HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1959-2025
Submission Date : 26-05-2025 01:57:46 PM
Applicant Type : Company
Project Type: NEW




BPTP LIMITED
OT-14, 3RD FLOOR, NEXTDOOR PARKLANDS,SECTOR-76 FARIDABDFARIDABAD HR 121004 IN
7428396818 (Number Shared by Promoter in Public)
Rera.gurugram@bptp.com
Http://bptp.com
XXXX442A
U45201HR2003PLC082732
 
 


 
 


 
 


 
 


 
 







GAIA RESIDENCES AT AMSTORIA 102
SECTOR 102 GURUGRAM
GURGAON
GURUGRAM
9810810516
9810810516 (Number Shared by Promoter in Public)
RERA.GURUGRAM@BPTP.COM
DEVENDER KUMAR
9810810516
9810810516 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151353226-05-20253865178ICICI BANKHRERA Gurugram
251353126-05-2025750528ICICI BANKHRERA Gurugram







1.6838 (Acre)
5.15
4.40
12.05 (Acre)
License no 123 of 2014
No
Address     OT 14 3RD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD
Annexure-B- ANNEXURE-B- AS A COLLABORATOR
BY VIRTUE OF COLLABORATION AGREEMENT.
Yes
AS PER THE ATTACHED COLLABORATION AGREEMENT
Yes
Yes
Yes







96519.35 Lakhs
285.59 Lakhs
83900.00 Lakhs
1125 Lakhs
11208.76 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.9089
3CONSTRUCTION OF ROADS 0.1292
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0.1058
6GREEN BELTS 0
7VEHICLE PARKINGS 0.1670
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13CONSTRUCTION 0.3729
Total1.6838




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS175AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM250AS PER PROJECT REPORT
3STORM WATER DRAINAGE90AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM340AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL110AS PER PROJECT REPORT
6STREET LIGHTING20AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING120AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS20AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED


NA (date)
23-05-2025 (date)
01-10-2025
31-12-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings17795.881771
Apartment/Shops/Other Buildings17169.001771
Apartment/Shops/Other Buildings17798.821771





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
ANY OTHER COST0
CONVERSION CHARGES0
EDC COST AS PER LOI0
IAC0
IDC INTEREST0
LAND COST AS PER SALE DEED0
LICENSE FEE AS PER LOI AND LICENSE POLICY0
RENEWABLE OF APPROVALS0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments294
Shops0
Plots0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments146814688811644.14
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments19341174.958811410
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments158688112331233
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1410158667466922
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments8306493458906645
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5437483366454833
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3623
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System202022.5
Sewerage treatment & garbage disposal8.88.89.9
Electricity Supply System000
Storm Water Drainage7.27.28.1
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements017.51614
Water Supply System25353537.5
Sewerage treatment & garbage disposal1115.416.537.5
Electricity Supply System0000
Storm Water Drainage911.6713.513.5
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light04
Security and fire Fighting1216.8

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements17.519.317.5
Water Supply System2027.57.5
Sewerage treatment & garbage disposal8.812.13.3
Electricity Supply System000
Storm Water Drainage7.29.92.7
Parks and Playgrounds001.6
Clubhouse/community centres000
Shopping area000
Other000
Elect Supply System173440.8
Street Light444
Security and fire Fighting121212

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16145.253.5
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds2.4432
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and fire Fighting1213.2346
Elect Supply System3127.21227.2

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements5.253.53.55.25
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds2.42.41.21
Clubhouse/community centres0000
Shopping area0000
Other0000
Elect Supply System020.423.810.2

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Elect Supply System10.2












Yes
No
HDFC BANK LIMITED , G 28 AND G 29 SECTOR 18 NOIDA 201301
57500001788908
HDFC0001592
110240181
001592
Mr. Kabul Chawla Address: 7, Amrita Shergill Marg Delhi-110003 Mr. Sudhanshu Tripathi Address: 202, 3rd Floor, Jor Bagh, , Delhi -110003 Mr. Manik Malik D- 2/2406, Vasant Kunj, South West Delhi, Delhi- 110070 Mr. Sachin Gupta H.No C-5/32. Yamuna Vihar, Delhi -110053 Mr. Rakesh Kumar Agrawal D-308 , Narwana Apartment , 89, IP Extension , Patparganj Delhi- 110092 Mr. Amit Singhal Address: E3/28, Nand Nagri Mandoli Delhi-110093 Mr. Sanjeev Loknath Agrawal Flat no 32 Sudarshan Apartments IP Extension Delhi -110092
ATTACHED











No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO 123 OF 2014ALREADY BEEN OBTAINED22-08-2015
II. TOD LICENSEALREADY BEEN OBTAINED18-11-2024
III. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED16-02-2024
IV. FOREST NOCALREADY BEEN OBTAINED27-11-2024
V. WATER ASSURANCEALREADY BEEN OBTAINED27-11-2024
VI. SEWERAGE ASSURANCEALREADY BEEN OBTAINED26-11-2024
VII. STORM WATER ASSURANCEALREADY BEEN OBTAINED26-11-2024
VIII. NOC FOR CONSTRUCTION WATERALREADY BEEN OBTAINED03-12-2024
IX. BUILDING PLAN APPROVALALREADY BEEN OBTAINED23-05-2025
X. ROAD ASSURANCEALREADY BEEN OBTAINED07-11-2024
XI. ELECTRICAL LOAD ASSURANCEALREADY BEEN OBTAINED21-11-2024
XII. ZONING PLAN APPROVALALREADY BEEN OBTAINED18-11-2024
XIII. SITE PLAN APPROVALALREADY BEEN OBTAINED23-05-2025
XIV. BUILDING PLAN APPROVALALREADY BEEN OBTAINED23-05-2025








Yes


Yes


As per HRERA Rules 2017







102 EDEN ESTATE (AMSTORIA)
126.674
0
1132
0
1048
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
92670.82090977.32
Cost of the apartments000
Cost of the infrastructure40939.85039246.35
Others costs51730.97051730.97


159500 Lakhs
8195 Lakhs
0 Lakhs
0 Lakhs
Yes
14-01-2011
30-04-2024




102 EDEN ESTATE II
7.03125
0
64
0
64
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2997.8602991.06
Cost of the apartments000
Cost of the infrastructure1517.2801490.48
Others costs1480.5801480.58


10641 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
01-09-2021
31-03-2025




ASTAIRE GARDEN
97.98125
0
1129
0
1074
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
94868.51093931.21
Cost of the apartments000
Cost of the infrastructure47126.39046189.09
Others costs47742.12047742.12


197159 Lakhs
4881 Lakhs
0 Lakhs
0 Lakhs
Yes
01-04-2011
31-08-2026




GREEN OAKS
15.5625
0
258
0
197
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
7221.4907195.97
Cost of the apartments000
Cost of the infrastructure4249.6604224.14
Others costs2971.8302971.83


42779 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-10-2021
27-08-2026




THE OVAL AT ASTAIRE GARDEN
1.872
0
31
0
3
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2571.8202171.51
Cost of the apartments000
Cost of the infrastructure340.7200.41
Others costs2177.102177.1


318 Lakhs
550 Lakhs
0 Lakhs
0 Lakhs
No
01-05-2024
30-11-2028




BPTP AMSTORIA VERTI GREEN
9.4292
885
0
450
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
23340606705.76
Cost of the apartments202010.1000
Cost of the infrastructure000
Others costs31396.0206705.76


12786 Lakhs
129886 Lakhs
0 Lakhs
0 Lakhs
No
01-04-2025
14-06-2032










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELAMINATED WOODDEN/TILE/MARBLE, PERGO/LOTUS KALEEN/ACTION/ NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
2WALL FINISHING DETAILSTILE,NITCO/SOMANY/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK/ OR EQUIVALENT ACRYLIC EMULSION/OBD/ ASIAN/BERGER/ NEROLAC OR EQUIVALENT
3KITCHEN DETAILSGREENPLY/SOHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/ANCHO/EURO OR EQUIVALENT MAKE
4BATHROOM FITTINGSJAQUAR/PARRYWARE/HINDWARE/OR EQUIVALANT
5WOOD WORK ETCGREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/ANCHO/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
6DOORS AND WINDOS FRAMESFLUSH DOOR, GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
7GLASS WORKCLEAR/TINTED/COATED/FROSTED GLASS SAINT GOBAIN /ASAHI/ GUARDIAN OR EQUIVALENT MAKE
8ELECTRIC FITTINGSSWITCH CONTROL FOR LIGHT, FAN GEYSER AND AC ETC. HOME AUTOMATION IN SELECT AREAS AS PER DESIGN
9CONDUCTING AND WIRING DETAILSFR PVC INSULATED MULTI STRAND COPPER WIRE (1.5-4.0 SQM)
10CUPBOARD DETAILSNA
11WATER STORAGEUPVC, SUPEREME/PRINCE/FINLOEX/ASTRAL/RCC OR EQUIVALENT MAKE
12LIFT DETAILSOTIS/MITSUBISHI/KONE/THYSSENKRUPP OR EQUIVALENT
13EXTERNAL GLAZINGSGLAZED WINDOWS WITH UPVC/AL/MS FRAMES ALUPLAST/DECUNIK/ENCRAFT/ASAHI/KOMMERLING/SHEDA/LG/SCHUCO/ALUK/ALUMIL/REYNAERS/MAHAVIR/HINDALCO/JINDAL/BHORUKA/EQUIVALENT
13.1WINDOWS/GLAZINGSGLAZED WINDOWS WITH UPVC/ALMS FRAMES,ALUPLAST/DECUNIK/ENCRAFT/ASAHI/SHEDA/LG/SCHUCO/ALUK/ALUMIL/REYNAERS/MAHAVIR/HINDALCO/JINDAL/BHORUKA/ EQUIVALENT
14DOORSFLUSH DOOR, GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/ DESHBANDHU OR EQUIVALENT MAKE
14.1MAIN DOORSFLUSH DOOR, GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
14.2INTERNAL DOORSFLUSH DOOR, GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
15AIR CONDITIONINGVRV / VRF WITH HIGH UNITS IN LIVING/DINING, KITCHEN, BEDROOMS DAIKIN/BLUESTAR/TOSHIBA/HITACHI/LG/SAMSUNG/VOLTAS/PANASONIC OR EQUIVALENT MAKE
16ELECTRICAL FITTINGSSP MCB(6-20AMP) 10KA, 4P MCB(32-63AMP)16KA, LEGRAND/HAGER/ABB/SCHNEDIER/SIEMENS/HAVELLS/L&T OR EQUIVALENT MAKE
17CNG PIPE LINE-
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISIONS ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE PAINT / TEXTURED PAINT ASIAN/BERGER/AKZONOBEL/JOTUN/KENAI NEROLAC OR EQUIVALENT MAKE
20INTERNAL FINISHINGACRYLIC EMULSION / OBD, ASIAN/BERGER/AKZONOBEL/JOTUN/KENAI NEROLAC OR EQUIVALENT MAKE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORTILE/MARBLE/GRANITE, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT
1 . 2 WALLSACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
1 . 3 CEILINGACRYLIC EMULSION, ASIAN/BERGERNEROLAC/OIKOS/ OR EQUIVALENT MAKE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING, PERGO/LOTUSKALEEN/ACTIONTESSA/DECOWOOD/EGGER/EDIFICE/GREENLAM OR EQUIVALENT
2 . 2 WALLSACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
2 . 3 CEILINGACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
2 . 4 MODULAR WARDROBES-
3 . MASTER TOILET
3 . 1 FLOORTILE/MARBLE/GRANITE, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT
3 . 2 WALLSCOMBINATION OF TILES / MARBLE / ACRYLIC EMULSION PAINT & MIRROR, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT PAINT- DULUX/ASIAN/BERGER/AKZONOBEL/JOTUN/KENAINEROLAC/OIKOS/SHERVINWILLIAM OR EQUIVALENT MAKE
3 . 3 CEILINGACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
3 . 4 COUNTERSTILE/QUARTZ UPTO 2' ABOVE COUNTER & EMULSION PAINT IN BALANCE AREA
3 . 5 SANITARY WARE/CP FITTINGSCHINAWARE, JAQUAR/HINDWARE/PARRYWARE OR QUIVALENT MAKE
3 . 6 FITTING/FIXTURESCP FITTINGS (BASIN MIXER, FAUCET, SHOWER, DIVERTER, ANGLE VALVES, ETC.), GROHE/JAQUAR/HINDWARE/PARRYWARE, OR EQUIVALENT MAKE
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING, PERGO/LOTUSKALEEN/ACTIONTESSA/DECOWOOD/EGGER/EDIFICE/GREENLAM OR EQUIVALENT
4 . 2 WALLSACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
4 . 3 CEILINGACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
4 . 4 WARDROBES-
5 . TOILET
5 . 1 FLOORTILE/MARBLE/GRANITE,MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
5 . 2 WALLSCOMBINATION OF TILES / MARBLE / ACRYLIC EMULSION PAINT & MIRROR, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT ACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
5 . 3 CEILINGACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
5 . 4 COUNTERSMARBLE/QUARTZ COUNTER & EMULSION PAINT IN BALANCE AREA, NITCO/SOMANY/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
5 . 5 SANITARY WARE/CP FITTINGSSS, JAYNA/NEELKANTH/FRANKE, OR EQUIVALENT MAKE
5 . 6 FIXTURESCP ANGLE VALVES, GROHE OR EQUIVALENT
6 . KITCHEN
6 . 1 FLOORTILE / GRANITE, ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
6 . 2 WALLSTILE/QUARTZ UP-TO 2' ABOVE COUNTER & EMULSION PAINT IN BALANCE AREA, NITCO/SOMANY/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
6 . 3 CEILINGACRYLIC EMULSION, ASIAN/BERGER/NEROLAC OR EQUIVALENT MAKE
6 . 4 COUNTERSQUARTZ/MARBLE/GRANITE
6 . 5 FIXTURES-
6 . 6 KITCHEN APPLIANCES-
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOOR-
7 . 2 WALLS & CEILING-
7 . 3 TOILET-
7 . 4 BALCONYTILE, ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT - OBD/ SEMI ACRYLIC /TILES, DULUX/ ASIAN/BERGER/EXTERNAL GRADE TEXTURE PAINT OR EQUIVALENT MAKE
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1CA CERTIFICATE FINANCIAL AND INVENTORY27-06-2025 View Document
2SECTION 03 TOWER 6,7&8 SC-0327-06-2025 View Document
3ROAD ACCESS27-06-2025 View Document
4SITE PLAN27-06-2025 View Document
5POWERLINE SHIFTING27-06-2025 View Document
6AGREEMENT TO SALE27-06-2025 View Document
7NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT23-05-2025 View Document
8SERVICE FLOOR PLAN T6-0327-06-2025 View Document
9NEW BR27-06-2025 View Document
10CA CERTIFICATE COST INCURRED27-06-2025 View Document
11COPY OF LICENSE ALONG WITH SCHEDULE OF LAND23-05-2025 View Document
12BANK UNDERTAKING27-06-2025 View Document
13AIRPORT HEIGHT PERMISSION27-06-2025 View Document
14DEMARCATION CUM ZONING PLAN27-06-2025 View Document
15SITE PLAN ST-0227-06-2025 View Document
16SERVICE ESTIMATES APPLIED27-06-2025 View Document
17ENTRY OF LICENSE AND MUTATION JAMABANDI_COMPRESSED27-06-2025 View Document
18BASEMENT AREA BS-0227-06-2025 View Document
19APPROVED PHASING PLAN FOR GH COLONY 12.05ACS IN SEC-102 GGM LETTER27-06-2025 View Document
20SHOOPING COMMUNITY BUILDING NURSERY SCHOOL27-06-2025 View Document
21EC RECOMENDED27-06-2025 View Document
22DHBVN ASSURANCE27-06-2025 View Document
23NCZ27-06-2025 View Document
24ELEVATION 02 &03; E-0227-06-2025 View Document
25ENTRY OF LICENSE27-06-2025 View Document
26TERRACE,MUMMTY & ROOF PLAN T6-0727-06-2025 View Document
27AFFIDAVIT 42LD27-06-2025 View Document
28CARPET AREA T6-0827-06-2025 View Document
29FIRE SCHEME APPLIED27-06-2025 View Document
30AKSH SHIZRA27-06-2025 View Document
31STORM WATER ASSURANCE - 12.05 ACRES27-06-2025 View Document
32ELEVATION 01 EV-0127-06-2025 View Document
33DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.27-06-2025 View Document
34CA CERTIFICATE NO DEFAULT27-06-2025 View Document
35GROUND FLOOR PLAN TOWER 6,7,8 T6-01A27-06-2025 View Document
36SECTION 1 SC-0127-06-2025 View Document
37FOREST NOC 12.70 ACRES SECTOR 102 GGM27-06-2025 View Document
38MINING27-06-2025 View Document
39BASEMENT AREA BS-0127-06-2025 View Document
40REFUGEE FLOOR T6-0627-06-2025 View Document
41IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN27-06-2025 View Document
42BASEMENT AREA BS-0327-06-2025 View Document
43IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN27-06-2025 View Document
44ALLOTMENT LETTER27-06-2025 View Document
45COLLABORATION_COMPRESSED27-06-2025 View Document
46FOREST LAND UNDERTAKING27-06-2025 View Document
47NOCUSE OF TREATED WATER27-06-2025 View Document
48SEWER ASSURANCE - 12.05 ACRES27-06-2025 View Document
49TOD APPROVAL27-06-2025 View Document
50TREE CUTTING UNDERTAKING27-06-2025 View Document
51WATER SUPPLY ASSURANCE27-06-2025 View Document
52ENVIRONMENT CLEARANCE APPLIED27-06-2025 View Document
53CA CERTIFICATE REP 127-06-2025 View Document
54SECTION 02 TOWER 6,7&8 SC-0227-06-2025 View Document
55AFFIDAVIT FOR WILD LIFE CLEARANCE27-06-2025 View Document
56BR-III BUILDING PLAN APPROVAL LETTER27-06-2025 View Document
57DTCP ORDER OF LICENSE27-06-2025 View Document
58LICENSE AND RENEWED27-06-2025 View Document
59LOI LICENSE 123 OF 201427-06-2025 View Document
60NEC27-06-2025 View Document
61BASEMENT BS-01A27-06-2025 View Document
62ELEVATION 0427-06-2025 View Document
63GROUND FLOOR PLAN TOWER 06 07 08 T6-0127-06-2025 View Document
64REFUGE FLOOR T6-05 TOWER-6,7,827-06-2025 View Document