HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2069-2025
Submission Date : 14-11-2025 03:11:12 PM
Applicant Type : Company
Project Type: NEW




ELAN ENCLAVE PRIVATE LIMITED
15TH FLOOR,TWO HORIZON CENTER DLF PHASE V SECTOR43,GOLF COURSE ROAD, GURGAON, GURUGRAM, HARYANA, INDIA,122002
1244101100
9311134842 (Number Shared by Promoter in Public)
elancoordination@elanlimited.com
Https://elanlimited.com
XXXX780E
U70109HR2021PTC099477
 
 


 
 


 
 


 
 







ELAN THE STATEMENT
SECTOR 49, GURUGRAM
GURGAON
GURUGRAM
1244101100
9623725675 (Number Shared by Promoter in Public)
elancoordination@elanlimited.com
MR AJAY CHANDRASHEKHAR
1244101100
9623725675 (Number Shared by Promoter in Public)
Ajay@elanlimited.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
14049001-12-20256325011HDFC BANKHRERA Gurugram
24043014-11-2025704200HDFC BANKHRERA Gurugram







5.875 (Acre)
5.12
4.825
5.875 (Acre)
50 of 2019 Dated 07.03.2019 valid upto 06.03.2029
No
Address     H- 340 L - G/F, NEW RAJINDER NAGAR, NEW DELHI - 110060
Annexure-B- ANNEXURE-B- COLLABORATOR
BEFORE
Yes
CLAUSE NO. 9
No
Yes
Yes







279015.2 Lakhs
142486.9 Lakhs
80529.86 Lakhs
5230 Lakhs
50768.44 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.7472
3CONSTRUCTION OF ROADS 1.265
4PAVEMENTS 0.440
5PARKS AND PLAYGROUNDS 0.5518
6GREEN BELTS 0.832
7VEHICLE PARKINGS 0.096
8ELECTRICITY SUB-STATION 0.074
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0.114
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13WATER 0.326
14STORM 0.496
15STREET 0.049
16ELECTRICITY 0.247
17SECURITY 0.096
18RENEWABLE 0.148
19UNDERGROUND 0.213
20RAIN 0.037
21STP 0.143
Total5.875




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSNHAIYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS500.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM800.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE230.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM400.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL100.00AS PER PROJECT REPORT
6STREET LIGHTING120.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING1750.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS300.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM40.00AS PER PROJECT REPORT
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15STP220.00AS PER PROJECT REPORT
16UNDERGROUND WATER TANK120.00AS PER PROJECT REPORT
17RAIN WATER HARVESTING50.00AS PER PROJECT REPORT
18ELECTRICAL SUB STATION600.00AS PER PROJECT REPORT


21-11-2025 (date)
21-11-2025 (date)
01-04-2026
30-06-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings240.261484
Apartment/Shops/Other Buildings240.261484
Apartment/Shops/Other Buildings241.90741
Apartment/Shops/Other Buildings376.5141
Apartment/Shops/Other Buildings376.5144
Apartment/Shops/Other Buildings378.2521
Apartment/Shops/Other Buildings18.855481
Apartment/Shops/Other Buildings19.12671
Apartment/Shops/Other Buildings18.551501
Apartment/Shops/Other Buildings18.61971
Apartment/Shops/Other Buildings18.752391
Apartment/Shops/Other Buildings20.50441
Apartment/Shops/Other Buildings164.20011
Apartment/Shops/Other Buildings125.01011
Apartment/Shops/Other Buildings76.10011





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments966.359966.359966.359
Shops000
Plots000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments966.359966.359966.359966.359
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1449.541449.542415.92415.9
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4509.684509.684509.684509.68
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5798.155798.154590.214590.21
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3543.323543.323623.853623.85
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2576.962576.962576.962576.96
Shops0000
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2576.9600
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements25.0025.0025.0025.00
Water Supply System00040.00
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
STP11.0011.0011.00
Underground water tank6.006.006.00
Security and fire fighting87.50

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements25.0025.0025.0025.00
Water Supply System40.0040.0040.0080.00
Sewerage treatment & garbage disposal5.005.005.005.00
Electricity Supply System20.0020.0020.0020.00
Storm Water Drainage11.5011.5023.0023.00
Parks and Playgrounds15.0015.0015.0015.00
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Lighting6.006.006.006.00
STP11.0011.0011.0011.00
Rain water harvesting2.502.502.502.50
Underground water tank6.006.006.006.00
Renewable energy system2.002.002.002.00
Security and fire fighting87.5087.5087.5087.50

