HRERA GurugramTemp Project Id : RERA-GRG-PROJ-610-2020
Submission Date : 06-03-2020 06:34:34 PM
Applicant Type : Company
Project Type: ONGOING




EMAAR MGF LAND LTD
EMAAR BUSINESS PARK, SIKANDERPUR SECTOR-28, GURUGRAM, HARYANA 122001
1244421155
9743999521 (Number Shared by Promoter in Public)
coordination@emaar-india.com
http://emaar-india.com/
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 







MARBELLA
SECTOR 65 &66;
GURGAON
GURUGRAM
1244791155
1244791155 (Number Shared by Promoter in Public)
coordination@emaar-india.com
RAJNISH BHARDWAJ
1244791155
9811907004 (Number Shared by Promoter in Public)
Rajnish.Bhardwaj@Emaar-India.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1031-07-20171694074HSBCHRERA Gurugram







107.919 (Acre)
132
131.5
41.86 (Acre)
97 of 2010
No
Address     EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR -28, GURUGRAM
Annexure-B- BY VIRTUE OF COLLABORATION AGREEMENT
NO
No
-
No
Yes
Yes







67822 Lakhs
15582 Lakhs
38328 Lakhs
43.79 Lakhs
13868 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD7.06
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS12.57
3CONSTRUCTION OF ROADS12.75
4PAVEMENTS0
5PARKS AND PLAYGROUNDS4.41
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0.484
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.129
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.2
13AREA UNDER COMMERCIAL UNITS1.462
14NURSING HOME0.247
15UGT OHT0.297
16BALANCE AREA NOT INCLUDED ABOVE1.25
17PRIMARY SCHOOL1
Total41.859




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHVBNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS578.509SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM227.276SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE121.629SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL180.118SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING64.288SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS0SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING


13-06-2013 (date)
13-06-2013 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type MAR-MD-1A,1B,3 TO 8,11,12,12A,14,17 TO 25,28,29,32 TO 36,39 TO 44,47 TO 49,58,63 TO 67,70 TO 74339.48948000
2APARTMENT/SHOPS/OTHER BUILDINGS Type MAR-MD-31454.4781000
3APARTMENT/SHOPS/OTHER BUILDINGS Type MAR-BE-11,23,24,31,55,80,83,84285.1818000
4APARTMENT/SHOPS/OTHER BUILDINGS Type MAR-BE-12,14 TO 18,20,21,26 TO 30,39,40,42 TO 45,47,51 TO 54,57 TO 61,81,85,89 TO 92289.05235000
5APARTMENT/SHOPS/OTHER BUILDINGS Type MAR-BL-42349.7671000
6APARTMENT/SHOPS/OTHER BUILDINGS Type MAR-BL-15 TO 36, 38 TO 40, 43 TO 49,51,53 TO 61,64 TO 74454.47853000
7APARTMENT/SHOPS/OTHER BUILDINGS Type MAR-MD-2,9,10,15,16,26,27,30,37, 45,46,50,59,69335.02914000
8PLOT Type MAR-BL-2,3,3A292.4753000
9PLOT Type MAR-BL-75 TO 82 & MAR-MD-61,62292.67810000
10PLOT Type MAR-BL-1293.5441000
11PLOT Type MAR-BE-115317.7531000
12PLOT Type MAR-BL-62396.6531000
13PLOT Type MAR-BL-63402.2861000
14PLOT Type MAR-BL-1A,2A,3B,3C,52418.0335000
15PLOT Type MAR-MD-1C436.8911000
16PLOT Type MAR-BL-41440.6981000
17PLOT Type MAR-MD-1463.4711000
18PLOT Type MAR-BE-88490.661000
19PLOT Type MAR-MD-60545.5831000
20PLOT Type MAR-BL-37492.5341000
21PLOT Type MAR-MD-38684.9271000
22PLOT Type MAR-BE-49,50,56,62223.0014000
23PLOT Type MAR-BE-1 TO 10,12A,22,25,32 TO 37,74 TO 79,82 , 86,87,93 TO 114, 24A TO 31A223.00358000
24PLOT Type MAR-BE-38,41,46,48,63 TO 73224.0715000
25PLOT Type MAR-BE-19249.9981000
26PLOT Type MAR-MD-75281.4211000






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
MAR-BL-421CONSTRUCTED
MAR-BL-15 TO 36, 38 TO 40, 43 TO 49,51,53 TO 61,64 TO 7453CONSTRUCTED
MAR-MD-2,9,10,15,16,26,27,30,37, 45,46,50,59,6914CONSTRUCTED
MAR-MD-1A,1B,3 TO 8,11,12,12A,14,17 TO 25,28,29,32 TO 36,39 TO 44,47 TO 49,58,63 TO 67,70 TO 7448CONSTRUCTED
MAR-MD-311CONSTRUCTED
MAR-BE-11,23,24,31,55,80,83,848CONSTRUCTED
MAR-BE-12,14 TO 18,20,21,26 TO 30,39,40,42 TO 45,47,51 TO 54,57 TO 61,81,85,89 TO 9235CONSTRUCTED
MAR-BL-15 TO 36, 38 TO 40, 43 TO 49,51,53 TO 61,64 TO 7453CONSTRUCTED
MAR-MD-2,9,10,15,16,26,27,30,37, 45,46,50,59,6914CONSTRUCTED
MAR-MD-1A,1B,3 TO 8,11,12,12A,14,17 TO 25,28,29,32 TO 36,39 TO 44,47 TO 49,58,63 TO 67,70 TO 7448CONSTRUCTED
MAR-MD-311CONSTRUCTED
MAR-BE-11,23,24,31,55,80,83,848CONSTRUCTED
MAR-BE-12,14 TO 18,20,21,26 TO 30,39,40,42 TO 45,47,51 TO 54,57 TO 61,81,85,89 TO 9235CONSTRUCTED


N/A
N/A
N/A
02-09-2013
97
16-10-2022
FINISHING IN PROGRESS


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
02-09-2013
97
16-10-2022


0
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments28391
Shops0
Plots0
Land Cost15582
Other Cost13456

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements8.97
Water Supply System6.01
Sewerage treatment & garbage disposal1.59
Electricity Supply System0.88
Storm Water Drainage0
Parks and Playgrounds6.24
Clubhouse/community centres0.90
Shopping area0
Other2.39
Electrical Substation6.50
Rain water Harvesting0.33
Security and Fire fighting0.09

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.320.96
Water Supply System0.381.14
Sewerage treatment & garbage disposal0.351.06
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds0.280.85
Clubhouse/community centres0.030.06
Shopping area00
Other0.050.14
Rain water harvesting0.03
Electrical Sub station2.65
Security And fire fighting0.16
Security and Fire Fighting0.05
Rain water Harvesting0.01
Electrical sub station1.36












Particulars Remarks, if any
i. No. of Flats/Apartments constructed0
ii. No. of Flats/ Apartments booked0
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter0 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter0 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter0 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application0 Lakhs
Land cost (If any)0 Lakhs
Apartments0 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.0 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession0 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS578.5098.97
II. WATER SUPPLY SYSTEM227.2768.4
III. STORM WATER DRAINAGE121.6290
IV. ELECTRICITY SUPPLY SYSTEM00.88
V. SEWAGE TREATMENT & GARBAGE DISPOSAL180.1181.59
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.06.24
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00.09
XVII. OTHER FACILITIES AS PER PROJECT REPORT64.2886.84









Yes
Yes
HSBC BANK, BARAKHAMBA ROAD
051504181957
HSBC0110002
110039002
110002
Rahul Bindle











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED18-11-2010








Yes


Yes









PALM HEIGHTS, SECTOR 77, GURUGRAM
5.50
297
0
148
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
20000200005548
Cost of the apartments18143181434156
Cost of the infrastructure000
Others costs185718571392


1615 Lakhs
14821 Lakhs
0 Lakhs
2464 Lakhs
No
31-08-2022
31-03-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED MARBLE / WOODEN FLOORING
2WALL FINISHING DETAILSPOP PUNNING WITH ACRYLIC EMULSION PAINT / TILES
3KITCHEN DETAILSPOP PUNNING WITH ACRYLIC EMULSION PAINT / TILES
4BATHROOM FITTINGSHIGH QUALITY IMPORTED CHINAWARE & CP FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESANODIZED / POWERED COATED ALIMINIUM / PVC FRAMES AND SHUTTERS
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSPVC CONDUITS AND FRLS WIRING
10CUPBOARD DETAILSNA
11WATER STORAGEUNDER GROUND AND OVER HEAD WATER TANK
12LIFT DETAILSMODERN ELEVATOR
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSANODIZED / POWERED COATED ALIMINIUM / PVC WINDOW FRAMES AND SHUTTERS
14DOORSANODIZED / POWERED COATED ALIMINIUM / PVC GLAZED DOOR ( EXTERIOR )
14.1MAIN DOORSPOLISHED TEAKWOOD FRAME WITH PANELLED DOOR SHUTTERS
14.2INTERNAL DOORSVENEERED FLUSH DOOR SHUTTERS
15AIR CONDITIONINGYES
16ELECTRICAL FITTINGSMODULAR SWITCHES
17CNG PIPE LINEPROVISION OF LPG GAS PIPE
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER PROOF PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED MARBLE
1 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
1 . 3 CEILINGPOP PUNNING WITH ACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORIMPORTED MARBLE / WOODEN FLOORING
2 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
2 . 3 CEILINGPOP PUNNING WITH ACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORIMPORTED MARBLE
3 . 2 WALLSPREMIUM CERAMIC TILES
3 . 3 CEILINGPOP PUNNING WITH ACRYLIC EMULSION PAINT
3 . 4 COUNTERSFINE QUALITY GRANITE OR MARBLE
3 . 5 SANITARY WARE/CP FITTINGSHIGH QUALITY IMPORTED CHINAWARE & CP FITTINGS
3 . 6 FITTING/FIXTURESFOUR FIXTURE TOILET
4 . BED ROOMS
4 . 1 FLOORIMPORTED TILES / LAMINATED WOODEN FLOORING
4 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
4 . 3 CEILINGPOP PUNNING WITH ACRYLIC EMULSION PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORIMPORTED CERAMIC TILE
5 . 2 WALLSPREMIUM CERAMIC TILES
5 . 3 CEILINGPOP PUNNING WITH ACRYLIC EMULSION PAINT
5 . 4 COUNTERSFINE QUALITY GRANITE OR MARBLE
5 . 5 SANITARY WARE/CP FITTINGSPREMIUM CHINAWARE & CP FITTINGS
5 . 6 FIXTURESHIGH QUALITY FIXTURES
6 . KITCHEN
6 . 1 FLOORHIGH QUALITY GRANITE OR VITRIIED TILES
6 . 2 WALLSPREMIUM CERAMIC TILES
6 . 3 CEILINGPOP PUNNING WITH ACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE COUNTER TOPS
6 . 5 FIXTURESSATINLESS STEEL SINK WITH DOUBLE BOWL AND DRAINAGE
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN WITH IMPORTED HOB AND CHIMNEY
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILE
7 . 2 WALLS & CEILINGPOP PUNNING WITH ACRYLIC EMULSION PAINT
7 . 3 TOILETCERAMIC TILE
7 . 4 BALCONYANTI SKID TILE
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND06-03-2020 View Document
2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.06-03-2020 View Document
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT06-03-2020 View Document
4ANNUAL REPORT 2017-1806-03-2020 ------
5ANNUAL REPORT 2018-1906-03-2020 ------
6IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN06-03-2020 View Document
7IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN06-03-2020 View Document
8ANNUAL REPORT 2016-1706-03-2020 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 OC uploaded 04-09-2023 View Document
2 OC uploaded 04-09-2023 View Document
3 OC uploaded 04-09-2023 View Document
4 OC uploaded 04-09-2023 View Document
5 OC uploaded 04-09-2023 View Document
6 OC uploaded 04-09-2023 View Document