HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1618-2024
Submission Date : 12-04-2024 03:51:25 PM
Applicant Type : Company
Project Type: NEW




ST. PATRICKS REALTY PVT. LTD.
THE MEDIAN CENTRAL PARK RESORTS, OFF SOHNA ROAD, SECTOR 48, GURUGRAM, HARYANA-122018
1244928164
9871640340 (Number Shared by Promoter in Public)
contact@centralpark.in
https://www.centralpark.in/
XXXX877J
U45200HR2008PTC037964
 
 


 
 


 
 







CENTRAL PARK BIGNONIA TOWERS
VILLAGE DHUNELA, SECTOR-32 SOHNA- GURUGRAM, HARYANA
SOHNA
GURUGRAM
1244928164
9871640340 (Number Shared by Promoter in Public)
contact@centralpark.in
CHIRAG GEHLOT
1244928164
9871640340 (Number Shared by Promoter in Public)
contact@centralpark.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
145487129-03-20241480000INDUSLND BANK LTD.HRERA Gurugram
245488508-05-202453000INDUSLND BANK LTD.HRERA Gurugram







7.35625 (Acre)
1.87
1.85
7.35625 (Acre)
136 of 2023
No
Address     THE MEDIAN CENTRAL PARK RESORTS, OFF SOHNA ROAD, SECTOR-48, GURUGRAM, HARYANA-122018
Address     RZ-D-17-C, MAHAVIR VIHAR, NEW DELHI - 110045
Address     RZ-D-17-C, MAHAVIR VIHAR, NEW DELHI - 110045
Annexure-B- ANNEXURE-B COLLABORATOR
BEFORE RECEIVING THE LICENSE
Yes
COLLABORATION AGREEMENT IS ANNEXED IN PART-A OF ANNEXURES
No
Yes
Yes







105959.46 Lakhs
6466.13 Lakhs
70683.83 Lakhs
4584.72 Lakhs
24224.78 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.644
3CONSTRUCTION OF ROADS1.2
4PAVEMENTS0.2
5PARKS AND PLAYGROUNDS0
6GREEN BELTS1.058
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0.37
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.33
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES1.3
12ANY OTHER2.25425
Total7.35625




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA No
WATER SUPPLYHSVPYes
ELECTRICITYDHBVN Yes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVP Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS425.05AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM85.01AS PER PROJECT REPORT
3STORM WATER DRAINAGE141.68AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM850.09AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL113.35AS PER PROJECT REPORT
6STREET LIGHTING85.01AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING340.04AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS141.68AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER70.84AS PER PROJECT REPORT
15SEWERAGE SYSTEM141.68AS PER PROJECT REPORT
16UNDERGROUND WATER TANK127.51AS PER PROJECT REPORT
17RAIN WATER HARVESTING 28.34AS PER PROJECT REPORT
18ELECTRICAL SUBSTATION283.36AS PER PROJECT REPORT
19CLUB1678.84AS PER PROJECT REPORT
20SHOP72.33AS PER PROJECT REPORT


10-04-2024 (date)
10-04-2024 (date)
01-04-2024
31-03-2028
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings157.47701
Apartment/Shops/Other Buildings211.26351
Apartment/Shops/Other Buildings203.92881
Apartment/Shops/Other Buildings17.56341





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments01693.512308.943540.20
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4121.344296.283935.793935.79
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4158.314158.314303.814879.12
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5317.774382.044365.424805.23
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5355.305126.6700
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres041.98122.80130.32
Shopping area01.731.801.94
Other01.421.421.42

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres138.91140.21132.9353.51
Shopping area1.940.984.094.09
Other1.422.832.832.83

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements17.0051.0151.0151.01
Water Supply System008.5015.30
Sewerage treatment & garbage disposal0014.1725.50
Electricity Supply System0085.01153.02
Storm Water Drainage0014.1725.50
Parks and Playgrounds0014.1714.17
Clubhouse/community centres58.0858.0861.2173.59
Shopping area4.094.094.096.05
Other2.835.675.675.67
Electrical Sub Station28.335.10
Street Lighting8.515.30
Rainwater Harvesting2.83
Rain water harvesting5.10
Underground Tank12.75
STP11.33
Security and Fire Fighting34.00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements51.0151.0151.0151.01
Water Supply System15.3015.3015.3015.30
Sewerage treatment & garbage disposal25.5025.5025.5025.50
Electricity Supply System153.02153.02153.02153.02
Storm Water Drainage25.5025.5025.5025.50
Parks and Playgrounds25.5025.5025.5025.50
Clubhouse/community centres87.64101.06100.71106.95
Shopping area7.167.237.237.23
Other5.675.675.675.67
Underground Tank25.5038.2538.2512.75
STP20.4020.4020.4020.40
Security and Firefighting61.2161.2161.2161.21
Street Lighting15.3015.3015.3015.30
Rain water harvesting5.105.15.105.10
Electrical Sub Station51.0051.0051.0051.00

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements51.010
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds11.330
Clubhouse/community centres137.89132.97
Shopping area3.754.75
Other5.678.50
STP20.40
Security and Firefighting61.21












Yes
No
INDUSIND BANK, BARAKHAMBA ROAD, NEW DELHI
251310202302
INDB0000005
110234002
000005
St. Patricks Realty Pvt. Ltd.
Yes, Attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
Yes
Yes
Yes
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED30-06-2024
II. ZONING ALREADY BEEN OBTAINED30-06-2023
III. BUILDING PLAN ALREADY BEEN OBTAINED10-04-2024
IV. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED30-01-2024
V. FIRE SCHEMEALREADY BEEN OBTAINED07-05-2024
VI. SERVICE PLAN ESTIMATESALREADY BEEN OBTAINED10-05-2024








Yes


Yes


Yes







COMMERCIAL PLOTTED COLONY "MAG MILE"
5.0
0
59
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6194.116194.1126.37
Cost of the apartments00212.47
Cost of the infrastructure227.64227.64702.02
Others costs5966.475966.470


0 Lakhs
0 Lakhs
2500 Lakhs
0 Lakhs
No
26-03-2028
26-04-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEITALIAN MARBLE, RECON WOODEN, VINYL FLOOR(GYM), RUBBER FLOORING (GYM), EPOXY FLOOR, DECK IPE ( FOR OUTDOOR AREAS), TILE ( UTILITY AND SERVICE AREAS)
2WALL FINISHING DETAILSITALIAN WALL CLADDING, VENEER PANELING, MIRROR, METAL PROFILES, SANDWICH GLASS, PAINT
3KITCHEN DETAILSTILE CLADDING, SS EQPT., GAS BANK, INDUSTRIAL EXHAUST
4BATHROOM FITTINGSSS/PWD COATED FF&E, SANITARYWARE
5WOOD WORK ETCBWP GRADE PLY/HDHMR
6DOORS AND WINDOS FRAMESFLUSHED DOORS/ FIRE RATED DOORS
7GLASS WORKSANDWICH GLASS, FLOAT GLASS, LACQUER
8ELECTRIC FITTINGSSWITCHES/SOCKETS AND SWITCHGEARS
9CONDUCTING AND WIRING DETAILSFRLSH, PCV, MS CONDUIT, BX METAL SPUN FLEXIBLE
10CUPBOARD DETAILSHDHMR- PU FINISH/LAMINATE/VENEER
11WATER STORAGEUGT/SWP- TILED, OHT- CPVC
12LIFT DETAILSITALIAN STONE,VENEER, METAL PROFILES
13EXTERNAL GLAZINGSDGU- ALUMINIUM FRAME
13.1WINDOWS/GLAZINGSDGU- ALUMINIUM FRAME
14DOORSFLUSHED- VENEER
14.1MAIN DOORSFLUSHED- VENEER
14.2INTERNAL DOORSFLUSHED- VENEER/ AL WITH SANDWICH GLASS
15AIR CONDITIONINGDAIKEN/SAMGSUNG/MITSUBISHI/KONE
16ELECTRICAL FITTINGSSWITCHES/SOCKETS AND SWITCHGEARS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMERECON STONE/STONE/PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE
1 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
1 . 3 CEILINGOIL BOUND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING/ MARBLE
2 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
2 . 3 CEILINGOIL BOUND DISTEMPER
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTI SKID TILES/MARBLES
3 . 2 WALLSHIGH QUALITY DESIGNER CERAMIC TILES/ MARBLES
3 . 3 CEILINGOIL BOUND DISTEMPER
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSCPVC/PVC
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING/ MARBLE
4 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
4 . 3 CEILINGOIL BOUND DISTEMPER
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI SKID TILES/MARBLES
5 . 2 WALLSHIGH QUALITY DESIGNER CERAMIC TILES/ MARBLES
5 . 3 CEILINGOIL BOUND DISTEMPER
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSCPVC
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORANTI SKID /VITRIFIED TILES/MARBLE
6 . 2 WALLSTILES UPTO 2FT ABOVE THE COUNTER
6 . 3 CEILINGOIL BOUND DISTEMPER
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES
7 . 2 WALLS & CEILINGOIL BOUND DISTEMPER
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1DEMARCATION PLAN12-04-2024 View Document
2ZONING PLAN12-04-2024 View Document
3IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN12-04-2024 View Document
4A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS12-04-2024 View Document
5IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN12-04-2024 View Document
6NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT12-04-2024 View Document
7CASH FLOW STATEMENT OF THE PROPOSED PROJECT12-04-2024 View Document
8CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT12-04-2024 View Document
9CA CERTIFICATE08-05-2024 ------
10BANK UNDERTAKING08-05-2024 ------
11FIRE SCHEME APPROVALS08-05-2024 ------
12ELECTRICITY ASSURANCE CERTIFICATE13-06-2024 ------
13ROAD SCHEME PLAN13-06-2024 ------
141ST BASEMENT13-06-2024 ------
15DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.13-06-2024 View Document
16TOWER B TYPICAL FLOOR113-06-2024 ------
173RD BASEMENT13-06-2024 ------
18ELECTRICAL LOAD AVAILABILITY13-06-2024 ------
19TOWER B GROUND FLOOR13-06-2024 ------
20APPROVAL OF SERVICE PLAN & ESTIMATE13-06-2024 ------
21BUILDING PLAN APPROVAL LETTER13-06-2024 ------
22PARKING PLAN13-06-2024 ------
23SERVICE ESTIMATE BOOKLET13-06-2024 ------
24STRUCTURAL PLAN13-06-2024 ------
252ND BASEMENT13-06-2024 ------
26COMMERCIAL BUILDING13-06-2024 ------
272ND FLOOR13-06-2024 ------
28APARTMENT PLAN13-06-2024 ------
29APPROVAL OF SERVICE ESTIMATE PLAN13-06-2024 ------
30ASSURANCE FOR EXCESS TREATED WATER DISCHARGE IN SEWER LINE13-06-2024 ------
31ASSURANCE FOR STORM WATER CONNECTION 13-06-2024 ------
32BANK UNDERTAKING13-06-2024 ------
33BR-III LETTER13-06-2024 ------
34ELEVATION PLAN13-06-2024 ------
35EWS BLOCK13-06-2024 ------
36FOREST NOC13-06-2024 ------
37GROUND & 1ST FLOOR13-06-2024 ------
38TOWER B ELEVATION & SEC13-06-2024 ------
39TOWER B TYPICAL FLOOR213-06-2024 ------
40FIRE SCHEME APPROVAL LETTER13-06-2024 ------
41FLOOR PLAN13-06-2024 ------
42DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD13-06-2024 View Document
43COPY OF LICENSE ALONG WITH SCHEDULE OF LAND13-06-2024 View Document
44LOI13-06-2024 ------
45NON- ENCUMBRANCE CERTIFICATE13-06-2024 ------
46ROAD SCHEME13-06-2024 ------
47SEWERAGE SCHEME PLAN13-06-2024 ------
48TOWER A MOMTY & OHWT13-06-2024 ------
49WATER SUPPLY SCHEME13-06-2024 ------
50X-SECTION PLAN13-06-2024 ------
51STORM WATER SUPPLY PLAN13-06-2024 ------
52TOWE A TYPICAL FLOOR13-06-2024 ------
53TOWER A ELEVATION - B13-06-2024 ------
54TOWER A ELEVATIONS13-06-2024 ------
55TOWER A REFUGE FLOOR13-06-2024 ------
56TOWER B 2ND FLOOR AND ETC13-06-2024 ------
57TOWER B TERRACE O.H.T13-06-2024 ------
58TOWER B TYPICAL REFUGE FLOOR13-06-2024 ------
59WATER SUPPLY SCHEME PLAN13-06-2024 ------
60SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN13-06-2024 View Document