HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1062-2022
Submission Date : 04-05-2022 05:19:06 PM
Applicant Type : Company
Project Type: ONGOING




ELAN LIMITED
3RD FLOOR, GOLF VIEW CORPORATE TOWER, GOLF COURSE ROAD, SECTOR 42 , GURUGRAM , HARYANA 122002
01244101100
9582727222 (Number Shared by Promoter in Public)
info@elanlimited.com
https://elanlimited.com
XXXX341G
U70200DL2013PLC250600
 
 


 
 


 
 


 
 







ELAN PARADISE
REVENUE ESTATE OF VILLAGE ADAMPUR, SUB TEHSIL- WAZIRABAD, SECTOR-50, DISTRICT GURUGRAM, HARYANA
WAZIRABAD ST
GURUGRAM
01244101100
8800093789 (Number Shared by Promoter in Public)
kapoorselan@gmail.com
SURESH RAWAT
01244101100
8130344701 (Number Shared by Promoter in Public)
suresh@elanlimited.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
16086330-04-2022486000HDFC BANK HRERA Gurugram
26091326-05-2022715700HDFC BANK HRERA Gurugram







3.35 (Acre)
1.87
1.86597
3.35 (Acre)
32 of 2020 and 29 of 2021
No
Address     OFFICE AT H-38, GROUND FLOOR, M2K WHITE HOUSE, SECTOR 57, GURUGRAM.
Address     OFFICE AT H-38, GROUND FLOOR, M2K WHITE HOUSE, SECTOR 57, GURUGRAM, HARYANA
Address     R/O BXX 3190 STREET NO. 7 NEAR GUJJU MALL BHAWAN, GURUDAV NAGAR, LUDHIANA PUNJAB-141001
Address     R/O BXX 3190 STREET NO. 7 NEAR GUJJU MALL BHAWAN, GURUDAV NAGAR, LUDHIANA PUNJAB-141001
Address     R/O H.NO. 150 ARYA NAGAR SITAPUR UP
Address     R/O 1304, T-4, ANSAL VALLY VIEW ESTATE, GURUGRAM, HARYANA
Annexure-B- COLLABORATION AGREEMENT
BEFORE LICENSE
Yes
CLAUSE 26 ,27 & 29 OF AGREEMENT
No
Yes
Yes







37573.1 Lakhs
2602.83 Lakhs
22611.32 Lakhs
1915.16 Lakhs
10443.80 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.9577
3CONSTRUCTION OF ROADS0.9128
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0.4795
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total3.35




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS85.291SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM216.31SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE62.4SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM466.41SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL102.54SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING12.86SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING178.75AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS3.94SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM54.32SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15PARKING 82AS PER PROJECT REPORT
16STP135.5AS PER PROJECT REPORT
17UNDER GROUND TANK 146.39AS PER PROJECT REPORT
18RAIN WATER HARVESTING 15AS PER PROJECT REPORT
19ELECTRICAL SUB STATION 353.45AS PER PROJECT REPORT


27-04-2022 (date)
27-04-2022 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL UNIT8318.5392652351111242
2APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL KIOSK67.93067365142
3APARTMENT/SHOPS/OTHER BUILDINGS Type RESTAURANT1807.0441766640262
4APARTMENT/SHOPS/OTHER BUILDINGS Type KIOSK - RESTAURANT1336.07148814676702
5APARTMENT/SHOPS/OTHER BUILDINGS Type MULTIPLEX186.03361245052






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
RETAIL UNIT 111EXCAVATION WORK IN PROGRESS
RETAIL KIOSK1EXCAVATION WORK IN PROGRESS
RESTAURANT40EXCAVATION WORK IN PROGRESS
KIOSK - RESTAURANT 76EXCAVATION WORK IN PROGRESS
MULTIPLEX0EXCAVATION WORK IN PROGRESS
RETAIL KIOSK1EXCAVATION WORK IN PROGRESS
RESTAURANT40EXCAVATION WORK IN PROGRESS
KIOSK - RESTAURANT 76EXCAVATION WORK IN PROGRESS
MULTIPLEX0EXCAVATION WORK IN PROGRESS


