HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2265-2026
Submission Date : 15-07-2026 07:40:12 PM
Applicant Type : Company
Project Type: NEW




DLF HOME DEVELOPERS LIMITED
2ND FLOOR ARJUN MARG DLF SHOPPING MALL DLF CITY PHASE-L GURGAON HARYANA INDIA 122002
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
https://www.dlf.in/
XXXX037H
U74899HR1995PLC082458
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







THE AUREVA
SECTOR 63, GURUGRAM, HARYANA-122102
BADSHAHPUR ST
GURUGRAM
1244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
VIKAS LAKRA
1244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152586827-05-20262225000ICICI BANKHRERA Gurugram
252592826-06-202625000ICICI BANKHRERA Gurugram







4.16875 (Acre)
3.15
3.12935
4.16875 (Acre)
209 of 2025 (16.10.2025)
No
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUNMARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUNMARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUNMARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUNMARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUNMARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Annexure-B- ANNEXURE-B- ANNEXURE-B- LICENSE HOLDER ANDCOLLABORATOR
BEFORE GRANT OF LICENSE
Yes
1. AKINA BUILDERS & DEVELOPERS PRIVATE LIMITED (DA NO.-6736 DATED 23.08.2024), 2. VAMIL BUILDERS & DEVELOPERS PRIVATE LIMITED (DA NO.-6737 DATED 23.08.2024), 3. HOSHI BUILDERS & DEVELOPERS PRIVATE LIMITED (DA NO.-6735 DATED 23.08.2024), 4. ARLIE BUILDERS & DEVELOPERS PRIVATE LIMITED (DA NO.-6733 DATED 23.08.2024) (DA NO.-7511 DATED 27.08.2025), 5. ATHEROL BUILDERS & DEVELOPERS PRIVATE LIMITED (DA NO.-6734 DATED 23.08.2024) THE ABOVE 5 COMPANIES HAVE BEEN MERGED WITH DLF LTD. VIDE MERGER ORDER DATED 14.01.2026
Yes
Yes
Yes







165633 Lakhs
12038 Lakhs
96399 Lakhs
3763 Lakhs
53433 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1555.447
3CONSTRUCTION OF ROADS 5038.136
4PAVEMENTS 81.79
5PARKS AND PLAYGROUNDS 667.952
6GREEN BELTS 1016.316
7VEHICLE PARKINGS 1559.42
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 1815.842
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 4948.533
13COMMERCIAL 186.859
Total16870.295




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS-No
WATER SUPPLYGURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYYes
ELECTRICITY-No
SEWAGE DISPOSALGURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYYes
STORM WATER DRAINAGEGURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS154.8AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM458.2AS PER PROJECT REPORT
3STORM WATER DRAINAGE72.6AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM47.6AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL93.5AS PER PROJECT REPORT
6STREET LIGHTING115.4AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING1455.7AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS37.9AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM10.5AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER1316.4AS PER PROJECT REPORT


NA (date)
NA (date)
15-09-2026
31-10-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings218.2631721
Apartment/Shops/Other Buildings25.04310
Apartment/Shops/Other Buildings22.16730
Apartment/Shops/Other Buildings26.53710
Apartment/Shops/Other Buildings26.04310
Apartment/Shops/Other Buildings35.71510
Apartment/Shops/Other Buildings16.18110





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments916
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments148.39677.931393.562019.08
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2436.103130.252085.082085.08
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1876.575076.735076.734659.71
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5652.856033.304990.764659.71
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5076.734034.195579.123617.17
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments7234.357541.075579.123617.17
Shops0000
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments993.143972.540.000.00
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Construction of circulation road as per conditions of license0
Electrical sub station0
Maintenance Charges and Surfacing of Road0
Parking0
Plantation and Road side trees0
Rain water harvesting0
Renewable energy system0
Security and fire fighting0
STP0
Street lighting0
Underground water tank0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements07.7415.4815.48
Water Supply System00022.91
Sewerage treatment & garbage disposal0004.68
Electricity Supply System0002.38
Storm Water Drainage0003.63
Parks and Playgrounds01.903.793.79
Clubhouse/community centres0000
Shopping area0000
Other07.3214.64141.46

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements15.4815.4815.4815.48
Water Supply System45.8245.8245.8245.82
Sewerage treatment & garbage disposal9.359.359.359.35
Electricity Supply System4.764.764.764.76
Storm Water Drainage7.267.267.267.26
Parks and Playgrounds3.793.793.793.79
Clubhouse/community centres0000
Shopping area0000
Other268.29268.29268.29268.29

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements15.4815.4815.487.74
Water Supply System45.8268.7268.7268.72
Sewerage treatment & garbage disposal9.3514.0314.0314.03
Electricity Supply System4.767.147.147.14
Storm Water Drainage7.2610.8810.8810.88
Parks and Playgrounds3.793.793.791.90
Clubhouse/community centres0000
Shopping area0000
Other268.29395.11397.32600.76

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
Yes
AXIS BANK LTD, 1ST & 2ND FLOOR SCO NO 57 HUDA DISTRICT CENTER, SECTOR 56, GURGAON
924020042122741
UTIB0001366
110211195
1366
01. Mr. Badal Bagri (148 Birch Court, Nirvana Country, Sector 50, Gurgaon, Haryana, 122018) 02. Mr. Sanjay Goenka (F- 222, Park Place, DLF5, DLF Golf Course Road, Sector 54, Gurgaon, Haryana) 03. Mr. Puneet Rakheja (H.No. 386, Sector 31, Faridabad, Haryana 121003) 04. Mr. Pankaj Kumar Jain (C701, Apex Acacia Valley, Sector 3, Vaishali, Ghaziabad, Uttar Pradesh 201010) 05. Mr. Himanshu Garg ( House No. E-301, Block-E, Ardee City Gate No. 2, Sector 52, Wazirabad, Farrukhnagar, Gurgaon Haryana 122003) 06. Mr. Gaurav Arora (A-33, Near Mehfil Banquet Hall, Mahendru Enclave, GT Karnal Road, Delhi 110009) 07. Mr. Pankaj Kumar (A3, Rajcottage 1/18, Rajendra Nagar, Ghaziabad, Uttar Pradesh 201005) 08. Mr. Amit Bansal (472, Sector-10, Panchkula, Haryana - 134113) 09. Mr. Rakesh Sharma ( Village Lohani, Postoffice baliah Khurd, Tehsil Barsar, Lohane (32/20), Hamirpur, Himachal Pradesh-174305) 10. Mr. Praveen Goyal (House No. 1091, Opposite Eicher School, Sector 46, Amarnagar, Faridabad, Haryana, 121003)
Uploaded











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE APPROVALALREADY BEEN OBTAINED16-10-2025
II. ZONING PLAN APPROVALALREADY BEEN OBTAINED29-05-2026
III. BUILDING PLAN /SITE PLAN APPROVALALREADY BEEN OBTAINED14-07-2026








Yes


Yes


As per HARERA Act & Rules







ARCADE 68
2
0
16
0
16
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
310535192774
Cost of the apartments000
Cost of the infrastructure6261491989
Others costs247920281784


4954 Lakhs
6157 Lakhs
0 Lakhs
3092 Lakhs
No
10-11-2027
10-11-2027




CENTRAL 67
8.6987
0
75
0
75
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1699820145.418745.45879
Cost of the apartments000
Cost of the infrastructure434955464513
Others costs126491459914232


44950 Lakhs
26019 Lakhs
0 Lakhs
27111 Lakhs
No
31-12-2027
31-12-2027




CENTRAL 74
3.325
0
8
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
463256752813
Cost of the apartments000
Cost of the infrastructure2628222412
Others costs200534512801


354 Lakhs
21524 Lakhs
0 Lakhs
8 Lakhs
No
08-09-2027
08-09-2027




CENTRAL 84
6.5438
0
46
0
46
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11889109305754
Cost of the apartments000
Cost of the infrastructure541946571704
Others costs647062734050


2948 Lakhs
23552 Lakhs
0 Lakhs
1970 Lakhs
No
13-01-2030
13-01-2030




THE ARBOUR
25.087
1137
0
1137
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
510577.71535497199965
Cost of the apartments325471.75362108145772
Cost of the infrastructure932800
Others costs175778.1817338954193


543241 Lakhs
259025 Lakhs
0 Lakhs
181358 Lakhs
No
31-03-2030
31-03-2030










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIPS FLOORING / TILES / MARBLE / GRANITE / LAMINATED WOOD
2WALL FINISHING DETAILSWHITE WASH / ACRYLIC EMULSION / OBD
3KITCHEN DETAILSMODULAR KITCHEN WITH APPLIANCES AS PERPOINT 6.6, CABINETRY, SINK AND EXHAUST FAN
4BATHROOM FITTINGSCP FITTINGS, WASH BASIN, WC
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMS / UPVC / AL / WOOD
7GLASS WORKCLEAR / FROSTED GLASS AS PER POINT NUMBER 13
8ELECTRIC FITTINGSINCLUDED IN POINT 16 BELOW
9CONDUCTING AND WIRING DETAILSPVC CONDUITS, FRLS WIRING
10CUPBOARD DETAILSMODULAR WARDROBES OF STANDARD MAKE IN BEDROOMS
11WATER STORAGEOHT & UGT WATER TANKS
12LIFT DETAILSBRANDED MAKE
13EXTERNAL GLAZINGSCLEAR GLASS IN SHUTTERS, UPVC / ALUMINIUM FRAMES IN HABITABLE ROOMS CLEAR GLASS IN SHUTTERS, UPVC / ALUMINIUM FRAMES (IN TOILETS)
13.1WINDOWS/GLAZINGSINCLUDED IN POINT 13 ABOVE
14DOORSFLUSH DOOR
14.1MAIN DOORSFIRE RATED FLUSH DOOR
14.2INTERNAL DOORSFLUSH DOOR
15AIR CONDITIONINGLIVING, DINING & BEDROOMS
16ELECTRICAL FITTINGSSWITCH BOARDS AND SOCKETS
17CNG PIPE LINENIL
18PROVISION OF WIFI AND BROADBAND FACILITYNIL
19EXTERNAL FINISHING/COLOUR SCHEMECEMENT BASED EXTERIOR GRADE PAINT
20INTERNAL FINISHINGNIL
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE
1 . 2 WALLSACRYLIC EMULSION / OBD
1 . 3 CEILINGACRYLIC EMULSION / OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION / OBD
2 . 3 CEILINGACRYLIC EMULSION / OBD
2 . 4 MODULAR WARDROBESMODULAR WARDROBES OF STANDARD MAKE
3 . MASTER TOILET
3 . 1 FLOORANTI-SKID TILES / MARBLE / GRANITE
3 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & MIRROR
3 . 3 CEILINGACRYLIC EMULSION / OBD
3 . 4 COUNTERSMARBLE / GRANITE / SYNTHETIC STONE
3 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC
3 . 6 FITTING/FIXTURESGLASS SHOWER-PARTITION IN TOILETS, EXHAUST FAN, TOWEL RAIL / RING, GEYSER, TOILET PAPER HOLDER, GRAB BAR
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION / OBD
4 . 3 CEILINGACRYLIC EMULSION / OBD
4 . 4 WARDROBESMODULAR WARDROBES OF STANDARD MAKE
5 . TOILET
5 . 1 FLOORANTISKID TILES / MARBLE / GRANITE
5 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & MIRROR
5 . 3 CEILINGACRYLIC EMULSION / OBD
5 . 4 COUNTERSGRANITE / MARBLE /SYNTHETIC STONE
5 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC
5 . 6 FIXTURESGLASS SHOWER-PARTITION IN TOILETS, EXHAUST FAN, TOWEL RAIL / RING, GEYSER, TOILET PAPER HOLDER
6 . KITCHEN
6 . 1 FLOORANTISKID TILES / MARBLE / GRANITE
6 . 2 WALLSTILES UP TO 2’ ABOVE COUNTER & OBD / EMULSION PAINT IN BALANCE AREA
6 . 3 CEILINGACRYLIC EMULSION / OBD
6 . 4 COUNTERSGRANITE /SYNTHETIC STONE
6 . 5 FIXTURESCP FITTINGS, SS SINK, EXHAUST FAN
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN WITH HOB, CHIMNEY, OVEN, MICROWAVE, DISHWASHER,REFRIGERATOR, WASHING MACHINE (IN BALCONY)
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCAST-IN-SITU FLOORING / TILES / IPS / TERRAZZO
7 . 2 WALLS & CEILINGWHITEWASH / OBD / TILES / IPS / TERRAZZO
7 . 3 TOILETWC, WASH BASIN AND FAUCET
7 . 4 BALCONYTILES / CRAZY FLOORING
8 . SIT-OUTS
8 . 1 FLOORTILES / CRAZY FLOORING / GRANITE
8 . 2 WALLS & CEILINGCEMENT-BASED EXTERIOR GRADE PAINT
8 . 3 RAILINGSMS / SS / AL
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 DEMARCATION PLAN 25-06-2026 View Document
2 ZONING PLAN 25-06-2026 View Document
3 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 11-07-2026 View Document
4 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 25-06-2026 View Document
5 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 15-07-2026 View Document
6 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 15-07-2026 View Document
7 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 11-07-2026 View Document
8 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 11-07-2026 View Document
9 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 11-07-2026 View Document
10 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 11-07-2026 View Document
11 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 11-07-2026 View Document
12 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 11-07-2026 View Document