HRERA GurugramTemp Project Id : RERA-GRG-PROJ-525-2019
Submission Date : 17-01-2020 04:52:29 AM
Applicant Type : Company
Project Type: ONGOING




SS GROUP PRIVATE LIMITED
SS HOUSE, PLOT NO-77,SECTOR-44, GURUGRAM, HARYANA-122003
01244335100
9783222311 (Number Shared by Promoter in Public)
ssgroup.gurgaon@gmail.com
https://www.ssgroup-india.com/
XXXX288Q
U70109HR2010PTC048739
 
 


 
 


 
 


 
 







THE CORALWOOD AND ALMERIA
VILL. SIHI, SECTOR-84
MANESAR
GURUGRAM
8586928480 (Number Shared by Promoter in Public)
ssgroup.gurgaon@gmail.com
VIJAY GOEL
8586928480 (Number Shared by Promoter in Public)
vijaygoel@ssgroup-india.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
120081327-07-2017618180KOTAK MAHINDRA BANKHRERA Gurugram
220082629-07-2017463700KOTAK MAHINDRA BANKHRERA Gurugram







15.275 (Acre)
1.75
1.74
15.275 (Acre)
59 of 2008(19-03-2008)
Yes







32260.00 Lakhs
2437.00 Lakhs
17908.00 Lakhs
3609.00 Lakhs
8306.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS3093.616
4PAVEMENTS3760.33
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS660.00
8ELECTRICITY SUB-STATION311.26
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY173.00
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13AREA298.151
Total8296.357




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHARYANA SHAHARI VIKAS PRADHIKARAN (HSVP)Yes
WATER SUPPLYHARYANA SHAHARI VIKAS PRADHIKARAN (HSVP)Yes
ELECTRICITYHARYANA SHAHARI VIKAS PRADHIKARAN (HSVP)Yes
SEWAGE DISPOSALHARYANA SHAHARI VIKAS PRADHIKARAN (HSVP)Yes
STORM WATER DRAINAGEHARYANA SHAHARI VIKAS PRADHIKARAN (HSVP)Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS426.75SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM339.27SUBMITTED TO HUDA
3STORM WATER DRAINAGE116.25SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM1312.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL190.60SUBMITTED TO HUDA
6STREET LIGHTING58.61SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING580.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS13.05SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE312.50AS PER PROJECT REPORT
10SHOPPING AREA33.60AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM25.00AS PER PROJECT REPORT
12SCHOOL201.04AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT


10-07-2018 (date)
19-12-2011 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE-5TH FLOOR330.62203171
2APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE-6TH FLOOR330.62100101
3APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE-7TH FLOOR330.62100101
4APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE-8TH FLOOR330.62100101
5APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE-9TH FLOOR330.62100101
6APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE-10TH FLOOR330.62100101
7APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE-11TH FLOOR330.62100101
8APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE-12TH FLOOR330.62100101
9APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS- GROUND FLOOR3321.38180154261
10APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS- FIRST FLOOR2176.61146112341
11APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS- SECOND FLOOR2249.19149109401
12APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS- THIRD FLOOR2052.91134113211






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
OFFICE-5TH FLOOR3PROGRESS
OFFICE-6TH FLOOR0PROGRESS
OFFICE-7TH FLOOR0PROGRESS
OFFICE-8TH FLOOR0PROGRESS
OFFICE-9TH FLOOR0PROGRESS
OFFICE-10TH FLOOR0PROGRESS
OFFICE-11TH FLOOR0PROGRESS
OFFICE-12TH FLOOR0PROGRESS
SHOPS- GROUND FLOOR154COMPLETED
SHOPS- FIRST FLOOR112COMPLETED
SHOPS- SECOND FLOOR109COMPLETED
SHOPS- THIRD FLOOR113COMPLETED


04-02-2015
27-08-2020
27-08-2020
04-02-2015
70
27-08-2020


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
04-02-2015
0
27-08-2020


400
0
0
62
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments17908.00
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments20633
Shops0
Plots0

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2016
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements425.50
Water Supply System339.00
Sewerage treatment & garbage disposal190.00
Electricity Supply System475.00
Storm Water Drainage115.75
Parks and Playgrounds12.00
Clubhouse/community centres312.50
Shopping area33.60
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements416
Water Supply System150
Sewerage treatment & garbage disposal190
Electricity Supply System108
Storm Water Drainage116
Parks and Playgrounds50
Clubhouse/community centres350
Shopping area40
Other1000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area40
Other744












Particulars Remarks, if any
i. No. of Flats/Apartments constructed798NA
ii. No. of Flats/ Apartments booked652NA
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter48700.00 LakhsNA
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter45600.00 LakhsNA
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter3100.00 LakhsNA
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter3100.00 LakhsNA
vii. Amount invested in the project upto the date of application31389.00 LakhsNA
Land cost (If any)2437.00 LakhsNA
Apartments17908.00 LakhsNA
Infrastructure2738.00 LakhsNA
EDC/ Taxes Etc.8306.00 LakhsNA
viii. Balance cost to be incurred for completion of the project and delivery of possession871.00 LakhsNA
(a) In respect of existing allottees871.00 LakhsNA
(b) In respect of rest of the project0 LakhsNA
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
5700.00 LakhsNA
x. Total liabilities against the project up-to-date. (Annex details in folder C) 285 LakhsNA



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS426.75425.50
II. WATER SUPPLY SYSTEM339.27339.00
III. STORM WATER DRAINAGE116.25115.75
IV. ELECTRICITY SUPPLY SYSTEM1312.00475.00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL190.60190.00
VI. CLUB HOUSE/COMMUNITY CENTRE312.50312.50
VII. SCHOOL201.04201.04
VIII. ANY OTHER83.6158.25
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING33.6033.60
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.13.0512.00
XIII. COVERED PARKING661.00661.00
XIV. OPEN PARKING125.00125.00
XV. GARAGES00
XVI. SECURITY SYSTEM580.00575
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
KOTAK MAHINDRA BANK, SAFDARJUNG ENCLAVE BRANCH, NEW DELHI
5311149479
KKBK0000175
110485006
175
1. Mr. Ashok Singh Jaunapuria, B-4-43, Safdarjung Enclave, New Delhi-110029 2. Mr. Sushil Singh Jaunapuria-B-4-43, Safdarjung Enclave, New Delhi-110029 3. Mrs. Dayawati-B-4-43, Safdarjung Enclave, New Delhi-110029
Annexed











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENCEALREADY BEEN OBTAINED19-03-2008
II. SANCTIONED BUILDING PLANALREADY BEEN OBTAINED19-12-2011
III. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED08-08-2011
IV. CONSENT TO ESTABLISHALREADY BEEN OBTAINED11-02-2014
V. AIRPORT HEIGHT CLEARANCE NOCALREADY BEEN OBTAINED02-02-2016
VI. FIRE SCHEME APPROVALALREADY BEEN OBTAINED09-02-2017
VII. SERVICE PLAN APPROVALALREADY BEEN OBTAINED24-08-2018
VIII. CONSENT TO OPERATEALREADY BEEN OBTAINED08-03-2019
IX. PART OCCUPATION CERTIFICATE (EXCEPT TOWER F & G)ALREADY BEEN OBTAINED17-10-2018
X. PART OCCUPATION CERTIFICATE (TOWER F & G)APPLIED FOR BUT YET TO RECEIVE15-11-2019








Yes


Yes


1. Total Price is escalation free, save & except increase on A/c of development charges or charges imposed by competent authority. 2. The allotte shall have right to cancel/withdraw in allotment in the project as provided in the act. 3. Default Liability period is 5 years from the date of handing over possession.







SS HIGH POINT, SECTOR-86, GURUGRAM
2.80625
238
0
19
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17402.0017402.002957.00
Cost of the apartments6873.006873.00148.00
Cost of the infrastructure1827.001827.000
Others costs8702.008702.002809.00


259.00 Lakhs
922.00 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2023
31-12-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECORALWOOD: VITRIFIED TILES ALMERIA: ITALIAN MARBLE
2WALL FINISHING DETAILSCORALWOOD: OBD ALMERIA: PLASTIC EMULSION PAINT
3KITCHEN DETAILSAS PER UNIT WISE SPECIFICATION GIVEN IN NEXT SECTION
4BATHROOM FITTINGSAS PER UNIT WISE SPECIFICATION GIVEN IN NEXT SECTION
5WOOD WORK ETCNIL
6DOORS AND WINDOS FRAMESCORALWOOD/ALMERIA: SEASONED HARDWOOD FRAMES WITH TEAK VENEERED SHUTTER
7GLASS WORKNIL
8ELECTRIC FITTINGSCORALWOOD/ALMERIA: MODULAR SWITCHES/MCB
9CONDUCTING AND WIRING DETAILSCORALWOOD/ALMERIA: COPPER ELECTRICAL WIRING IN CONCEALED CONDUITS, WIRING FOR TELEPHONE AND TV CONNECTION
10CUPBOARD DETAILSNIL
11WATER STORAGECORALWOOD/ALMERIA: OVERHEAD TANK AT TERRACE LEVEL
12LIFT DETAILSCORALWOOD: 2 LIFTS IN EACH TOWER(INCLUDING ONE LIFT IN EACH TOWER FOR WHEEL CHAIR USERS AS PER HARYANA BUILDING CODE) ALMERIA: NA
13EXTERNAL GLAZINGSCORALWOOD/ALMERIA: WINDOWS-6/8 MM THICK PLAIN GLASS
13.1WINDOWS/GLAZINGSCORALWOOD/ALMERIA: WINDOWS-6/8 MM THICK PLAIN GLASS
14DOORSAS SPECIFIED BELOW:
14.1MAIN DOORSCORALWOOD/ALMERIA: SEASONED HARDWOOD FRAMES WITH TEAK VENEERED SHUTTER
14.2INTERNAL DOORSCORALWOOD/ALMERIA: SEASONED HARDWOOD FRAMES WITH TEAK VENEERED SHUTTER
15AIR CONDITIONINGNIL
16ELECTRICAL FITTINGSCORALWOOD/ALMERIA: MODULAR SWITCHES/MCB
17CNG PIPE LINENIL
18PROVISION OF WIFI AND BROADBAND FACILITYNIL
19EXTERNAL FINISHING/COLOUR SCHEMECORALWOOD/ALMERIA: TEXTURED PAINT
20INTERNAL FINISHINGCORALWOOD: OBD ALMERIA: PLASTIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORCORALWOOD: VITRIFIED TILES ALMERIA: ITALIAN MARBLE
1 . 2 WALLSCORALWOOD: OBD ALMERIA: PLASTIC EMULSION PAINT
1 . 3 CEILINGCORALWOOD: OBD ALMERIA: PLASTIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORCORALWOOD: LAMINATED WOODEN FLOOR ALMERIA: ITALIAN MARBLE
2 . 2 WALLSCORALWOOD: OBD ALMERIA: PLASTIC EMULSION PAINT
2 . 3 CEILINGCORALWOOD: OBD ALMERIA: PLASTIC EMULSION PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCORALWOOD: CERAMIC TILES ALMERIA: ITALIAN MARBLE
3 . 2 WALLSCORALWOOD: CERAMIC TILES ALMERIA: ITALIAN MARBLE
3 . 3 CEILINGCORALWOOD: GRID CEILING ALMERIA: POP
3 . 4 COUNTERSCORALWOOD/ALMERIA: GRANITE COUNTERS
3 . 5 SANITARY WARE/CP FITTINGSCORALWOOD/ALMERIA: CHINAWARE, CP FITTINGS, GRANITE COUNTER
3 . 6 FITTING/FIXTURESCORALWOOD/ALMERIA: CHINAWARE, CP FITTINGS, GRANITE COUNTER
4 . BED ROOMS
4 . 1 FLOORCORALWOOD: VITRIFIED TILES ALMERIA: LAMINATED WOODEN FLOOR
4 . 2 WALLSCORALWOOD: OBD ALMERIA: PLASTIC EMULSION PAINT
4 . 3 CEILINGCORALWOOD: OBD ALMERIA: PLASTIC EMULSION PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCORALWOOD/ALMERIA: CERAMIC TILES
5 . 2 WALLSCORALWOOD/ALMERIA: CERAMIC TILES
5 . 3 CEILINGCORALWOOD: GRID CEILING ALMERIA: POP
5 . 4 COUNTERSCORALWOOD/ALMERIA: GRANITE COUNTERS
5 . 5 SANITARY WARE/CP FITTINGSCORALWOOD/ALMERIA: CHINAWARE, CP FITTINGS, GRANITE COUNTER
5 . 6 FIXTURESCORALWOOD/ALMERIA: CHINAWARE, CP FITTINGS, GRANITE COUNTER
6 . KITCHEN
6 . 1 FLOORCORALWOOD: VITRIFIED TILES ALMERIA: ITALIAN MARBLE
6 . 2 WALLSCORALWOOD/ALMERIA: COMBINATION OF CERAMIC TILES AND PLASTIC PAINT
6 . 3 CEILINGCORALWOOD: OBD ALMERIA: PLASTIC PAINT
6 . 4 COUNTERSCORALWOOD/ALMERIA: GRANITE COUNTERS
6 . 5 FIXTURESCORALWOOD/ALMERIA: STAINLESS STEEL SINK WITH SINGLE BOWL
6 . 6 KITCHEN APPLIANCESNIL
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCORALWOOD/ALMERIA: TILES
7 . 2 WALLS & CEILINGCORALWOOD/ALMERIA: OBD
7 . 3 TOILETCORALWOOD/ALMERIA: ISI QUALITY TILES, CHINAWARE AND CP FITTINGS
7 . 4 BALCONYCORALWOOD/ALMERIA: ISI QUALITY TILES WITH 1.0M HIGH M.S RAILING
8 . SIT-OUTS
8 . 1 FLOORCORALWOOD/ALMERIA: ANTI-SKID VITRIFIED TILES
8 . 2 WALLS & CEILINGCORALWOOD/ALMERIA: WEATHER PROOF PAINT
8 . 3 RAILINGSCORALWOOD/ALMERIA: M.S. RAILING
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS02-01-2020 View Document
2NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT08-01-2020 View Document
3CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT08-01-2020 View Document
4COPY OF LICENSE ALONG WITH SCHEDULE OF LAND02-01-2020 View Document
5ZONING PLAN02-01-2020 View Document
6SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN02-01-2020 View Document
7DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.02-01-2020 View Document
8CASH FLOW STATEMENT OF THE PROPOSED PROJECT17-01-2020 View Document
9DEMARCATION PLAN03-01-2020 View Document
10IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN02-01-2020 View Document
11IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN02-01-2020 View Document