ASHIANA AMARAH PHASE 6
REVENUE ESTATE OF VILLAGE- WAZIRPUR, SECTOR 93, DISTT. GURUGRAM, HARYANA
HARSARU ST
GURUGRAM
01142654265
0114265426 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com
JATIN KUMAR
01142654265
9540237727 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
0
01-01-2025
ICICI BANK
HRERA Gurugram
2990.698 (Acre)
184
182.976
22.344 (Acre)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed
Yes
502.60 Lakhs
0 Lakhs
378.66 Lakhs
63 Lakhs
61 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
0
3
CONSTRUCTION OF ROADS
1490.5
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
0
6
GREEN BELTS
206.16
7
VEHICLE PARKINGS
721.213
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
13
STREET LIGHTING
4
14
SCHOOL
568.787
Total
2990.66
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
GMDA
No
WATER SUPPLY
GMDA
No
ELECTRICITY
HSVP
No
SEWAGE DISPOSAL
GMDA
No
STORM WATER DRAINAGE
GMDA
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
0
YET TO BE PREPARED
2
WATER SUPPLY SYSTEM
1
YET TO BE PREPARED
3
STORM WATER DRAINAGE
0
YET TO BE PREPARED
4
ELECTRICITY SUPPLY SYSTEM
3
YET TO BE PREPARED
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
5
YET TO BE PREPARED
6
STREET LIGHTING
19
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
0
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
35
YET TO BE PREPARED
9
CLUB HOUSE/COMMUNITY CENTRE
0
YET TO BE PREPARED
10
SHOPPING AREA
0
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
0
YET TO BE PREPARED
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
NA (date)
NA (date)
01-09-2025
30-04-2029
Sr. No
Plot Area(In Square Meter)
Number of plots in the project
1
0
0
Total
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
784.14
1
1
Apartment/Shops/Other Buildings
309.30
1
1
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
Shops
0
0
0
Plots
0
0
0
School
3.12
13.03
Others
3.05
3.05
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
School
37.75
59.47
72.60
63.83
Others
6.10
6.10
6.10
6.10
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
School
63.20
32.39
13.57
11.81
Others
6.10
6.10
6.10
6.10
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
0
Plots
0
School
7.88
Others
6.10
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
Water Supply System
1
0
Sewerage treatment & garbage disposal
1.15
2.15
Electricity Supply System
1
1
Storm Water Drainage
0
0
Parks and Playgrounds
0
0
Clubhouse/community centres
0
0
Shopping area
0
0
Other
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
1.70
0
0
0
Electricity Supply System
1
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
3.60
6.30
6.30
6.30
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
6.30
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Light
6.30
6.30
6.30
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
6.30
Clubhouse/community centres
0
Shopping area
0
Other
0
Yes
Yes
ICICI BANK LIMITED AND PREET VIHAR, DELHI
777705227112
ICIC0000037
110229006
000037
Varun Gupta (Whole Time Director) N-5, Second Floor, Panchsheel Park, New Delhi.
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. I. ENVIRONMENTAL CLEARANCE
ALREADY BEEN OBTAINED
26-11-2021
II. II. FOREST NOC
ALREADY BEEN OBTAINED
12-12-2021
III. III. PORTABLE WATER ASSURANCE
ALREADY BEEN OBTAINED
04-08-2021
IV. IV. AIRPORT AUTHORITY OF INDIA NOC
ALREADY BEEN OBTAINED
06-08-2021
V. V. CONSTRUCTION WATER NOC
ALREADY BEEN OBTAINED
23-07-2021
VI. VI. LICENSE OF 41 OF 2010
ALREADY BEEN OBTAINED
07-06-2010
VII. VII. ELECTRIFICATION PLAN
ALREADY BEEN OBTAINED
11-12-2023
VIII. VIII. BUILDING PLAN APPROVAL LETTER (BR-III)
