HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2002-2025
Submission Date : 05-11-2025 06:13:00 PM
Applicant Type : Company
Project Type: NEW




REGIONAL CONSTRUCTION PVT. LTD.
ROOM NO 205, WELCOME PLAZA,S-551, SCHOOL BLOCK-II, SHAKARPUR, DELHI-110092
01244561500
9711312848 (Number Shared by Promoter in Public)
narendra.singh@parasbuildtech.com
http://ekamcourtyard.com
XXXX967F
U45203DL2011PTC212558
 
 


 
 


 
 







EKAM COURTYARD
SECTOR 5, SOHNA, SOHNA RURAL, HARYANA- 122103
SOHNA
GURUGRAM
01244561500
8500221353 (Number Shared by Promoter in Public)
narendra.singh@parasbuildtech.com
ISHWAR SINGH
01244561500
8500221353 (Number Shared by Promoter in Public)
ishwar.singh@parasbuildtech.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1520002-12-202575444KOTAK MAHINDRA BANK LTD.HRERA Gurugram
2515204-11-202570000KOTAK MAHINDRA BANK LTD.HRERA Gurugram
3515204-11-202570000KOTAK MAHINDRA BANK LTD.HRERA Gurugram







0.599 (Acre)
150
140.90
15 (Acre)
55 of 2019(08-03-2019)
Yes







3153.50 Lakhs
70 Lakhs
0 Lakhs
1870 Lakhs
1213.50 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 985.531
3CONSTRUCTION OF ROADS 1439.5322
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total2425.0632




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSPWD, HARYANAYes
WATER SUPPLYHSVP, HARYANAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVP, HARYANA, MEMO NO. 213750 DATED 30.06.2025Yes
STORM WATER DRAINAGEHSVP, HARYANA, MEMO NO. 213750 DATED 30.06.2025Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS46.18YET TO BE PREPARED
2WATER SUPPLY SYSTEM44.69YET TO BE PREPARED
3STORM WATER DRAINAGE8.39YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM85.77YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL6.62YET TO BE PREPARED
6STREET LIGHTING21YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING10.5YET TO BE PREPARED
8PLAYGROUNDS AND PARKS70YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA1355YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER221.87YET TO BE PREPARED


NA (date)
25-06-2025 (date)
01-09-2025
31-05-2030
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings15.2861
Apartment/Shops/Other Buildings15.3031
Apartment/Shops/Other Buildings19.9241
Apartment/Shops/Other Buildings20.04121
Apartment/Shops/Other Buildings20.1541
Apartment/Shops/Other Buildings21.94271
Apartment/Shops/Other Buildings22.0541
Apartment/Shops/Other Buildings22.1341
Apartment/Shops/Other Buildings24.8811
Apartment/Shops/Other Buildings24.9931
Apartment/Shops/Other Buildings27.6441
Apartment/Shops/Other Buildings28.6741
Apartment/Shops/Other Buildings34.4041
Apartment/Shops/Other Buildings36.3841
Apartment/Shops/Other Buildings36.8441





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops0136.03
Plots00

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops92.12127.39202.38190.58
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops181.76181.76181.76170.91
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops54.8554.8554.8544.00
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops44.0044.0043.0633.31
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops33.31
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements04.614.614.61
Water Supply System04.464.464.46
Sewerage treatment & garbage disposal00.660.660.66
Electricity Supply System08.578.578.57
Storm Water Drainage00.840.840.84
Parks and Playgrounds06.996.996.99
Clubhouse/community centres0000
Shopping area0135.36135.36135.36
Other022.1622.1622.16
Security and Fire fighting01.051.051.05
Street lighting2.102.102.10
Street Lighting0

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3.463.463.463.46
Water Supply System3.353.353.353.35
Sewerage treatment & garbage disposal0.500.500.500.50
Electricity Supply System6.436.436.436.43
Storm Water Drainage0.630.630.630.63
Parks and Playgrounds5.255.255.255.25
Clubhouse/community centres0000
Shopping area101.63101.63101.63101.63
Other16.6416.6416.6416.64
Security and Fire fighting0.790.790.790.79
Street lighting1.581.581.581.58

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2.312.312.312.31
Water Supply System2.232.232.232.23
Sewerage treatment & garbage disposal0.330.330.330.33
Electricity Supply System4.294.294.294.29
Storm Water Drainage0.420.420.420.42
Parks and Playgrounds3.503.503.503.50
Clubhouse/community centres0000
Shopping area67.7567.7567.7567.75
Other11.0911.0911.0911.09
Street lighting1.051.051.051.05
Security and Fire finghting0.53
Security and Fire fighting0.530.530.53

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2.312.312.311.15
Water Supply System2.232.232.231.12
Sewerage treatment & garbage disposal0.330.330.330.17
Electricity Supply System4.294.294.292.14
Storm Water Drainage0.420.420.420.21
Parks and Playgrounds3.503.503.501.75
Clubhouse/community centres0000
Shopping area67.7567.7567.7533.83
Other11.0911.0911.095.55
Security and Fire fighting0.530.530.530.26
Street lighting1.051.051.050.53

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.15
Water Supply System1.12
Sewerage treatment & garbage disposal0.17
Electricity Supply System2.14
Storm Water Drainage0.21
Parks and Playgrounds1.75
Clubhouse/community centres0
Shopping area33.83
Other5.54
Security and Fire fighting0.26
Street lighting0.52












Yes
No
ICICI BANK LTD., GROUND FLOOR, TIME TOWER, MG ROAD, GURGAON, HARYANA
777705168588
ICIC0001143
110229199
1143
Narender Aggarwal House No. 594, street 11, near Pnb Bank, ward No. 2, new baselwa colony, Kheri Kalan, Faridabad, Haryana- 121002
Uploaded. No defaults in debt liabilities











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. STORM WATER CONNECTION ASSURANCE ALREADY BEEN OBTAINED30-06-2025
II. SEWERAGE CONNECTION ASSURANCE ALREADY BEEN OBTAINED30-06-2025
III. WATER SUPPLY & DRINKING WATER ASSURANCEALREADY BEEN OBTAINED30-06-2025
IV. ROAD ACCESS PERMISSION / NOC ALREADY BEEN OBTAINED12-09-2020
V. STP TREATED WATER FOR CONSTRUCTION ASSURANCEALREADY BEEN OBTAINED30-06-2025
VI. ELECTRICAL LOAD CONNECTION ALREADY BEEN OBTAINED06-07-2019
VII. FOREST NOCALREADY BEEN OBTAINED11-12-2013
VIII. NON-FOREST LANDALREADY BEEN OBTAINED28-10-2013
IX. FOREST DIVERSION ACCESSALREADY BEEN OBTAINED26-07-2022
X. FIRE SCHEME APPROVALALREADY BEEN OBTAINED10-03-2026








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED MARBLE/ VETRIFIED TILE
2WALL FINISHING DETAILSCERAMIC TILE
3KITCHEN DETAILSCERAMIC TILE/ PAINT
4BATHROOM FITTINGSSTAINLESS STEEL
5WOOD WORK ETCWOODEN & PLYBOARD
6DOORS AND WINDOS FRAMESWOODEN & PLYBOARD
7GLASS WORK6MM TOUGHENED GLASS
8ELECTRIC FITTINGSPHILIPS OR EQUIVALENT
9CONDUCTING AND WIRING DETAILSPHILIPS OR EQUIVALENT
10CUPBOARD DETAILSN/A
11WATER STORAGEOHT/ UGT
12LIFT DETAILSJOHNSON, THYSSENKRUPP OR EQUIVALENT
13EXTERNAL GLAZINGSGLASS & PAINT
13.1WINDOWS/GLAZINGSGLASS & PAINT
14DOORSWOODEN & PLYBOARD
14.1MAIN DOORSWOODEN & PLYBOARD
14.2INTERNAL DOORSWOODEN & PLYBOARD
15AIR CONDITIONING1.5T VOLTAS OR EQUIVALENT
16ELECTRICAL FITTINGSPHILIPS OR EQUIVALENT
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYAIRTEL OR AS PER AVAILABILITY
19EXTERNAL FINISHING/COLOUR SCHEMEPLASTIC EMULSION
20INTERNAL FINISHINGPLASTIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORN/A
1 . 2 WALLSN/A
1 . 3 CEILINGN/A
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORN/A
2 . 2 WALLSN/A
2 . 3 CEILINGN/A
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORN/A
3 . 2 WALLSN/A
3 . 3 CEILINGN/A
3 . 4 COUNTERSN/A
3 . 5 SANITARY WARE/CP FITTINGSN/A
3 . 6 FITTING/FIXTURESN/A
4 . BED ROOMS
4 . 1 FLOORN/A
4 . 2 WALLSN/A
4 . 3 CEILINGN/A
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORANTISKID TILE
5 . 2 WALLSCERAMIC TILE
5 . 3 CEILINGOIL BOND DISTEMPER
5 . 4 COUNTERSN/A
5 . 5 SANITARY WARE/CP FITTINGSSTAINLESS STEEL
5 . 6 FIXTURESSTAINLESS STEEL
6 . KITCHEN
6 . 1 FLOORN/A
6 . 2 WALLSN/A
6 . 3 CEILINGN/A
6 . 4 COUNTERSN/A
6 . 5 FIXTURESN/A
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN/A
7 . 2 WALLS & CEILINGN/A
7 . 3 TOILETN/A
7 . 4 BALCONYN/A
8 . SIT-OUTS
8 . 1 FLOORN/A
8 . 2 WALLS & CEILINGN/A
8 . 3 RAILINGSN/A
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1 AGGREEMENT LC-IV 16-04-2026 ------
2 AUTHORISED SIGNATORY_BOARD RESOLUTION 16-04-2026 ------
3 EKAM COURTYARD_FIRE SCHEME APPROVAL 16-04-2026 ------
4 SERVICE ESTIMATES 16-04-2026 ------
5 WATER SUPPLY CONNECTION ASSURANCE 16-04-2026 ------
6 BROCHURE DOCUMENT 16-04-2026 ------
7 ROC STATEMENT WITH CHARGES 16-04-2026 ------
8 BUILDING PLAN APPROVAL LETTER (BR-III) 16-04-2026 ------
9 LOI-REGIONAL CONSTRUCTION 16-04-2026 ------
10 EKAM COURTYARD_MINING CLARIFICATION LETTER 16-04-2026 ------
11 EKAM COURTYARD_NCZ AFFIDAVIT - COPY 16-04-2026 ------
12 EKAM COURTYARD_NCZ AFFIDAVIT 16-04-2026 ------
13 EKAM COURTYARD_NO POWERLINE SHIFTING AFFIDAVIT 16-04-2026 ------
14 EKAM COURTYARD_NO TREE CUTTING AFFIDAVIT 16-04-2026 ------
15 EKAM LICENSE (WITH COMPLETION CERTIFICATE) 16-04-2026 ------
16 EKAM-AKSH SIJRA 16-04-2026 ------
17 ELECTRICAL CONNECTION APPROVAL 16-04-2026 ------
18 FOREST NOC 16-04-2026 ------
19 HUDA CONSTRUCTION WATER NOC 16-04-2026 ------
20 INFORMATION TO REVENUE DEPARTMENT 16-04-2026 ------
21 LAND TITLE SEARCH REPORT 16-04-2026 ------
22 NO DUES CERTIFICATE & NO LOAN AFFIDAVIT 16-04-2026 ------
23 NON-ENCUMBRANCE CERTIFICATE 16-04-2026 ------
24 PROJECT REPORT_EKAM COURTYARD (BROCHURE & PHOTOS) 16-04-2026 ------
25 REGIONAL CONSTRUCTION_ROC CHARGE FORM 16-04-2026 ------
26 SERVICE PLANS AND ESTIMATES APPROVAL SANCTION LETTER ONLY 16-04-2026 ------
27 ELEVATION PLAN 16-04-2026 ------
28 CA CERTIFICATE FOR FINANCIAL & INVENTORY DETAILS 16-04-2026 ------
