings111982
Apartment/Shops/Other Buildings11561
Apartment/Shops/Other Buildings134462
Apartment/Shops/Other Buildings14322
Apartment/Shops/Other Buildings1851041
Apartment/Shops/Other Buildings23241
Apartment/Shops/Other Buildings18461





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Cost of Construction0
Cost of Construction of Community Facilities0
External Development Charges1596.11
Infrastructure Development Charges500.52
Internal Development Works32
Land Cost Expenditure6598
Others Cost2263.18

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0
Cost of Construction of Community Facilities0
Cost of Construction0
Internal Development Works25
Infrastructure Development Charges0
External Development Charges0
Land Cost Expenditure0
Others Cost149.45

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Infrastructure Development Charges0000
External Development Charges462.2501330
Land Cost Expenditure0000
Others Cost100157351.64165
Cost of Construction189.51763.871566.431604.85
Cost of Construction of Community Facilities0000
Internal Development Works0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Cost of Construction1455.601504.851455.251442.69
Internal Development Works0027.5055
Infrastructure Development Charges0000
External Development Charges38802300
Land Cost Expenditure0000
Others Cost243223205223
Cost of Construction of Community Facilities00012.53

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Internal Development Works27.500035
Others Cost202220200225
Cost of Construction of Community Facilities25.03133.06158.09175.64
Cost of Construction1569.091771.051931.681777.10
Infrastructure Development Charges0000
External Development Charges21902090
Land Cost Expenditure0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Internal Development Works357000
Infrastructure Development Charges0000
External Development Charges19801870
Others Cost212204152161
Cost of Construction of Community Facilities118.95175.41148.24130.24
Cost of Construction1622.961677.231790.881563.34
Land Cost Expenditure0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Land Cost Expenditure0000
External Development Charges0000
Infrastructure Development Charges0000
Internal Development Works183.25720.641007.091340.04
Cost of Construction1637.581704.861641.681689.50
Cost of Construction of Community Facilities135.36130.77125.5075.18
Others Cost142156114105

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other32

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0027.5055

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other27.500035

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other357000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other183.25720.641007.091340.04

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
No
YES BANK GROUND FLOOR, UNIT 004, UNITECH TRADE CENTER, SUSHANT LOK 1, GURUGRAM
016166200000076
YESB0000161
110532033
000161
Mr. Pradeep Jain, Address: H. No. F63A, Radhe Mohan Drive, Fathepur Beri, New Delhi-10074 along with any one of Mr. Mangi Lal Dagar, Address: H-2/45, Bengali Colony, Mahavir Enclave, Palam Gaon, Dabri, Delhi-110045 Mr. Abha Jain, Address: H. No. F63A, Radhe Mohan Drive, Fathepur Beri, New Delhi-10074 Mr. Sandeep Handa, Address: 2046, Pocket-2, Sector-D, Vasant Kunj, New Delhi-110070











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
No
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. TOD APPROVALALREADY BEEN OBTAINED19-08-2019
II. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED14-09-2020
III. FOREST NOCALREADY BEEN OBTAINED11-08-2015
IV. WATER SUPPLYALREADY BEEN OBTAINED07-03-2018
V. ELECTRICAL LOAD AVAILABILITYALREADY BEEN OBTAINED17-01-2020
VI. LICENSE APPROVALALREADY BEEN OBTAINED27-12-2013
VII. ZONING PLAN ALREADY BEEN OBTAINED19-08-2019
VIII. BUILDING PLAN/ SITE PLAN APPROVALALREADY BEEN OBTAINED12-10-2020
IX. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED01-02-2021
X. SEWAGE DISPOSALAPPLIED FOR BUT YET TO RECEIVE19-01-2021
XI. FIRE SCHEME APPROVALAPPLIED FOR BUT YET TO RECEIVENA
XII. SERVICE PLAN ESTIMATES APPROVALAPPLIED FOR BUT YET TO RECEIVENA








Yes


Yes


Possession Date as per RERA RC-11.10.2025













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECOMBINATION OF LAMINATED WOODEN FLOORING , NATURAL STONE & TILES
2WALL FINISHING DETAILSCOMBINATION OF ACRYLIC EMULSION PAINT , POP PUNNING
3KITCHEN DETAILSANTISLIP VITRIFIED TILES;ACRYLIC EMULSION PAINT, GRANITE STONE COUNTER, SINGLE LEVER CP FITTINGS &DOUBLE; BOWL SS SINK WITH DRAIN BOARD,HOB AND CHIMNEY, MODULAR KITCHEN CABINETRY
4BATHROOM FITTINGSVANITIES WITH MIRROR, SINGLE LEVER CP FITTINGS WITH WASH BASIN & EUROPEAN WC
5WOOD WORK ETCMODULAR KITCHEN CABINETRY
6DOORS AND WINDOS FRAMESHARDWOOD DOOR FRAME FOR INTERNAL DOORS
7GLASS WORKN/A
8ELECTRIC FITTINGSMODULAR SWITCHES
9CONDUCTING AND WIRING DETAILSUPVC CONDUITING WITH WIRING
10CUPBOARD DETAILSMODULAR KITCHEN
11WATER STORAGEOHT AT PROJECT LEVEL
12LIFT DETAILS12-18 PERSONS APPROX. EACH LIFT CAPACITY
13EXTERNAL GLAZINGSUPVC FRAME / ALUMINIUM FRAME WITH GLASS
13.1WINDOWS/GLAZINGSUPVC FRAME / ALUMINIUM FRAME WITH GLASS
14DOORSINTERNAL POLISHED VENEER/ PANELLED/ FLUSH SHUTTER
14.1MAIN DOORSWOODEN PANELLED DOOR/POLISHED VENEER
14.2INTERNAL DOORSINTERNAL POLISHED VENEER/ PANELLED/ FLUSH SHUTTER
15AIR CONDITIONINGVRV / SPLIT AC SYSTEM
16ELECTRICAL FITTINGSMODULAR SWITCHES
17CNG PIPE LINEPROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEHIGH GRADE EXTERNAL PAINT AND STONE
20INTERNAL FINISHINGCOMBINATION OF ACRYLIC EMULSION PAINT , POP PUNNING
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNATURAL STONE
1 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESPROVISION
3 . MASTER TOILET
3 . 1 FLOORCOMBINATION OF NATURAL STONE /TILES
3 . 2 WALLSCOMBINATION OF NATURAL STONE /TILES AND ACRYLIC EMULSION PAINT
3 . 3 CEILINGFALSE CEILING PAINTED IN ACRYLIC EMULSION PAINT
3 . 4 COUNTERSSTONE TOP
3 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTING, HEALTH FAUCET, WASH BASINS & WALL HUNG WC
3 . 6 FITTING/FIXTURESVANITIES WITH MIRROR, EXHAUST FAN , TOWER RAIL, TOWEL RING, TOILET PAPER HOLDER, ROBE HOOK
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORNATURAL STONE /TILES
5 . 2 WALLSCOMBINATION OF TILES AND ACRYLIC EMULSION PAINT
5 . 3 CEILINGFALSE CEILING PAINTED IN ACRYLIC EMULSION PAINT
5 . 4 COUNTERSSTONE TOP
5 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTING, HEALTH FAUCET, WASH BASINS & WALL HUNG WC
5 . 6 FIXTURESVANITIES WITH MIRROR, EXHAUST FAN , TOWER RAIL, TOWEL RING, TOILET PAPER HOLDER, ROBE HOOK
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCOMBINATION OF TILES AND ACRYLIC EMULSION PAINT
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE COUNTER
6 . 5 FIXTURESCP FITTING & DOUBLE BOWL SS SINK WITH DRAIN BOARD
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN CABINETRY, HOB & CHIMNEY
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES/ANTISKID TILES
7 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT
7 . 3 TOILETTOILET WITH BASIC CP FITTINGS, WASH BASIN AND SPOUT
7 . 4 BALCONYUTILITY BALCONY TO HAVE THE PROVISION OF ELECTRICAL AND WATER CONNECTIVITY
8 . SIT-OUTS
8 . 1 FLOORANTISKID TIMES
8 . 2 WALLS & CEILINGPLASTER WITH ACRYLIC EMULSION
8 . 3 RAILINGSCOMBINATION OF SS, GLASS &MS;
8 . 4 FIXTURESLED LIGHTS












Sr. No.Document DescriptionDate of Document UploadView Document
1NON -ENCUMBRANCE CERTIFICATE04-11-2020 ------
2TAN SIPL04-11-2020 ------
3POWER LOAD APPROVAL -2804-11-2020 ------
4LICENSE-28 RENEWED04-11-2020 ------
5ELECTRICAL LOAD NOC04-11-2020 ------
6MOA04-11-2020 ------
7ENVIRONMENT NOC- HIGHTOWN04-11-2020 ------
8LICENSE RENEWAL 14.7.2004-11-2020 ------
9TOD LOI- HIGHTOWN04-11-2020 ------
10TOD APPROVAL04-11-2020 ------
11LOI -HIGHTOWN04-11-2020 ------
12AOA04-11-2020 ------
13LC-IV04-11-2020 ------
14GRIHA APPROVAL-HIGHTOWN04-11-2020 ------
15COLLABORATION AGREEMENT04-11-2020 ------
16GST CERTIFICATE SIPL04-11-2020 ------
17LICENSE WITH LAND DETAILS-2804-11-2020 ------
18WATER FOR CONSTRUCTION-2804-11-2020 ------
19BALANCE SHEET_SGI_2017-18-1904-11-2020 ------
20ELECTRICAL PLAN ESTIMATE04-11-2020 ------
21BR-III26-11-2020 ------
22ZONING PLAN11-01-2020 View Document
23IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN11-01-2020 View Document
24DEMARCATION PLAN11-01-2020 View Document
25COPY OF LICENSE ALONG WITH SCHEDULE OF LAND11-01-2020 View Document
26A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS11-01-2020 View Document
27SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN11-01-2020 View Document
28CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT13-01-2020 View Document
29IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN11-01-2020 View Document
30DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD11-01-2020 View Document
31NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT04-11-2020 View Document
32NOC FOREST DEPARTMENT- HIGHTOWN04-11-2020 ------
33TOWER C 4TH-23RD, TYPICAL FLOOR PLAN (EXCEPT 16TH FLOOR) AND AREA DIAGRAM23-02-2021 ------
34INVENTORY DETAILS- RESIDENTIAL_HIGHTOWN_TOWER B20-02-2021 ------
35INVENTORY DETAILS- RESIDENTIAL_HIGHTOWN_TOWER C20-02-2021 ------
36INVENTORY DETAILS- RESIDENTIAL_HIGHTOWN_TOWER A20-02-2021 ------
37AGREEMENT TO SALE20-02-2021 ------
38AIRPORT AUTHORITY NOC- HIGHTOWN20-02-2021 ------
39ALLOTMENT LETTER20-02-2021 ------
40APPLICATION FOR FIRE APPROVAL20-02-2021 ------
41APPROVAL SEWERAGE 20-02-2021 ------
42CASH FLOW STATEMENT OF THE PROPOSED PROJECT20-02-2021 View Document
43DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.20-02-2021 View Document
44REVISED_EC_UNDER TOD20-02-2021 ------
45SERVICE PLAN ESTIMATE20-02-2021 ------
46STORM WATER APPLICATION20-02-2021 ------
471ST BASEMENT PARTIAL FLOOR PLAN AND AREA CALCULATION22-02-2021 ------
482ND BASEMENT PARTIAL FLOOR PLAN AND AREA CALCULATION22-02-2021 ------
493RD BASEMENT PARTIAL FLOOR PLAN AND AREA CALCULATION22-02-2021 ------
50COMMERCIAL BLOCK ELEVATIONS22-02-2021 ------
51EWS 5TH TO TERRACE FLOOR PLAN AND AREA CALCULATION22-02-2021 ------
52EWS FRONT ELEVATION AND CROSS SECTION22-02-2021 ------
53EWS PARKING AREA CALCULATION22-02-2021 ------
54EWS STILT TO 1ST FLOOR PLAN AND AREA CALCULATION22-02-2021 ------
55GREEN AREA CALCULATION22-02-2021 ------
56GROUND COVERAGE CALCULATION22-02-2021 ------
57TOWER A 1-26 TYPICAL FLOOR AREA DIAGRAM22-02-2021 ------