ALREADY BEEN OBTAINED
09-02-2024
IX. IX. REVISED FIRE FIGHTING SCHEME
ALREADY BEEN OBTAINED
20-04-2024
X. X. REVISED SERVICE ESTIMATE PLAN
ALREADY BEEN OBTAINED
12-08-2024
No
No
NA
ASHIANA ANMOL PHASE-1
3.800
300
0
300
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
11823.05
0
11285.86
Cost of the apartments
7465.36
0
6183.79
Cost of the infrastructure
1926.44
0
2422.33
Others costs
2431.25
0
2679.74
23173.30 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
03-10-2020
03-10-2020
ASHIANA ANMOL PLAZA-1
0.339
76
0
76
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
216.28
0
216.28
Cost of the apartments
137.92
0
137.92
Cost of the infrastructure
26.26
0
26.26
Others costs
52.1
0
52.1
180.18 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019
ASHIANA AMARAH PHASE-1 & 1A
5.041
224
0
224
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
14520.61
0
2585.93
Cost of the apartments
7087
0
423.21
Cost of the infrastructure
7087
0
22.98
Others costs
5715
0
1933.83
5764.18 Lakhs
19710.59 Lakhs
4000 Lakhs
4000 Lakhs
No
15-01-2027
15-01-2027
ASHIANA ANMOL PHASE-2
2.49
180
0
180
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
10876.26
0
4319.42
Cost of the apartments
4822.65
0
1640.86
Cost of the infrastructure
634.05
0
99.21
Others costs
5419.57
0
2579.35
6784.92 Lakhs
10536.84 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2026
30-04-2026
ASHIANA ANMOL PHASE-3 & PLAZA PHASE II
6.7879
300
0
300
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
17555.57
0
4535.57
Cost of the apartments
7371.7
0
5.02
Cost of the infrastructure
1006.43
0
156.61
Others costs
9177.45
0
4373.94
2710.57 Lakhs
15121.27 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2028
31-12-2028
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
CLASSROOMS/ PRINCIPAL & ADMIN OFFICES/ LOBBY/ ALL TOILET AND PANTRY: CERAMIC TILE (300 X 300)
STAIRCASE: KOTA STONE OR COMBINATION LOCAL STONE OF APPROPRIATE SIZE.
2
WALL FINISHING DETAILS
CLASSROOMS & OFFICES: SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
TOILET: CERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
PANTRY: CERAMIC TILES 0.60 METER FROM COUNTERTOP. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
3
KITCHEN DETAILS
1 STAINLESS STEEL SINK WITH ONE BOWL
1 SWIVEL TYPE SINK COCK.
1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO
NO TAP IS PROVIDED BELOW SINK.
4
BATHROOM FITTINGS
SANITARY WARES: CERA/PARRY WARE OR EQUIVALENT
BATH FITTINGS:
PILLAR COCK FOR ALL WASH BASIN AND SHOWER IN ONE CHANGE ROOM OF AMERICAN STANDARD/ GROHE OR EQUIVALENT.
OTHER ANGLE VALVE EITHER OF CP OR PTMT OF STANDARD MAKE LIKE JAL/CONTINENTAL/PRAYAG OR EQUIVALENT
5
WOOD WORK ETC
NOT APPLICABLE
6
DOORS AND WINDOS FRAMES
WINDOWS, WITH SLIDING PANELS DEPENDING UPON SIZE WITH 5/6MM TOUGHENED GLASS.
DOOR FRAMES: GI FOLDED SECTION WITH PAINT FINISH
7
GLASS WORK
NOT APPLICABLE
8
ELECTRIC FITTINGS
MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/PANASONIC/NORTH WEST/LEGRAND OR EQUIVALENT
9
CONDUCTING AND WIRING DETAILS
ALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS .
10
CUPBOARD DETAILS
NOT APPLICABLE
11
WATER STORAGE
NOT APPLICABLE
12
LIFT DETAILS
NOT APPLICABLE
13
EXTERNAL GLAZINGS
ALL EXTERNAL WALLS INCLUDING ROOF TERRACE, OPEN TERRACE, CEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR OBD PAINT FINISH
13.1
WINDOWS/GLAZINGS
2 TRACK ALUMINUM WINDOWS, WITH SLIDING PANELS DEPENDING UPON SIZE WITH 5/6MM TOUGHENED GLASS.
14
DOORS
CLASS ROOM,OFFICES,LOBBY & TOILETS:FLUSH DOOR SHUTTERS WITH 32 MM THICKNESS WITH PAINT FINISH ON BOTH SIDE.
