HRERA GurugramTemp Project Id : RERA-GRG-PROJ-453-2019
Submission Date : 18-12-2019 12:28:06 PM
Applicant Type : Company
Project Type: NEW




EMAAR MGF LAND LTD.
EMAAR BUSINESS PARK, SIKANDERPUR SECTOR-28, GURUGRAM, HARYANA 122001
1244421155
9743999521 (Number Shared by Promoter in Public)
coordination@emaar-india.com
http://emaar-india.com/
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 


 
 


 
 


 
 


 
 







EMERALD NUEVO
SECTOR 65 & 62 BADSHAHPUR NANGLI MAIDAWAS
GURGAON
GURUGRAM
01244421155
0124442115 (Number Shared by Promoter in Public)
coordination@emaar-india.com
SANJEEV KUMAR
01244421155
8800422722 (Number Shared by Promoter in Public)
Sanjeev.Kumar@Emaar-India.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
120289305-12-2019443887HSBCHRERA Gurugram







1.344 (Acre)
264
240
195.2412 (Acre)
Lic No. 10 of 2009 dt. 21.05.2009 (102.7412 Acres) and Lic. No. 113 fo 2011 dt. 22.12.2011 (92.50 Acres)
No
Address     306-308, SQUARE ONE, C2 DISTRICT CENTRE, SAKET, NEW DELHI- 110017
Annexure-B- AS DEVELOPER
BY VIRTUE OF COLLABORATION AGREEMENTS
Yes
THE OWNER SHALL BE ENTITLED TO RETAIN SUCH PORTION OF THE REVENUE AS IS EQUIVALENT TO (A) THE COST OF THE LAND AND PERCENTAGE(ONE PERCENT) MARK UP ON THE COST OF LAND OR (B) THE CIRCLE RATE AS APPLICABLE TO THE STATE OR (C) RS 25000 PER ACRE WHICHEVER IS LOWER, AS CONSIDERATION IN RESPECT OF THE RIGHTS ASSIGNED TO THE DEVELOPER FOR DEVELOPMENT OF THE PROJECT WHICH SHALL BECAME PAYABLE AS AND WHEN THE REVENUE IS RECOGNIZED BY THE DEVELOPER IN RESPECT OF SUCH LAND.
No
Yes
Yes







9311.10 Lakhs
178 Lakhs
7323 Lakhs
152.10 Lakhs
1658 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.344
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total1.344




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTEDYes
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS24.6SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM10.5SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE9.2SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM31.1SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL8.3SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING1.4SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING2.5SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS1.2SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM1SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING
15STP14.5SUBMITTED TO TOWN & COUNTRY PLANNING
16UG4.8SUBMITTED TO TOWN & COUNTRY PLANNING
17RAIN WATER HARVESTING1.7SUBMITTED TO TOWN & COUNTRY PLANNING
18ELECTRICAL SUBSTATION22.8SUBMITTED TO TOWN & COUNTRY PLANNING
19CONSTRUCTION OF CIRCULATION ROAD18.6SUBMITTED TO TOWN & COUNTRY PLANNING


