CANARY GREENS
VILLAGE- BEHRAMPUR, SECTOR-73, GURUGRAM. HARYANA
GURGAON
GURUGRAM
8130499733
8130499733 (Number Shared by Promoter in Public)
arunupadhyay@todayhomes.co.in
ARUN UPADHYAY
8130499733
8130499733 (Number Shared by Promoter in Public)
arunupadhyay@todayhomes.co.in
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
885337
21-07-2017
2306000
INDUSIND BANK
HRERA Gurugram
2
400142
27-09-2019
1145983
INDUSIND BANK
HRERA Gurugram
10.81 (Acre)
175
171
21.637 (Acre)
03 of 2009
No
Address B-44, 2ND FLOOR , JANGPURA-B, NEW DELHI-110014
Address B-44, 2ND FLOOR , JANGPURA-B, NEW DELHI-110014
Address B-44, 2ND FLOOR , JANGPURA-B, NEW DELHI-110014
Address B-44, 2ND FLOOR , JANGPURA-B, NEW DELHI-110014
Annexure-B- DEVELOPMENT AGREEMENT DATED 03.03.2007 EXECUTED BETWEEN THE OWNER VIJ SHRI MORDHWAJ SINGH , SHRI VIKRAMJEET SINGH, SHRI RAM NARAYAN SINGH AND SHRI BHIM SINGH ALL S S/O SHRI CHARANJEET SINGH AND M/S NEW INDIA DEVELOPERS PRIVATE LIMITED.
POA (POWER OF ATTORNY) DATED 19.01.2010 EXECUTED BY M/S NEW INDIA CITY DEVELOPERS PRIVATE LIMITED IN FAVOUR OF M/S TODAY HOMES AND INFRASTRUCTURE PRIVATE LIMITED.
YES
Yes
YES BEFORE PARA 1: "NOW, THEREFORE BY THIS POWER OF
ATTORNEY WE, THE EXECUTANTS ABOVE NAMED, DO HEREBY
CONSTITUTE, NOMINATE AND APPOINT M/S TODAY HOMES AND
INFRASTRUCTURE PVT. LTD., A COMPANY REGISTERED UNDER THE
INDIAN COMPANIES ACT, 1956, ...........
1. TO REPRESENT US ANDAPPEAR BEFORE ANY AND ALL CONCERNED AUTHORITIES
INCLUDING MUNICIPAL AUTHORITIES, DIRECTOR, TOWN AND
COUNTRY PLANNING, HARYANA (DTCP), HARYANA URBAN
DEVELOPMENT AUTHORITIES (HUDA), TEHSIL, OR ANY OTHER
LOCAL/STATE/CENTRAL GOVT. AUTHORITIES...........
2. TO APPLY FORAND OBTAIN LICENSES, PERMISSIONS, NOC FROM THE CONCERNED
AUTHORITIES INCLUDING DTCP, CHANDIGARH, HUDA, NHAI, AND/OR
ANY OTHER CONCERNED AUTHORITIES..........
3. TO APPLY FOR AND OBTAIN ALL REQUISITE PERMISSIONS AND APPROVALS AS MEY BE
REQUIRED FOR DEVELOPMENT OF THE SAID LAND FOR GROUP
HOUSING AND/OR INFORMATION TECHNOLOGY PARK / CYBER PARK
DEVELOPMENT THEREON …………
4. TO APPLY FOR AND OBTAIN ALLREQUISITE PERMISSIONS, APPROVALS, NOC FROM THE CONCERNEDAUTHORITIES SUCH AS FIRE DEPARTMENT, LICENSING AUTHORITIES,
MUNICIPAL AUTHORITIES AND/OR AUTHORITIES IN CHARGE OF
SEWER, WATER, ELECTRICITY, HIGHWAYS OR ANY OTHER
CONCERNED AUTHORITIES……………..