14.1
MAIN DOORS
NOT APPLICABLE
14.2
INTERNAL DOORS
NOT APPLICABLE
15
AIR CONDITIONING
NOT APPLICABLE
16
ELECTRICAL FITTINGS
MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/PANASONIC/NORTH WEST/LEGRAND OR EQUIVALENT
17
CNG PIPE LINE
NOT APPLICABLE
18
PROVISION OF WIFI AND BROADBAND FACILITY
PROVISION FOR INTERNET ROUTER WILL BE DONE AT SUITABLE LOCATION
19
EXTERNAL FINISHING/COLOUR SCHEME
ALL EXTERNAL WALLS INCLUDING ROOF TERRACE, OPEN TERRACE, CEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR OBD PAINT FINISH.
20
INTERNAL FINISHING
NOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
NOT APPLICABLE
1 . 2
WALLS
NOT APPLICABLE
1 . 3
CEILING
NOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
NOT APPLICABLE
2 . 2
WALLS
NOT APPLICABLE
2 . 3
CEILING
NOT APPLICABLE
2 . 4
MODULAR WARDROBES
NOT APPLICABLE
3 . MASTER TOILET
3 . 1
FLOOR
NOT APPLICABLE
3 . 2
WALLS
NOT APPLICABLE
3 . 3
CEILING
NOT APPLICABLE
3 . 4
COUNTERS
NOT APPLICABLE
3 . 5
SANITARY WARE/CP FITTINGS
NOT APPLICABLE
3 . 6
FITTING/FIXTURES
NOT APPLICABLE
4 . BED ROOMS
4 . 1
FLOOR
NOT APPLICABLE
4 . 2
WALLS
NOT APPLICABLE
4 . 3
CEILING
NOT APPLICABLE
4 . 4
WARDROBES
NOT APPLICABLE
5 . TOILET
5 . 1
FLOOR
CERAMIC TILES (300X300)
5 . 2
WALLS
CERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
5 . 3
CEILING
PLEASING SHADE CEMENT PAINT /DISTEMPER/EMULSION OF APPROPRIATE QUALITY (AS PER ARCHITECTS RECOMMENDATION
5 . 4
COUNTERS
NOT APPLICABLE
5 . 5
SANITARY WARE/CP FITTINGS
WALL MOUNTED WASH BASING WITHOUT COUNTER & WITHOUT PEDESTAL FIXED ON MS ANGLES
CONVENTIONAL PRO S/P TRAP FLOOR MOUNTED EWS WITH 6 LITER CAPACITY SINGLE FLUSH PVC CISTERN WITH SEAT AND SEAT COVER.
A SINGLE LEVER HALF/QUARTER TURN CP BASIN MIXER IN WASH BASIN, A SINGLE LEVER WALL MIXER WITH OVERHEAD SHOWER AND A SPOUT IN SHOWER AREA.
5 . 6
FIXTURES
1 CP ANGLE VALVE ALONG WITH CHROME PLATED PVC SEMI RIGID/FLEXIBLE HEALTH FAUCET OF STANDARD MAKE.
2 ANGLE VALVES FOR WATER CONNECTION TO WASH BASIN AND 1 ANGLE VALVE FOR WATER CONNECTION TO FLUSHING CISTERN AND 1 BOTTLE TRAP OF STANDARD MAKE PTMT MATERIAL
1 TOWEL ROD OF SS MAKE OF STANDARD MAKE & SIZE.
EXHAUST FAN IN ALL TOILETS
6 . KITCHEN
6 . 1
FLOOR
1 STAINLESS STEEL SINK WITH ONE BOWL
1 SWIVEL TYPE SINK COCK.
1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO
NO TAP IS PROVIDED BELOW SINK.
6 . 2
WALLS
CERAMIC TILES 0.60 METER FROM COUNTERTOP. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
6 . 3
CEILING
PLEASING SHADE CEMENT PAINT /DISTEMPER/EMULSION OF APPROPRIATE QUALITY (AS PER ARCHITECTS RECOMMENDATION)
6 . 4
COUNTERS
NOT APPLICABLE
6 . 5
FIXTURES
1 STAINLESS STEEL SINK WITH ONE BOWL
1 SWIVEL TYPE SINK COCK.
1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO
NO TAP IS PROVIDED BELOW SINK.
6 . 6
KITCHEN APPLIANCES
NOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
NOT APPLICABLE
7 . 2
WALLS & CEILING
NOT APPLICABLE
7 . 3
TOILET
NOT APPLICABLE
7 . 4
BALCONY
BALCONY METAL/WALL RAILING HEIGHT IS 1050 TO 1100 MM AND STAIR METAL/WALL RAILING HEIGHT IS 1000MM.
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT