HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1249-2022
Submission Date : 29-12-2022 02:49:18 PM
Applicant Type : Company
Project Type: NEW




ASHIANA HOUSING LIMITED
ASHIANA HOUSING LIMITED SECTOR 93, VILLAGE WAZIRPUR, GURGAON - 122505, HARYANA , INDIA.
9001995544
8826464161 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com
https://www.ashianahousing.com
XXXX093P
L70109WB1986PLC040864
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







ASHIANA AMARAH PHASE II
REVENUE ESTATE OF VILLAGE- WAZIRPUR, SECTOR 93, DISTT. GURUGRAM, HARYANA
GURGAON
GURUGRAM
01142654265
8826464161 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com
JATIN KUMAR
01414139999
8826464161 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152541228-12-2022806211ICICI BANK HRERA Gurugram
252551325-01-20232334891ICICI BANKHRERA Gurugram







3.9378 (Acre)
184
182.976
22.344 (Acre)
41 of 2010 (7-06-2010)
Yes







17030.61 Lakhs
1320.65 Lakhs
5912.00 Lakhs
2098.00 Lakhs
7699.96 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS2532.45
3CONSTRUCTION OF ROADS4291.94
4PAVEMENTS0
5PARKS AND PLAYGROUNDS2254.20
6GREEN BELTS3211.09
7VEHICLE PARKINGS862.5
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY488
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13ROAD SURRENDERED1574
14STREET LIGHTING21.15
15STROM WATER DRAINAGE700.50
Total15935.83




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS507YET TO BE PREPARED
2WATER SUPPLY SYSTEM82YET TO BE PREPARED
3STORM WATER DRAINAGE56YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM211YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL306YET TO BE PREPARED
6STREET LIGHTING16YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING104YET TO BE PREPARED
8PLAYGROUNDS AND PARKS11YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM5YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15CONSTRUCTION AND ROAD CIRCULATION300YET TO BE PREPARED
16ELECTRICITY SUB STATION201YET TO BE PREPARED
17PARKING287YET TO BE PREPARED
18RAIN WATER HARVESTING 12YET TO BE PREPARED


17-05-2022 (date)
17-05-2022 (date)
15-04-2023
15-10-2027
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings22943.22244





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments189405473385
Shops0000
Plots0000
Other Costs190403470384

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments385463553473
Shops0000
Plots0000
Other Costs384460550471

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments473414554355
Shops0000
Plots0000
Other Costs471412551354

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments236177177118
Shops0000
Plots0000
Other Costs237179179121

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments82000
Shops0000
Plots0000
Other Costs83000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Construction of Circulation road0
Electrical sub station0
Parking0
rain water Harvesting0
Renewal Energy System0
Security and FIre Fighting0
Street Lighting0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal3668
Electricity Supply System00
Storm Water Drainage028
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Electrical Sub Station18
Rainwater Harvesting6
Construction of Circulation Road7
Security and Firefighting Services14

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0417900
Water Supply System82000
Sewerage treatment & garbage disposal9910300
Electricity Supply System0042125
Storm Water Drainage28000
Parks and Playgrounds11000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light00160
Construction of Circulation of Road459711140
Electrical Sub Station6565458
Parking287000
Rainwater Harvesting6000
Renewal Energy0003
Security and Firefighting Services4535100

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System44000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Construction of Circulation of Road0000
Security and Firefighting Services0000
Renewal Energy2000
Rainwater Harvesting0000
Parking0000
Electrical Sub Station0000
Street Light0000












Yes
No
ICICI BANK LTD,F11, PREET VIHAR, NEW DELHI 110092
777705227091
ICIC0000037
110229006
000037
Ankur Gupta, Varun Gupta, Vikash Dugar and Harpreet Kaur Ashiana Housing Limited, Sector93, Village Wazirpur, Gurgaon-122505. Haryana, India.











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENTAL CLEARANCE ALREADY BEEN OBTAINED26-11-2021
II. FOREST NOCALREADY BEEN OBTAINED29-12-2021
III. PORTABLE WATER ASSURANCEALREADY BEEN OBTAINED04-08-2021
IV. AIRPORT AUTHORITY OF INDIA NOCALREADY BEEN OBTAINED16-08-2021
V. CONSTRUCTION WATER NOC ALREADY BEEN OBTAINED23-07-2021
VI. LICENSE OF 41 OF 2010ALREADY BEEN OBTAINED07-06-2010








Yes


Yes









ASHIANA ANMOL PHASE-1
3.80
300
0
300
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11823.05011285.86
Cost of the apartments7465.3606183.79
Cost of the infrastructure1926.4402422.33
Others costs2431.2502679.74


23173.30 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2020
31-10-2020




ASHIANA ANMOL PLAZA-1
0.339
76
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
216.280216.28
Cost of the apartments137.920137.92
Cost of the infrastructure26.26026.26
Others costs52.10052.10


180.18 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019




ASHIANA AMARAH PHASE-1 & 1A
5.041
224
0
224
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
14520.6102585.93
Cost of the apartments7087.00423.21
Cost of the infrastructure1718.61022.98
Others costs5715.0001933.83


5767.03 Lakhs
19710.59 Lakhs
4000.00 Lakhs
4000.00 Lakhs
No
15-01-2027
15-01-2027




ASHIANA ANMOL PHASE-2
2.49
180
0
180
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10876.2604319.42
Cost of the apartments4822.6501640.86
Cost of the infrastructure634.05099.21
Others costs5419.5702579.35


6784.92 Lakhs
10536.84 Lakhs
0 Lakhs
0 Lakhs
No
30-04-2026
30-04-2026




ASHIANA ANMOL PHASE-3 & PLAZA PHASE II
6.7879
370
0
250
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17555.5704535.57
Cost of the apartments7371.7005.02
Cost of the infrastructure1006.430156.61
Others costs9177.4504373.94


2710.57 Lakhs
15121.27 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2028
31-12-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEUNITS (A)LIVING/DINING, ENTRANCE FOYER, CORRIDOR LEADING TO BEDROOMS: VITRIFIED TILES (600X600) OR (600X1200). (B) MASTER AND ALL OTHER BATHROOMS: CERAMIC TILES (300X300 OR OTHER SIZES UP TO 600X600) AND/OR COMBINATION. (C) BALCONY: CERAMIC TILES (300X300 OR 300X600 OTHER SIZES UP TO 450X450 AND/OR COMBINATION) SUITABLE QUALITY GLAZED/MATT FINISH. (E) OPEN TERRACE: KOTA STONE/OTHER LOCAL STONE/CERAMIC TILES OF APPROPRIATE QUALITY/STONE MOSAIC FLOOR.
2WALL FINISHING DETAILSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES OR TILE 0.60 METER- SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
3KITCHEN DETAILS1 STAINLESS STEEL SINK WITH ONE BOWL OF 160-200 MM DEPTH AND A DRAIN BOARD, 1 SWIVAL TYPE SINK MIXER, 2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER, 1CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO, NO TAP IS PROVIDED BELOW SINK, PIPED LPG GAS WITH LPG METER WILL BE PROVIDED, WOODEN KITCHEN CABINET, KITCHEN CHIMNEY WITH HOB AND CHIMNEY
4BATHROOM FITTINGSSANITARY WARES: HINDWARE/ROCA/KOHLER/JAQUAR/AMERICAN STANDARD RAK/VITRA OR EQUIVALENT BATH FITTINGS, BASIN MIXER, WALL MIXER AND SHOWER OF JAGUAR/ROCA/AMERICAN STANDARD/ GROHE OR EQUIVALENT AND OTHER ANGLE VALVE EITHER OF CP OR PTMT OF STANDARD MAKE LIKE JAL/CONTINENTAL/PRAYAG OR EQUIVALENT
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMAIN DOOR FRAME - ENAMEL PAINTED/POWDER COATED / POLISH FINISH. DOOR FRAMES - ENAMEL PAINTED
7GLASS WORKNA
8ELECTRIC FITTINGSCONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS AND PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN. (B) MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/NORTH WEST/LEGRAND OR EQUIVALENT
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSCEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR EMULSION PAINT FINISH.
13.1WINDOWS/GLAZINGSBED ROOMS;DRAWING/DINING & KITCHEN: 2-3 TRACK ALUMINUM/UPVC FRAMED WINDOW, WITH 2-3 SLIDING PANELS(DEPENDING ON SIZE) WITH CLEAR FLAT GLASS/6MM TOUGHENED GLASS AND PROVISION FOR PLY MESH SHUTTER. ALL BATHROOMS/POWDER ROOM: TOP HUNG/LOUVERED WITH FROSTED GLASS/PIN HEAD NO FLY MESH SHUTTER IS PROVIDED.2 NUMBERS WELL SUPPORT MS HORIZONTAL BAR ACROSS THE WINDOW OPENING AT SUITABLE HEIGHT.
14DOORSMAIN ENTRANCE: 1 HOUR FIRE RATED MS/ WOODEN/MS IN WOODEN FINISH SHUTTER WITH HANDLE AND LOCK SYSTEM, WHEREAS BEDROOMS, STUDY ROOM, MASTER AND ALL OTHER TOILETS: FLUSH DOOR OR MOULDED SKIN DOORS.
14.1MAIN DOORS(A) MAIN ENTRANCE: 1 HOUR FIRE RATED MS/ WOODEN/MS IN WOODEN FINISH SHUTTER WITH HANDLE AND LOCK SYSTEM
14.2INTERNAL DOORS(A) BEDROOMS, STUDY ROOM, MASTER AND ALL OTHER TOILETS: FLUSH DOOR OR MOULDED SKIN DOORS.
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSCONCEALED CONDUITS WITH COPPER WIRES, PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN. MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/NORTH WEST/LEGRAND OR EQUIVALENT
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMECEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR EMULSION PAINT FINISH.
20INTERNAL FINISHINGGRANITE AND/OR MARBLE AND/OR QUARTZ STONE AND /VITRIFIED TILES AND/OR CERAMIC TILES AND/OR CEMENT SAND PLASTER AND/OR OTHER LOCAL STONE AND/OR COMBINATION OF ANY TWO OR MORE ITEMS WITH EMULSION PAINT FINISH (WHEREVER APPLICABLE)
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES (600X600) OR (800X800) OR (600X1200)
1 . 2 WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
1 . 3 CEILING(1) PLASTERED WITH EITHER- A. SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B. GYPSUM (2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES WOODEN TEXTURE
2 . 2 WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
2 . 3 CEILING(1) PLASTERED WITH EITHER- A. SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B. GYPSUM (2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES (300X300 OR OTHER SIZES UP TO 600X600) AND/OR COMBINATION.
3 . 2 WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
3 . 3 CEILING1) PLASTERED WITH EITHER- A. SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B. GYPSUM (2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURES1 WASH BASIN, (B) 1 FLOOR MOUNTED EWC WITH 6 LITER CAPACITY (C) GLASS CURTAIN (D) A SINGLE LEVER WITH OVER HEAD SHOWER AND A SPOUT IN SHOWER AREA. (E) 1 CP ANGLE VALVE WITH CHROME PLATED PVC SEMI RIGID/FLEXIBLE HEALTH FAUCET. (F) 2 CP ANGLE VALVE (G) 2 ANGLE VALVES FOR WATER CONNECTION AND 1 BOTTLE TRAP OF STANDARD MAKE PTMT MATERIAL (H) 1 TOWEL ROD, A MIRROR (I) 1 TOWEL RACK IN MASTER TOILET ONLY
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES (600X600) OR (800X800) OR (600X1200)
4 . 2 WALLSBRICK WALL OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCK/HOLLOW CONCRETE BLOCK
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCERAMIC TILES (300X300 OR 300X600 OTHER SIZES UP TO 600X600) AND/OR COMBINATION.
5 . 2 WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
5 . 3 CEILING1) PLASTERED WITH EITHER- A. SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B. GYPSUM (2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURES1 WASH BASIN, (B) 1 FLOOR MOUNTED EWC WITH 6 LITER CAPACITY (C) GLASS CURTAIN (D) A SINGLE LEVER WITH OVER HEAD SHOWER AND A SPOUT IN SHOWER AREA. (E) 1 CP ANGLE VALVE WITH CHROME PLATED PVC SEMI RIGID/FLEXIBLE HEALTH FAUCET. (F) 2 CP ANGLE VALVE (G) 2 ANGLE VALVES FOR WATER CONNECTION AND 1 BOTTLE TRAP OF STANDARD MAKE PTMT MATERIAL (H) 1 TOWEL ROD, A MIRROR (I) 1 TOWEL RACK IN MASTER TOILET ONLY
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES (600X600) OR (800X800) OR (600X1200)
6 . 2 WALLSCERAMIC TILES 0.60 METER FROM COUNTERTOP AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT
6 . 3 CEILING(1) PLASTERED WITH EITHER- A. SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B. GYPSUM (2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
6 . 4 COUNTERSNA
6 . 5 FIXTURES(A) 1 STAINLESS STEEL SINK WITH ONE BOWL AND A DRAIN BOARD. (B) 1 SWIVAL TYPE SINK MIXER (C) 2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER. (D) 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO (E) NO TAP IS PROVIDED BELOW SINK. (F) PIPED LPG GAS WITH LPG METER WILL BE PROVIDED. (G) KITCHEN CABINET. (H) KITCHEN CHIMNEY WITH HOB & CHIMNEY
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND28-12-2022 View Document
2IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN28-12-2022 View Document
3A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS29-12-2022 View Document
4DEMARCATION PLAN28-12-2022 View Document
5ZONING PLAN28-12-2022 View Document
6DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD28-12-2022 View Document
7SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN28-12-2022 View Document
8IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN28-12-2022 View Document
9CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT29-12-2022 View Document
10BUILDING PLAN APPROVAL LETTER (BR-III)21-03-2023 ------
113 + 2T TYPE ELEVATIONS C & D A-1521-03-2023 ------
123 + 2T TYPE ELEVATIONS A & B A-0821-03-2023 ------
13STORM WATER DRAINAGE PLAN21-03-2023 ------
14PARKING PLAN21-03-2023 ------
153 + 2T TYPE MUMTY & MACHINE RM. PLAN & AREA CALCULATIONS A-1321-03-2023 ------
163 + 3T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS A-1721-03-2023 ------
17SITE PLAN21-03-2023 ------
18RENEWAL OF LICENSE 41 OF 201021-03-2023 ------
19STREET LIGHT PLAN21-03-2023 ------
20SEWERAGE PLAN21-03-2023 ------
213 + 2T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS A-0521-03-2023 ------
223 + 3T TYPE ELEVATIONS A & B A-2021-03-2023 ------
23ENVIRONMENT CLEARANCE21-03-2023 ------
243 + 2T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS A-0621-03-2023 ------
25DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.21-03-2023 View Document
26SERVICE PLAN APPROVAL LETTER21-03-2023 ------
27FIRE FIGHTING PLAN & WATER SUPPLY PLAN21-03-2023 ------
283 + 3T TYPE SECTIONS 1 & 2 A-2221-03-2023 ------
293 + 3T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS A-1821-03-2023 ------
30ELECTRICITY SUPPLY PLAN21-03-2023 ------
31LC-IV21-03-2023 ------
323 + 2T TYPE MUMTY & MACHINE RM PLAN & AREA CALCULATIONSA-0721-03-2023 ------
333 + 2T TYPE ELEVATIONS A & B A-1421-03-2023 ------
343 + 2T TYPE SECTIONS 1 & 2 A-1021-03-2023 ------
353 + 2T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS A-1121-03-2023 ------
36ROADS AND PAVEMENT PLAN21-03-2023 ------
37FIRE SCHEME21-03-2023 ------
383 + 3T TYPE ELEVATIONS C & D A-2121-03-2023 ------
39SOLID WASTE MANAGEMENT PLAN21-03-2023 ------
40BANK UNDERTAKING21-03-2023 ------
41LANDSCAPE PLAN21-03-2023 ------
423 + 2T TYPE SECTIONS 1 & 2 A-1621-03-2023 ------
433 + 2T TYPE ELEVATIONS C & D A-0921-03-2023 ------
443 + 2T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS A-1221-03-2023 ------
45NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT22-03-2023 View Document