29 CA CERTIFICATE FOR NON-DEFAULTS 16-04-2026 ------
30 DEMARCATION PLAN 16-04-2026 ------
31 FLOOR PLANS 16-04-2026 ------
32 LAYOUT PLAN 16-04-2026 ------
33 PARKING PLAN 16-04-2026 ------
34 PROJECT PROGRESS CHART 16-04-2026 ------
35 ROAD AND PAVEMENT PLAN 16-04-2026 ------
36 SECTION PLAN 16-04-2026 ------
37 SERVICE ESTIMATES 16-04-2026 ------
38 SITE PLAN 16-04-2026 ------
39 SOLID WASTE MANAGEMENT PLAN 16-04-2026 ------
40 STORM WATER DRAINAGE PLAN 16-04-2026 ------
41 WATER SUPPLY PLAN 16-04-2026 ------
42 ZONING PLAN 16-04-2026 ------
43 1STORM WATER CONNECTION ASSURANCE 16-04-2026 ------
44 REP-II_BR 16-04-2026 ------
45 ROAD ACCESS PERMISSION 16-04-2026 ------
46 COPY OF DEMAND DRAFTBANKERS CHEQUE SUBMITTED EARLIER 16-04-2026 ------
47 SEWERAGE CONNECTION ASSURANCE 16-04-2026 ------
48 EKAM COURTYARD_CA CERTIFICATE_CASH INFLOW OUTFLOW 16-04-2026 ------
49 EKAM COURTYARD_CA CERTIFICATE_COST OF PROJECT 16-04-2026 ------
50 EKAM COURTYARD_CA CERTIFICATE_NON DEFAULTER 16-04-2026 ------
51 EKAM COURTYARD_CA CERTIFICATE_REP-I 16-04-2026 ------
52 EKAM CURTYARD_CA CERTIFICATE_INVENTORY 16-04-2026 ------
53 EKAM COURTYARD_ UNDERTAKING FOR AUTO CREDIT 16-04-2026 ------
54 EKAM_EDC PAYMENT RECEIPTS 16-04-2026 ------
55 EKAM_EDC SCHEDULE OF PAYMENTS 16-04-2026 ------
56 EKAM_IDC PAYMENT RECEIPT 16-04-2026 ------
57 ADVERTISEMENT DOCUMENT 16-04-2026 ------
58 AFFIDAVIT 42(L)(D) 16-04-2026 ------
59 COPY OF ADDRESS PROOF OF PERSON OPERATIONG ACCOUNT 16-04-2026 ------
60 COPY OF ADHAAR CARD OF PERSON OPERATING ACCOUNT 16-04-2026 ------
61 COPY OF BOARD RESOLUTION FOR AUTHORIZING BANK ACCOUNT OPERATION 16-04-2026 ------
62 COPY OF DEMAND DRAFT FOR DEFICIT FEE 16-04-2026 ------
63 ESCROW AGREEMENT WITH BANK 16-04-2026 ------
64 COPY OF PAN CARD OF ACCOUNT HOLDER 16-04-2026 ------
65 EKAM COURTYARD_ALLOTMENT LETTER 16-04-2026 ------
66 EKAM COURTYARD_APPLICATION FORM 16-04-2026 ------
67 EKAM COURTYARD_BBA(ATS) 16-04-2026 ------
68 EKAM COURTYARD_CA CERTIFICATE_COST OF PROJECT 16-04-2026 ------
69 EKAM COURTYARD_CLARIFICATION OF LAND COST 16-04-2026 ------
70 EKAM COURTYARD_PAYMENT RECEIPT 16-04-2026 ------
71 EKAM COURTYARD_QUARTERLY EXPENDITURES 16-04-2026 ------
72 EKAM COURTYARD_QUARTERLY NET CASHFLOW 16-04-2026 ------
73 EKAM COURTYARD_QUARTERLY SOURCES OF FUNDS 16-04-2026 ------
74 EKAM COUTYARD_CONVEYANCE DEED 16-04-2026 ------
75 EKAM ORIGINAL BANK UNDERTAKING 16-04-2026 ------
76 REP-II_EKAM COURTYARD 16-04-2026 ------
77 ZONING PLAN 05-11-2025 View Document
78 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 05-11-2025 View Document
79 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 05-11-2025 View Document
80 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 05-11-2025 View Document
81 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 05-11-2025 View Document
82 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 05-11-2025 View Document
83 DEMARCATION PLAN 05-11-2025 View Document
84 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 05-11-2025 View Document
85 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 05-11-2025 View Document
86 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 05-11-2025 View Document
87 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 05-11-2025 View Document
88 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 05-11-2025 View Document