HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1886-2025
Submission Date : 28-02-2025 02:47:23 PM
Applicant Type : Company
Project Type: NEW




KRISUMI CORPORATION PVT. LTD.
UNIT 02, 11TH FLOOR, EMAAR CAPITAL TOWER - 2, MG ROAD SECTOR 26, 122002, GURUGRAM
7303183987
7303183987 (Number Shared by Promoter in Public)
akash@krisumi.com
XXXX565A
U70200HR2012PTC064545
 
 


 
 


 
 


 
 


 
 


 
 


 
 







WATERSIDE RESIDENCES THE FOREST RESERVE
SECTOR- 36A
HARSARU ST
GURUGRAM
7303183987
7303183987 (Number Shared by Promoter in Public)
akash@krisumi.com
RAMBIR
7303183987
7303183987 (Number Shared by Promoter in Public)
info@krisumi.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
12505945811528-02-20252828350SUMITOMO MITSUI BANKING CORPORATION (NEFT-UTR SMBCH25059458115)HRERA Gurugram







5.1743 (Acre)
350
350
33.3813 (Acre)
39 of 2013 dated 4.6.2013, 85 of2014 dated 8.8.2014 , 166 of 2023 dated 18.10.2023 and 71 of 2024 dated 28.06.2024
Yes







142982.74 Lakhs
78529.92 Lakhs
52418.77 Lakhs
4795.87 Lakhs
7238.18 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.78
3CONSTRUCTION OF ROADS3.1693
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0.5601
6GREEN BELTS0
7VEHICLE PARKINGS0.1575
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.5074
Total5.1743




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTED Yes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS615.25YET TO BE PREPARED
2WATER SUPPLY SYSTEM395.52YET TO BE PREPARED
3STORM WATER DRAINAGE307.63YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM395.52YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL0YET TO BE PREPARED
6STREET LIGHTING87.89YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING703.15YET TO BE PREPARED
8PLAYGROUNDS AND PARKS175.79YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15PARKING 43.95YET TO BE PREPARED
16STP87.89YET TO BE PREPARED
17UNDERGROUND WATER TANK175.79YET TO BE PREPARED
18RAIN WATER HARVESTING87.89YET TO BE PREPARED
19ELECTRICAL SUB STATION395.52YET TO BE PREPARED
20CONSTRUCTION OF CIRCULATION ROAD 395.52YET TO BE PREPARED
21SEBERAGE SYSTEM527.36YET TO BE PREPARED


23-01-2025 (date)
23-01-2025 (date)
01-06-2025
30-06-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings158.3531
Apartment/Shops/Other Buildings185.4721
Apartment/Shops/Other Buildings185.4721
Apartment/Shops/Other Buildings185.471391
Apartment/Shops/Other Buildings319.7221
Apartment/Shops/Other Buildings351.8621
Apartment/Shops/Other Buildings110.6831
Apartment/Shops/Other Buildings139.6721
Apartment/Shops/Other Buildings139.6721
Apartment/Shops/Other Buildings139.671371
Apartment/Shops/Other Buildings283.3941





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments20.9720.9741.94
Shops000
Plots000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments209.681467.731467.731750.79
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2033.852379.813040.293213.27
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3559.234188.264188.264188.26
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3899.963391.493218.513218.51
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1887.081431.031431.031085.07
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments629.03465.04
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System15.82
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00030.76
Water Supply System19.7819.7819.7819.78
Sewerage treatment & garbage disposal0000
Electricity Supply System00019.78
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting35.16
Electrical Sub Station19.78

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements43.0773.8373.8392.29
Water Supply System27.6927.6927.6939.55
Sewerage treatment & garbage disposal0000
Electricity Supply System19.7839.5547.4659.33
Storm Water Drainage0015.3846.14
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting35.1670.3184.38
Electrical Sub Station19.7839.5559.33
Rain water harvesting4.394.398.79
under Ground water tank8.7917.58
Sewerage System26.37
STP4.39
Parking2.20
Construction of Circulation road0