NA (date)
17-12-2019 (date)
31-01-2020
31-12-2022
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings161.84610
Apartment/Shops/Other Buildings160.62110
Apartment/Shops/Other Buildings160.17610
Apartment/Shops/Other Buildings136.12910
Apartment/Shops/Other Buildings161.5310
Apartment/Shops/Other Buildings160.4110
Apartment/Shops/Other Buildings159.9610
Apartment/Shops/Other Buildings135.9210
Apartment/Shops/Other Buildings161.73510
Apartment/Shops/Other Buildings160.5110
Apartment/Shops/Other Buildings160.06510
Apartment/Shops/Other Buildings136.03510
Apartment/Shops/Other Buildings161.84610
Apartment/Shops/Other Buildings160.62110
Apartment/Shops/Other Buildings160.17610
Apartment/Shops/Other Buildings136.12910
Apartment/Shops/Other Buildings161.5310
Apartment/Shops/Other Buildings160.4110
Apartment/Shops/Other Buildings159.9610
Apartment/Shops/Other Buildings135.9210
Apartment/Shops/Other Buildings161.5310
Apartment/Shops/Other Buildings160.4110
Apartment/Shops/Other Buildings159.9610
Apartment/Shops/Other Buildings135.9210
Apartment/Shops/Other Buildings161.84610
Apartment/Shops/Other Buildings160.62110
Apartment/Shops/Other Buildings160.17610
Apartment/Shops/Other Buildings136.12910
Apartment/Shops/Other Buildings161.84610
Apartment/Shops/Other Buildings160.62110
Apartment/Shops/Other Buildings160.17610
Apartment/Shops/Other Buildings136.12910
Apartment/Shops/Other Buildings161.5310
Apartment/Shops/Other Buildings160.4110
Apartment/Shops/Other Buildings159.9610
Apartment/Shops/Other Buildings135.9210
Apartment/Shops/Other Buildings161.73510
Apartment/Shops/Other Buildings160.5110
Apartment/Shops/Other Buildings160.06510
Apartment/Shops/Other Buildings136.03510
Apartment/Shops/Other Buildings161.8510
Apartment/Shops/Other Buildings160.6210
Apartment/Shops/Other Buildings160.1810
Apartment/Shops/Other Buildings136.1310
Apartment/Shops/Other Buildings161.5310
Apartment/Shops/Other Buildings160.4110
Apartment/Shops/Other Buildings159.9610
Apartment/Shops/Other Buildings135.9210
Apartment/Shops/Other Buildings161.5310
Apartment/Shops/Other Buildings160.4110
Apartment/Shops/Other Buildings159.9610
Apartment/Shops/Other Buildings135.9210
Apartment/Shops/Other Buildings161.8510
Apartment/Shops/Other Buildings160.6210
Apartment/Shops/Other Buildings160.1810
Apartment/Shops/Other Buildings136.1310
Apartment/Shops/Other Buildings161.84610
Apartment/Shops/Other Buildings160.62110
Apartment/Shops/Other Buildings160.17610
Apartment/Shops/Other Buildings136.12910
Apartment/Shops/Other Buildings161.5310
Apartment/Shops/Other Buildings160.4110
Apartment/Shops/Other Buildings159.9610
Apartment/Shops/Other Buildings135.9210
Apartment/Shops/Other Buildings161.5310
Apartment/Shops/Other Buildings160.4110
Apartment/Shops/Other Buildings159.9610
Apartment/Shops/Other Buildings135.9210
Apartment/Shops/Other Buildings161.84610
Apartment/Shops/Other Buildings160.62110
Apartment/Shops/Other Buildings160.17610
Apartment/Shops/Other Buildings136.12910





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments445
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments138206602
Shops000
Plots000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments430135817022098
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments344
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Electrical Sub Station0.23
Renewable Energy System0.01
STP0.14
Underground tank0.05

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00.060.11
Water Supply System0.020.030.04
Sewerage treatment & garbage disposal0.010.020.03
Electricity Supply System0.050.080.11
Storm Water Drainage00.010.02
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Security and Firefighting Services0.010.01

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.150.11
Water Supply System0.020.01
Sewerage treatment & garbage disposal0.020
Electricity Supply System0.060.02
Storm Water Drainage0.030.02
Parks and Playgrounds0.010
Clubhouse/community centres00
Shopping area00
Other00
Rainwater Harvesting0.01
Street Light0.01












Yes
No
KOTAK MAHINDRA BANK
5213086551
KKBK0000172
110485003
172
Mr. Rahul Bindle and Mr. Abhishek Kumar











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ELECTRICITY LOADALREADY BEEN OBTAINED26-10-2017
II. ARAVALI NOCALREADY BEEN OBTAINED10-07-2014
III. LICENSE APPROVAL ALREADY BEEN OBTAINED20-05-2019
IV. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED05-01-2015
V. SERVICE PLAN ESTIMATESALREADY BEEN OBTAINED12-12-2017
VI. FOREST NOCALREADY BEEN OBTAINED02-04-2014








