HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2024-2025
Submission Date : 04-08-2025 02:00:28 PM
Applicant Type : Company
Project Type: NEW




ADANI BRAHMA SYNERGY PRIVATE LIMITED
BLOCK C, FLAT NO. 53 FLATTED FACTORY COMPLEX, JHANDEWALAN
1242555002
9289934504 (Number Shared by Promoter in Public)
satyendranath.tiwari@adani.com
http://www.samsaragurgaon.com/
XXXX275K
U45200DL2017PTC317052
 
 


 
 


 
 







SAMSARA IVANA 2.0
SECTOR 63, BLOCK - I VILLAGE MAIDAVAS
BADSHAHPUR ST
GURUGRAM
1242555155
9811143547 (Number Shared by Promoter in Public)
satyendranath.tiwari@adani.com
SATYENDRANATH TIWARI
1242555155
9811143547 (Number Shared by Promoter in Public)
satyendranath.tiwari@adani.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150062902-08-2025334100ICICI BANKHRERA Gurugram
250065628-08-202571539ICICI BANKHRERA Gurugram







1.22 (Acre)
2.4
2.4
141.6687 (Acre)
64 of 2010 dated 21.08.2010
Yes







19495.21 Lakhs
3861.00 Lakhs
10625.00 Lakhs
0.00 Lakhs
5009.20 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.22
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total1.22




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVP/GMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM0AS PER PROJECT REPORT
3STORM WATER DRAINAGE0AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL0AS PER PROJECT REPORT
6STREET LIGHTING0AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT


NA (date)
08-07-2025 (date)
01-11-2025
30-06-2029
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings149.82941
Apartment/Shops/Other Buildings157.527164
Apartment/Shops/Other Buildings158.1634812





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0325.00
Shops00
Plots00

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments750.00850.00850.00750.00
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments500.00800.001000.001000.00
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments800.00750.00750.00800.00
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments500.00200.00
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00












Yes
No
ICICI BANK SHOP NO 107 AND 108, EMAAR EMERALD PLAZA, SEC 65, GURGAON, 122018
777705999374
ICIC0005885
110229424
5885
Atul Jain, Flat No. 701, VidyaEnclave, GH-11, Sector-56,GURUGRAM
Yes











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. I. 64 OF 2010 DATED 21.08.2010ALREADY BEEN OBTAINED21-08-2021








Yes


Yes


As per Draft agreement of RERA







SAMSARA (PART-1), SECTOR-60, TEHSIL-WAZIRABAD, GURUGRAM
9832
66
22
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
857584508450
Cost of the apartments000
Cost of the infrastructure000
Others costs250026252625


13865 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2022
31-03-2022




SAMSARA (PART-3), SECTOR-60, TEHSIL-WAZIRABAD, GURUGRAM
10194
63
21
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
870087008700
Cost of the apartments000
Cost of the infrastructure000
Others costs262526252625


13871.62 Lakhs
15.64 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2022
31-03-2022




SAMSARA (PART-V), SECTOR-63, GURUGRAM
12243
172
43
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
22745227459304
Cost of the apartments000
Cost of the infrastructure000
Others costs592059205920


16217 Lakhs
1166 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2023
30-09-2023




SAMSARA VILASA & SAMSARA ARYA, SECTOR-60, GURUGRAM
2.308
84
21
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
16008.9304082.53
Cost of the apartments9878.704082.53
Cost of the infrastructure000
Others costs6130.2300


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2022
31-03-2022










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT
3KITCHEN DETAILSMODULAR KITCHEN WITH HOB
4BATHROOM FITTINGSJAQUAR OR EQUIVALENT
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESALUMINIUM/UPVC WITH GLASS DOORS & WINDOWS
7GLASS WORKNA
8ELECTRIC FITTINGSMODULAR SWITCH & SOCKET OR ISI APPROVED
9CONDUCTING AND WIRING DETAILSPVC CONDUIT & COPPER WIRING
10CUPBOARD DETAILSNA
11WATER STORAGEOVERHEAD HDPE TANK
12LIFT DETAILS5/6 PASSENGERS
13EXTERNAL GLAZINGSCLEAR GLASS ALUMINIUM/UPVC WINDOWS
13.1WINDOWS/GLAZINGSCLEAR GLASS ALUMINIUM/UPVC WINDOWS
14DOORSFLUSH DOOR WITH HARDWARE
14.1MAIN DOORSFLUSH DOOR WITH HARDWARE
14.2INTERNAL DOORSFLUSH DOOR WITH HARDWARE
15AIR CONDITIONINGVRF AIRCONDITIONING IN LIVING/DINING & ALL BEDROOMS
16ELECTRICAL FITTINGSNA
17CNG PIPE LINE(COOKING GAS) PROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION OF WI-FI ENABLED HOTSPOT IN LOCALITY
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
3 . 2 WALLSCERAMIC TILES
3 . 3 CEILINGOBD
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGSJAQUAR OR EQUIVALENT
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGOBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
5 . 2 WALLSCERAMIC TILES UPTO DOOR HEIGHT
5 . 3 CEILINGOBD
5 . 4 COUNTERSGRANITE OR EQUIVALENT
5 . 5 SANITARY WARE/CP FITTINGSJAQUAR OR EQUIVALENT
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
6 . 2 WALLSCERAMIC TILES UPTO 2 FEET ABOVE COUNTER
6 . 3 CEILINGOBD
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESJAQUAR OR EQUIVALENT
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
7 . 2 WALLS & CEILINGOBD
7 . 3 TOILETCERAMIC TILES
7 . 4 BALCONYCERAMIC/VITRIFIED TILES
8 . SIT-OUTS
8 . 1 FLOORVITRIFIED TILES/CERAMIC TILES OR EQUIVALENT
8 . 2 WALLS & CEILINGWEATHER PROOF PAINT
8 . 3 RAILINGSM.S. RAILING OR EQUIVALENT
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 02-08-2025 View Document
2 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 02-08-2025 View Document
3 DEMARCATION PLAN 02-08-2025 View Document
4 ZONING PLAN 02-08-2025 View Document
5 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 03-08-2025 View Document
6 CA CETIFICATE FINANCIAL & INVENTORY CERTIFICATE 02-08-2025 ------
7 I48 BRS-I & II 19-12-2025 ------
8 I65 CONVEYANCE DEED 19-12-2025 ------
9 I54 CONVEYANCE DEED 19-12-2025 ------
10 I49 CONVEYANCE DEED 19-12-2025 ------
11 PLOT NO I-67 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
12 PLOT NO I-83 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
13 LC-IV 19-12-2025 ------
14 SHAJRA 19-12-2025 ------
15 I64 BRS-I & II 19-12-2025 ------
16 I66 BRS-I & II 19-12-2025 ------
17 I84 CONVEYANCE DEED 19-12-2025 ------
18 PLOT NO I-84 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
19 DRAFT ALLOTMENT LETTER 19-12-2025 ------
20 PLOT NO I-51 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
21 PLOT NO I-65 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
22 I50 CONVEYANCE DEED 19-12-2025 ------
23 HUDA CONSTRUCTION WATER NOC 19-12-2025 ------
24 I67 BRS-I & II 19-12-2025 ------
25 PLOT NO I-50 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
26 PLOT NO I-66 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
27 I69 BRS-I & II 19-12-2025 ------
28 UNDERTAKING FOR NON-APPLICABILITY OF NCZ, TREE CUTTING, POWERLINE SHIFTING AND FORST LAND DIVERSION 19-12-2025 ------
29 ASSURANCE FOR SEWERAGE CONNECTION 19-12-2025 ------
30 I68 CONVEYANCE DEED 19-12-2025 ------
31 I52 BRS-I & II 19-12-2025 ------
32 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 19-12-2025 View Document
33 ASSURANCE FOR STORM WATER CONNECTION 19-12-2025 ------
34 JAMABANDI 19-12-2025 ------
35 I68 BRS-I & II 19-12-2025 ------
36 I85 BRS-I & II 19-12-2025 ------
37 I50 BRS-I & II 19-12-2025 ------
38 I53 BRS-I & II 19-12-2025 ------
39 I70 BRS-I & II 19-12-2025 ------
40 PLOT NO I-69 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
41 ASSURANCE FOR WATER SUPPLY 19-12-2025 ------
42 I64 CONVEYANCE DEED 19-12-2025 ------
43 MUTATION 19-12-2025 ------
44 PLOT NO I-49 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
45 PLOT NO I-85 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
46 BRS-III 19-12-2025 ------
47 LOI 19-12-2025 ------
48 I51 BRS-I & II 19-12-2025 ------
49 I83 BRS-I & II 19-12-2025 ------
50 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 19-12-2025 View Document
51 PLOT NO I-48 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
52 I70 CONVEYANCE DEED 19-12-2025 ------
53 DRAFT BUILDER BUYER AGREEMENT 19-12-2025 ------
54 I66 CONVEYANCE DEED 19-12-2025 ------
55 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 19-12-2025 View Document
56 PLOT NO I-70 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
57 I51 CONVEYANCE DEED 19-12-2025 ------
58 I52 CONVEYANCE DEED 19-12-2025 ------
59 PLOT NO I-53 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
60 I69 CONVEYANCE DEED 19-12-2025 ------
61 APPROVAL OF ELECTRIFICATION PLAN 19-12-2025 ------
62 PLOT NO I-54 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
63 I67 CONVEYANCE DEED 19-12-2025 ------
64 I53 CONVEYANCE DEED 19-12-2025 ------
65 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 19-12-2025 View Document
66 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 19-12-2025 View Document
67 I48 CONVEYANCE DEED 19-12-2025 ------
68 I49 BRS-I & II 19-12-2025 ------
69 I54 BRS-I & II 19-12-2025 ------
70 I65 BRS-I & II 19-12-2025 ------
71 I84 BRS-I & II 19-12-2025 ------
72 PLOT NO I-52 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
73 PLOT NO I-64 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
74 PLOT NO I-68 (PLAN) AND (ELEVATIONS AND SECTIONS) 19-12-2025 ------
75 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 19-12-2025 View Document
76 BANK UNDERTAKING 19-12-2025 ------
77 ENVIRONMENT CLEARANCE 19-12-2025 ------
78 FOREST NOC 19-12-2025 ------
79 I83 CONVEYANCE DEED 19-12-2025 ------
80 I85 CONVEYANCE DEED 19-12-2025 ------
81 NON ENCUMBRENCE CERTIFICATE 19-12-2025 ------
82 SERVICE PLAN ESTIMATES 19-12-2025 ------