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements92.29123.0530.7630.76
Water Supply System39.5539.5539.5539.55
Sewerage treatment & garbage disposal0000
Electricity Supply System59.3379.1031.6419.78
Storm Water Drainage61.5361.5346.1461.53
Parks and Playgrounds0087.8952.74
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting105.47140.6356.2535.16
Electrical Sub Station59.3379.1019.7819.78
Rain water harvesting13.1817.5817.584.39
Construction of Circulation road59.33118.6679.1079.10
Parking8.798.796.595.27
STP13.1817.5817.5817.58
under Ground water tank43.9552.7426.37
Sewerage System105.47105.4779.10105.47
Street Lighting8.7935.16

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements24.610
Water Supply System19.780
Sewerage treatment & garbage disposal00
Electricity Supply System19.780
Storm Water Drainage15.380
Parks and Playgrounds26.378.79
Clubhouse/community centres00
Shopping area00
Other00
Construction of Circulation road27.6911.87
Parking3.522.20
Rain water harvesting4.39
Sewerage System0
Street Lighting0
Security and Fire Fighting35.16
Electrical Sub Station19.78
STP8.79












Yes
No
SUMITOMO MITSUI BANKING CORPORATION, 2ND FLOOR, WORLDMARK 3, HOSPITALITY DISTRICT, AEROCITY, NEW DELHI
10087013
SMBC0000001
445
9971
Akash Khurana, Apartment No. C-P H-01, Tower T C Araya, Sector-62,Bilaspur(146), Gurugram-122004
YES











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINEDNA
II. ENVIRONMENT CLEARANCEAPPLIED FOR BUT YET TO RECEIVENA








Yes


Yes


AS per RERA NORMS













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELAMINATED WOOD / ENGINEERED WOOD / VITRIFIED TILES / STONE / MARBLE / GRANITE
2WALL FINISHING DETAILSOBD / SEMI ACRYLIC / ACRYLIC EMULSION / VITRIFIED TILES
3KITCHEN DETAILSLAMINATED WOOD / ENGINEERED WOOD / VITRIFIED TILES / STONE / MARBLE / GRANITE / VITROMITE / QUARTZ
4BATHROOM FITTINGSD TILES / STONE / MARBLE / GRANITE / VITROMITE / QUARTZ 4 BATHROOM FITTINGS REPUTED MAKE OF CP FITTINGS & SANITARY WARE
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESWOOD / MS / UPVC / AL / COMPOSITE MATERIAL
7GLASS WORKFROSTED / CLEAR GLASS
8ELECTRIC FITTINGSMODULAR / SWITCH BOX AND FITTINGS
9CONDUCTING AND WIRING DETAILSPVC CONDUITS, FR WIRING
10CUPBOARD DETAILSN/A
11WATER STORAGEOHT / UGT WATER TANKS
12LIFT DETAILSMITSUBISHI / SCHINDLER / KONE / OTIS / EQUIVALENT
13EXTERNAL GLAZINGSMS / ALUMINIUM / UPVC / GLASS
13.1WINDOWS/GLAZINGSMS / ALUMINIUM / UPVC / GLASS
14DOORSMAIN DOOR INTERNAL DOORS
14.1MAIN DOORSFIRE RESISTANT FLUSH DOOR
14.2INTERNAL DOORSFLUSH DOOR
15AIR CONDITIONINGN/A
16ELECTRICAL FITTINGSSAME AS POINT 8
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR PAINT
20INTERNAL FINISHINGEMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORLAMINATED WOOD / ENGINEERED WOOD / MARBLE / TILE
1 . 2 WALLSOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT / VITRIFIED TILES
1 . 3 CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOOD / ENGINEERED WOOD / MARBLE / TILE
2 . 2 WALLSOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT / VITRIFIED TILES
2 . 3 CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORTILES / MARBLE / GRANITE
3 . 2 WALLSTILES / MARBLE / GRANITE
3 . 3 CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
3 . 4 COUNTERSGRANITE STONE / VITRONITE / QUARTZ
3 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC
3 . 6 FITTING/FIXTURESEXHAUST FAN
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOOD / ENGINEERED WOOD / MARBLE / TILE
4 . 2 WALLSOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT / VITRIFIED TILES
4 . 3 CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORTILES / MARBLE / GRANITE
5 . 2 WALLSTILES / MARBLE / GRANITE
5 . 3 CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
5 . 4 COUNTERSGRANITE STONE / VITRONITE / QUARTZ
5 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC
5 . 6 FIXTURESEXHAUST FAN
6 . KITCHEN
6 . 1 FLOORTILES / MARBLE / GRANITE
6 . 2 WALLSTILES / MARBLE / GRANITE, OBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
6 . 3 CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE STONE / VITRONITE / QUARTZ
6 . 5 FIXTURESCP FITTINGS, SS SINK, EXHAUST FAN
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES
7 . 2 WALLS & CEILINGOBD / SEMI ACRYLIC PAINT / TILES
7 . 3 TOILETCP FITTINGS, WASH BASIN, WC
7 . 4 BALCONYTILES / EXTERIOR PAINT
8 . SIT-OUTS
8 . 1 FLOORTILES
8 . 2 WALLS & CEILINGEXTERIOR PAINT
8 . 3 RAILINGSMS/SS/AL/GLASS (FINISHES AS PER DESIGN)
8 . 4 FIXTURESCEILING / WALL LIGHT