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEBARE RCC SLAB / KOTA STONE/ GRANITE/ CERAMIC TILE / VITRIFIED TILES / IMPORTED MARBLE/LAMINATES/REFLECTIVE PAINT
2WALL FINISHING DETAILSCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT / CERAMIC TILE / VITRIFIED TILE
3KITCHEN DETAILSCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT / CERAMIC TILE / VITRIFIED TILE
4BATHROOM FITTINGSHIGH QUALITY SANITARY WARE AND CP FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNO INTERNAL DOORS / FACTORY FINISHED ENGINEERED WOODEN DOOR WITH DOOR FRAMES
7GLASS WORKNA
8ELECTRIC FITTINGSMODULAR SWITCHES
9CONDUCTING AND WIRING DETAILSPVC CONDUIT AND FRLS WIRING
10CUPBOARD DETAILSNA
11WATER STORAGEOVER HEAD WATER TANKS
12LIFT DETAILSSS FINISH INSIDE LIFT CAR
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSUPVC/ ALUMINIUM PAINTED /MS PAINTED DOOR-WINDOW WITH GLASS
14DOORSNA
14.1MAIN DOORSFACTORY FINISHED ENGINEERED WOODEN DOOR WITH DOOR FRAMES
14.2INTERNAL DOORSFACTORY FINISHED ENGINEERED WOODEN DOOR WITH DOOR FRAMES
15AIR CONDITIONINGVRF SYSTEM WITH HI-WALL UNITS
16ELECTRICAL FITTINGSMODULAR SWITCHES
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE / WEATHER PROOF PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORBARE RCC SLAB / VITREFIED TILE / IMPORTED MARBLE
1 . 2 WALLSCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT
1 . 3 CEILINGCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT WITH FALSE CEILING (EXTENT AS PER DESIGN)
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORBARE RCC SLAB / LAMINATE WOODEN FLOORING
2 . 2 WALLSCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT
2 . 3 CEILINGCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT WITH FALSE CEILING (EXTENT AS PER DESIGN)
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORBARE RCC SLAB / VITRIFIED TILES
3 . 2 WALLSCEMENT PLASTER FINISH / WHITE WASH / VITRIFIED TILES UPTO 7’WITH ACRYLIC EMULSION.
3 . 3 CEILINGCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT WITH FALSE CEILING (EXTENT AS PER DESIGN)
3 . 4 COUNTERSGRANITE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSQUALITY SANITARY WARE AND CP FITTINGS
3 . 6 FITTING/FIXTURESHIGH QUALITY FIXTURES
4 . BED ROOMS
4 . 1 FLOORBARE RCC SLAB / LAMINATE WOODEN FLOORING
4 . 2 WALLSCEMENT PLASTER FINISH / OBD/ WHITE-WASH / ACRYLIC EMULSION PAINT
4 . 3 CEILINGCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT WITH FALSE CEILING (EXTENT AS PER DESIGN)
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORBARE RCC SLAB / VITRIFIED TILES
5 . 2 WALLSCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT
5 . 3 CEILINGCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT WITH FALSE CEILING (EXTENT AS PER DESIGN)
5 . 4 COUNTERSGRANITE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSHIGH QUALITY SANITARY WARE AND CP FITTINGS
5 . 6 FIXTURESHIGH QUALITY FIXTURES
6 . KITCHEN
6 . 1 FLOORBARE RCC SLAB / VITRIFIED TILE FLOORING
6 . 2 WALLSCEMENT PLASTER FINISH / WHITE WASH / OBD / TILE CLADDING WITH ACRYLIC EMULSION PAINT
6 . 3 CEILINGCEMENT PLASTER FINISH / OBD/ WHITE-WASH/ACRYLIC EMULSION PAINT WITH FALSE CEILING (EXTENT AS PER DESIGN)
6 . 4 COUNTERSGRANITE COUNTER
6 . 5 FIXTURESSINK AND FAUCET
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN WITH CHIMNEY, HOB
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORBARE RCC SLAB / CERAMIC TILES / VITRIFIED TILES
7 . 2 WALLS & CEILINGCEMENT PLASTER FINISH / WHITE WASH / TEXTURE PAINT / WEATHER PROOF PAINT
7 . 3 TOILETNA
7 . 4 BALCONYCOMBINATION OF PARAPET WITH WEATHER PROOF PAINT AND M.S. RAILING WITH ENAMEL PAINT
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN18-12-2019 View Document
2COPY OF LICENSE ALONG WITH SCHEDULE OF LAND18-12-2019 View Document
3BR-III27-01-2020 ------
4ENVIRONMENTAL CLEARANCE27-01-2020 ------
5LC-IV27-01-2020 ------
6LICENSE27-01-2020 ------
7LOI27-01-2020 ------
8SHIJRA SUMPERIMPOSED APPROVED LAYOUT27-01-2020 ------
9DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.31-01-2020 View Document
10NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT27-01-2020 View Document
11WATER CONNECTION EMERALD HILLS APPROVAL LETTER27-01-2020 ------
12DOMESTIC WATER SUPPLY27-01-2020 ------
13ELECTRICAL LAYOUT27-01-2020 ------
14FLUSHING SUPPLY27-01-2020 ------
15RECHARGE WELL27-01-2020 ------
16ROADS27-01-2020 ------
17SEWER LAYOUT27-01-2020 ------
18STORM WATER27-01-2020 ------
19STREET LIGHT PLAN27-01-2020 ------
20IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN27-01-2020 View Document