23-03-2021
30-09-2025
16-06-2026
01-10-2022
0
01-06-2024
YES
YES


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NA
04-05-2022
0
04-05-2022


507
0
0
2
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments4199
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1221.421221.421221.42
Shops000
Plots000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1221.421221.421221.421221.42
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1221.421221.421221.421221.42
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1221.421221.421221.421312.44
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Underground Tank73.2073.200
Security and Fire Fighting29.79

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00028.43
Water Supply System0054.0854.08
Sewerage treatment & garbage disposal025.6425.6425.64
Electricity Supply System0116.60116.60116.60
Storm Water Drainage015.6015.6015.60
Parks and Playgrounds01.971.970
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain water harvesting5.05.05
Security and Fire fighting29.7929.7929.7929.79
Electrical Sub Station117.82117.82119.81
Parking27.3427.3327.33
Renewable Energy13.5813.58
STP45.17
Underground tank0

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements28.4328.430
Water Supply System54.0854.080
Sewerage treatment & garbage disposal25.6400
Electricity Supply System116.6000
Storm Water Drainage15.6000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Renewable Energy13.5813.58
Street Lighting4.294.294.28
STP45.1745.17
Security and Fire fighting29.79












Particulars Remarks, if any
i. No. of Flats/Apartments constructed609
ii. No. of Flats/ Apartments booked228
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter40282.82 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter12800.79 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter27482.03 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter11682.38 Lakhs
vii. Amount invested in the project upto the date of application8131.69 Lakhs
Land cost (If any)2602.83 Lakhs
Apartments4199.0 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.4880.55 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession25890.72 Lakhs
(a) In respect of existing allottees25890.72 Lakhs
(b) In respect of rest of the project25890.72 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS85.290
II. WATER SUPPLY SYSTEM216.310
III. STORM WATER DRAINAGE62.40
IV. ELECTRICITY SUPPLY SYSTEM466.410
V. SEWAGE TREATMENT & GARBAGE DISPOSAL102.540
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.3.940
XIII. COVERED PARKING00
XIV. OPEN PARKING820
XV. GARAGES00
XVI. SECURITY SYSTEM178.750
XVII. OTHER FACILITIES AS PER PROJECT REPORT717.520









Yes
Yes
HDFC BANK LIMITED BRANCH - SECTOR -53, VATIKA ATRIUM, A BLOCK, GOLF COURSE ROAD, GURUGRAM , HARYANA 122002
50200055952382
HDFC0000572
110240093
000572
MR. GAURAV KHANDELWAL, Address-3rd Floor, Golf View Corporate Tower, Sector-42, Golf Course Road, Gurgaon 122002.
Attached











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE -1 (32 OF 2020)ALREADY BEEN OBTAINED31-10-2020
II. LICENSE-2 (29 OF 2021ALREADY BEEN OBTAINED22-06-2021
III. BUILDING PLAN - MEMO. NO. ZP-1452/AD(RA)/2022/11460ALREADY BEEN OBTAINED27-04-2022
IV. SEIAA(128)/HR/2021/612ALREADY BEEN OBTAINED09-07-2021
V. FOREST NOC - YN7-FJH-NAGDALREADY BEEN OBTAINED01-03-2021
VI. WATER ASSURANCE - MEMO NO. 169 DATED 10/03/2022ALREADY BEEN OBTAINED10-03-2022
VII. SEWER ASSURANCE- VIDE MEMO NO. GMDASCW/2022/270 DATED 10/03/2022ALREADY BEEN OBTAINED10-03-2022
VIII. GMDA/ DRAINAGE /2022/677 DATED 10/03/2022ALREADY BEEN OBTAINED10-03-2022
IX. MEMO NO. CH 47/DGR/26B DATED 15/03/2022ALREADY BEEN OBTAINED15-03-2022








Yes


Yes


As per RERA Norms







ELAN EPIC
3.525
490
0
464
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
370003700022011
Cost of the apartments12960129607211
Cost of the infrastructure161161161
Others costs238792387914639