Sr. No.Document DescriptionDate of Document UploadView Document
1DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD28-02-2025 View Document
2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.28-02-2025 View Document
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT28-02-2025 View Document
4SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN28-02-2025 View Document
5COPY OF LICENSE ALONG WITH SCHEDULE OF LAND28-02-2025 View Document
6IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN28-02-2025 View Document
7IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN28-02-2025 View Document
8A20 - ELECTRICAL ASSURANCE07-05-2025 View Document
9A7 - MUTATION SIHI, HARSARU 33.38125 ACRES07-05-2025 View Document
10 LICENSE A1 - 33.38125 ACRE07-05-2025 View Document
11APPLICATION FORM07-05-2025 View Document
12PRESCRIBED FORM ROC07-05-2025 View Document
13ADDENDUM TO COLL AGREEMENT07-05-2025 View Document
14A12(B) -33.38125 ACRES NEC HARSARU07-05-2025 View Document
15A26 - 33.38125 ACRE ASSURANCES07-05-2025 View Document
16C10 -PHASE 5-6 PARKING PLAN07-05-2025 View Document
17ADVERTISEMENT 07-05-2025 View Document
18COST INCURRED CERTIFICATE-PH-607-05-2025 View Document
19A8 - JAMABANDI, SIHI, HARSARU 33.38125 ACRES07-05-2025 View Document
20A6- PROJECT REPORT PHASE 607-05-2025 View Document
21SITE PLAN 07-05-2025 View Document
22C9 -PHASE 6 STRUCTURAL DRAWING07-05-2025 View Document
23SUPER IMPOSED DEMARCATION PLAN 07-05-2025 View Document
24A9 - VILLAGE HARSARU, SIHI MAP 33.38125 ACRES07-05-2025 View Document
25A12(A) -33.38125 ACRE NEC FROM MANESAR07-05-2025 View Document
26MCA ROC DETAILS07-05-2025 View Document
27PERT CHART- PHASE 6 07-05-2025 View Document
28BANK UNDERTAKING PH 607-05-2025 View Document
29 ZONING 07-05-2025 View Document
30 C5 -PHASE 6 FLOOR PLANS07-05-2025 View Document
31C12 -PHASE 5-6 SITE PLAN GREEN07-05-2025 View Document
32 LOI A2 - 33.38125 ACRE07-05-2025 View Document
33A3 -LC IV07-05-2025 View Document
34A19 -SERVICE ESTAIMATE APPLICATION07-05-2025 View Document
35C7 -PHASE 6 ELEVATION07-05-2025 View Document
36COST ESTIMATES-PH 607-05-2025 View Document
37A13 - PRESCRIBED FORM ROC07-05-2025 View Document
38SALE DEED07-05-2025 View Document
39NDC07-05-2025 View Document
40ALLOTTMENT LETTER07-05-2025 View Document
41AGREEMENT FOR SALE07-05-2025 View Document
42CONVEYANCE DEED07-05-2025 View Document
43C6 -PHASE 6 FLOOR PLANS07-05-2025 View Document
44C8 -TOWER 4.1 SECTION07-05-2025 View Document
45A10 - 33.38125 ACRE ENTRY OF LICENSE07-05-2025 View Document
46A18 - BR III07-05-2025 View Document
47A21 - FOREST- 33.38125 ACRE07-05-2025 View Document