HRERA GurugramTemp Project Id : RERA-GRG-PROJ-510-2019
Submission Date : 07-01-2020 01:32:09 AM
Applicant Type : Company
Project Type: ONGOING




ILD MILLANNIUM PRIVATE LIMITED
B 418 NEW FRIENDS COLONY
01294935100
7042195640 (Number Shared by Promoter in Public)
ild@ild.co.in
http://www.ild.co.in
XXXX170C
U70109DL2006PTC153686
 
 


 
 


 
 







ILD GREEN P-II T 2,6,7
37C
GURGAON
GURUGRAM
01244935100
7042195640 (Number Shared by Promoter in Public)
ILD@ILD.CO.IN
RUPAK KUMAR
01244935100
7042195640 (Number Shared by Promoter in Public)
ILD@ILD.CO.IN








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15695329-07-2017646212HDFCHRERA Gurugram
21596916-07-2017484658HDFCHRERA Gurugram
31750628-03-2018565500HDFCHRERA Gurugram







9.1490 (Acre)
1.75
1.75
15.4829 (Acre)
NO.13 DT 31.1.2008
Yes







26522 Lakhs
1731 Lakhs
10795 Lakhs
6762 Lakhs
7264 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS79600.3466
3CONSTRUCTION OF ROADS12107
4PAVEMENTS5357
5PARKS AND PLAYGROUNDS10777
6GREEN BELTS5460
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION250
9CLUB HOUSE419.17
10SEWAGE AND SOLID WASTE TREATMENT FACILITY770.35
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total114740.8666




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA/PWDYes
WATER SUPPLYHUDA/PWDYes
ELECTRICITYHUDA/PWDYes
SEWAGE DISPOSALHUDA/PWDYes
STORM WATER DRAINAGEHUDA/PWDYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS1266SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM290SUBMITTED TO HUDA
3STORM WATER DRAINAGE125SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM703SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL200SUBMITTED TO HUDA
6STREET LIGHTING0SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING0SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS2863SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO HUDA
10SHOPPING AREA304SUBMITTED TO HUDA
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO HUDA
12SCHOOL0SUBMITTED TO HUDA
13HOSPITAL/DISPENSARY0SUBMITTED TO HUDA
14ANY OTHER1011SUBMITTED TO HUDA


05-09-2014 (date)
01-01-2015 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK57923254172821
2APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK120407262101
3APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK9638766881






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
3BHK172COMPLETED
3BHK62COMPLETED
2BHK68COMPLETED


09-12-2014
15-08-2019
31-12-2020
09-12-2014
71
31-12-2020
ATTACHED
ATTACHED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
31-12-2019
0
31-12-2019
YES
YES


410
0
0
150
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments13960
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0046535306
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments674438429
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements25
Water Supply System100
Sewerage treatment & garbage disposal40
Electricity Supply System100
Storm Water Drainage15
Parks and Playgrounds10
Clubhouse/community centres20
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0010200
Water Supply System004010
Sewerage treatment & garbage disposal001530
Electricity Supply System003045
Storm Water Drainage00610
Parks and Playgrounds00390
Clubhouse/community centres00100
Shopping area0000
Other00090

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements200200200200
Water Supply System10101010
Sewerage treatment & garbage disposal50505050
Electricity Supply System60606060
Storm Water Drainage10101010
Parks and Playgrounds100100100100
Clubhouse/community centres0000
Shopping area0000
Other100100100100












Particulars Remarks, if any
i. No. of Flats/Apartments constructed402NIL
ii. No. of Flats/ Apartments booked302NIL
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter20800 LakhsNIL
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter15688 LakhsNIL
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter444 LakhsNIL
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter5066 LakhsNIL
vii. Amount invested in the project upto the date of application0 LakhsNIL
Land cost (If any)1731 LakhsNIL
Apartments12959 LakhsNIL
Infrastructure1000 LakhsNIL
EDC/ Taxes Etc.5888 LakhsNIL
viii. Balance cost to be incurred for completion of the project and delivery of possession4972 LakhsNIL
(a) In respect of existing allottees3305 LakhsNIL
(b) In respect of rest of the project1666 LakhsNIL
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
10000 LakhsNIL
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 LakhsNIL



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS250.7425
II. WATER SUPPLY SYSTEM243100
III. STORM WATER DRAINAGE40.515
IV. ELECTRICITY SUPPLY SYSTEM500100
V. SEWAGE TREATMENT & GARBAGE DISPOSAL5240
VI. CLUB HOUSE/COMMUNITY CENTRE8020
VII. SCHOOL10080
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.10010
XIII. COVERED PARKING10080
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM3010
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
209-214, KAILASH BUILDING, 26, KASTURBA GANDHI MARG, NEW DELHI
00030350020719
HDFC0000003
110240001
000003
NA
NA











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. FIRE NOC RENEWEDALREADY BEEN OBTAINED09-05-2019
II. LICENCE RENEWED ALREADY BEEN OBTAINED17-08-2016
III. LICENCE 13 OF 2008 (DT 31.1.2008)ALREADY BEEN OBTAINED08-01-2009
IV. FIRE SCHEME APPROVALALREADY BEEN OBTAINED10-10-2014
V. SITE PLANALREADY BEEN OBTAINED10-12-2012
VI. AIRPORT AUTHORITY APPROVALALREADY BEEN OBTAINED13-10-2015
VII. SEWAGE CONNECTIVITYALREADY BEEN OBTAINED31-08-2016
VIII. WATER SUPPLYALREADY BEEN OBTAINED06-09-2016
IX. CONSENT TO ESTABLISHALREADY BEEN OBTAINED12-08-2014
X. CONSENT TO OPERATEALREADY BEEN OBTAINED22-03-2016
XI. ZONING PLANALREADY BEEN OBTAINED11-12-2011
XII. ELECTRICAL APPROVALALREADY BEEN OBTAINED04-05-2017
XIII. POLLUTION APPROVALALREADY BEEN OBTAINED21-01-2010
XIV. BUILDING PLANALREADY BEEN OBTAINED05-06-2015
XV. SERVICE ESTIMATEALREADY BEEN OBTAINED23-08-2016
XVI. LICENCE RENEWAL REQUESTAPPLIED FOR BUT YET TO RECEIVE08-01-2018








Yes


Yes


AS PER AGREEMENT







ILD GREENS T 3,4,5
3.097
162
0
162
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
380138013801
Cost of the apartments333633363336
Cost of the infrastructure304304304
Others costs161161161


7069 Lakhs
110 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2016
31-03-2016




ILD GRAND (TOWER NOS. A, B & C)
5.697
334
0
228
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
13000122727512
Cost of the apartments11000107127232
Cost of the infrastructure10501035225
Others costs55052555


12584 Lakhs
832 Lakhs
500 Lakhs
400 Lakhs
Yes
30-09-2019
31-03-2021




GRAND CENTRA PHASE – IV T1
2
216
0
67
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
660067401012
Cost of the apartments61006227815
Cost of the infrastructure30031254
Others costs200201143


1459 Lakhs
15623 Lakhs
4000 Lakhs
3000 Lakhs
No
28-02-2020
28-02-2020




ARETE T1 & T2
8.79
336
0
276
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
331.42331.42151.47
Cost of the apartments166.13166.1384.37
Cost of the infrastructure35.4435.440.40
Others costs129.85129.8566.70


101.95 Lakhs
113.71 Lakhs
100 Lakhs
84.10 Lakhs
No
30-09-2021
30-03-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED / ANTISKID CERAMIC TILES
2WALL FINISHING DETAILSACRYLIC PAINT / CERAMIC TILES
3KITCHEN DETAILSGRANITE COUNTER / 2’ DADO CERAMIC TILE
4BATHROOM FITTINGSSOMANY / RYBO OR SIMILAR BRAND
5WOOD WORK ETCMIRANDI DOOR FRAME
6DOORS AND WINDOS FRAMESENAMEL PAINT FINISH / MIRANDI DOOR FRAME
7GLASS WORK5/6 MM PLAIN GLASS
8ELECTRIC FITTINGSANCHOR ROMA /EQUIVALENT SWITCHES / POWER POINTS
9CONDUCTING AND WIRING DETAILSCOPPER WIRING
10CUPBOARD DETAILSN/A
11WATER STORAGEUGT / OHT
12LIFT DETAILSJOHNSON / / EQUIVALENT
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGS5/6MM PLAIN GLASS WITH ALUMINIUM FRAME
14DOORSNA
14.1MAIN DOORSLAMINATED FLUSH DOOR
14.2INTERNAL DOORSENAMEL PAINTED FINISH DOOR
15AIR CONDITIONINGN/A
16ELECTRICAL FITTINGSANCHOR ROMA / EQUIVALENT
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMEALL WEATHER PROOF PAINT / WHITE / DARK BROWN
20INTERNAL FINISHINGACRYLIC / OBD
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSACRYLIC PAINT FINISH
1 . 3 CEILINGOIL BOUND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILE
2 . 2 WALLSACRYLIC PAINT FINISH
2 . 3 CEILINGOIL BOUND DISTEMPER (OBD)
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORANTI-SKID CERAMIC TILES
3 . 2 WALLSCERAMIC TILES
3 . 3 CEILINGOBD / FALSE CEILING (GRID)
3 . 4 COUNTERSGRANITE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSSOMANY /RYBO OR SIMILAR
3 . 6 FITTING/FIXTURESSOMANY /RYBO OR SIMILAR
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSACRYLIC PAINT FINISH
4 . 3 CEILINGOBD
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORANTI-SKID CERAMIC TILES
5 . 2 WALLSCERAMIC TILES
5 . 3 CEILINGOBD / FALSE CEILING (GRID)
5 . 4 COUNTERSGRANITE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSSOMANY /RYBO OR SIMILAR
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORCERAMIC TILES
6 . 2 WALLSACRYLIC / OBD
6 . 3 CEILINGOBD
6 . 4 COUNTERSGRANITE COUNTER WITH 2’ CERAMIC TILE DADO
6 . 5 FIXTURESSINGLE BOWL SS SINK WITH DRAIN BOARD
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN/A
7 . 2 WALLS & CEILINGN/A
7 . 3 TOILETN/A
7 . 4 BALCONYANTI-SKID CERAMIC TILE
8 . SIT-OUTS
8 . 1 FLOORINDIAN STONE / CERAMIC TILES
8 . 2 WALLS & CEILINGOBD
8 . 3 RAILINGSMS RAILING WITH ENAMEL PAINT
8 . 4 FIXTURESLIGHT FIXTURE POINTS












Sr. No.Document DescriptionDate of Document UploadView Document
1DEMARCATION PLAN28-12-2019 View Document
2SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN28-12-2019 View Document
3ZONING PLAN30-12-2019 View Document
4AIR PORT AUTHORITY APPROVAL30-12-2019 ------
5DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD28-12-2019 View Document
6A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS28-12-2019 View Document
7CONSENT TO ESTABLISH30-12-2019 ------
8FLOOR PLAN30-12-2019 ------
9BOOKING APPLICATION30-12-2019 ------
10COPY OF LICENSE ALONG WITH SCHEDULE OF LAND30-12-2019 View Document
11CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT30-12-2019 View Document
12CASH FLOW STATEMENT OF THE PROPOSED PROJECT03-01-2020 View Document
13ALLOTMENT LETTER30-12-2019 ------
14BALANCE SHEET 201630-12-2019 ------
15BALANCE SHEET 1730-12-2019 ------
16BALANCE SJHEET 201830-12-2019 ------
17DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.30-12-2019 View Document
18STORM WATER30-12-2019 ------
19SITE PLAN30-12-2019 ------
20AGREEMENT30-12-2019 ------
21CONVEYANCE DEED30-12-2019 ------
22DEMARCATION PLAN30-12-2019 ------
23FLOOR PLAN30-12-2019 ------
24WATER SUPPLY30-12-2019 ------
25IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN03-01-2020 View Document
26SEWER CONNECTION30-12-2019 ------
27NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT30-12-2019 View Document
28IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN30-12-2019 View Document
29FLOOR PLAN30-12-2019 ------