58TOWER A 1-26 TYPICAL FLOOR PLAN (EXCEPT 17TH & 25TH FLOOR) REFUGE LEVEL22-02-2021 ------
59TOWER A 1-26 TYPICAL FLOOR PLAN (EXCEPT 17TH & 25TH FLOOR)22-02-2021 ------
60TOWER A 27TH FLOOR PLAN(PENTHOUSE LEVEL-I) AREA DIAGRAM22-02-2021 ------
61TOWER A 27TH FLOOR PLAN(PENTHOUSE LEVEL-I)22-02-2021 ------
62TOWER A 28TH FLOOR PLAN(PENTHOUSE LEVEL-2) & AREA DIAGRAM22-02-2021 ------
63TOWER A FRONT ELEVATION22-02-2021 ------
64TOWER A GF PLAN & COMMUNITY BLDG AREA DIAGRAM22-02-2021 ------
65TOWER A SECTION A22-02-2021 ------
66TOWER A SIDE ELEVATION22-02-2021 ------
67TOWER B 24TH FLOOR PLAN AND AREA CALCULATION22-02-2021 ------
68TOWER C (COMMERCIAL BLOCK) 7TH & 8TH TYPICAL FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
69TOWER A- TERRACE, MUMTY & OHWT LEVEL PLAN22-02-2021 ------
70TOWER A UNIT CARPET AREA CALCULATION22-02-2021 ------
71TOWER B & C FRONT ELEVATION22-02-2021 ------
72TOWER B & C SECTION22-02-2021 ------
73TOWER B & C SIDE ELEVATION22-02-2021 ------
74TOWER B & C UNIT CARPET AREA CALCULATION22-02-2021 ------
75TOWER B 1ST-23RD, TYPICAL FLOOR PLAN (EXCEPT 16TH FLOOR) AND AREA CALCULATION22-02-2021 ------
76TOWER B 16TH FLOOR PLAN REFUGE LEVEL AND AREA CALCULATION22-02-2021 ------
77TOWER B 16TH FLOOR PLAN REFUGE LEVEL AND AREA DIAGRAM22-02-2021 ------
78TOWER B 25TH FLOOR PLAN AND AREA CALCULATION22-02-2021 ------
79TOWER B 26TH FLOOR LEVEL PLAN AND AREA CALCULATION22-02-2021 ------
80TOWER B GF PLAN & AREA CALCULATION22-02-2021 ------
81TOWER B- TERRACE, MUMTY & OHWT LEVEL PLAN22-02-2021 ------
82TOWER C (COMMERCIAL BLOCK) 2NDFLOOR PLAN AND AREA CALCULATION23-02-2021 ------
83TOWER C (COMMERCIAL BLOCK) 3RD FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
84TOWER C (COMMERCIAL BLOCK) 4TH FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
85TOWER C (COMMERCIAL BLOCK) 6TH FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
86TOWER C (COMMERCIAL BLOCK) 9TH FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
87TOWER C (COMMERCIAL BLOCK) SECTION23-02-2021 ------
88TOWER C (COMMERCIAL BLOCK) TERRACE PLAN AND CARPET AREA CALCULATION23-02-2021 ------
89TOWER C (COMMERCIAL BLOCK) 1ST FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
90TOWER C (COMMERCIAL BLOCK) 5TH FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
91TOWER C (COMMERCIAL BLOCK) GROUND FLOOR AREA CALCULATION23-02-2021 ------
92TOWER C (COMMERCIAL BLOCK) GROUND FLOOR PLAN23-02-2021 ------
93TOWER C 24TH FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
94TOWER C 25TH FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
95TOWER C 26TH FLOOR LEVEL PLAN AND AREA CALCULATION23-02-2021 ------
96TOWER C GF PLAN & AREA CALCULATION23-02-2021 ------
97TOWER C- TERRACE, MUMTY & OHWT LEVEL PLAN23-02-2021 ------
98TOWER C_1ST TO 3RD TYPICAL FLOOR PLAN AND AREA CALCULATION23-02-2021 ------
99SITE PLAN (PHE)_COMPRESSED23-02-2021 ------
100SITE PLAN23-02-2021 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 Revised/Corrected RC 23-08-2022 View Document
2 Change Bank Accounts 20-06-2023 View Document