HRERA GurugramTemp Project Id : RERA-GRG-PROJ-441-2019
Submission Date : 28-12-2019 12:07:29 PM
Applicant Type : Company
Project Type: ONGOING




ORRIS INFRASTRUCTURE PRIVATE LIMITED
C-3/260, JANAKPURI, NEW DELHI-110058
01244979200
9560099004 (Number Shared by Promoter in Public)
info@orris.in
http://www.orris.in/
XXXX494P
U70109DL2006PTC151295
 
 


 
 


 
 


 
 







ORRIS MARKET 89
SECTOR - 89, GURUGRAM
HARSARU ST
GURUGRAM
01244979200
0124497920 (Number Shared by Promoter in Public)
ilnfo@orris.in
KHUSHHAL SINGH
01244979200
9958196565 (Number Shared by Promoter in Public)
Khushhal.singh@orris.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
19338825-08-2017956703AXIS BANKHRERA Gurugram
250595926-07-2018109ICICI BANKHRERA Gurugram
351028111-10-2021635000ICICI BANKHRERA Gurugram
451505429-11-2021116753ICICI BANKHRERA Gurugram







3.86 (Acre)
1.75
174.986
101.081 (Acre)
59 of 2013
No
Address     C-3/260, JANAKPURI, NEW DELHI -110058
Address     C-3/260, JANAKPURI, NEW DELHI -110058
Address     C-3/260, JANAKPURI, NEW DELHI -110058
Address     C-3/260, JANAKPURI, NEW DELHI -110058
Address     C-3/260, JANAKPURI, NEW DELHI -110058
Address     SALAG KI DHANI(HAYATPUR), TEHSHIL & DISTRICT GURUGRAM
Address     VILLAGE HAYATPUR, TEHSHIL & DISTRICT GURUGRAM
Address     SALAG KI DHANI(HAYATPUR), TEHSHIL & DISTRICT GURUGRAM
Address     C-3/260, JANAKPURI, NEW DELHI -110058
Address     C-3/260, JANAKPURI, NEW DELHI -110058
Address     VILLAGE HAYATPUR, TEHSHIL & DISTRICT GURUGRAM
Annexure-B- ANNEXURE
COLL
No
SUMMARY
No
No
No







16599 Lakhs
669.13 Lakhs
10973 Lakhs
1890.60 Lakhs
3066.22 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.563
3CONSTRUCTION OF ROADS1.035
4PAVEMENTS0.115
5PARKS AND PLAYGROUNDS0.409
6GREEN BELTS0
7VEHICLE PARKINGS0.614
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.124
Total3.86




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHARYANA PUBLIC WORK DEVELOPMENT, HARYANAYes
WATER SUPPLYGMDAYes
ELECTRICITYDAKSHIN HARYANA BIJLI VITRAN NIGAMYes
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS205YET TO BE PREPARED
2WATER SUPPLY SYSTEM50YET TO BE PREPARED
3STORM WATER DRAINAGE40YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM850YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL40YET TO BE PREPARED
6STREET LIGHTING50YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING305YET TO BE PREPARED
8PLAYGROUNDS AND PARKS125YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER225.60YET TO BE PREPARED


16-07-2013 (date)
09-09-2016 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 108162915250






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
TYPE 1291SUB STRUCTURE COMPLETED


05-10-2016
15-01-2022
14-01-2023
05-10-2016
0
30-11-2022


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
05-10-2016
0
30-11-2022


442
0
0
110
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops1762.31
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0002193.59
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops2135.111793.591793.591294.81
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements102.5102.5
Water Supply System25.025.0
Sewerage treatment & garbage disposal20.020.0
Electricity Supply System425.0425.0
Storm Water Drainage20.020.0
Parks and Playgrounds62.562.5
Clubhouse/community centres00
Shopping area00
Other112.8112.8












Particulars Remarks, if any
i. No. of Flats/Apartments constructed816
ii. No. of Flats/ Apartments booked291
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter8132.68 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter4761.48 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter3371.2 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter9 Lakhs
vii. Amount invested in the project upto the date of application3094.15 Lakhs
Land cost (If any)669.13 Lakhs
Apartments1762.31 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.662.71 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession13504.8 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS2050
II. WATER SUPPLY SYSTEM500
III. STORM WATER DRAINAGE400
IV. ELECTRICITY SUPPLY SYSTEM8500
V. SEWAGE TREATMENT & GARBAGE DISPOSAL400
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER225.60
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.1250
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM3050
XVII. OTHER FACILITIES AS PER PROJECT REPORT500









Yes
Yes
HDFC BANK, KAILASH BUILDING, 26, KASTURBA GANDHI MARG, NEW DELHI-110001
57500000325342
HDFC0000003
110240001
3
Mr. Vijay Gupta and Mr. Amit Gupta Address: C-3/260, Janakpuri, New Delhi-110058











Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes


No
No
Yes
Yes
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. FOREST NOCALREADY BEEN OBTAINED20-01-2014
II. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED23-02-2016
III. WET CONSTRUCTIONALREADY BEEN OBTAINED15-05-2017
IV. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED16-09-2016
V. CONSENT TO ESTABLISHALREADY BEEN OBTAINED18-10-2016
VI. MINING PERMISSIONALREADY BEEN OBTAINED03-10-2016
VII. NOC FOR APPROACH ROADALREADY BEEN OBTAINED24-05-2017
VIII. ARAVALIALREADY BEEN OBTAINED30-01-2014
IX. DRINKING WATERALREADY BEEN OBTAINED22-11-2016
X. DHBVNALREADY BEEN OBTAINED21-03-2016
XI. FIRE FIGHTING SCHEMEALREADY BEEN OBTAINED09-02-2017








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE & LAMINATED WOODEN FLOORING SERVICE APARTMENT, KOTA STONE IN BASEMENT.
2WALL FINISHING DETAILSTEXTURED PAINT & OBD
3KITCHEN DETAILSMODULAR KITCHEN, GRANITE COUNTER
4BATHROOM FITTINGSCHROME PLATED BATHROOM FITTINGS
5WOOD WORK ETCINTERNAL DOOR - FLUSH DOOR, WOODEN FRAME - MIRANDI
6DOORS AND WINDOS FRAMESUPVC- EXTERNAL DOORS
7GLASS WORKCLEAR GLASS
8ELECTRIC FITTINGSM.S. CONDUIT, HD PVC CONDUIT, 18 W-40W LIGHT FIXTURES.
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSSTRCUCTURAL GLAZING - SEMI UNITIZED
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSGLASS DOOR
14.2INTERNAL DOORSFLUSH DOOR
15AIR CONDITIONINGAIR CONDITIONED
16ELECTRICAL FITTINGS18W - 40W LIGHT FIXTURES
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE PAINT
20INTERNAL FINISHINGOBD PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED GRANITE
1 . 2 WALLSTEXTURE PAINT, VITRIFIED TILE
1 . 3 CEILINGFALSE CEILING
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORCARPET & GRANITE STONE
2 . 2 WALLSTEXTURE PAINT
2 . 3 CEILINGFALSE CEILING
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1BASEMENT-02 PLAN11-02-2020 ------
2BASEMENT (1+2)AREA11-02-2020 ------
3GROUND FLOOR AREA11-02-2020 ------
4FIRST & SECOND-AREA11-02-2020 ------
5ELEVATION -FRONT11-02-2020 ------
6ELEVATION- SIDE11-02-2020 ------
7ELEVATION-REAR11-02-2020 ------
8SECTION B-B11-02-2020 ------
9IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN23-12-2019 View Document
10DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.24-12-2019 View Document
11SERVICE PLAN AND ESTIMATE APPROVAL LETTER11-02-2020 ------
12AGREEMENT TO SALE11-02-2020 ------
13ESCROW ACCOUNT DETAILS11-02-2020 ------
14FOREST NOC11-02-2020 ------
15SERVICE PLAN APPROVAL LETTER11-02-2020 ------
16ENVIRONMENT CLEARANCE APPROVAL11-02-2020 ------
17LOI11-02-2020 ------
18LC - IV11-02-2020 ------
19AIRPORT HEIGHT CLEARANCE11-02-2020 ------
20BUILDING PLAN APPROVAL LETTER (BR-III)11-02-2020 ------
21SERVICE PLAN11-02-2020 ------
22FEES DEMAND DRAFT DETAILS11-02-2020 ------
23SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN11-02-2020 View Document
24FIRE SCHEME APPROVAL11-02-2020 ------
25APPLICATION FORM11-02-2020 ------
26NON-ENCUMBRANCE CERTIFICATE11-02-2020 ------
27CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT11-02-2020 View Document
28A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS11-02-2020 View Document
29SECTION A-A11-02-2020 ------
30THIRD FLOOR PLAN11-02-2020 ------
31GROUND FLOOR PLAN11-02-2020 ------
32FIRST FLOOR PLAN11-02-2020 ------
33SECOND FLOOR PLAN11-02-2020 ------
34TYPICAL FLOOR PLAN AND AREA11-02-2020 ------
35BASEMENT-01 PLAN11-02-2020 ------
36NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT04-04-2022 View Document
37DEMARCATION PLAN04-04-2022 View Document
38DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD04-04-2022 View Document
39ELECTRICITY SUPPLY PLAN04-04-2022 ------
40IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN04-04-2022 View Document
41COPY OF LICENSE ALONG WITH SCHEDULE OF LAND04-04-2022 View Document
42PARKING PLAN04-04-2022 ------
43ROADS AND PAVEMENT PLAN04-04-2022 ------
44SEWERAGE PLAN04-04-2022 ------
45STORM WATER DRAINAGE PLAN04-04-2022 ------
46STREET LIGHT PLAN04-04-2022 ------
47STRUCTURAL PLAN04-04-2022 ------
48WATER SUPPLY PLAN04-04-2022 ------
49ZONING PLAN04-04-2022 View Document
50X-SECTION PLAN04-04-2022 ------
51SITE PLAN04-04-2022 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 EXTENSION NO. 02 OF 2022 DATED 06.04.2022 16-12-2022 View Document
2 PROJECT CONTINUATION- RC/REP/HARERA/GGM/38 of 2018/7(3)/24/2023/01 DATED 30.01.2023 12-04-2023 View Document