No
Yes
Yes
41985 Lakhs
12000 Lakhs
20930 Lakhs
1696 Lakhs
7359 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
4991.00
3
CONSTRUCTION OF ROADS
8670
4
PAVEMENTS
2535
5
PARKS AND PLAYGROUNDS
6653.54
6
GREEN BELTS
0
7
VEHICLE PARKINGS
2906
8
ELECTRICITY SUB-STATION
921.72
9
CLUB HOUSE
496
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
300
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
11261.48
13
SHOPPING
198
14
NURSERY
800.29
15
PRIMARY
4046.48
Total
43779.51
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HUDA
No
WATER SUPPLY
HUDA
Yes
ELECTRICITY
DHVBN
Yes
SEWAGE DISPOSAL
HUDA
No
STORM WATER DRAINAGE
HUDA
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
275
YET TO BE PREPARED
2
WATER SUPPLY SYSTEM
34
YET TO BE PREPARED
3
STORM WATER DRAINAGE
56
YET TO BE PREPARED
4
ELECTRICITY SUPPLY SYSTEM
400
YET TO BE PREPARED
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
31.7
YET TO BE PREPARED
6
STREET LIGHTING
12
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
246
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
32
YET TO BE PREPARED
9
CLUB HOUSE/COMMUNITY CENTRE
175
YET TO BE PREPARED
10
SHOPPING AREA
30
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
50
YET TO BE PREPARED
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
354.30
YET TO BE PREPARED
13-05-2011 (date)
13-05-2011 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 2 BHK
73.145
165
160
5
1
2
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 3 BHK
95
274
253
21
6
3
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 3 BHK+SQ
113
108
84
24
3
4
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 4 BHK
150
30
25
5
1
5
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE PENT HOUSE
180
6
0
6
3
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
2 BHK
160
STRUCTURE COMPLETED, B.W. UPTO 17TH FLOOR
3 BHK
253
T-05 TO T-7 STRUCTURE & INTERNAL PLASTER COMPLETED AND T-6 & T-7 EXTERNAL PLASTER & TILE WORK UNDER PROGRESS 2. TOWER-02 14TH FLOOR ROOF SLAB UNDER PROGRESS AND B.W. UPTO 12TH FLOOR 3. TOWER-03 09TH FLOOR ROOF SLAB & 08TH FLOOR B.W. UNDER PROGRESS 4. TOWER-08 10TH FLOOR ROOF SLAB & B.W. UNDER PROGRESS
3 BHK + SQ
84
TOWER-02 14TH FLOOR ROOF SLAB UNDER PROGRESS AND B.W. UPTO 12TH FLOOR 3. TOWER-03 09TH FLOOR ROOF SLAB & 08TH FLOOR B.W. UNDER PROGRESS 4. TOWER-08 10TH FLOOR ROOF SLAB & B.W. UNDER PROGRESS
4 BHK
25
13TH FLOOR ROOF SLAB AND 12TH FLOOR B.W. UNDER PROGRESS
13-05-2011
17-02-2015
31-07-2021
13-05-2011
0
31-07-2021
YES
ANNEXURE
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
0
31-03-2019
0
31-03-2019
NOT APPLICABLE
NOT APPLICABLE
635
33
668
230
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Land cost plus EDC plus IDC plus others
31633.34
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
12756
Shops
0
Plots
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
769
758
901
858
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
746
861
896
926
Shops
0
0
10
10
Plots
0
0
0
0
Community
20
25
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
836
716
90
Shops
10
0
0
Plots
0
0
0
Community
25
65
40
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
Water Supply System
0
0
Sewerage treatment & garbage disposal
0
0
Electricity Supply System
0
0
Storm Water Drainage
0
0
Parks and Playgrounds
0
0
Clubhouse/community centres
0
0
Shopping area
0
0
Other
0
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
40
40
30
30
Water Supply System
0
0
0
10
Sewerage treatment & garbage disposal
0
10
10
10
Electricity Supply System
100
150
100
60
Storm Water Drainage
0
10
10
6
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
25
70
70
40
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
30
22
20
20
Water Supply System
10
10
4
0
Sewerage treatment & garbage disposal
1.7
0
0
0
Electricity Supply System
55
30
30
30
Storm Water Drainage
10
5
5
5
Parks and Playgrounds
0
0
10
10
Clubhouse/community centres
0
0
20
25
Shopping area
0
0
10
10
Other
32.3
30
52
35
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
20
20
3
Water Supply System
0
0
0
Sewerage treatment & garbage disposal
0
0
0
Electricity Supply System
31
14
0
Storm Water Drainage
5
0
0
Parks and Playgrounds
10
2
0
Clubhouse/community centres
25
65
40
Shopping area
10
0
0
Other
28
50
30
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
583
under construction
ii. No. of Flats/ Apartments booked
522
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
34762 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
27569 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
7193 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
218 Lakhs
vii. Amount invested in the project upto the date of application
31633 Lakhs
Land cost (If any)
12000 Lakhs
Apartments
12756 Lakhs
Infrastructure
0 Lakhs
EDC/ Taxes Etc.
6877 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
10352 Lakhs
(a) In respect of existing allottees
9251 Lakhs
(b) In respect of rest of the project
1101 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
0 Lakhs
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
275
0
II. WATER SUPPLY SYSTEM
34
0
III. STORM WATER DRAINAGE
56
0
IV. ELECTRICITY SUPPLY SYSTEM
400
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
50
0
VI. CLUB HOUSE/COMMUNITY CENTRE
175
0
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
31.7
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
30
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
32
0
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
15
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
21
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
576.3
0
Yes
Yes
INDUSIND BANK GOPALDAS BHAWAN, 28, BARAKHAMBA ROAD, NEW DELHI-110001
201001409650
INDB0000005
110234002
000005
Rajesh Kumar , Address:V-579 ,Gali No.15,V-Block, Vijay Park, Delhi
or Prabhat Mishra, Address: House No. 79, Judge Colony, Sector-9 Vaishali, Ghaziabad
and Neha Sharma, Address: CV-164, Block-B,RajaPuri Road, Sector-C, Bhagwati Vihar, Uttam Nagar, Delhi-59
or Varun Kumar
( Any two)
YES
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. MINING PERMISSION LETTER NO. 1073
ALREADY BEEN OBTAINED
17-11-2011
II. CONSENT TO ESTABLISH
HSPCB/CONSENT/2821213GUSOCTE258155
ALREADY BEEN OBTAINED
11-10-2013
III. ENVIRONMENTAL CLEARANCE LETTER NO.
SEIAA/HR/2018/1097
ALREADY BEEN OBTAINED
20-08-2018
IV. POWER LINE SHIFTING NOC LETTER NO. 1157
ALREADY BEEN OBTAINED
26-11-2010
V. HUDA CONSTRUCTION WATER NOC LETTER NO.14774
ALREADY BEEN OBTAINED
13-09-2011
VI. AIRPORT HEIGHT CLEARANCE NOC
AAI/RHR/NR/ATM/NOC/2018/213/1249/1252
ALREADY BEEN OBTAINED
05-08-2018
VII. FOREST NOC LETTER NO. 2021
ALREADY BEEN OBTAINED
24-11-2011
VIII. LICENSE - 03 OF 2009 LC-1358-PA-2009/1276
ALREADY BEEN OBTAINED
16-02-2009
Yes
Yes
ATTACHED
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
MARBLE FLOORING
2
WALL FINISHING DETAILS
PLASTIC PAINT
3
KITCHEN DETAILS
CERAMIC TILE/OBD
4
BATHROOM FITTINGS
JAQUAR FITTINGS
5
WOOD WORK ETC
NA
6
DOORS AND WINDOS FRAMES
ALUMINIUM DOOR AND WINDOWS
7
GLASS WORK
DOOR & WINDOWS
8
ELECTRIC FITTINGS
ANCHOR
9
CONDUCTING AND WIRING DETAILS
POLYCAB
10
CUPBOARD DETAILS
NA
11
WATER STORAGE
ANCHOR POLYCAB- UGT/OHT
12
LIFT DETAILS
NOT REQUIRED
13
EXTERNAL GLAZINGS
PROVIDED
13.1
WINDOWS/GLAZINGS
PROVIDED
14
DOORS
ALUMINIUM DOOR
14.1
MAIN DOORS
ALUMINIUM DOOR
14.2
INTERNAL DOORS
FLUSH
15
AIR CONDITIONING
SPLIT
16
ELECTRICAL FITTINGS
ANCHOR
17
CNG PIPE LINE
NA
18
PROVISION OF WIFI AND BROADBAND FACILITY
NA
19
EXTERNAL FINISHING/COLOUR SCHEME
TEXTURE FINISH
20
INTERNAL FINISHING
PLASTIC PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
VITRIFIED TILE
1 . 2
WALLS
OBD PAINT
1 . 3
CEILING
OBD PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
VITRIFIED TILE
2 . 2
WALLS
OBD PAINT
2 . 3
CEILING
OBD PAINT
2 . 4
MODULAR WARDROBES
NA
3 . MASTER TOILET
3 . 1
FLOOR
ANTI SKID CERAMIC TILE
3 . 2
WALLS
CERAMIC TILE/OBD PAINT
3 . 3
CEILING
OBD PAINT
3 . 4
COUNTERS
GRANITE
3 . 5
SANITARY WARE/CP FITTINGS
PROVIDED
3 . 6
FITTING/FIXTURES
PROVISION
4 . BED ROOMS
4 . 1
FLOOR
VITRIFIED TILE
4 . 2
WALLS
OBD PAINT
4 . 3
CEILING
OBD PAINT
4 . 4
WARDROBES
NA
5 . TOILET
5 . 1
FLOOR
ANTI SKID CERAMIC TILE
5 . 2
WALLS
CERAMIC TILE/OBD PAINT
5 . 3
CEILING
OBD PAINT
5 . 4
COUNTERS
NA
5 . 5
SANITARY WARE/CP FITTINGS
PROVIDED
5 . 6
FIXTURES
PROVISION
6 . KITCHEN
6 . 1
FLOOR
ANTI SKID CERAMIC TILE
6 . 2
WALLS
CERAMIC TILE/OBD PAINT
6 . 3
CEILING
OBD PAINT
6 . 4
COUNTERS
GRANITE
6 . 5
FIXTURES
PROVISION
6 . 6
KITCHEN APPLIANCES
NA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
VITRIFIED TILE
7 . 2
WALLS & CEILING
WHITE WASH
7 . 3
TOILET
ANTI SKID CERAMIC TILE
7 . 4
BALCONY
CERAMIC TILES
8 . SIT-OUTS
8 . 1
FLOOR
CERAMIC TILES
8 . 2
WALLS & CEILING
OBD
8 . 3
RAILINGS
MS RAILING
8 . 4
FIXTURES
PROVISION
Sr. No.
Document Description
Date of Document Upload
View Document
1
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT