VATIKA ONE ON ONE PRIVATE LIMITED (FORMERLY KNOWN AS CALDER DEVELOPERS PVT. LTD.)
FLAT NO. 224A, 2ND FLOOR DEVIKA TOWER, 6, NEHRU PLACE NEW DELHI - 110019.
01244177777
9810566938 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
http://www.vatikagroup.com
XXXX937P
U70101DL2011PTC213593
ONE ON ONE (PHASE-I)
SECTOR-16, VILLAGE SILOKHERA
WAZIRABAD ST
GURUGRAM
0000000000
9810656416 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
SUBHASH GOEL
0000000000
9810656416 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
Annexure-B- COLLABORATION AGREEMENTS, GPA REVENUE RECORDS, ETC.
YES
Yes
PROVIDED
No
Yes
Yes
63342.00 Lakhs
15200.00 Lakhs
22500.00 Lakhs
2500.00 Lakhs
23142.00 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
9417.242
3
CONSTRUCTION OF ROADS
0
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
0
6
GREEN BELTS
0
7
VEHICLE PARKINGS
5180.843
8
ELECTRICITY SUB-STATION
260.458
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
34234.806
Total
49093.349
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HUDA/HSVP
No
WATER SUPPLY
HUDA/HSVP
No
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
HUDA/HSVP
No
STORM WATER DRAINAGE
HUDA/HSVP
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
450.00
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
375.00
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
200.00
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
100.00
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
250.00
AS PER PROJECT REPORT
6
STREET LIGHTING
100.00
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
275.00
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
25.00
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
AS PER PROJECT REPORT
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
50.00
AS PER PROJECT REPORT
12
SCHOOL
0
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
0
AS PER PROJECT REPORT
15
STP
150.00
YET TO BE PREPARED
16
UNDERGROUND TANK
175.00
YET TO BE PREPARED
17
RAIN WATER HARVESTING
75.00
YET TO BE PREPARED
18
ELECTRICAL SUB STATION
125.00
YET TO BE PREPARED
19
PARKING
150.00
YET TO BE PREPARED
18-05-2017 (date)
18-05-2017 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEX-20 (DETAILS OF UNITS)
34285.82
1098
632
466
4
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
ANNEX-20 (DETAILS OF UNITS)
632
ANNEXURE 20
20-05-2017
31-07-2020
31-07-2020
20-05-2017
9.12
31-07-2020
PROVIDED
PROVIDED
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
0
20-05-2017
0
31-07-2020
NOT APPLICABLE
NOT APPLICABLE
0
0
850
30
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
5349.60
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2017
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
Shops
0
750
900
Plots
0
0
0
Infrastructure Development Charges
0
External Development Charges
0
Other Cost
0
Cost of Construction
0
Internal Development Works
0
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
950
1100
1250
1290
Plots
0
0
0
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
1881
2297
1040
2081
Plots
0
0
0
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
1040
1356.00
1215.40
0
Plots
0
0
0
0
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
Shops
0
0
Plots
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
100.00
Water Supply System
100.00
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Electrical Sub station
0
Parking
28.06
Rain Water Harvesting
0
Renewable energy system
0
Security and fire fighting
0
STP
0
Street lighting
0
Underground Tank
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2017
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
13.50
16.20
Water Supply System
11.25
13.50
Sewerage treatment & garbage disposal
7.50
9.00
Electricity Supply System
3.00
3.60
Storm Water Drainage
6.00
7.20
Parks and Playgrounds
0.75
0.90
Clubhouse/community centres
0
0
Shopping area
0
0
Other
0
0
Rain Water Harvesting
2.25
2.70
Parking
4.50
5.40
Street lighting
3.00
3.60
Security and fire fighting
8.25
9.90
Renewable energy system
1.50
1.80
STP
4.50
5.40
Underground Tank
5.25
6.30
Electrical Sub station
3.75
4.50
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
18.00
22.50
25.20
29.88
Water Supply System
15.00
18.75
21.00
24.90
Sewerage treatment & garbage disposal
10.00
12.50
14.00
16.60
Electricity Supply System
4.00
5.00
5.60
6.64
Storm Water Drainage
8.00
10.00
11.20
13.28
Parks and Playgrounds
1.00
1.25
1.40
1.66
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Underground Tank
7.00
8.75
9.80
11.62
STP
6.00
7.50
8.40
9.96
Street lighting
4.00
5.00
5.60
6.64
Security and fire fighting
11.00
13.75
15.40
18.26
Renewable energy system
2.00
2.50
2.80
3.32
Rain Water Harvesting
3.00
3.75
4.20
4.98
Electrical Sub station
5.00
6.25
7.00
8.30
Parking
6.00
7.50
8.40
9.96
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
41.58
44.81
20.88
77.58
Water Supply System
34.65
37.34
17.40
64.65
Sewerage treatment & garbage disposal
23.10
24.89
11.60
43.10
Electricity Supply System
9.24
9.96
4.64
17.24
Storm Water Drainage
18.48
19.92
9.28
34.48
Parks and Playgrounds
2.31
2.49
1.16
4.31
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Security and fire fighting
25.41
27.38
12.76
47.41
Electrical Sub station
11.55
12.45
5.80
21.55
Renewable energy system
4.62
4.98
2.32
8.62
STP
13.86
14.94
6.96
25.86
Street lighting
9.24
9.96
4.64
17.24
Parking
13.86
14.94
6.96
25.86
Underground Tank
16.17
17.43
8.12
30.17
Rain Water Harvesting
6.93
7.47
3.48
12.93
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
20.88
47.16
30.78
Water Supply System
17.40
39.30
25.65
Sewerage treatment & garbage disposal
11.60
26.20
17.10
Electricity Supply System
4.64
10.48
6.84
Storm Water Drainage
9.28
20.96
13.68
Parks and Playgrounds
1.16
2.62
1.71
Clubhouse/community centres
0
0
0
Shopping area
0
0
0
Other
0
0
0
Renewable energy system
2.32
5.24
3.42
Electrical Sub station
5.80
13.10
8.55
Parking
6.96
15.72
10.26
Underground Tank
8.12
18.34
11.97
Street lighting
4.64
10.48
6.84
Security and fire fighting
12.76
28.82
18.81
STP
6.96
15.72
10.26
Rain Water Harvesting
3.48
7.86
5.13
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
1098
To be Constructed
ii. No. of Flats/ Apartments booked
632
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
35505.28 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
33663.17 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
1842.11 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
1842.11 Lakhs
vii. Amount invested in the project upto the date of application
32468.48 Lakhs
Land cost (If any)
15100.13 Lakhs
Apartments
5349.60 Lakhs
Infrastructure
228.06 Lakhs
EDC/ Taxes Etc.
11790.69 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
30873.52 Lakhs
(a) In respect of existing allottees
17770.55 Lakhs
(b) In respect of rest of the project
13102.97 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
11580.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
11580.00 Lakhs
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
450.00
100.00
II. WATER SUPPLY SYSTEM
375.00
100.00
III. STORM WATER DRAINAGE
200.00
0
IV. ELECTRICITY SUPPLY SYSTEM
100.00
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
250.00
0
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
25.00
0
XIII. COVERED PARKING
150
28.06
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
275.00
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
675.00
0
Yes
Yes
HDFC BANK LTD. , FIRST INDIA PLACE, M.G.ROAD, GURUGRAM HARYANA-122002.
02800350000419
HDFC0000280
110240037
0280
Mr. Anil Bhalla-Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030
Mr. Gautam Bhalla-LCG05 PHB, The Laburnam, Nathupur (67),Nathupur Gurgaon,Gurgaon, Haryana 122002
Mr. K. V. George-Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075
Ms. Veena Bhoomia-C1/577B,Rear Block,1st Floor, Near Euro Kids School,Palam Vihar,Choma (62), Gurgaon, Haryana 122017
Uploaded
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. LAY OUT PLAN
ALREADY BEEN OBTAINED
18-05-2017
II. ZONING PLAN
ALREADY BEEN OBTAINED
07-08-2015
III. BUILDING PLAN
ALREADY BEEN OBTAINED
18-05-2017
IV. SITE PLAN
ALREADY BEEN OBTAINED
18-05-2017
V. FLOOR PLAN
ALREADY BEEN OBTAINED
18-05-2017
VI. APARTMENT PLANS
ALREADY BEEN OBTAINED
18-05-2017
VII. ELEVATION SECTION
ALREADY BEEN OBTAINED
18-05-2017
VIII. DETAIL OF PERMISSIBLE FAR
ALREADY BEEN OBTAINED
18-05-2017
IX. DETAIL OF COVERED AREA ACHIEVED FAR.
ALREADY BEEN OBTAINED
18-05-2017
Yes
Yes
Provided
NIL - THIS IS THE FIRST PROJECT OF THE COMPANY
0
0
0
0
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
19-09-2022
19-09-2022
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
COMBINATION OF MATERIALS SUCH AS STONE, HIGH QUALITY TILES IN COMMON AREAS
2
WALL FINISHING DETAILS
COMBINATION OF TILES & PAINT IN COMMON AREAS.