28717.38 Lakhs
29330.62 Lakhs
0 Lakhs
0 Lakhs
No
07-12-2018
31-12-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSESTONE / TILES IN COMMON AREAS
2WALL FINISHING DETAILSCEMENT PLASTER
3KITCHEN DETAILSNA
4BATHROOM FITTINGSCHINAWARE WITH CP FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESALUMINIUM / MS FRAME WITH GLASS
7GLASS WORK6 MM TOUGHENED GLASS AND ABOVE
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSPVC CONDUITING WITH WIRING AS PER NBC.
10CUPBOARD DETAILSNA
11WATER STORAGEYES
12LIFT DETAILS04 LIFTS
13EXTERNAL GLAZINGSALUMINIUM / MS FRAME WITH GLASS
13.1WINDOWS/GLAZINGSALUMINIUM / MS FRAME WITH GLASS
14DOORSGLASS DOOR, COMMERCIAL FLUSH DOOR SHUTTERS
14.1MAIN DOORSGLASS DOOR
14.2INTERNAL DOORSCOMMERCIAL FLUSH DOOR SHUTTERS
15AIR CONDITIONINGAS PER DBR IN SELECTED SPACES.
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEPLASTER AND PAINTING, GLAZING, ACP / STONE CLADDING.
20INTERNAL FINISHINGPLASTER AND PAINTING, GLAZING, ACP / STONE CLADDING.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COLLABORATION AGREEMENT 01-05-2022 ------
2A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS01-05-2022 View Document
3ELEVATION 01-05-2022 ------
4PARKING PLAN 01-05-2022 ------
5AAI01-05-2022 ------
6WATER ASSURANCE01-05-2022 ------
7SEWER ASSURANCE01-05-2022 ------
8STROM ASSURANCE01-05-2022 ------
9FOREST NOC01-05-2022 ------
10TREE CUTTING NOC01-05-2022 ------
11LOI01-05-2022 ------
12LC V01-05-2022 ------
13COPY OF LICENSE ALONG WITH SCHEDULE OF LAND01-05-2022 View Document
14SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN01-05-2022 View Document
15DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD01-05-2022 View Document
16JAMABANDI 01-05-2022 ------
17AKS SIZRA01-05-2022 ------
18BALANCE SHEET 19-2001-05-2022 ------
19ENVIRONMENT CLEARANCE 01-05-2022 ------
20SERVICE ESTIMATES 01-05-2022 ------
21SALE DEED01-05-2022 ------
22BALANCE SHEET 18-1901-05-2022 ------
23BALANCE SHEET 20-2101-05-2022 ------
24DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.04-05-2022 View Document
25NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT23-06-2022 View Document
26CASH FLOW STATEMENT OF THE PROPOSED PROJECT23-06-2022 View Document
27CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT23-06-2022 View Document
28DEMARCATION PLAN23-06-2022 View Document
29DRAINAGE LAYOUT PLAN23-06-2022 ------
30FIRE LAYOUT PLAN23-06-2022 ------
31FLUSHING LAYOUT PLAN23-06-2022 ------
32MINING PERMISSION23-06-2022 ------
33NON ENCUMBRANCE CERTIFICATE FROM REVENUE DEPARTMENT23-06-2022 ------
34ROAD LAYOUT PLAN23-06-2022 ------
35SEWER LAYOUT PLAN23-06-2022 ------
36REVISED FIRE SCHEME APPROVAL23-06-2022 ------
37ZONING PLAN23-06-2022 View Document
38WATER SUPPLY LAYOUT PLAN07-07-2022 ------
39T-A 4TH FLOOR PLAN07-07-2022 ------
40T-A FF FLOOR PLAN07-07-2022 ------
41T-A- SF FLOOR PLAN07-07-2022 ------
42T-A TF FLOOR PLAN07-07-2022 ------
43TOWER A- GF FLOOR PLAN07-07-2022 ------
44TOWERA- LGF FLOOR PLAN07-07-2022 ------
45TOWER A TERRACE PLAN07-07-2022 ------
46T-B LGF FLOOR PLAN07-07-2022 ------
47X SECTION 07-07-2022 ------
48IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN07-07-2022 View Document
49IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN07-07-2022 View Document
50LANDSCAPING PLAN07-07-2022 ------
51SUPERIMPOSED PLAN07-07-2022 ------