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements25.0025.0050.0050.00
Water Supply System80.0080.0080.0080.00
Sewerage treatment & garbage disposal10.0010.0010.0010.00
Electricity Supply System40.0040.0040.0040.00
Storm Water Drainage23.0023.0023.0023.00
Parks and Playgrounds30.0030.0030.0030.00
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and fire fighting87.50175.00175.00175.00
Underground water tank6.006.006.0012.00
Renewable energy system4.004.004.004.00
Street Lighting12.0012.0012.0012.00
Electrical sub station60.0060.0060.00
STP11.0011.0011.0022.00
Rain water harvesting5.005.005.005.00

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements50.0050.0050.000
Water Supply System80.0080.0080.000
Sewerage treatment & garbage disposal10.0010.0010.0010.00
Electricity Supply System40.0040.0040.0040.00
Storm Water Drainage23.0023.0023.000
Parks and Playgrounds30.0030.0030.0030.00
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and fire fighting175.00175.00175.00175.00
Street Lighting12.0012.0012.0012.00
Renewable energy system4.004.004.004.00
Underground water tank12.0012.0012.0012.00
Rain water harvesting5.005.005.005.00
STP22.0022.0022.0022.00
Electrical sub station60.0060.0060.00120.00

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Electrical sub station120.00












Yes
Yes
INDUSIND BANK LTD, DR. GOPAL DAS BHAWAN, 28 BARAKHAMBA ROAD, NEW DELHI - 110001
256000500096
INDB0000005
110234002
000005
Mr. Akash Kapoor and Mr. Ravish Kapoor both R/o - 1910A, The Magnolias, Golf Course Road, Sector 42, Gurgaon, Haryana 122009, and Gaurav Khandelwal R/o- 65-A, Bank Colony, Madhuvan, Alwar, Rajashthan 301001
YES











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ZONNINGALREADY BEEN OBTAINED21-11-2025
II. LOIALREADY BEEN OBTAINED08-02-2019
III. AAI NOCALREADY BEEN OBTAINED14-10-2024
IV. ELECTRICAL LOADALREADY BEEN OBTAINED13-12-2024
V. FOREST NOCALREADY BEEN OBTAINED27-10-2016
VI. ASSURANCE OF WATER SUPPLYALREADY BEEN OBTAINED10-12-2024
VII. ASSURANCE OF STORM WATERALREADY BEEN OBTAINED10-12-2024
VIII. ASSURANCE OF SEWERAGE CONNECTIONALREADY BEEN OBTAINED10-12-2024
IX. HUDA CONSTRUCTION WATER NOCALREADY BEEN OBTAINED13-03-2025
X. BR-IIIALREADY BEEN OBTAINED21-11-2025
XI. LICENSEALREADY BEEN OBTAINED07-03-2019
XII. SERVICE PLAN AND ESTIMATE APPROVALAPPLIED FOR BUT YET TO RECEIVE25-11-2025
XIII. FIRE FIGHTING SCHEME APPROVALAPPLIED FOR BUT YET TO RECEIVE07-11-2025
XIV. ENVIRONMENT CLEARANCE APPROVALAPPLIED FOR BUT YET TO RECEIVE27-12-2024








Yes


Yes


As per HARERA Norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE, ENGINEERED WOODEN FLOORING,VITRIFIED TILE, EPOXY PAINT FLOORING
2WALL FINISHING DETAILSVITRIFIED TILE
3KITCHEN DETAILSVITRIFIED TILE, PREMIUM GRADE ACRYLIC EMULSION, FULL HEIGHT WINDOWS- ALUMINIUM POWDERCOATED SECTIONS
4BATHROOM FITTINGSVITRIFIED TILE
5WOOD WORK ETCNO
6DOORS AND WINDOS FRAMESFULL HEIGHT WINDOWS- ALUMINIUM PODERCOATED SECTIONS AND WOODEN FRAME WITHFLUSH DOOR WITH VENEER FINISH (ON BOTHSIDES) & ARCHITRAVES
7GLASS WORKFULL HEIGHT WINDOWS- ALUMINIUM PODERCOATED SECTIONS
8ELECTRIC FITTINGSLED, SWITCH BOARD-MODULER, CONDUIT-HEAVY DUTY
9CONDUCTING AND WIRING DETAILSHEAVY DUTY , MODULAR
10CUPBOARD DETAILSNA
11WATER STORAGEYES
12LIFT DETAILSNA
13EXTERNAL GLAZINGSEXTRANL GRADE TEXTURE PAINT
13.1WINDOWS/GLAZINGSFULL HEIGHT WINDOWS- ALUMINIUM PODERCOATED SECTIONS
14DOORSWOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
14.1MAIN DOORSWOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES
14.2INTERNAL DOORSWOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
15AIR CONDITIONINGVARIABLE RATE FLOW SYSTEM
16ELECTRICAL FITTINGSHEAVY DUTY CONDUTING MODULAR SWITCHES,C CURVE MCB
17CNG PIPE LINEYES
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE TEXTURE PAINT
20INTERNAL FINISHINGPREMIUM GRADE ACRYLIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORPREMIUM GRADE ACRYLIC EMULSION
1 . 2 WALLSPREMIUM GRADE ACRYLIC EMULSION
1 . 3 CEILINGPREMIUM GRADE ACRYLIC EMULSION
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATE WOODEN FLOORING MARBLE
2 . 2 WALLSPREMIUM GRADE ACRYLIC EMULSION
2 . 3 CEILINGPREMIUM GRADE ACRYLIC EMULSION
2 . 4 MODULAR WARDROBESNO
3 . MASTER TOILET
3 . 1 FLOORMARBLE/ VITRIFIED TILES
3 . 2 WALLSMARBLE
3 . 3 CEILINGPREMIUM ACRYLIC DISTEMPER
3 . 4 COUNTERSSINGLE LEVER COUNTER TOP
3 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER COUNTER TOP
3 . 6 FITTING/FIXTURESSINGLE LEVER COUNTER TOP
4 . BED ROOMS
4 . 1 FLOORENGINEERED WOODEN FLOORING
4 . 2 WALLSPREMIUM GRADE ACRYLIC EMULSION
4 . 3 CEILINGPREMIUM GRADE ACRYLIC EMULSION
4 . 4 WARDROBESNO
5 . TOILET
5 . 1 FLOORVITRIFIED TILES
5 . 2 WALLSPREMIUM ACRYLIC DISTEMPER EMULSION
5 . 3 CEILINGPREMIUM ACRYLIC DISTEMPER EMULSION
5 . 4 COUNTERSSINGLE LEVER COUNTER TOP
5 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER COUNTER TOP
5 . 6 FIXTURESSINGLE LEVER COUNTER TOP
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE
6 . 2 WALLSPREMIUM ACRYLIC EMULSION
6 . 3 CEILINGPREMIUM ACRYLIC EMULSION
6 . 4 COUNTERSSINGLE LEVER COUNTER TOP
6 . 5 FIXTURESSINGLE LEVER COUNTER TOP
6 . 6 KITCHEN APPLIANCESSINGLE LEVER COUNTER TOP
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGOBD
7 . 3 TOILETVITRIFIED TILE, PREMIUM ACRYLIC DISTEMPER EMULSION
7 . 4 BALCONYPREMIUM ACRYLIC EMULSION
8 . SIT-OUTS
8 . 1 FLOORVITRIFIED TILES
8 . 2 WALLS & CEILINGPREMIUM ACRYLIC EMULSION
8 . 3 RAILINGSALUMINIUM POWDER COATING
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 NEC 21-09-2025 ------
2 ELECTRICAL LOAD 21-09-2025 ------
3 JAMABANDI 21-09-2025 ------
4 COLLABORATION AGREEMENT 21-09-2025 ------
5 ASSURANCE OF SEWERAGE CONNECTION 21-09-2025 ------
6 AKS SHIJRA 21-09-2025 ------
