HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1567-2024
Submission Date : 20-02-2024 02:10:12 PM
Applicant Type : Company
Project Type: NEW




ALPHA CORP DEVELOPMENT PRIVATE LIMITED
6TH FLOOR, GOLF VIEWCORPORATE TOWER - A, GOLFCOURSE ROAD, SECTOR 42,GURGAON, HARYANA - 122002
01244831111
8130074912 (Number Shared by Promoter in Public)
SECRETARIAL@ALPHACORP.IN
Http://alphacorp.in
XXXX259Q
U45201PB2003PTC045680
 
 


 
 


 
 







ALPHA CORP SKY1 (POCKET B)
SECTOR - 15, GURUGRAM, HARYANA
GURGAON
GURUGRAM
01244831111
8130074912 (Number Shared by Promoter in Public)
secretarial@alphacorp.in
SANTOSH SINGH MEHRA
01244831111
8130074912 (Number Shared by Promoter in Public)
secretarial@alphacorp.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
11062501-02-2024332200YES BANK LIMITED(YESBR12024020100010625)HRERA Gurugram
24080013443220-03-2024183000YES BANK LIMITED(YESIG40800134432)HRERA Gurugram







2.3640 (Acre)
1.87
1.851
2.3640 (Acre)
13 OF 2018 DATED 09/02/2018 AND RENEWED UPTO 08/02/2028
No
Address     36R, NEW COLONY, SECTOR - 12, GURGAON
Address     518, SECTOR - 7, URBAN ESTATE, KARNAL, HARYANA
Address     6TH FLOOR, GOLF VIEW CORPORATE TOWER - A, SECTOR - 42, GOLF COURSE ROAD, GURUGRAM, HARYANA -122002
Annexure-B- COLLABORATOR
BEFORE GRANT OF LICENSE, 493 & 494 DATED 12/04/2017
Yes
ATTACHED
No
Yes
Yes







19188.81 Lakhs
4004.72 Lakhs
4812.62 Lakhs
2639.24 Lakhs
7732.23 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1630.038
3CONSTRUCTION OF ROADS2092.63
4PAVEMENTS0
5PARKS AND PLAYGROUNDS3493.94
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION21.45
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY50.18
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13WATERSUPPLYSYSTEM59.89
14STORMWATERDRAINAGE390.12
15STREETLIGHTING471.86
16ELECTRICITYSUPPLYSYSTEM500.19
17SECURITYANDFIREFIGHTING471.86
18STP199.91
19UNDERGROUNDWATERTANK161.87
20RAINWATERHARVESTING23.07
Total9567.008




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPYes
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNLYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS58.76AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM9.82AS PER PROJECT REPORT
3STORM WATER DRAINAGE7.29AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM78.26AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL54.70AS PER PROJECT REPORT
6STREET LIGHTING16.55AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING323.12AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS365.45AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE613.85AS PER PROJECT REPORT
10SHOPPING AREA8.48AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM40.11AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15SEWERAGE SYSTEM7.29AS PER PROJECT REPORT
16PARKING778.30AS PER PROJECT REPORT
17UNDERGROUND WATER TANK32.82AS PER PROJECT REPORT
18RAIN WATER HARVESTING2.52AS PER PROJECT REPORT
19ELECTRICAL SUB STATION150.87AS PER PROJECT REPORT
20CONSTRUCTION OF CIRCULAR ROAD10.00AS PER PROJECT REPORT
21ELECTRIFICATION COST UPTO PROJECT SITE81.06AS PER PROJECT REPORT


14-09-2018 (date)
14-09-2018 (date)
01-04-2025
31-03-2030
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings122.96311
Apartment/Shops/Other Buildings122.96311
Apartment/Shops/Other Buildings122.38311
Apartment/Shops/Other Buildings112.08211
Apartment/Shops/Other Buildings122.96311
Apartment/Shops/Other Buildings122.96311
Apartment/Shops/Other Buildings112.38311
Apartment/Shops/Other Buildings112.08211
Apartment/Shops/Other Buildings122.18391
Apartment/Shops/Other Buildings122.18391
Apartment/Shops/Other Buildings112.38391
Apartment/Shops/Other Buildings112.08291
Apartment/Shops/Other Buildings122.183141
Apartment/Shops/Other Buildings122.183141
Apartment/Shops/Other Buildings122.836141
Apartment/Shops/Other Buildings112.08141





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments55.2980.09100.97
Shops000
Plots000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments266.57297.44394.84410.41
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments455.72465.76470.88455.36
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments378.05267.00242.95145.05
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments125.46101.9877.8920.92
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Parking7.6514.3024.43

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres9.2052.3271.4438.94
Shopping area0000
Other0000
Parking38.1954.5971.3785.33

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System01.462.925.09
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres40.2349.7455.8757.58
Shopping area0000
Other0000
Parking93.3093.3085.3371.37

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0007.65
Water Supply System00.721.091.44
Sewerage treatment & garbage disposal00.530.811.07
Electricity Supply System7.7310.2011.7311.73
Storm Water Drainage00.530.811.07
Parks and Playgrounds00047.61
Clubhouse/community centres55.2450.0939.1632.70
Shopping area0.311.522.072.20
Other0000
Parking54.5938.1924.4314.30
Security and Fire Fighting23.6835.9347.44
Renewable Energy System2.944.465.89
Rain Water Harvesting0.330.430.50
Underground Water Tank4.285.656.49
STP7.139.4110.81

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.1111.6111.6110.11
Water Supply System1.661.661.441.09
Sewerage treatment & garbage disposal1.231.231.070.81
Electricity Supply System10.207.735.092.92
Storm Water Drainage1.231.231.070.81
Parks and Playgrounds62.8772.2472.2462.87
Clubhouse/community centres27.7022.0511.590
Shopping area1.580.7900
Other0000
Underground Water Tank6.495.654.28
Street Lighting1.194.104.494.29
Security and Fire Fighting54.5154.5147.4435.93
Renewable Energy System6.776.775.894.46
Parking7.650
Rain Water Harvesting0.500.430.33
Electrical Sub Station35.1040.3340.33
Electrification cost upto project site018.8621.6721.67
STP10.819.417.13
Construction of Circulation Road5.00

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements7.65
Water Supply System0.72
Sewerage treatment & garbage disposal0.53
Electricity Supply System1.46
Storm Water Drainage0.53
Parks and Playgrounds47.61
Clubhouse/community centres0
Shopping area0
Other0
Renewable Energy System2.94
Street Lighting2.48
Security and Fire Fighting23.68
Electrification cost upto Project site18.86
Electrical Sub Station35.10
Construction of Circulation Road5.00












Yes
No
HDFC BANK LIMITED, C-5/32, SDA, NEW DELHI - 110016
50200092148022
HDFC0000032
110240004
0032
SANTOSH AGARWAL 6TH FLOOR, GOLF VIEW CORPORATE TOWER - A, GOLF COURSE ROAD,SECTOR - 42, GURGAON, HARYANA - 122002 ASHISH SARIN 6TH FLOOR, GOLF VIEW CORPORATE TOWER - A, GOLF COURSE ROAD,SECTOR - 42, GURGAON, HARYANA - 122002
ATTACHED











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED27-04-2018
II. FIRE SCHEME APPROVALALREADY BEEN OBTAINED08-02-2019
III. SERVICE PLAN ESTIMATES APPROVALALREADY BEEN OBTAINED31-12-2021
IV. FOREST NOCALREADY BEEN OBTAINED01-09-2017
V. NATURAL CONSERVATION ZONE NOCALREADY BEEN OBTAINED30-04-2019
VI. TREE CUTTING PERMISSION/ NOCAPPLIED FOR BUT YET TO RECEIVE28-09-2018








Yes


Yes


ATTACHED













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE/ MARBLE/ GRANITE /LAMINATED WOODEN FLOORING
2WALL FINISHING DETAILSLOW VOC PAINT OF APPROVED MAKE OR ASSPECIFIED BY ARCHITECT / CONSULTANT
3KITCHEN DETAILSVITRIFIED TILE/ LOW VOC PAINT OFAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
4BATHROOM FITTINGSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESHARD WOOD/ ALUMINIUM/ UPVC
7GLASS WORKPLAIN FLOAT GLASS/TOUGHENED
8ELECTRIC FITTINGSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
9CONDUCTING AND WIRING DETAILSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGECOMMON UNDERGROUND AND OVERHEADWATER TANK
12LIFT DETAILSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
13EXTERNAL GLAZINGSALUMINUM / UPVC
13.1WINDOWS/GLAZINGSPLAIN FLOAT GLASS/TOUGHENED
14DOORSFLUSH DOOR WITH HARD WOOD FRAMES /ALUMINIUM/ UPVC
14.1MAIN DOORSFLUSH DOOR WITH HARD WOOD FRAMES
14.2INTERNAL DOORSFLUSH DOOR WITH HARD WOOD FRAMES
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMEAS SPECIFIED BY ARCHITECT / CONSULTANT
20INTERNAL FINISHINGAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILE/ MARBLE/ GRANITE
1 . 2 WALLSLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
1 . 3 CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILE/ LAMINATED WOODEN FLOORING
2 . 2 WALLSLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
2 . 3 CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILE
3 . 2 WALLSVITRIFIED TILE/ LOW VOC PAINT OF APPROVEDMAKE AS SPECIFIED BY ARCHITECT /CONSULTANT
3 . 3 CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
3 . 4 COUNTERSMARBLE/ GRANITE
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILE/ LAMINATED WOODEN FLOORING
4 . 2 WALLSLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
4 . 3 CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORVITRIFIED TILE
5 . 2 WALLSVITRIFIED TILE/ LOW VOC PAINT OF APPROVEDMAKE AS SPECIFIED BY ARCHITECT /CONSULTANT
5 . 3 CEILINGLOW VOC PAINT OF APPROVED
5 . 4 COUNTERSMARBLE/ GRANITE
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
5 . 6 FIXTURESAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE
6 . 2 WALLSVITRIFIED TILE TILL 2 FEET ABOVE COUNTER/LOW VOC PAINT
6 . 3 CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
6 . 4 COUNTERSMARBLE/ GRANITE
6 . 5 FIXTURESAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED / CERAMIC TILES
7 . 2 WALLS & CEILINGLOW VOC PAINT/ OBD/ AS PER APPROVED MAKERECOMMENDED BY ARCHITECT/ CONSULTANT
7 . 3 TOILETVITRIFIED / CERAMIC TILES / LOW VOC PAINT
7 . 4 BALCONYCERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORCERAMIC TILES
8 . 2 WALLS & CEILINGEXTERNAL GRADE TEXTURE PAINT OF APPROVEDMAKE AS SPECIFIED BY ARCHITECT /CONSULTANT
8 . 3 RAILINGSMS / GLASS
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1ZONING PLAN20-02-2024 View Document
2SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN20-02-2024 View Document
3CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT20-02-2024 View Document
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT20-02-2024 View Document
5JDA-MR. RAVIJEET SINGH GROVER19-06-2024 ------
6ROAD LAYOUT19-06-2024 ------
7AIRPORT HEIGHT CLEARANCE19-06-2024 ------
8AFFIDAVIT 4(2)(L)(D)19-06-2024 ------
9BR III APPROVAL LETTER19-06-2024 ------
10FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_BASEMENT 0119-06-2024 ------
11FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_EWS_ALL FLOOR PLAN19-06-2024 ------
12FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_BASEMENT 0219-06-2024 ------
13LC IV & BILATERAL AGREEMENT19-06-2024 ------
14MUTATION19-06-2024 ------
15STRUCTURE PLAN_G.A. PLAN AT FIRST FLOOR LEVEL-LAYOUT119-06-2024 ------
16AKS SHIJRA19-06-2024 ------
17STRUCTURE PLAN_G.A. PLAN AT THIRD FLOOR LEVEL-LAYOUT119-06-2024 ------
18BANK UNDERTAKING19-06-2024 ------
19BASEMENT-1 PARKING PLAN19-06-2024 ------
20DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.19-06-2024 View Document
21BASEMENT-2 PARKING PLAN19-06-2024 ------
22CA CERTIFICATE (EXPENDITURE)19-06-2024 ------
23CONSTRUCTION WATER N.O.C19-06-2024 ------
24DEMARCATION PLAN19-06-2024 View Document
25DOMESTIC WATER SUPPLY19-06-2024 ------
26FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_SCHEMATIC DIAGRAM19-06-2024 ------
27FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_SITE PLAN19-06-2024 ------
28FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_3 TO 26 FLOOR PLAN19-06-2024 ------
29FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_BASEMENT 0119-06-2024 ------
30FIRE SCHEME_APPROVAL19-06-2024 ------
31DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD19-06-2024 View Document
32EC APPROVAL19-06-2024 ------
33ELECTRIC LOAD AVAILABILITY19-06-2024 ------
34ELECTRICITY SUPPLY PLAN19-06-2024 ------
35ELEVATIONS PLAN19-06-2024 ------
36EWS19-06-2024 ------
37FLOOR PLAN_1ST AND 2ND FLOOR PLAN19-06-2024 ------
38LOI19-06-2024 ------
39STRUCTURE PLAN_G.A. PLAN AT TERRACE LEVEL-LAYOUT119-06-2024 ------
40EXTERNAL LIGHTING LAYOUT19-06-2024 ------
41FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_1 & 2 FLOOR PLAN19-06-2024 ------
42FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_1 & 2 FLR PLAN19-06-2024 ------
43FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_3-12,14-17,19-26 FLR PLAN19-06-2024 ------
44FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_18 & 27 & TERRACE PLAN19-06-2024 ------
45UNIT PLAN-4 PKT-119-06-2024 ------
46STRUCTURE PLAN_G.A. PLAN AT GROUND FLOOR LEVEL-LAYOUT119-06-2024 ------
47FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_BASEMENT 0219-06-2024 ------
48JDA-MR. PAWAN SAINI19-06-2024 ------
49IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN19-06-2024 View Document
50FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_GROUND FLR PLAN19-06-2024 ------
51FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_REFUGE FLR & TERRACE FLOOR PLAN19-06-2024 ------
52RENEWAL OF LICENSE NO. 13 OF 2018 TILL 08.02.2819-06-2024 ------
53STRUCTURE PLAN_G.A. PLAN AT SECOND FLOOR LEVEL-LAYOUT119-06-2024 ------
54FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_SITE PLAN19-06-2024 ------
55FLOOR PLAN_16TH TO 27TH FLOOR PLAN19-06-2024 ------
56FOREST NOC19-06-2024 ------
57JAMABANDI19-06-2024 ------
58LANDSCAPE LAYOUT PLAN19-06-2024 ------
59IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN19-06-2024 View Document
60COPY OF LICENSE ALONG WITH SCHEDULE OF LAND19-06-2024 View Document
61NON-ENCUMBRANCE CERTIFICATE19-06-2024 ------
62STORM WATER DRAINAGE LAYOUT19-06-2024 ------
63STRUCTURE PLAN_FOUNDATION PLAN & DETAIL-LAYOUT119-06-2024 ------
64REVALIDATED BR-III APPROVAL LETTER19-06-2024 ------
65SECTION PLAN19-06-2024 ------
66SERVICE PLAN & ESTIMATE REPORT19-06-2024 ------
67SERVICE PLAN ESTIMATE APPROVAL LETTER19-06-2024 ------
68SEWERAGE LAYOUT19-06-2024 ------
69SOLID WASTE MANAGEMENT19-06-2024 ------
70UNIT PLAN-1 PKT-119-06-2024 ------
71UNIT PLAN-2 PKT-119-06-2024 ------
72UNIT PLAN-3 PKT-119-06-2024 ------
73STRUCTURE PLAN_COLUMN LAYOUT PLAN-LAYOUT119-06-2024 ------
74STRUCTURE PLAN_G.A. PLAN AT 4TH TO 14TH FLOOR LEVEL-LAYOUT119-06-2024 ------
75STRUCTURE PLAN_G.A. PLAN AT 15TH TO 26TH FLOOR LEVEL-LAYOUT119-06-2024 ------