HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2160-2026
Submission Date : 22-01-2026 07:58:36 PM
Applicant Type : Company
Project Type: NEW




ELDECO INFRASTRUCTURE AND PROPERTIES LIMITED
SHOP NO. S-16, SECOND FLOOR, ELDECO STATION 1, SITE NO. 1, SECTOR 12 FARIDABAD, HARYANA-121007
01140655000
9810946102 (Number Shared by Promoter in Public)
secretarial@eldecoproperties.com
https://eldecogroup.com/
XXXX177D
U74899HR2000PLC043893
 
 


 
 


 
 


 
 


 
 


 
 


 
 







ELDECO TERRA & SOL
PLOT NO- 3A, SECTOR 80, MANESAR, GURUGRAM
MANESAR
GURUGRAM
01140655000
9910482382 (Number Shared by Promoter in Public)
shad.ahmed@eldecoproperties.com
ARUN KUMAR SINGH
01140655000
9910482382 (Number Shared by Promoter in Public)
arun.singh@eldecoproperties.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1951522-01-2026796725HDFC BANKHRERA Gurugram
2965318-02-2026633428HDFC BANKHRERA Gurugram







2.7001 (Acre)
3.15
3.15
2.7001 (Acre)
HSIIDC 270
Yes







69509.30 Lakhs
14261.90 Lakhs
20227 Lakhs
14409.00 Lakhs
20611.4 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 2261.00
3CONSTRUCTION OF ROADS 3070.00
4PAVEMENTS 1177.00
5PARKS AND PLAYGROUNDS 4157.00
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 36.50
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 225.50
Total10927




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSIIDCYes
WATER SUPPLYHSIIDCYes
ELECTRICITYHSIIDCYes
SEWAGE DISPOSALHSIIDCYes
STORM WATER DRAINAGEHSIIDCYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS25YET TO BE PREPARED
2WATER SUPPLY SYSTEM92YET TO BE PREPARED
3STORM WATER DRAINAGE47YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM1423YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL6YET TO BE PREPARED
6STREET LIGHTING15YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING915YET TO BE PREPARED
8PLAYGROUNDS AND PARKS497YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE2285YET TO BE PREPARED
10SHOPPING AREA11YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM22YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER9071YET TO BE PREPARED


16-01-2026 (date)
16-01-2026 (date)
15-02-2026
15-01-2031
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings108.491082
Apartment/Shops/Other Buildings113.1482
Apartment/Shops/Other Buildings120.761002
Apartment/Shops/Other Buildings193.3642
Apartment/Shops/Other Buildings206.8342





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments200300900927
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1000100011001200
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1200120012001200
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1200120012001200
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1000100010001000
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres000100
Shopping area0000
Other124215430330

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres100100100100
Shopping area0000
Other520640640430

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0003
Electricity Supply System0000
Storm Water Drainage00010
Parks and Playgrounds0000
Clubhouse/community centres100100100100
Shopping area0000
Other580590670370

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements5555
Water Supply System10101012
Sewerage treatment & garbage disposal31001010
Electricity Supply System1000200200
Storm Water Drainage1010107
Parks and Playgrounds001050
Clubhouse/community centres100100200200
Shopping area0000
Other370520641450

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements5000
Water Supply System1020200
Sewerage treatment & garbage disposal10102011
Electricity Supply System224200200200
Storm Water Drainage0000
Parks and Playgrounds100137100100
Clubhouse/community centres200200200185
Shopping area6600
Other490600657485












Yes
No
HDFC BANK LTD, SCO-36, SECTOR- 14, OLD DELHI GURGAON ROAD GURUGRAM- 122001 (HARYANA)
99999818682005
HDFC0000090
110240012
90
MR. MANISH JAISWAL, MR. NAVDEEP SHARMA, MR. RAJIV KHURANA 201-212, Splendor Forum, Jasola District Centre Delhi 110025
YES











Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. ZONING PLANALREADY BEEN OBTAINED15-10-2025
II. SITE PLANALREADY BEEN OBTAINED16-01-2026
III. BUILDING PLANALREADY BEEN OBTAINED16-01-2026
IV. AIRPORT AUTHORITY OF INDIA CLEARANCEALREADY BEEN OBTAINED08-07-2025
V. REGULAR LETTER OF ALLOTMENT BY HSIIDCALREADY BEEN OBTAINED15-03-2024
VI. ASSURANCE OF POWER SUPPLY BY HSIIDCALREADY BEEN OBTAINED16-12-2025
VII. ASSURANCE OF SEWAGE CONNECTIONALREADY BEEN OBTAINED12-12-2025
VIII. ASSURANCE OF WATER SUPPLYALREADY BEEN OBTAINED12-12-2025
IX. ASSURANCE FOR STORM WATER DISPOSALALREADY BEEN OBTAINED23-02-2026








Yes


Yes









ELDECO ARANYA
13.0875
38
197
38
194
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
4211.3307172.54
Cost of the apartments658.5500
Cost of the infrastructure1243.3103519.08
Others costs2309.4703653.46


13532.29 Lakhs
2694.14 Lakhs
4200 Lakhs
3840 Lakhs
Yes
30-11-2024
30-11-2024




ELDECO ESTATE ONE PRESTIGE
2.90625
0
24
0
24
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1347.030373.47
Cost of the apartments000
Cost of the infrastructure771.030120.76
Others costs5760252.71


524.24 Lakhs
10507.12 Lakhs
0 Lakhs
0 Lakhs
No
12-02-2029
12-02-2029




ELDECO FAIRWAY RESERVE
33752
380
0
202
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
71744.62017498.45
Cost of the apartments28785.9805967.51
Cost of the infrastructure13782.6400
Others costs29176011530.95


22187.74 Lakhs
67541.50 Lakhs
20000 Lakhs
20000 Lakhs
Yes
31-12-2031
31-12-2031




ELDECO ESTATE ONE PINNACLE
2.9167
36
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1592.34020.4
Cost of the apartments000
Cost of the infrastructure836.38015.59
Others costs599.0804.81


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
08-05-2030
08-05-2030




ELDECO PLAZA
0.903
0
23
0
23
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6300433.98
Cost of the apartments000
Cost of the infrastructure145068.34
Others costs4600365.64


105498880 Lakhs
914820 Lakhs
1010 Lakhs
1010 Lakhs
No
12-04-2024
12-04-2024










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES
2WALL FINISHING DETAILSACRYLIC EMULSION /OBD/PLASTIC PAINT / TILES/TEXTURE PAINTS ETC
3KITCHEN DETAILSFLOORS: TILES; WALLS: VITRIFIED TILES/ CERAMIC TILES/ PLASTIC PAINT/OBD; CEILING: OBD/ PLASTIC PAINT; GOOD QUALITY PAINT WINDOW/ GLAZING: GLAZED WINDOWS WITH UPVC/AL/MS FRAMES" GLAZED WINDOWS WITH UPVC/AL/MS
4BATHROOM FITTINGSWASH BASIN: UNDER COUNTER/ COUNTER TOP TAP: CP FITTINGS GOOD QUALITY
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESHARDWOOD /ENGINERED WOOD" /UPVC/AL/MS FRAMES
7GLASS WORKCLEAR/FROSTED GLASS
8ELECTRIC FITTINGSMODULAR SWITCHES. SOCKETS & SWITCH BOARDS
9CONDUCTING AND WIRING DETAILSCONDUIT: "PVC, COPPER WIRING AS PER REQUIRMENTS
10CUPBOARD DETAILSNA
11WATER STORAGEOHT & UGT WATER TANKS
12LIFT DETAILSNA
13EXTERNAL GLAZINGSGLAZED WINDOW WITH UPVC/ AL MS FRAMES
13.1WINDOWS/GLAZINGSGLAZED WINDOW WITH UPVC/ AL MS FRAMES
14DOORSFLUSH DOOR WITH LAMINATE / PU / VENEER FINISH/PAINT FINISH
14.1MAIN DOORSFLUSH DOOR WITH LAMINATE / PU / VENEER FINISH/ POLISH
14.2INTERNAL DOORSFLUSH DOOR WITH LAMINATE / PU / VENEER FINISH/PAINT
15AIR CONDITIONINGVRV WITH SPLIT / SPLIT UNIT
16ELECTRICAL FITTINGSMODULAR SWITCHES, SOCKET & SWITCH BOARDS
17CNG PIPE LINEAS PER NORMS
18PROVISION OF WIFI AND BROADBAND FACILITYINTERNET CONNECTIVITY (WIFI) PROVISION ONLY
19EXTERNAL FINISHING/COLOUR SCHEMECEMENT BASED GRADE PAINT EXTERIOR"/TEXTURED PAINT OR EQUIVALENT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE/ VERIFIED TILES
1 . 2 WALLSACRYLIC EMULSION/OBD /PLASTIC PAINT
1 . 3 CEILINGOBD / PLASTIC PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORAC-4 GRADE, LAMINATED WOODEN FLOORING// VERIFIED TILES
2 . 2 WALLSPLASTIC PAINT OBD
2 . 3 CEILINGOBD / PLASTIC PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOOR/CERAMIC/ ANTI SKID VERIFIED TILES
3 . 2 WALLS/CERAMIC/ ANTI SKID VERIFIED TILES
3 . 3 CEILINGFALSE / GRID CEILING
3 . 4 COUNTERS STONE
3 . 5 SANITARY WARE/CP FITTINGSWASH BASIN : UNDER COUNTER/ COUNTER TOP
3 . 6 FITTING/FIXTURESCP FITTINGS GOOD QUALITY
4 . BED ROOMS
4 . 1 FLOOR VERIFIED TILES
4 . 2 WALLSPLASTIC PAINT//OBD
4 . 3 CEILINGOBD / PLASTIC PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORVITRIFIED TILES /CERAMIC TILES /
5 . 2 WALLSWALLS VITRIFIED / CERAMIC TILES
5 . 3 CEILINGFALSE / GRID CEILING
5 . 4 COUNTERS STONE
5 . 5 SANITARY WARE/CP FITTINGSWASH BASIN: UNDER COUNTER/ COUNTER TOP; TAP SINGLE LEVER MIXER
5 . 6 FIXTURESCP FITTINGS
6 . KITCHEN
6 . 1 FLOOR/VITRIFIED / CERAMIC TILES
6 . 2 WALLSTILE UP-TO 2 ABOVE COUNTER & EMULSION PAINT IN BALANCE AREA
6 . 3 CEILINGACRYLIC EMULSION PAINTS/OBD
6 . 4 COUNTERSCOMPOSITE GRANITE/STONE
6 . 5 FIXTURESSS SINK DOUBLE BOWL WITH DRAIN BOARD/ SS FINISH SINK TAPS SINGLE LEVER MIXERS
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITIRFIED TILES / CERAMIC TILES
7 . 2 WALLS & CEILINGPLASTIC PAINT/OBD
7 . 3 TOILETNA
7 . 4 BALCONYVITIRFIED TILES / CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 22-01-2026 View Document
2 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 21-01-2026 View Document
3 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 22-01-2026 View Document
4 BASEMENT 3&2 22-01-2026 ------
5 BR - ACCOUNT SIGNATORIES 22-01-2026 ------
6 PLAN 1, 22-01-2026 ------
7 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 22-01-2026 View Document
8 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 22-01-2026 View Document
9 DEMAND DRAFT 22-01-2026 ------
10 ASSURANCE FOR SEWAGE WATER ELECTRICITY 22-01-2026 ------
11 MUMTY 22-01-2026 ------
12 BASEMENT 1 & GF 22-01-2026 ------
13 TYPICAL 22-01-2026 ------
14 ZONING PLAN 21-01-2026 View Document
15 PLAN FLOOR 2-9 22-01-2026 ------
16 PENTHOUSE 22-01-2026 ------
17 DEMARCATION PLAN 21-01-2026 View Document
18 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 21-01-2026 View Document
19 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 21-01-2026 View Document
20 PLAN FLOOR 10-18 22-01-2026 ------
21 PLAN FLOOR 22-01-2026 ------
22 NOCS 06-03-2026 ------
23 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 06-03-2026 View Document
24 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 06-03-2026 View Document
25 ENCUMBRANCE CERTIFICATE-PROJECT ELDECO TERRA AND SOL 06-03-2026 ------