7 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 21-09-2025 View Document
8 MUTATION 21-09-2025 ------
9 ASSURANCE OF STORM WATER 21-09-2025 ------
10 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 21-09-2025 View Document
11 HUDA CONSTRUCTION WATER NOC 21-09-2025 ------
12 LC-IV 21-09-2025 ------
13 ASSURANCE OF WATER SUPPLY 21-09-2025 ------
14 FOREST NOC 21-09-2025 ------
15 LOI 21-09-2025 ------
16 AAI NOC 21-09-2025 ------
17 ROAD ACCESS PERMISSION 07-11-2025 ------
18 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 08-12-2025 View Document
19 TREE CUTTING 12-11-2025 ------
20 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 14-11-2025 View Document
21 ZONING PLAN 14-11-2025 View Document
22 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 14-11-2025 View Document
23 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 08-12-2025 View Document
24 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 14-11-2025 View Document
25 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 08-12-2025 View Document
26 DEMARCATION PLAN 08-12-2025 View Document
27 A-T5-03 TOWER-5 1ST LVL LAYOUT & AREA_COMPRESSED 17-12-2025 ------
28 SITE PLAN SEWERAGE SCHEME 17-12-2025 ------
29 BASEMENT 3 17-12-2025 ------
30 A-T4-04 TOWER-4 TYPICAL LVL LAYOUT (LEVEL 2ND TO 15,17,23,25,32 & 34 TO 37 FLOOR & AREA DETAIL_COMPRESSED 17-12-2025 ------
31 EWS-02 EWS 10 TO 16 FLOOR PLANS & AREA_COMPRESSED 18-12-2025 ------
32 A-T4-01 TOWER-4 GF LVL AREA DEATIL_COMPRESSED 17-12-2025 ------
33 30 ALLOTMENT LETTER ELAN THE STATMENT 17-12-2025 ------
34 ELE-01 TOWER 1,2,3 & 5 ELEVATION 1 & 2_COMPRESSED 18-12-2025 ------
35 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 09-12-2025 View Document
36 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 09-12-2025 View Document
37 BBA ELAN THE STATMENT 17-12-2025 ------
38 APPLIED SERVICE PLAN ESTIMATE 17-12-2025 ------
39 A-T2-01 TOWER-2 & CONVENIENT SHOPPING GF 17-12-2025 ------
40 A-T3-03 TOWER-3 1ST LVL LAYOUT & AREA_COMPRESSED 17-12-2025 ------
41 A-T3-09 TOWER-3 UNIT CARPET AREA_COMPRESSED 17-12-2025 ------
42 A-T4-09 TOWER-4 UNIT CARPET AREA_COMPRESSED 17-12-2025 ------
43 A-T4-03 TOWER-4 (LEVEL-1ST) & AREA DETAIL_COMPRESSED 17-12-2025 ------
44 SEC-01- TOWER 1,2,3,&5 SECTION A&B_COMPRESSED 17-12-2025 ------
45 A-T2-05 TOWER-2 16,24,33, LVL PLAN (REFUGE FLOOR)_COMPRESSED 17-12-2025 ------
46 SITE DRAINAGE PLAN 17-12-2025 ------
47 COMMUNITY BUILDING PLAN 2 17-12-2025 ------
48 A-T2-07 TOWER-2 PENTHOUSE LVL-2 LAYOUT (LEVEL 39TH FLOOR)_COMPRESSED 17-12-2025 ------
49 A-T5-08 TOWER-5 TERRACE PLAN, MUMTY, MACHINE ROOM PLAN & AREA_COMPRESSED 17-12-2025 ------
50 A-T3-01 TOWER-3 & CONVENIENT SHOPPING GF LVL AREA_COMPRESSED 17-12-2025 ------
51 D-04- COMMUNITY BUILDING GF LVL AREA_COMPRESSED 17-12-2025 ------
52 A-T3-08 TOWER-3 TERRACE LVL PLAN, MUMTY,MACHINE ROOM PLAN & AREA_COMPRESSED 18-12-2025 ------
53 ELE-02 TOWER-4 ELEVATION 1 & 2_COMPRESSED 18-12-2025 ------
54 EWS-01- EWS 1ST FLOOR TO 9TH FLOOR PLAN & AREA_COMPRESSED 17-12-2025 ------
55 A-T1-09 TOWER-1 UNIT CARPET AREA_COMPRESSED 17-12-2025 ------
56 BANK UNDERTAKING ELAN THE STATEMENT 17-12-2025 ------
57 29 4(2)(L)(D) 17-12-2025 ------
58 A-T3-04 TOWER-4 TYPICAL LVL LAYOUT (LEVEL 2ND TO 15TH,17 TO 23, 25 TO 32 & 34 TO 37 FLOOR)_COMPRESSED 17-12-2025 ------
59 A-T5-01 TOWER-5 LVL GF AREA 17-12-2025 ------
60 A-T2-04 TOWER-2 TYPICAL LVL LAYOUT (LEVEL-2ND TO 15,17,TO 23,25 TO 32 & 34 TO 37 FLOOR)_COMPRESSED 17-12-2025 ------
61 D-07B-COMMUNITY BUILDING SECTIONB_COMPRESSED 17-12-2025 ------
62 A-T4-05 TOWER-4 16,24 & 33 LVL PLAN (REFUGE FLOOR) & AREA_COMPRESSED 17-12-2025 ------
63 A-T1-06 TOWER-1 PENTHOUSE LVL-1 LAYOUT (LEVEL 38TH FLOOR)_COMPRESSED 17-12-2025 ------
64 A-T1-08 TOWER-1 TERRACE LVL PLAN, MUMTY, MACHINE ROOM PLAN_COMPRESSED 17-12-2025 ------
65 A-T4-06 TOWER-4 PENTHOUSE LVL-1 LAYOUT (LEVEL-38TH FLOOR) & AREA_COMPRESSED 17-12-2025 ------
66 EWS-03 EWS 17 TO 20 AND MUMTY & TERRACE PLANS & AREA_COMPRESSED 17-12-2025 ------
67 A-T1-03. TOWER 1 1ST LVL LAYOUT & AREA DETAIL_COMPRESSED 17-12-2025 ------
68 A-T2-02 TOWER 3&4 GROUND COVERAGE AREA_COMPRESSED 17-12-2025 ------
69 A-T5-02 TOWER-5 GROUND COVERAGE AREA 17-12-2025 ------
70 SITE PLAN ROAD SCHEME 17-12-2025 ------
71 A-T1-07. TOWER-1 PENTHOUSE LVL-2 LAYOUT (LEVEL 39TH FLOOR)_COMPRESSED 17-12-2025 ------
72 NO LITIGATION PENDING 17-12-2025 ------
73 EC SUBMISSION - 27-12-24 17-12-2025 ------
74 A-T2-09 TOWER-2 UNIT CARPET AREA_COMPRESSED 17-12-2025 ------
75 A-T2-06 TOWER-2 PENTHOUSE LVL-1 LAYOUT (LEVEL 38TH FLOOR) & AREA_COMPRESSED 17-12-2025 ------
76 BA-04-2ND BASEMENT PLAN AREA DIAGRAM_COMPRESSED 17-12-2025 ------
77 A-T4-07 TOWER-4 PENTHOUSE LVL-2 LAYOUT (LEVEL 39TH FLOOR) & AREA_COMPRESSED 17-12-2025 ------
78 A-T4-08 TOWER-4 TERRACE LVL PLAN, MUMTY, MACHINE ROOM PLAN & AREA_COMPRESSED 17-12-2025 ------
79 APPLIED FIRE 17-12-2025 ------
80 SITE PLAN FLUSHING WATER SUPPLY SCHEME 17-12-2025 ------
81 A-T1-05. TOWER-1 16,24,33 LVL PLAN (REFUGE FLOOR) & AREA_COMPRESSED 17-12-2025 ------
82 A-T2-03 TOWER-2 1ST LVL LAYOUT & AREA DETAIL_COMPRESSED 17-12-2025 ------
83 A-T2-08 TOWER-2 TERRACE LVL PLAN, MUMTY, MACHINE ROOM PLAN & AREA_COMPRESSED 17-12-2025 ------
84 A-T5-06 TOWER-5 PENTHOUSE LVL-1 LAYOUT (LEVEL-38TH FLOOR) & AREA_COMPRESSED 17-12-2025 ------
85 A-T3-05 TOWER-3 16,24, & 33 LVL PLAN (REFUGE FLOOR) & AREA_COMPRESSED 17-12-2025 ------
86 A-T3-06 TOWER-3 PENTHOUSE LVL-1, LAYOUT (LEVEL-38TH FLOOR) & AREA_COMPRESSED 17-12-2025 ------
87 A-T5-09 TOWER-5 UNIT CARPET AREA_COMPRESSED 17-12-2025 ------
88 A-T3-07 TOWER-3 PENTHOUSE LVL-2, LAYOUT (LEVEL-39TH FLOOR) & AREA_COMPRESSED 17-12-2025 ------
89 NO SALE SFFIDAVIT BY VA AGRICULTURE 17-12-2025 ------
90 A-T5-05 TOWER-5 16,24&33; LVL PLAN (REFUGE FLOOR) & AREA_COMPRESSED 17-12-2025 ------
91 A-T5-07 TOWER-5 PENTHOUSE LVL-2 LAYOUT (LEVEL 39TH FLOOR) & AREA_COMPRESSED 17-12-2025 ------
92 D-05-COMMUNITY BUILDING 1ST FLOOR & TERRACE LVL AREA_COMPRESSED 17-12-2025 ------
93 D-06 COMMUNITY BUILDING ELEVATIONS_COMPRESSED 17-12-2025 ------
94 D-07B COMMUNITY BUILDING SECTIONB_COMPRESSED 17-12-2025 ------
95 EWS-04- EWS SECTIONS X & Y_COMPRESSED 17-12-2025 ------
96 NO SALE SFFIDAVIT BY ELAN ENCLAVE 17-12-2025 ------
97 SEC-02 TOWER-4 SECTION A&B_COMPRESSED 17-12-2025 ------
98 SITE PLAN DOMESTIC WATER SUPPLY SCHEME 17-12-2025 ------
99 SITE PLAN EXTERNAL FIRE HYDRANT SCHEME 17-12-2025 ------