3
KITCHEN DETAILS
NOT APPLICABLE
4
BATHROOM FITTINGS
SANITARY WARE OF STANDARD MAKE AND BRANDS FOR COMMON TOILETS.
5
WOOD WORK ETC
NOT APPLICABLE
6
DOORS AND WINDOS FRAMES
NOT APPLICABLE
7
GLASS WORK
NOT APPLICABLE
8
ELECTRIC FITTINGS
NOT APPLICABLE
9
CONDUCTING AND WIRING DETAILS
IS COMPLIANT WIRING IN COMMON AREAS.
10
CUPBOARD DETAILS
NOT APPLICABLE
11
WATER STORAGE
OHT & UG TANKS
12
LIFT DETAILS
PASSENGER ELEVATORS DESIGNED TO CATER FOR THE EXPECTED TRAFFIC WITH HIGH QUALITY FINISHES.
DEDICATED SERVICE LIFT FOR MOVEMENT OF GOODS AND MATERIALS ONE PER BLOCK
13
EXTERNAL GLAZINGS
NA
13.1
WINDOWS/GLAZINGS
GLAZED ALUMINUM WINDOWS AND FENESTRATION ALONG WITH CURTAIN GLASS IN LOCATIONS
14
DOORS
NA
14.1
MAIN DOORS
NOT APPLICABLE
14.2
INTERNAL DOORS
NOT APPLICABLE
15
AIR CONDITIONING
OFFICE SPACE SHALL BE AIR-CONDITIONED THROUGH HIGHLY ENERGY EFFICIENT CENTRAL A.C. SYSTEM WITH BMS
16
ELECTRICAL FITTINGS
IS COMPLIANT PROVISIONING FOR CRITICAL LIGHTING IN AREAS OF CIRCULATION AND EMERGENCY USAGE
17
CNG PIPE LINE
NOT APPLICABLE
18
PROVISION OF WIFI AND BROADBAND FACILITY
NOT APPLICABLE
19
EXTERNAL FINISHING/COLOUR SCHEME
A COMBINATION OF MATERIALS OF INTERNATIONAL STANDARDS SUCH AS CLADDING, HIGH QUALITY PAINT ETC
20
INTERNAL FINISHING
COMBINATION OF MATERIALS SUCH AS STONE, HIGH QUALITY TILES, WALL AND CEILING FINISHES FOR COMMON AREAS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
NOT APPLICABLE
1 . 2
WALLS
NOT APPLICABLE
1 . 3
CEILING
NOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
NOT APPLICABLE
2 . 2
WALLS
NOT APPLICABLE
2 . 3
CEILING
NOT APPLICABLE
2 . 4
MODULAR WARDROBES
NOT APPLICABLE
3 . MASTER TOILET
3 . 1
FLOOR
NOT APPLICABLE
3 . 2
WALLS
NOT APPLICABLE
3 . 3
CEILING
NOT APPLICABLE
3 . 4
COUNTERS
NOT APPLICABLE
3 . 5
SANITARY WARE/CP FITTINGS
NOT APPLICABLE
3 . 6
FITTING/FIXTURES
NOT APPLICABLE
4 . BED ROOMS
4 . 1
FLOOR
NOT APPLICABLE
4 . 2
WALLS
NOT APPLICABLE
4 . 3
CEILING
NOT APPLICABLE
4 . 4
WARDROBES
NOT APPLICABLE
5 . TOILET
5 . 1
FLOOR
NOT APPLICABLE
5 . 2
WALLS
NOT APPLICABLE
5 . 3
CEILING
NOT APPLICABLE
5 . 4
COUNTERS
NOT APPLICABLE
5 . 5
SANITARY WARE/CP FITTINGS
NOT APPLICABLE
5 . 6
FIXTURES
NOT APPLICABLE
6 . KITCHEN
6 . 1
FLOOR
NOT APPLICABLE
6 . 2
WALLS
NOT APPLICABLE
6 . 3
CEILING
NOT APPLICABLE
6 . 4
COUNTERS
NOT APPLICABLE
6 . 5
FIXTURES
NOT APPLICABLE
6 . 6
KITCHEN APPLIANCES
NOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
NOT APPLICABLE
7 . 2
WALLS & CEILING
NOT APPLICABLE
7 . 3
TOILET
NOT APPLICABLE
7 . 4
BALCONY
NOT APPLICABLE
8 . SIT-OUTS
8 . 1
FLOOR
NOT APPLICABLE
8 . 2
WALLS & CEILING
NOT APPLICABLE
8 . 3
RAILINGS
NOT APPLICABLE
8 . 4
FIXTURES
NOT APPLICABLE
Sr. No.
Document Description
Date of Document Upload
View Document
1
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT