HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1536-2024
Submission Date : 09-02-2024 02:26:37 PM
Applicant Type : Company
Project Type: NEW




GODREJ PROPERTIES LTD
3RD FLOOR, PLOT NO 35, UM HOUSE TOWER A, SECTOR 44
01244842300
8800207105 (Number Shared by Promoter in Public)
godrej89.ggn@godrejproperties.com
https://www.godrejproperties.com
XXXX995M
L74120MH1985PLC035308
 
 


 
 


 
 


 
 







GODREJ ZENITH
SECTOR 89, GURUGRAM, HARYANA
HARSARU ST
GURUGRAM
1244842300
9560396251 (Number Shared by Promoter in Public)
godrej89.ggn@godrejproperties.com
SURESH KUMAR RATHI
1244842300
9560396251 (Number Shared by Promoter in Public)
sureshkumar.rathi@godrejproperties.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1159219-01-20249950000AXIS BANKHRERA Gurugram
224022317884108523-02-202441700AXIS BANK-THROUGH CREDIT CARDHRERA Gurugram







14.20625 (Acre)
3.62
3.58998
14.20625 (Acre)
151 OF 2023 dated 20.07.2023
Yes







214873.14 Lakhs
33785.46 Lakhs
127895.11 Lakhs
24632.59 Lakhs
28559.98 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7528.71
3CONSTRUCTION OF ROADS11226.06
4PAVEMENTS3554.18
5PARKS AND PLAYGROUNDS1928.4
6GREEN BELTS2666.34
7VEHICLE PARKINGS2850.00
8ELECTRICITY SUB-STATION2372.00
9CLUB HOUSE1565.19
10SEWAGE AND SOLID WASTE TREATMENT FACILITY1300.00
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER4213.73
13AREA UNDER COMMERCIAL UNITS1579.05
14HARDSCAPE INCL PLAYGROUND AND HARD SURFACES9803.5
15SOFTSCAPE6903.4
Total57490.56




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDANo
ELECTRICITYDHBVNNo
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS558.72YET TO BE PREPARED
2WATER SUPPLY SYSTEM1213.25YET TO BE PREPARED
3STORM WATER DRAINAGE395.98YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM5553.79YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL75.98YET TO BE PREPARED
6STREET LIGHTING226.44YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING3403.78YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE3194.14YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL1490.43YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER5055.34YET TO BE PREPARED
15SOFTSCAPE253.97YET TO BE PREPARED
16HARDSCAPE761.90YET TO BE PREPARED
17ELECTRICAL SUB STATION625.70YET TO BE PREPARED
18SIGNAGES203.17YET TO BE PREPARED
19LANDSCAPE761.90YET TO BE PREPARED
20HIGHSIDE858.10YET TO BE PREPARED


