HRERA GurugramTemp Project Id : RERA-GRG-PROJ-660-2020
Submission Date : 19-08-2020 11:49:26 AM
Applicant Type : Company
Project Type: ONGOING




BPTP LIMITED
OT-14, 3RD FLOOR, NEXT DOOR PARKLANDS, SECTOR-76 FARIDABAD FARIDABAD HR 121004 IN
01149572787
9871883334 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com
http://bptp.com
XXXX442A
U45201DL2003PLC121733
 
 


 
 


 
 







PARK GENERATION
VILLAGE BASAI .SECTOR 37 D, GURUGRAM, HARYANA
GURGAON
GURUGRAM
8800093280
8800093280 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com
KRISHNA KANT BALYAN
8800093280
8800093280 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
174827428-07-2017502757RBL BANKHRERA Gurugram







26542.55 (Sqr/mtrs)
1.75
1.75
43.558 (Sqr/mtrs)
License no 83 of 2008 and License no 94 of 2011
No
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Annexure-B- AS A PROMOTER.
COLLABORATION AGREEMENT
No
AS ANNEXED.
No
No
Yes







11144.20 Lakhs
1117.36 Lakhs
6324.00 Lakhs
1099.33 Lakhs
2603.51 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS26542.55
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total26542.55




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS28.00SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM328.15SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE15.86SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM322.51SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL25.00SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING25.00SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING139.81SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS215.01SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING


21-09-2012 (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BED ROOM HALL KITCHEN FLAT83.7914814173
2APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BED ROOM HALL KITCHEN FLAT100.771101
3APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BED ROOM, LIFESTYLE ROOM,HALL KITCHEN83.792201
4APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BED ROOM, LIFESTYLE ROOM,HALL KITCHEN100.77706731
5APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BED ROOM, LIFESTYLE ROOM,HALL KITCHEN106.124401






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
APARTMENTS215OCCUPATION CERTIFICATE RECEIVED


21-09-2012
30-06-2016
30-04-2018
21-09-2012
100
30-04-2018
OCCUPATION CERTIFICATE RECEIVED
OCCUPATION CERTIFICATE RECEIVED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
21-09-2012
100
30-04-2018
OCCUPATION CERTIFICATE RECEIVED
OCCUPATION CERTIFICATE RECEIVED


185
78
0
63
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments4155.17
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments670550600
Shops000
Plots000

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments348500191
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System106.10
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements876
Water Supply System456065
Sewerage treatment & garbage disposal865
Electricity Supply System809095
Storm Water Drainage374
Parks and Playgrounds456065
Clubhouse/community centres000
Shopping area000
Other424550

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements7
Water Supply System52
Sewerage treatment & garbage disposal6
Electricity Supply System58
Storm Water Drainage2
Parks and Playgrounds45
Clubhouse/community centres0
Shopping area0
Other27












Particulars Remarks, if any
i. No. of Flats/Apartments constructed225
ii. No. of Flats/ Apartments booked215
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter15213.14 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter13822.44 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter1330.70 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter1330.70 Lakhs
vii. Amount invested in the project upto the date of application0 Lakhs
Land cost (If any)1108.20 Lakhs
Apartments4155.17 Lakhs
Infrastructure106.10 Lakhs
EDC/ Taxes Etc.2761.11 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession3013.61 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 1462.24 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS28.000
II. WATER SUPPLY SYSTEM328.15106.10
III. STORM WATER DRAINAGE15.860
IV. ELECTRICITY SUPPLY SYSTEM322.510
V. SEWAGE TREATMENT & GARBAGE DISPOSAL25.000
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.215.010
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM139.810
XVII. OTHER FACILITIES AS PER PROJECT REPORT25.000









Yes
Yes
STATE BANK OF INDIA, NEW DELHI HOUSE ,27, BARAKHAMBA ROAD, NEW DELHI-110001
61311054926
SBBJ0010390
110003008
010390
Inderbir Singh Bhatia and Rakesh Aggarwal
As Annexed.











No
No
No
No
No
No
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO 83 OF 2008ALREADY BEEN OBTAINED05-04-2008
II. LICENSE NO 94 OF 2011ALREADY BEEN OBTAINED24-10-2011
III. SERVICE PLAN ESTIMATEALREADY BEEN OBTAINED07-11-2013
IV. ZONNING PLAN APPROVALALREADY BEEN OBTAINED09-05-2012
V. ENVIORNMENTAL CLEARANCE ALREADY BEEN OBTAINED20-07-2016
VI. FOREST NOCALREADY BEEN OBTAINED08-02-2012
VII. FIRE FIGHTING SCHEMEALREADY BEEN OBTAINED09-07-2013








Yes


Yes


As Annexed.







PARK TERRA, SEC 37D GURUGRAM
840305
456
0
373
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
35269.38020987.44
Cost of the apartments000
Cost of the infrastructure000
Others costs000


30900 Lakhs
9500 Lakhs
6500.00 Lakhs
4500.00 Lakhs
Yes
31-12-2012
31-10-2020




PARK SENTOSA, SECTOR 77 FARIDABAD
743720
420
0
159
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
22701.6505630.20
Cost of the apartments000
Cost of the infrastructure000
Others costs000


3600 Lakhs
10100 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2013
31-07-2022




VISSIONAIRE VIALLS, SECTOR 70 GURUGRAM
56233
10
10
5
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
932.830932.83
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1300 Lakhs
1000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020




PEDESTAL FLOORS SECTOR 70A GURUGRAM
303304
174
58
143
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
5550.8705550.87
Cost of the apartments000
Cost of the infrastructure000
Others costs000


10200 Lakhs
8000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
30-07-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSE VITRIFIED TILES IN LIVING& DRAWING, KITCHEN, WOODEN FLOORING IN ALL BEDROOMS.
2WALL FINISHING DETAILS PAINT ACRYLIC EMULSION
3KITCHEN DETAILSFLOORING –VITRIFIED TILES DADO -CERAMIC TILES
4BATHROOM FITTINGSGROHE
5WOOD WORK ETC N.A
6DOORS AND WINDOS FRAMES OUTER - UPVC INTERNAL –RED MIRANDI SIZE-125MMX65MM
7GLASS WORK 6MM TO 8MM TOUGHENED GLASS
8ELECTRIC FITTINGS LEGRAND & EQUIVILENT
9CONDUCTING AND WIRING DETAILS PVC CONDUITS –HEAVY DUTY
10CUPBOARD DETAILSNIL
11WATER STORAGE UG TANK & OVERHEAD TANKS
12LIFT DETAILS 2 NOS.
13EXTERNAL GLAZINGS UPVC
13.1WINDOWS/GLAZINGS UPVC
14DOORSAS MENTIONED IN 14.1 AND 14.2
14.1MAIN DOORS FLUSH DOORS
14.2INTERNAL DOORS FLUSH DOORS
15AIR CONDITIONING_
16ELECTRICAL FITTINGS LEGRAND & EQUIVILENT
17CNG PIPE LINE N.A
18PROVISION OF WIFI AND BROADBAND FACILITY_
19EXTERNAL FINISHING/COLOUR SCHEME TEXTURE PAINT
20INTERNAL FINISHING ACRYLIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLS PAINTED ACRYLIC EMULSION
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOOR LAMINATED WOODEN FLOORING
2 . 2 WALLS OBD/ACRYLIC EMULSION
2 . 3 CEILING OBD/ACRYLIC EMULSION
2 . 4 MODULAR WARDROBES N.A
3 . MASTER TOILET
3 . 1 FLOOR CERAMIC TILES
3 . 2 WALLS CERAMIC TILES
3 . 3 CEILING GRID CEILING
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGS GROHE & EQUIVILENT
3 . 6 FITTING/FIXTURES GROHE & EQUIVILENT
4 . BED ROOMS
4 . 1 FLOOR LAMINATED WOODEN FLOORING
4 . 2 WALLSOBD/ACRYLIC EMULSION
4 . 3 CEILINGOBD/ACRYLIC EMULSION
4 . 4 WARDROBES N.A
5 . TOILET
5 . 1 FLOORCERAMIC TILES
5 . 2 WALLSCERAMIC TILES
5 . 3 CEILINGGRID CEILING
5 . 4 COUNTERSGRANITE
5 . 5 SANITARY WARE/CP FITTINGS_
5 . 6 FIXTURESAMERICAN STD & GROHE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCERAMIC TILES
6 . 3 CEILINGOBD/ACRYLIC EMULSION
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESGROHE
6 . 6 KITCHEN APPLIANCES N.A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGOBD/ACRYLIC EMULSION
7 . 3 TOILETCERAMIC TILES
7 . 4 BALCONYCERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORN.A
8 . 2 WALLS & CEILINGN.A
8 . 3 RAILINGSN.A
8 . 4 FIXTURESN.A












Sr. No.Document DescriptionDate of Document UploadView Document
1DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.09-03-2020 View Document
2CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT09-03-2020 View Document
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT09-03-2020 View Document
4COPY OF LICENSE ALONG WITH SCHEDULE OF LAND09-03-2020 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN09-03-2020 View Document
6IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN09-03-2020 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 Extension No. HARERA/GGM/REP/RC/07/ 2O18/EXT/93/2018 DATED-12.06.2019 28-05-2020 View Document
2 OC for Tower 14, 15 and 18 dated 20.09.2019 03-08-2023 View Document
3 OC uploaded 08-08-2023 View Document