HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2134-2025
Submission Date : 19-12-2025 04:56:19 PM
Applicant Type : Company
Project Type: NEW




ASHIANA HOUSING LIMITED
304, SOUTHERN PARK SAKET DISTRICT CENTRE, SAKET, NEW DELHI 110017
01142654265
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
https://www.ashianahousing.com/
XXXX093P
L70109WB1986PLC040864
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







ASHIANA AAROHAM PHASE II
REVENUE ESTATE OF VILLAGE- HSIIDC PLOT NO GH-04 SECTOR 80 IMT MANESAR GURUGRAM HARYANA
MANESAR
GURUGRAM
01142654265
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
ASHIANA HOUSING LIMITED
01142654265
9971992553 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151788411-12-2025761070ICICI BANKHRERA Gurugram







3.59 (Acre)
1.87
186.481
10.80 (Acre)
Allotment No. HSIIDC 221 dated 01-08-2023
Yes







29565.54 Lakhs
7246.47 Lakhs
11133.81 Lakhs
1188.91 Lakhs
9996.45 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1333.463
3CONSTRUCTION OF ROADS 3195
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 8335
6GREEN BELTS 0
7VEHICLE PARKINGS 137.5
8ELECTRICITY SUB-STATION 191
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13NURSERY SCHOOL 281.437
14ELECTRICITY SUPPLY SYSTEM 287.15
Total13760.55




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSIIDCYes
WATER SUPPLYHSIIDCYes
ELECTRICITYHSIIDCYes
SEWAGE DISPOSALHSIIDCYes
STORM WATER DRAINAGEHSIIDCYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS141.71AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM13.60AS PER PROJECT REPORT
3STORM WATER DRAINAGE22.10AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM25AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL13.61AS PER PROJECT REPORT
6STREET LIGHTING9.55AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS206.71AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL361.61AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15UNDERGROUND WATER TANK75.37AS PER PROJECT REPORT
16STP106.04AS PER PROJECT REPORT
17RAINWATER HARVESTING SYSTEM23.94AS PER PROJECT REPORT
18ELECTRIC SUB STATION160.24AS PER PROJECT REPORT
19PARKING29.43AS PER PROJECT REPORT


08-10-2025 (date)
08-10-2025 (date)
15-09-2026
28-02-2031
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings116.99432
Apartment/Shops/Other Buildings141.32452
Apartment/Shops/Other Buildings242.7321
Apartment/Shops/Other Buildings219.8011
Apartment/Shops/Other Buildings98.23432
Apartment/Shops/Other Buildings113.62452
Apartment/Shops/Other Buildings195.0221
Apartment/Shops/Other Buildings178.2511





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments222.68890.70
Shops00
Plots00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1002.04779.37890.70556.69
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments890.70779.37779.37668.03
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments668.03668.03556.69890.70
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments556.69334.01
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
NURSERY SCHOOL0

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements9.92
Water Supply System0.95
Sewerage treatment & garbage disposal0.95
Electricity Supply System1.75
Storm Water Drainage1.55
Parks and Playgrounds14.47
Clubhouse/community centres0
Shopping area0
Other0
Electrical sub station11.22
Street Lighting0.67
Parking2.06
STP7.42
Underground water tank5.28
Rain water harvesting1.68
NURSERY SCHOOL25.31

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements21.2628.3425.5128.34
Water Supply System2.042.722.452.72
Sewerage treatment & garbage disposal2.042.722.452.72
Electricity Supply System3.755.004.505.00
Storm Water Drainage3.314.423.984.42
Parks and Playgrounds31.0141.3437.2141.34
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrical Substation24.0432.0528.8432.05
Street Light1.431.911.721.91
Parking4.415.895.305.89
STP15.9121.2119.0921.21
Underground water Tank11.3115.0713.5715.07
Nursery School54.2472.3265.0972.32
Rain Water Harvesting3.594.794.314.79