01-02-2024 (date)
01-02-2024 (date)
01-04-2024
31-03-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings90.75351
Apartment/Shops/Other Buildings67.4341
Apartment/Shops/Other Buildings86.59351
Apartment/Shops/Other Buildings91.57341
Apartment/Shops/Other Buildings67.03331
Apartment/Shops/Other Buildings86.64351
Apartment/Shops/Other Buildings86.84661
Apartment/Shops/Other Buildings67.4691
Apartment/Shops/Other Buildings75.6841
Apartment/Shops/Other Buildings128.45631
Apartment/Shops/Other Buildings128.55671
Apartment/Shops/Other Buildings108.8111
Apartment/Shops/Other Buildings108.7341
Apartment/Shops/Other Buildings59.04701
Apartment/Shops/Other Buildings98.42651
Apartment/Shops/Other Buildings78.6441
Apartment/Shops/Other Buildings136.03691
Apartment/Shops/Other Buildings98.97651
Apartment/Shops/Other Buildings110.9611
Apartment/Shops/Other Buildings78.5641
Apartment/Shops/Other Buildings16.1911
Apartment/Shops/Other Buildings24.1231
Apartment/Shops/Other Buildings15.2911
Apartment/Shops/Other Buildings15.2611
Apartment/Shops/Other Buildings22.0331
Apartment/Shops/Other Buildings25.1131
Apartment/Shops/Other Buildings10.9411
Apartment/Shops/Other Buildings11.4831
Apartment/Shops/Other Buildings11.3231
Apartment/Shops/Other Buildings3.4811
Apartment/Shops/Other Buildings2.3211
Apartment/Shops/Other Buildings7.4311
Apartment/Shops/Other Buildings7.5511
Apartment/Shops/Other Buildings39.6421
Apartment/Shops/Other Buildings34.7921
Apartment/Shops/Other Buildings127.461342
Apartment/Shops/Other Buildings160.311422
Apartment/Shops/Other Buildings139.9722
Apartment/Shops/Other Buildings106.3282
Apartment/Shops/Other Buildings113.21301
Apartment/Shops/Other Buildings85.4411
Apartment/Shops/Other Buildings95.141
Apartment/Shops/Other Buildings128.55631
Apartment/Shops/Other Buildings127.89681
Apartment/Shops/Other Buildings107.0941
Apartment/Shops/Other Buildings22.0311
Apartment/Shops/Other Buildings24.621
Apartment/Shops/Other Buildings27.2531
Apartment/Shops/Other Buildings28.3531
Apartment/Shops/Other Buildings9.2831
Apartment/Shops/Other Buildings9.9411
Apartment/Shops/Other Buildings16.8111
Apartment/Shops/Other Buildings9.9411
Apartment/Shops/Other Buildings17.3411
Apartment/Shops/Other Buildings16.8711
Apartment/Shops/Other Buildings17.2211
Apartment/Shops/Other Buildings17.3111
Apartment/Shops/Other Buildings17.4311
Apartment/Shops/Other Buildings17.6111
Apartment/Shops/Other Buildings20.3111
Apartment/Shops/Other Buildings35.8911
Apartment/Shops/Other Buildings18.7411
Apartment/Shops/Other Buildings31.1211
Apartment/Shops/Other Buildings20.6911
Apartment/Shops/Other Buildings34.9321
Apartment/Shops/Other Buildings35.4621
Apartment/Shops/Other Buildings35.0021
Apartment/Shops/Other Buildings32.8221
Apartment/Shops/Other Buildings30.0021
Apartment/Shops/Other Buildings87.9721
Apartment/Shops/Other Buildings37.6721
Apartment/Shops/Other Buildings31.1621
Apartment/Shops/Other Buildings3.4821
Apartment/Shops/Other Buildings30.3011
Apartment/Shops/Other Buildings30.2811
Apartment/Shops/Other Buildings11.9721
Apartment/Shops/Other Buildings4.5921
Apartment/Shops/Other Buildings9.0521
Apartment/Shops/Other Buildings3.521
Apartment/Shops/Other Buildings24.59101
Apartment/Shops/Other Buildings27.91101
Apartment/Shops/Other Buildings35.65101
Apartment/Shops/Other Buildings38.0881
Apartment/Shops/Other Buildings27.58101
Apartment/Shops/Other Buildings27.43101
Apartment/Shops/Other Buildings30.64101
Apartment/Shops/Other Buildings27.85101
Apartment/Shops/Other Buildings28.16101
Apartment/Shops/Other Buildings28.20101
Apartment/Shops/Other Buildings28.13101
Apartment/Shops/Other Buildings28.23101
Apartment/Shops/Other Buildings28.11101
Apartment/Shops/Other Buildings28.03101
Apartment/Shops/Other Buildings17.58161
Apartment/Shops/Other Buildings17.58161
Apartment/Shops/Other Buildings17.58161
Apartment/Shops/Other Buildings17.58161
Apartment/Shops/Other Buildings17.44161
Apartment/Shops/Other Buildings17.28161
Apartment/Shops/Other Buildings17.56161
Apartment/Shops/Other Buildings17.54161
Apartment/Shops/Other Buildings17.56161
Apartment/Shops/Other Buildings17.56161
Apartment/Shops/Other Buildings17.54161
Apartment/Shops/Other Buildings17.54161
Apartment/Shops/Other Buildings17.07161
Apartment/Shops/Other Buildings17.08161
Apartment/Shops/Other Buildings17.2811
Apartment/Shops/Other Buildings17.5611
Apartment/Shops/Other Buildings17.5411
Apartment/Shops/Other Buildings17.5611
Apartment/Shops/Other Buildings17.5611
Apartment/Shops/Other Buildings17.5411
Apartment/Shops/Other Buildings17.5411
Apartment/Shops/Other Buildings17.0711
Apartment/Shops/Other Buildings17.0811
Apartment/Shops/Other Buildings24.4031
Apartment/Shops/Other Buildings25.1131
Apartment/Shops/Other Buildings24.3331
Apartment/Shops/Other Buildings25.1131





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments546
Shops0
Plots0
EDC1827
IDC1295
Land33785
Other3350

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0379383694
Shops0000
Plots0000
Other64128565128
EDC00911.990

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments48798910651432
Shops0000
Plots0000
EDC911.990911.990
Other514385710385

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1401141626274221
Shops0000
Plots00911.990
EDC911.99000
Other661513730513

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4754674178188087
Shops0000
Plots0000
Other678513621513
EDC911.990911.990

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments8042890993879366
Shops0000
Plots0000
Other568577577577
EDC908.96000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9845834061616161
Shops0000
Plots0000
EDC0000
Other577577577577

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5498579838633294
Shops0000
Plots0000
EDC0000
Other577577577834

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2034
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2035
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Electrical sub station0
Hardscape0
Highside0
Landscape0
School0
Security and fire fighting0
Signages0
Softscape0
Street Lighting0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System36364924
Sewerage treatment & garbage disposal2232
Electricity Supply System0000
Storm Water Drainage1212168
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other00051

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements17285617
Water Supply System61619736
Sewerage treatment & garbage disposal4462
Electricity Supply System167278555167
Storm Water Drainage20203212
Parks and Playgrounds0000
Clubhouse/community centres0646464
Shopping area0000
Other253253404404
Electrical sub station001331
School0303030
Highside9346926

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements28454534
Water Supply System731219773
Sewerage treatment & garbage disposal5865
Electricity Supply System389444444333
Storm Water Drainage24403224
Parks and Playgrounds0000
Clubhouse/community centres64224224224
Shopping area0000
Other607607506506
Softscape0000
Street Lighting711187
Security and fire fighting170272340102
School30104104104
Hardscape23383823
Electrical sub station50506319
Signages0000
Landscape0383823
Highside86866926

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements34343939
Water Supply System73737361
Sewerage treatment & garbage disposal5554
Electricity Supply System333333389389
Storm Water Drainage24242420
Parks and Playgrounds0000
Clubhouse/community centres319383383383
Shopping area0000
Other404253202152
Hardscape114919176
School149179179179
Signages10303041
Electrical sub station50637563
Softscape002551
Street Lighting23343411
Security and fire fighting272511511340
Landscape11411411476
Highside69868634

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements45452828
Water Supply System61493624
Sewerage treatment & garbage disposal4322
Electricity Supply System444444278167
Storm Water Drainage2016128
Parks and Playgrounds0000
Clubhouse/community centres256192192160
Shopping area0000
Other152101101101
Highside6969430
Signages41202010
Electrical sub station6350380
Hardscape76616169
Softscape51513838
School119898975
Security and fire fighting27227227268
Street Lighting2327239
Landscape76617630

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2034
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2035
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
No
AXIS BANK LIMITED, STS 25 & 45, GR, BOYS PG BEHIND DLF STAR MALL, TOWER, SECTOR 30, GURUGRAM, HARYAN
923020071940926
UTIB0003622
110211230
003622
Sushil Kumar S/O: Kali Dass, Bah (391), Mandi, Himachal Pradesh, 175049
Yes











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LETTER OF INTENT (LOI) ALREADY BEEN OBTAINED13-02-2023
II. LICENCE NO. 151 OF 2023 ALREADY BEEN OBTAINED20-07-2023
III. NOC FOR HEIGHT CLEARANCEALREADY BEEN OBTAINED16-08-2023
IV. ASSURANCE OF WATER SUPPLY ALREADY BEEN OBTAINED25-08-2023
V. ASSURANCE OF ELECTRICAL LOADALREADY BEEN OBTAINED25-08-2023
VI. ASSURANCE OF SEWERAGE CONNECTIONALREADY BEEN OBTAINED23-08-2023
VII. ASSURANCE OF STORM WATER CONNECTIONALREADY BEEN OBTAINED23-08-2023
VIII. ASSURANCE OF WATER SUPPLY FOR CONSTRUCTION PURPOSEALREADY BEEN OBTAINED23-08-2023
IX. APPROVAL OF FOREST NOCALREADY BEEN OBTAINED12-05-2023
X. APPROVAL OF ARAVALI NOCALREADY BEEN OBTAINED28-07-2023
XI. APPROVAL OF ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED08-12-2023
XII. ZONING PLANALREADY BEEN OBTAINED21-07-2023
XIII. BUILDING PLAN APPROVALALREADY BEEN OBTAINED01-02-2024








Yes


Yes


The draft agreement is in the prescribed format







GODREJ RETREAT AROMA
9.7063
0
180
0
177
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3223.822885.792424.21
Cost of the apartments000
Cost of the infrastructure399.18399.18234.43
Others costs4344.524830.494830.49


5763 Lakhs
4650 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022




GODREJ ARISTOCRAT
9.56875
857
8
607
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
133571.44133571.446488.71
Cost of the apartments88002.0488002.042905.00
Cost of the infrastructure20085.4020085.40663.03
Others costs25484.0025484.002920.68


26006.76 Lakhs
250914.52 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2030
31-12-2030




GODREJ HABITAT
7.46875
452
5
381
5
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
323003447515013
Cost of the apartments000
Cost of the infrastructure000
Others costs11500107358788


16994 Lakhs
29364 Lakhs
0 Lakhs
0 Lakhs
No
25-02-2023
24-08-2024




GODREJ RETREAT SYMPHONY
9.31875
0
166
0
159
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3022.023022.022059.38
Cost of the apartments000
Cost of the infrastructure370.79370.79159.36
Others costs4406.554485.624485.62


7172 Lakhs
6333 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022




GOREJ RETREAT VIBE
7.806
0
141
0
141
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3065.193065.192011.11
Cost of the apartments000
Cost of the infrastructure360.64360.6471.22
Others costs4285.984286.054286.05


7118 Lakhs
5633 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022




GODREJ RETREAT VISTA
6.70
0
119
0
115
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2207.912207.911523.76
Cost of the apartments000
Cost of the infrastructure272.60272.6056.26
Others costs3239.633239.633238.89


5205 Lakhs
4127 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022




GODREJ RETREAT ORCHARD
10.3375
0
187
0
184
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3403.753403.753348.83
Cost of the apartments000
Cost of the infrastructure459.76459.76139.84
Others costs5863.955863.955563.07


8992 Lakhs
7588 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES / CERAMIC TILES
2WALL FINISHING DETAILSACRYLIC EMULSION/ OIL BOUND DISTEMPER
3KITCHEN DETAILSFLOOR: VITRIFIED TILES WALL: CERAMIC TILES 2'-0" ABOVE COUNTER & OIL BOUND DISTEMPER CEILING: OIL BOUND DISTEMPER
4BATHROOM FITTINGSALL PROVIDED WITH STANDARD COMPANY MAKE
5WOOD WORK ETCLAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL WITH LAMINATE)
6DOORS AND WINDOS FRAMESLAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL WITH LAMINATE)
7GLASS WORK4MM & ABOVE AS PER SPECIFICATION
8ELECTRIC FITTINGSAS PER BUILDING NORMS
9CONDUCTING AND WIRING DETAILSAS PER BUILDING NORMS
10CUPBOARD DETAILSNA
11WATER STORAGEUNDERGROUND WASTER TANK & OVERHEAD WATER TANK
12LIFT DETAILS3 IN EACH TOWER- 2 PASSENGER AND 1 SERVICE
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSPOWDER COATED ALUMINUM / UPVC
14DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME) (PREHUNG- LVL WITH LAMINATE)
14.1MAIN DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL WITH LAMINATE)
14.2INTERNAL DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL WITH LAMINATE)
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSAS PER BUILDING NORMS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMETBD
20INTERNAL FINISHINGPROVIDING AND APPLYING 10 TO 12MM THICK PLASTER TO MASONRY AND RCC WALLS, COLUMNS ETC. IN CEMENT MORTAR 1:5
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSACRYLIC EMULSION/ OIL BOUND DISTEMPER
1 . 3 CEILINGOIL BOUND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION
2 . 3 CEILINGOIL BOUND DISTEMPER
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTI SKID CERAMIC TILES
3 . 2 WALLSCERAMIC TILES TILL 7' ON ALL SIDES & OIL BOUND DIST
3 . 3 CEILINGGRID CEILING
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY NAME
3 . 6 FITTING/FIXTURESALL PROVIDED OF STANDARD COMPANY NAME
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION
4 . 3 CEILINGOIL BOUND DISTEMPER
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI SKID CERAMIC TILE
5 . 2 WALLSACRYLIC EMULSION / OIL BOUND DISTEMPER
5 . 3 CEILINGOIL BOUND DISTEMPER
5 . 4 COUNTERSGRANITE
5 . 5 SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY NAME
5 . 6 FIXTURESALL PROVIDED OF STANDARD COMPANY NAME
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSOIL BOUND DISTEMPER
6 . 3 CEILINGOIL BOUND DISTEMPER
6 . 4 COUNTERSCERAMIC TILES 2FT ABOVE COUNTER
6 . 5 FIXTURESALL PROVIDED OF STANDARD COMPANY NAME
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGACRYLIC EMULSION / OIL BOUND DISTEMPER
7 . 3 TOILETANTI SKID TILE
7 . 4 BALCONYVITRIFIED TILES
8 . SIT-OUTS
8 . 1 FLOORANTI SKID CERAMIC TILE
8 . 2 WALLS & CEILINGACRYLIC EMULSION / OIL BOUND DISTEMPER
8 . 3 RAILINGSMS STEEL
8 . 4 FIXTURESALL PROVIDED OF STANDARD COMPANY NAME












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND18-01-2024 View Document
2APPROVAL OF SEWERAGE ASSURANCE18-01-2024 ------
3FOREST NOC18-01-2024 ------
4APPROVAL OF WATER ASSURANCE18-01-2024 ------
5APPROVAL OF ELECTRICAL ASSURANCE18-01-2024 ------
6APPROVAL OF STORM WATER ASSURANCE18-01-2024 ------
7APPROVAL OF SUPPLY OF TREATED WATER FOR CONSTRUCTION 18-01-2024 ------
8ENVIRONMENT CLEARANCE18-01-2024 ------
9ARAVALI NOC18-01-2024 ------
10NOC FOR HEIGHT CLEARANCE18-01-2024 ------
11NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT27-01-2024 View Document
12IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN31-01-2024 View Document
13CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT27-01-2024 View Document
14APPROVAL OF BUILDING PLAN01-02-2024 ------
15LOI29-02-2024 ------
16TOWER3_REFUGE (20TH AND 30TH),TERRACE FLOOR AND OHT LVL PLAN29-02-2024 ------
17LC IV AND BILATERAL AGREEMENTS29-02-2024 ------
18COMMERCIAL AND RETAIL_13TH FLOOR PLAN AND TERRACE29-02-2024 ------
19SCHOOL AND EWS_TYPICAL FLOOR PLAN - 5TH TO 20TH FLOOR29-02-2024 ------
20DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD29-02-2024 View Document
21TOWER9_ELEVATION229-02-2024 ------
22COMMERCIAL_BASEMENT229-02-2024 ------
23TOWER9_GROUND FLOOR PLAN29-02-2024 ------
24CA CERTIFICATE FOR FINANCIAL & INVENTORY DETAILS29-02-2024 ------
25COMMERCIAL_ELEVATION29-02-2024 ------
26BASEMENT129-02-2024 ------
27EWS,SCHOOL_SECTION29-02-2024 ------
28CASH FLOW STATEMENT OF THE PROPOSED PROJECT29-02-2024 View Document
29ASSURANCE STP TREATED WATER FOR CONSTRUCTION29-02-2024 ------
30COMMERCIAL_SECTION29-02-2024 ------
31TOWER4_REFUGE (20TH AND 30TH),TERRACE FLOOR AND OHT LVL PLAN29-02-2024 ------
32TOWER3_SECTION29-02-2024 ------
33A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS05-02-2024 View Document
34IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN05-02-2024 View Document
35COMMERCIAL AND RETAIL_SECOND FLOOR PLAN29-02-2024 ------
36TOWER1_GROUND FLOOR PLAN29-02-2024 ------
37TOWER4_ELEVATION229-02-2024 ------
38TOWER1_ELEVATION29-02-2024 ------
39TOWER7_FIRST AND TYPICAL FLOOR PLAN29-02-2024 ------
40TOWER1_REFUGE (20TH AND 30TH),TERRACE FLOOR AND OHT LVL PLAN29-02-2024 ------
41TOWER2_GROUND FLOOR PLAN29-02-2024 ------
42EWS,SCHOOL_ELEVATIONS29-02-2024 ------
43TOWER4_SECTION29-02-2024 ------
44TOWER5_GROUND FLOOR PLAN29-02-2024 ------
45TOWER9_FIRST AND TYPICAL FLOOR PLAN29-02-2024 ------
46ASSURANCE OF ELECTRICAL29-02-2024 ------
47COMMERCIAL AND RETAIL_THIRD FLOOR PLAN29-02-2024 ------
48SITE PLAN29-02-2024 ------
49TOWER3_ELEVATION129-02-2024 ------
50TOWER5_ELEVATION129-02-2024 ------
51DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.29-02-2024 View Document
52COMMUNITY_BUILDING_ELEVATION29-02-2024 ------
53TOWER1_ELEVATION229-02-2024 ------
54TOWER4_ELEVATION129-02-2024 ------
55TOWER 6,8_ELEVATION229-02-2024 ------
56SCHOOL AND EWS_TYPICAL FLOOR PLAN - 1ST TO 3RD FLOOR29-02-2024 ------
57TOWER3_GROUND FLOOR PLAN29-02-2024 ------
58TOWER7_SECTION29-02-2024 ------
59COMMUNITY BUILDING_GROUND FLOOR PLAN29-02-2024 ------
60COMMUNITY BUILDING_ROOF PLAN29-02-2024 ------
61TOWER2_REFUGE (20TH AND 30TH),TERRACE FLOOR AND OHT LVL PLAN29-02-2024 ------
62TOWER9_SECTION29-02-2024 ------
63PODIUM29-02-2024 ------
64BASEMENT229-02-2024 ------
65CA CERTIFICATE FOR COST INCURRED29-02-2024 ------
66COMMERCIAL_BASEMENT129-02-2024 ------
67COMMUNITY_SECTION29-02-2024 ------
68TOWER2_ELEVATION129-02-2024 ------
69TOWER7_ELEVATION229-02-2024 ------
70TOWER1_ELEVATION129-02-2024 ------
71TOWER1_FIRST AND TYPICAL FLOOR PLAN29-02-2024 ------
72AFFIDAVIT OF PROMOTER REGARDING ARRANGEMENT WITH THE BANK OF MASTER ACCOUNT29-02-2024 ------
73COMMERCIAL AND RETAIL_GROUND FLOOR PLAN29-02-2024 ------
74SCHOOL AND EWS_TERRACE FLOOR PLAN29-02-2024 ------
75TOWER2_SECTION29-02-2024 ------
76TOWER5_REFUGE (20TH AND 30TH),TERRACE FLOOR AND OHT LVL PLAN29-02-2024 ------
77TOWER5_ELEVATION229-02-2024 ------
78TOWER9_ELEVATION129-02-2024 ------
79COPY OF SUPERIMPOSED DEMARCATION PLAN ON APPROVED LAYOUT PLAN29-02-2024 ------
80TOWER1_SECTION29-02-2024 ------
81TOWER4_GROUND FLOOR PLAN29-02-2024 ------
82TOWER5_SECTION29-02-2024 ------
83TOWER5_FIRST AND TYPICAL FLOOR PLAN29-02-2024 ------
84BANK UNDERTAKING29-02-2024 ------
85BASEMENT1_PLAN29-02-2024 ------
86TOWER7_GROUND FLOOR PLAN29-02-2024 ------
87COMMERCIAL AND RETAIL_TYPICAL (4TH-6TH AND 8TH-11TH) FLOOR PLAN29-02-2024 ------
88TOWER3_ELEVATION229-02-2024 ------
89CA CERTIFCATE_NETWORTH OF PROMOTOR29-02-2024 ------
90COMMUNITY BUILDING_SECOND FLOOR PLAN29-02-2024 ------
91SCHOOL AND EWS_REFUGE FLOOR PLAN - 21ST FLOOR29-02-2024 ------
92TOWER6 AND TOWER 8_FIRST AND TYPICAL FLOOR PLAN29-02-2024 ------
93TOWER7_REFUGE (20TH AND 30TH),TERRACE FLOOR AND OHT LVL PLAN29-02-2024 ------
94COMMUNITY BUILDING_FIRST-PODIUM FLOOR PLAN29-02-2024 ------
95DEMARCATION PLAN29-02-2024 View Document
96TOWER3_FIRST AND TYPICAL FLOOR PLAN29-02-2024 ------
97TOWER4_FIRST AND TYPICAL FLOOR PLAN29-02-2024 ------
98COMMERCIAL AND RETAIL_REFUGE (7TH AND 12TH) FLOOR PLAN29-02-2024 ------
99TOWER6,8_ELEVATION129-02-2024 ------
100NEC HAYATPUR29-02-2024 ------
101TOWER2_FIRST AND TYPICAL FLOOR PLAN29-02-2024 ------
102TOWER2_ELEVATION229-02-2024 ------
103TOWER6 AND TOWER 8_GROUND FLOOR PLAN29-02-2024 ------
104TOWER7_ELEVATION129-02-2024 ------
105COMMERCIAL AND RETAIL_FIRST FLOOR PLAN29-02-2024 ------
106ZONING PLAN29-02-2024 View Document
107COMMUNITY BUILDING_STAIRCASE EXIT WIDTH CALCULATIONS29-02-2024 ------
108COMMUNITY BUILDING_TERRACE FLOOR PLAN29-02-2024 ------
109TOWER9_REFUGE (20TH AND 30TH),TERRACE FLOOR AND OHT LVL PLAN29-02-2024 ------
110TOWER1_GROUND FLOOR APARTMENT PLAN29-02-2024 ------
111TOWER6 AND TOWER 8_REFUGE (19TH AND 28TH),TERRACE FLOOR AND OHT LVL29-02-2024 ------
112TOWER6,8_SECTION29-02-2024 ------