HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1850-2025
Submission Date : 24-01-2025 01:53:21 PM
Applicant Type : Company
Project Type: NEW




RIVERDAY INFRASTRUCTURE PRIVATE LIMITED
12A FLOOR, TOWER 2 M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66, GURGAON, GURUGRAM, HARYANA
1246600000
8929012754 (Number Shared by Promoter in Public)
secretarial@smartworlddevelopers.com
http://www.riverdayinfrastructure.com
XXXX273J
U70100HR2021PTC098078
 
 


 
 


 
 


 
 







TRUMP RESIDENCES GURGAON
SECTOR 69
BADSHAHPUR ST
GURUGRAM
01246600000
8929012754 (Number Shared by Promoter in Public)
secretarial@smartworlddevelopers.com
ARVIND AGARWAL
01246600000
8929012754 (Number Shared by Promoter in Public)
secretarial@smartworlddevelopers.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151059122-01-20253463690ICICI BANK LIMITEDHRERA Gurugram
251059222-01-2025695650ICICI BANK LIMITEDHRERA Gurugram
364005111-02-202598024KOTAK MAHINDRA BANKHRERA Gurugram







0.633 (Acre)
5.12
4.98
11.66875 (Acre)
90 of 2024 dated 18.07.2024
No
Address     41ST FLOOR, TOWER-1, M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66, GURUGRAM
Address     12A FLOOR, TOWER 2 M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66, GURGAON, GURUGRAM, HARYANA
Annexure-B- COLLABORATOR VIDE REGISTERED DEVELOPMENT RIGHTS AGREEMENT
BEFORE THE GRANT OF LICENSE
Yes
THE SUMMARY OF THE AGREEMENTS ARE ATTACHED IN FOLDER-A
No
Yes
Yes







191771.48 Lakhs
55770.20 Lakhs
62363.12 Lakhs
2508.54 Lakhs
71129.62 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.63
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total0.63




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS386.74AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM189.85AS PER PROJECT REPORT
3STORM WATER DRAINAGE73.88AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM419.12AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL34.10AS PER PROJECT REPORT
6STREET LIGHTING34.10AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING40.56AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS29.68AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP 59.48AS PER PROJECT REPORT
16UNDERGROUND TANK34.10AS PER PROJECT REPORT
17RAIN WATER HARVESTING98.19AS PER PROJECT REPORT
18ELECTRICAL SUB STATION 505.36AS PER PROJECT REPORT
19ELECTRIFICATION306.65AS PER PROJECT REPORT
20CONSULTANCY148.38AS PER PROJECT REPORT
21INFRA ESTABLISHMENTS118.70AS PER PROJECT REPORT
22PNG WORKS29.68AS PER PROJECT REPORT


27-01-2025 (date)
27-01-2025 (date)
01-02-2025
30-04-2033
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings195.70902
Apartment/Shops/Other Buildings153.96902
Apartment/Shops/Other Buildings245.87482
Apartment/Shops/Other Buildings244.55502
Apartment/Shops/Other Buildings115.4582
Apartment/Shops/Other Buildings153.9622
Apartment/Shops/Other Buildings360.2042
Apartment/Shops/Other Buildings245.8722
Apartment/Shops/Other Buildings195.7022
Apartment/Shops/Other Buildings268.8222





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments162.18162.18324.37405.46
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments544.602037.721768.191994.36
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2580.112886.992784.802826.66
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3759.714281.185022.644461.57
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3710.893320.173517.093341.76
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2761.911706.371458.941431.23
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1534.721114.24833.76835.58
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments793.72
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements019.34
Water Supply System09.49
Sewerage treatment & garbage disposal01.70
Electricity Supply System00
Storm Water Drainage03.69
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Electrical sub station50.5450.54
Firefighting services1.66
Rain water harvesting4.91

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements19.3438.6738.6738.67
Water Supply System9.4918.9818.9818.98
Sewerage treatment & garbage disposal1.703.413.413.41
Electricity Supply System0000
Storm Water Drainage3.697.397.397.39
Parks and Playgrounds2.972.972.972.97
Clubhouse/community centres0000
Shopping area0000
Other0000
Fire Fighting services2.082.082.082.08
Rain water harvesting4.919.829.829.82
Electrical sub station50.5450.5450.5450.54
Consultancy14.8414.8429.6829.68
Infra Establishments11.8711.8723.7423.74
Street Light3.413.413.41
STP2.978.92
Underground tank1.705.11

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements58.0158.0146.4138.67
Water Supply System28.4828.4822.7818.98
Sewerage treatment & garbage disposal5.115.114.093.41
Electricity Supply System0104.78104.78104.78
Storm Water Drainage11.0811.088.877.39
Parks and Playgrounds2.972.975.942.97
Clubhouse/community centres0000
Shopping area0000
Other0000
STP11.9011.9011.905.95
Underground tank6.826.826.823.41
Rain water harvesting14.7314.7311.789.82
Switching Station76.6676.6676.66
Consultancy14.8414.8414.8414.84
Infra Establishments11.8711.8711.8711.87
PNG Works7.427.427.42
Electrical sub station50.5450.5450.5450.54
Street Light3.416.826.823.41
Security4.954.954.95
Fire Fighting services2.084.152.081.66

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements30.94
Water Supply System15.19
Sewerage treatment & garbage disposal2.73
Electricity Supply System104.78
Storm Water Drainage5.91
Parks and Playgrounds2.97
Clubhouse/community centres0
Shopping area0
Other0
STP5.95
PNG Works7.42
Rain water harvesting7.85
Underground tank3.41
Electrification76.66
Fire Fighting services0.83
Security4.95
Street Light3.41












Yes
Yes
ICICI BANK LIMITED,TRANSACTION BANKING GROUP,PICASSO CENTRE,SECTOR-61,GURGAON
777705983764
ICIC0005894
110229424
005894
1. Gaurav Bansal-C-501, Lions Society, Opposite Tau Devi Lal Park, Sector 56, Gurgaon Sector 56, Gurgaon, Haryana - 122011 2. Rajat Jain-Villa no 44, Tulip Lvory, Gurgaon, Sector 70, Badshahpur, Gurgaon, Haryana-122101 3. Vivek Singhal-Flat No 7A, Tower 1, Fairway West, M3M Golf Estate, Sector 65, Badshahpur , Gurgaon, Haryana-122101 4. Anuj Kumar Goel- House No- C-25, Street No-1, Near Sunrise Public School, Bhajanpura, North East, Delhi- 110053 5. Anil Mittal H No 723, Sector 31 Gurugram 6.Meenal Sood-C-81A, Moti Nagar, Ramesh Nagar H.O, West Delhi, Delhi 110015
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. DTCP LICENSE NO 90 OF 2024 DATED 18.07.2024ALREADY BEEN OBTAINED18-07-2024
II. LOIALREADY BEEN OBTAINED13-03-2024
III. AAI NOCALREADY BEEN OBTAINED14-03-2023
IV. FOREST NOCALREADY BEEN OBTAINED01-05-2024
V. SEWERAGE ASSURANCEALREADY BEEN OBTAINED05-07-2024
VI. STORM WATER ASSURANCEALREADY BEEN OBTAINED05-07-2024
VII. WATER SUPPLY ASSURANCEALREADY BEEN OBTAINED05-07-2024








Yes


Yes


AS PER THE RULES ANDREGULATIONS OFHARERA







SMARTWORLD SKY ARC
6.97635
952
0
891
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
340765.96340765.9614296.54
Cost of the apartments147001.72147001.727501.77
Cost of the infrastructure9028.169028.160.00
Others costs184736.08184736.086794.77


46879.93 Lakhs
66009.11 Lakhs
0 Lakhs
0 Lakhs
No
31-05-2032
31-05-2032










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE / LAMINATED WOODEN FLOORING / VITRIFIED TILES / CERAMIC TILE
2WALL FINISHING DETAILSACYLIC EMULSION PAINT / OIL BOUND DISTEMPER, OVER GYPSUM/CEMENT PLASTER.
3KITCHEN DETAILSSTONE OVER KITCHEN COUNTER, SS SINK
4BATHROOM FITTINGSCP FITING & CHINAWARE
5WOOD WORK ETCAS PER INTERIOR FITTINGS
6DOORS AND WINDOS FRAMESMAIN DOOR - MODULAR DOORS WITH HARDWARES. BED ROOMS / TOILETS / KITCHEN DOORS: - DOORS WITH HARDWARES.
7GLASS WORKGLASS WITH ALUMINIUM FRAME OR ABOVE
8ELECTRIC FITTINGSLED TYPE FITTINGS IN SPECIFIED AREA
9CONDUCTING AND WIRING DETAILSFR WIRES, HEAVY DUTY PVC CONDUITS.
10CUPBOARD DETAILSN A
11WATER STORAGEUGWT & OHWT
12LIFT DETAILSHIGH SPEED ELEVATORS (PASSENGER & SERVICE)
13EXTERNAL GLAZINGSUPVC / ALUMINIUM DOUBLE/SINGLE GLAZED UNIT DOORS & WINDOWS
13.1WINDOWS/GLAZINGSUPVC / ALUMINIUM DOUBLE/SINGLE GLAZED UNIT DOORS & WINDOW
14DOORSBED ROOMS / TOILETS / KITCHEN DOORS: - DOORS WITH HARDWARES.
14.1MAIN DOORSMAIN DOOR - DOORS WITH HARDWARES.
14.2INTERNAL DOORSBED ROOMS / TOILETS / KITCHEN DOORS: - DOORS WITH HARDWARES.
15AIR CONDITIONINGYES, IN SPECIFIC AREAS
16ELECTRICAL FITTINGSCOMMON AREA LIGHT FIXTURES
17CNG PIPE LINEPROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR WEATHER SHIELD PAINT (TEXTURE / PLAIN)
20INTERNAL FINISHINGAS STATED ABOVE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORSTONE / VITRIFIED TILES FLOORING
1 . 2 WALLSACYLIC EMULSION PAINT/OBD
1 . 3 CEILINGOIL BOUND DISTEMPER OR ABOVE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING /VITRIFIED TILE
2 . 2 WALLSACYLIC EMULSION PAINT/OBD OR ABOVE
2 . 3 CEILINGOIL BOUND DISTEMPER OR ABOVE
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID TILE FLOORING
3 . 2 WALLSVITRIFIED TILE DADO AND ACRYLIC EMUSION PAINT ABOVE TILE DADO.
3 . 3 CEILINGOIL BOUND DISTEMPER OVER MR GYP BOARD FALSE CEILING/ AS PER DESIGN
3 . 4 COUNTERSSTONE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSC P FITTINGS & CHINAWARE
3 . 6 FITTING/FIXTURESSWITCHES & SOCKETS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES / WODEN FLOORING / STONE
4 . 2 WALLSACYLIC EMULSION PAINT /OBD AS APPLICABLE
4 . 3 CEILINGOIL BOUND DISTEMPER OR ABOVE
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID TILE FLOORING
5 . 2 WALLSTILE DADO AND ACRYLIC EMUSION PAINT OABOVE TILE DADO / AS PER DESIGN
5 . 3 CEILINGOIL BOUND DISTEMPER OVER MR GYP BOARD FALSE CEILING / AS PER DESIGN
5 . 4 COUNTERSSTONE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSC P FITTINGS & CHINAWARE
5 . 6 FIXTURESSWITCHES & SOCKETS
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE FLOORING OR ABOVE
6 . 2 WALLSVITRIFIED TILE DADO ABOVE KITCHEN COUNTER) AND ACRYLIC EMUSION PAINT ABOVE OR AS PER DESIGN
6 . 3 CEILINGOIL BOUND DISTEMPER OR ABOVE
6 . 4 COUNTERSSTONE COUNTER
6 . 5 FIXTURESC P FITTING.
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES FLOORING OR ABOVE
7 . 2 WALLS & CEILINGACYLIC EMULSION PAINT / OIL BOUND DISTEMPER/AS PER DESIGN
7 . 3 TOILETTILES IN FLOORING & DADO
7 . 4 BALCONYANTISKID/ VITRIFIED TILES FLOORING
8 . SIT-OUTS
8 . 1 FLOORFLOORING
8 . 2 WALLS & CEILINGEXTERIOR GRADE WEATHERSHIELD PAINT
8 . 3 RAILINGSGLASS/MS/ALUMINIUM
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1RAPAT18-02-2025 ------
2T1&2- 16TH REFUGEE FLOOR18-02-2025 ------
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT24-01-2025 View Document
4ELEVATION PLAN -118-02-2025 ------
5ENVIRONMENTAL CLEARANCE18-02-2025 ------
6NON-ENCUMBRANCE CERTIFICATE18-02-2025 ------
7BASEMENT-02 PLAN18-02-2025 ------
8STRUCTURAL PLAN-218-02-2025 ------
9STRUCTURAL PLAN-318-02-2025 ------
10COPY OF LICENSE ALONG WITH SCHEDULE OF LAND23-01-2025 View Document
11IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN23-01-2025 View Document
12IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN23-01-2025 View Document
13DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.23-01-2025 View Document
14T1&2- 24TH FLOOR PLAN18-02-2025 ------
15LOI24-01-2025 ------
16LC VI24-01-2025 ------
17COD PERMISSION24-01-2025 ------
18ELECTRICAL LOAD ASSURANCE24-01-2025 ------
19STORM WATER ASSURANCE24-01-2025 ------
20DRINKING WATER ASSURANCE24-01-2025 ------
21SEWRAGE CONNECTION ASSURANCE24-01-2025 ------
22ZONING PLAN24-01-2025 ------
23PHASING PLAN24-01-2025 ------
24PERT CHART24-01-2025 ------
25T1&2- 46TH & 47TH FLOOR PLAN18-02-2025 ------
26BASEMENT-01 PLAN18-02-2025 ------
27T1&2- 33RD & 41ST REFUGEE FLOOR18-02-2025 ------
28STRUCTURAL PLAN-118-02-2025 ------
29T1&2- 48TH &50TH; FLOOR PLAN(PENTHOUSE)18-02-2025 ------
30ELEVATION PLAN-0218-02-2025 ------
31REVISED PHASING PLAN18-02-2025 ------
32SITE PLAN (ALL SERVICES)18-02-2025 ------
33T1&2- 33RD & 41ST REFUGEE FLOOR18-02-2025 ------
34BR-III18-02-2025 ------
35STRUCTURAL PLAN-418-02-2025 ------
36T1&2-23RD FLOOR & 24TH REFUGEE FLOOR PLAN18-02-2025 ------
37T1& AND 2 - 1ST FLOOR PLAN & AREA CALCULATION18-02-2025 ------
38BASEMENT-04 PLAN18-02-2025 ------
39SECTION PLAN-AA18-02-2025 ------
40T1&2- 23RD FLOOR PLAN18-02-2025 ------
41T1&2- TYPICAL FLOOR PLAN18-02-2025 ------
42REVISED DEMARCATION CUM ZONING PLAN18-02-2025 ------
43T1&2- GROUND FLOOR PLAN & AREA CALCULATION18-02-2025 ------
44T1&2- 24TH FLOOR PLAN18-02-2025 ------
45FOREST NOC18-02-2025 ------
46T1&2- TYPICAL FLOOR PLANS18-02-2025 ------
47LICENSE18-02-2025 ------
48AKS-SHAJRA18-02-2025 ------
49BASEMENT-03 PLAN18-02-2025 ------
50CASHFLOW STATEMENT18-02-2025 ------
51COD PERMISSION18-02-2025 ------
52JAMABANDI18-02-2025 ------
53LOI18-02-2025 ------
54MUTATION18-02-2025 ------
55SECTION PLAN-BB18-02-2025 ------
56SITE PLAN18-02-2025 ------
57T1&2- ROOF PLAN, MUMTY AREA18-02-2025 ------
58TITLE SEARCH REPORT18-02-2025 ------
59FIRE SCHEME APPLICATION25-03-2025 ------
60SEWER LAYOUT25-03-2025 ------
61IRRIGATION LAYOUT PLAN25-03-2025 ------
62SERVICE PLANS AND ESTIMATES REPORT25-03-2025 ------
63SERVICE PLAN ESTIMATE APPLICATION25-03-2025 ------
64WATER SUPPLY LAYOUT25-03-2025 ------
65ROAD LAYOUT25-03-2025 ------
66STORM LAYOUT25-03-2025 ------