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements21.267.09
Water Supply System2.040.68
Sewerage treatment & garbage disposal2.040.68
Electricity Supply System3.751.25
Storm Water Drainage3.311.10
Parks and Playgrounds31.0110.34
Clubhouse/community centres00
Shopping area00
Other00
Street Light1.430.48
Underground Water Tank11.313.77
STP15.915.30
Parking4.411.47
Electrical Substation24.048.01
NURSERY SCHOOL54.2418.08
Rain Water Harvesting3.591.20












Yes
Yes
SHOP NO. 75 & 76, JMS CROSSWALK, SECTOR 93, GURUGRAM, HARYANA - 122005
777705229203
ICIC0005891
ICIC0005891
5891
Shop No. 75 & 76, JMS Crosswalk, Sector 93, Gurugram, Haryana - 122005
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed











Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. ECALREADY BEEN OBTAINED13-11-2024
II. FOREST NOCALREADY BEEN OBTAINED04-04-2024
III. ARAVALI NOCALREADY BEEN OBTAINED24-04-2024
IV. PORTABLE WATER ASSURANCEALREADY BEEN OBTAINED18-03-2024
V. AIRPORT AUTHORITY OF INDIA NOC ALREADY BEEN OBTAINED24-04-2024
VI. CONSTRUCTION WATER NOCALREADY BEEN OBTAINED21-03-2024
VII. BUILDING PLAN APPROVALALREADY BEEN OBTAINED08-10-2025
VIII. REVISED ZONING PLANALREADY BEEN OBTAINED13-08-2025








Yes


Yes


As per RERA norms







ASHIANA ANMOL PHASE-1
3.800
300
0
300
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11823.05011285.86
Cost of the apartments7465.3606183.79
Cost of the infrastructure1926.4402422.33
Others costs2431.2502679.74


23173.30 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
03-10-2020
03-10-2020




ASHIANA ANMOL PLAZA-1
0.339
76
0
76
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
216.280216.28
Cost of the apartments137.920137.92
Cost of the infrastructure26.26026.26
Others costs52.1052.1


180.18 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019




ASHIANA AMARAH PHASE-1 & 1A
5.041
224
0
224
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
14520.6102585.93
Cost of the apartments70870423.21
Cost of the infrastructure7087022.98
Others costs571501933.83


5764.18 Lakhs
19710.59 Lakhs
4000 Lakhs
4000 Lakhs
No
15-01-2027
15-01-2027




ASHIANA ANMOL PHASE-2
2.49
180
0
180
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10876.2604319.42
Cost of the apartments4822.6501640.86
Cost of the infrastructure634.05099.21
Others costs5419.5702579.35


6784.92 Lakhs
10536.84 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2026
30-04-2026




ASHIANA ANMOL PHASE-3 & PLAZA PHASE II
6.7879
300
0
300
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17555.5704535.57
Cost of the apartments7371.705.02
Cost of the infrastructure1006.430156.61
Others costs9177.4504373.94


2710.57 Lakhs
15121.27 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2028
31-12-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING/DINING/LOBBY/KITCHEN:VIRTIFIED TILES;MASTER/OTHER BEDROOM:WOODEN VITRIFIED TEXTURE TILES;MASTER BATHROOM:COMBINATION OF VITRIFIED & WOODEN TEXTURE TILES;OTHER BATHROOM:CERAMIC TILES ON FLOOR
2WALL FINISHING DETAILSLIVING/DINING/LOBBY/BALCONY:ACRYLIC EMULSION OF PLEASING SHADE OF REPUTED BRAND;KITCHEN:HIGH CERAMIC TILES DADO;BATHROOM:CERAMIC TILES UPTO CEILING
3KITCHEN DETAILSPLATFORM IN QUARTZ/GRANITE STONE/VIRTIFIED TILE;STAINLESS STEEL,HOBBWOODEN CABINET,CHIMNEY,DISH WASHER &OVEN;
4BATHROOM FITTINGSWASH BASIN OF ROCA/JAQUAR;GLASS CURTAIN;MIRROR,TOWEL RACK 7 HEALTH FAUCET
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMAIN DOOR:FOLDED STEEL SECTION/WOODEN FINISH;OTHERS: WOODEN FINISH DOOR
7GLASS WORKNA
8ELECTRIC FITTINGSELECTRICAL SWITCHES WITH SOCKETS & FAN REGULATORS
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSCEMENT SAND PLASTER WITH SPRAY TEXTURE/PAINT FINISH
13.1WINDOWS/GLAZINGSPOWER COATED/ANODIZED ALIMINIUM/UPVC WINDOWS WITH THICK PERFORMANCE GLASS
14DOORSMAIN DOOR:FOLDED STEEL SECTION/WOODEN FINISH;OTHERS: WOODEN FINISH DOOR
14.1MAIN DOORSFOLDED STEEL SECTION/WOODEN FINISH
14.2INTERNAL DOORSWOODEN FINISH DOOR
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSELECTRICAL SWITCHES WITH SOCKETS & FAN REGULATORS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMECEMENT SAND PLASTER WITH SPRAY TEXTURE/PAINT FINISH
20INTERNAL FINISHINGGRANITE/MARBLE/QUARTZ STONE/VIRTIFIED/CERAMIC TILES
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 GROUND FLOOR ( COMMUNITY BUILDING ) 15-12-2025 ------
2 SECTION-A (TOWER-2,4 &5) 15-12-2025 ------
3 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 19-12-2025 View Document
4 MINING PERMISSION UNDERTAKING 30-01-2026 ------
5 PROJECT REPORT 19-12-2025 ------
6 FIRST FLOOR PLAN & AREA DETAILS (COMMUNITY BUILDING) 15-12-2025 ------
7 ELEVATION-1&2 TOWER-6) 15-12-2025 ------
8 GROUND COVERAGE AREA DETAILS (TOWER-1,3&6) 15-12-2025 ------
9 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 12-12-2025 View Document
10 TYP FLOOR PLAN& AREA DETAILS (TOWER-2,4&5) 15-12-2025 ------
11 BANK UNDERTAKING 15-12-2025 ------
12 SECTION-1&2 (COMMUNITY BUILDING) 15-12-2025 ------
13 POWER LINE SHIFTING 16-12-2025 ------
14 EWS APPROVAL 16-12-2025 ------
15 BALANCE SHEET- AHL STANDALONE SIGNED FINANCIALS FY 22-23 16-12-2025 ------
16 NOC BY IFC FOR PHAS 1 OF ASHIANA AAROHAM_SIGNED 19-12-2025 ------
17 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 12-12-2025 View Document
18 ELEVATION-1&2 (TOWER-2,4&5) 15-12-2025 ------
19 BROCHURE DOCUMENT 18-12-2025 ------
20 DD 19-12-2025 ------
21 PERT CHART 19-12-2025 ------
22 PLANS,SLEVATION,SECTION & AREA CALCULATIONS (NURSERY SCHOOL LEARNING CENTER 15-12-2025 ------
23 PAYMENT RECEIPT 16-12-2025 ------
24 GROUND FLOOR PLAN & AREA DETAILS (TOWER-2,4&5) 15-12-2025 ------
25 1ST FLOOR PLAN & AREA DETAILS (TOWER-1,3&6) 16-12-2025 ------
26 GREEN AREA DETAILS 16-12-2025 ------
27 IFC ASHIANA DEBENTURE TRUST DEED NCD 16-12-2025 ------
28 ELEVATION -3&4 (TOWER-2,4&5) 15-12-2025 ------
29 DEMARCATION PLAN 12-12-2025 View Document
30 SITE PLAN 15-12-2025 ------
31 HSIIDC LETTER FOR SEP 15-12-2025 ------
32 ELEVATION-3&4 (TOWER-1&3) 16-12-2025 ------
33 GROUND FLOOR PLAN & AREA DETAILS (TOWER-1&6) 16-12-2025 ------
34 CONVENIENT SHOPPING (PLANS, ELEVATIONS, SECTIONS & AREA CALCULATIONS) 15-12-2025 ------
35 TERRACE PLAN (COMMUNITY BUILDING) 15-12-2025 ------
36 1ST FLOOR PLAN & AREA DETAILS (TOWER-2,4&5) 15-12-2025 ------
37 TERRACE PLAN & AREA DETAILS (TOWER-1,3&6) 15-12-2025 ------
38 LOWER GROUND FLOOR AND AREA DETAILS ( COMMUNITY BUILDING) 15-12-2025 ------
39 ELEVATION-3&4 (TOWER-6) 16-12-2025 ------
40 ALLOTMENT LETTER AND ZONING LETTER 16-12-2025 ------
41 20TH FLOOR PLAN& AREA DETAILS ( REFUGE FLOOR) (TOWER-1,3&6) 15-12-2025 ------
42 NON-ENCUMBRANCE CERTIFICATE 16-12-2025 ------
43 20TH FLOOR PLAN & AREA DETAILS (REFUGE FLOOR) (TOWER-2,4 &5) 15-12-2025 ------
44 FOREST NOC 16-12-2025 ------
45 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 12-12-2025 View Document
46 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 12-12-2025 View Document
47 ZONING PLAN 12-12-2025 View Document
48 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 12-12-2025 View Document
49 SITE PLAN (SERVICE) 15-12-2025 ------
50 POSSESSION CERTIFICATE HSIIDC 15-12-2025 ------
51 CONVEYANCE DEED FROM HSIIDC 15-12-2025 ------
52 SECATION-A (TOWER-1&3) 15-12-2025 ------
53 TYPICAL FLOOR PLAN & AREA DETAILS (TOWER-1,3&6) 15-12-2025 ------
54 CLUBE ELEVATIONS (COMMUNITY BUILDING) 15-12-2025 ------
55 SECTION -A (TOWER-6) 15-12-2025 ------
56 PODIUM PLAN & AREA DETAILS 16-12-2025 ------
57 AKS-SHAJRA 16-12-2025 ------
58 APPROVAL-TEMPORARY SITE OFFICE 16-12-2025 ------
59 GROUND COVERAGE AREA DETAILS ( COMMUNITY BUILDING) 15-12-2025 ------
60 GROUND FLOOR AREA DETAILS (COMMUNITY BUILDING) 15-12-2025 ------
61 ELEVATION 1&2 (TOWER-&3) 15-12-2025 ------
62 SITE & PODIUM SECTIONS 15-12-2025 ------
63 PODIUM TERRACE PLAN 15-12-2025 ------
64 TERRACE,MUMTY MACHINE ROOM PLAN& AREA DETAILS (TOWER-2,4&5) 15-12-2025 ------
65 BASEMENT PLAN & AREA DETAILS 16-12-2025 ------
66 BALANCE SHEET- AHL STANDALONE 23-24 SIGNED 16-12-2025 ------
67 GROUND FLOOR PLAN& AREA DETAILS (TOWER-3) 16-12-2025 ------
68 JAMABANDI COPY 16-12-2025 ------
69 BBA 16-12-2025 ------
70 REVISED ZONNING PLAN 16-12-2025 ------
71 MUTATION COPY 16-12-2025 ------
72 APPLICATION FFS ASHIANA 80 16-12-2025 ------
73 NATURAL CONSERVATION ZONE NOC 16-12-2025 ------
74 ENVIRONMENT CLEARANCE 16-12-2025 ------
75 CONVEYANCE DEED 16-12-2025 ------
76 AGREEMENT BETWEEN AHL VS HSIIDC 16-12-2025 ------
77 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 30-01-2026 View Document
78 TREE CUTTING PERMISSION AFFIDAVIT 30-01-2026 ------
79 APPLICATION FORM 18-12-2025 ------
80 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 19-12-2025 View Document
81 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 30-01-2026 View Document
82 ALLOTMENT LETTER DRAFT 30-01-2026 ------
83 LAND COST & OTHER COST 30-01-2026 ------
84 CA CERTIFICATE INVENTORY 30-01-2026 ------
85 AAI NOC 30-01-2026 ------
86 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 30-01-2026 View Document
87 CA CERTIFICATE NET WORTH 30-01-2026 ------
88 CA CERTIFICATE PROMOTER CONTRIBUTION IN FUND 30-01-2026 ------