HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2242-2026
Submission Date : 20-05-2026 12:55:56 PM
Applicant Type : Company
Project Type: NEW




OBEROI REALTY LIMITED
4TH FLOOR, ONE HORIZON CENTER, GOLF COURSE RD, HORIZON COLONY, SECTOR 43, GURUGRAM, HARYANA 122009
2266773333
9899087426 (Number Shared by Promoter in Public)
hrera@oberoirealty.com
Https://www.oberoirealty.com
XXXX235H
L45200MH1998PLC114818
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







THREE SIXTY NORTH TOWER C
VILLAGE GHATA SECTOR 58, GURUGRAM
GURGAON
GURUGRAM
2266773333
9899087426 (Number Shared by Promoter in Public)
hrera@oberoirealty.com
ANJAY PATHAK
2266773333
7832902718 (Number Shared by Promoter in Public)
anjay.pathak@oberoirealty.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
122483319-05-20261140184AXIS BANK LIMITEDHRERA Gurugram
222489410-06-2026446691AXIS BANK LIMITEDHRERA Gurugram







1.40879 (Acre)
5.0
3.67
14.81875 (Acre)
69 of 2025 Dated 12.05.2025
Yes







45984.76 Lakhs
4512.56 Lakhs
33727.95 Lakhs
910.10 Lakhs
6834.15 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1015.89
3CONSTRUCTION OF ROADS 1825.85
4PAVEMENTS 2330.98
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 528.43
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total5701.15




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHVBNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS131.08AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM7.64AS PER PROJECT REPORT
3STORM WATER DRAINAGE19.66AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM88.05AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL15.28AS PER PROJECT REPORT
6STREET LIGHTING12.72AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING15.25AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS196.63AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM15.25AS PER PROJECT REPORT
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15UNDERGROUND WATER TANK10.16AS PER PROJECT REPORT
16RAIN WATER HARVESTING50.82AS PER PROJECT REPORT
17STP18.65AS PER PROJECT REPORT
18ELECTRICAL SUB STATION328.91AS PER PROJECT REPORT


NA (date)
19-05-2026 (date)
01-10-2026
31-12-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings271.93301
Apartment/Shops/Other Buildings265.6341
Apartment/Shops/Other Buildings269.57341
Apartment/Shops/Other Buildings263.2921
Apartment/Shops/Other Buildings32.69341
Apartment/Shops/Other Buildings32.24361





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments628.15
Shops0
Plots0

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments628.15628.15628.15680.50
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments680.50680.501727.341046.85
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1046.851599.141599.141773.62
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1773.621773.621773.621773.62
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1773.621884.081884.081884.08
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1884.08662.75662.75662.75
Shops0000
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments662.75662.75662.75
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Underground water tank1.52
STP2.80

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements019.6626.2232.77
Water Supply System001.911.91
Sewerage treatment & garbage disposal003.823.82
Electricity Supply System0022.0122.01
Storm Water Drainage004.924.92
Parks and Playgrounds0049.1649.16
Clubhouse/community centres0000
Shopping area0000
Other0000
STP2.802.802.802.80
Underground water tank1.521.521.521.52
Street Lighting3.183.18
Security and fire fighting3.813.81
Renewable energy system3.813.81
Rain water harvesting12.7012.70
Electrical sub station98.67

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements39.3313.11
Water Supply System1.911.91
Sewerage treatment & garbage disposal3.823.82
Electricity Supply System22.0122.01
Storm Water Drainage4.924.92
Parks and Playgrounds49.1649.16
Clubhouse/community centres00
Shopping area00
Other00
Street Lighting3.183.18
Security and fire fighting3.813.81
Renewable energy system3.813.81
Underground water tank1.521.02
Rain water harvesting12.7012.70
STP2.801.86
Electrical sub station115.12115.12












Yes
Yes
AXIS BANK LIMITED, 1ST & 2ND FLOOR SCO NO. 57 HUDA DISTRICT CENTRE SECTOR 56 GURGAON HARYANA 122001
924020042122903
UTIB0005051
110211375
005051
AXIS Bank Limited, 1st & 2nd Floor SCO No. 57 HUDA District Centre Sector 56 Gurgaon Haryana 122001 and Vikas Oberoi, Bindu Oberoi, Santosh Oberoi, Saumil Daru, Hitesh Naik, Abhishek Bajoria, Deepak Agarwal, Vikas Bansal, Netra Wagdhare, Hiren Parekh, Jhalak Tank, Jagdish Meriya, Amit Wadkar, Dharmendra Shah, Hardika Khara Address 4th Floor, One Horizon Center, Golf Course Rd, Horizon Colony, Sector 43, Gurugram, Haryana 122009
YES











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. CODALREADY BEEN OBTAINED17-06-2025
II. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED03-09-2025
III. FOREST NOCALREADY BEEN OBTAINED05-03-2025
IV. ASSURANCE OF SEWERAGE CONNECTIONALREADY BEEN OBTAINED07-05-2026
V. ASSURANCE FOR STORM WATERALREADY BEEN OBTAINED24-02-2026
VI. HUDA CONSTRUCTIONALREADY BEEN OBTAINED24-02-2026
VII. ELECTRICAL LOADALREADY BEEN OBTAINED27-05-2026
VIII. EC ALREADY BEEN OBTAINED08-06-2026
IX. ASSURANCE OF WATER SUPPLYALREADY BEEN OBTAINED27-02-2026
X. BR-IIIALREADY BEEN OBTAINED19-05-2026
XI. PHASING PLAN APPROVALALREADY BEEN OBTAINED13-04-2026
XII. LICENSEALREADY BEEN OBTAINED12-05-2025
XIII. FIRE SCHEME APPROVALAPPLIED FOR BUT YET TO RECEIVE04-06-2026
XIV. SERVICE ESTIMATES AND PLANAPPLIED FOR BUT YET TO RECEIVE04-06-2026








Yes


Yes


As per norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEBARE SHELL APARTMENT - BASE COAT OF WATER PROOFING IN SUNKEN AREAS OF THE APARTMENT
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESFIRE RATED DOOR FRAMES FOR MAIN DOOR. POWDER COATED ALUMINIUM FRAMES FOR WINDOWS
7GLASS WORK4MM AND ABOVE AS PER SPECIFICATIONS
8ELECTRIC FITTINGSAS PER SPECIFICATION OF STANDARD MAKE
9CONDUCTING AND WIRING DETAILSUPTO MAIN DB
10CUPBOARD DETAILSNA
11WATER STORAGEUNDERGROUND AND OVERHEAD WATER TANKS
12LIFT DETAILS& NO S OF ELEVATORS FROM LOWER GROUNDто RESIDENTIAL FLOORS PERTOWER AND 1 LIFT FOR GROUND TO BASEMENT PER TOWER
13EXTERNAL GLAZINGS--
13.1WINDOWS/GLAZINGSFIXED WINDOWS WITH POWDER COATED ALUMINIUM FRAME / FULL HEIGHT SLIDING WINDOWS WITH POWDER COATED ALUMINIUM FRAME.
14DOORS--
14.1MAIN DOORSWOODEN/MS DOOR WITH FIRE RATING AS PER NORMS
14.2INTERNAL DOORSNA
15AIR CONDITIONINGPROVISION FOR VRV SYSTEM
16ELECTRICAL FITTINGSAS PER SPECIFICATION OF STANDARD MAKE
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORCONCRETE RCC SLAB
1 . 2 WALLSDRY WALL
1 . 3 CEILINGCONCRETE CEILING
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORCONCRETE RCC SLAB
2 . 2 WALLSDRY WALL
2 . 3 CEILINGCONCRETE CEILING
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCONCRETE RCC SLAB
3 . 2 WALLSDRY WALL
3 . 3 CEILINGCONCRETE CEILING
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORCONCRETE RCC SLAB
4 . 2 WALLSDRY WALL
4 . 3 CEILINGCONCRETE CEILING
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCONCRETE RCC SLAB
5 . 2 WALLSDRY WALL
5 . 3 CEILINGCONCRETE CEILING
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORCONCRETE RCC SLAB
6 . 2 WALLSDRY WALL
6 . 3 CEILINGCONCRETE CEILING
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCONCRETE RCC SLAB
7 . 2 WALLS & CEILINGDRY WALL & CONCRETE CEILING
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORCONCRETE RCC SLAB
8 . 2 WALLS & CEILINGDRY WALL & CONCRETE CEILING
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 HUDA CONSTRUCTION 09-05-2026 ------
2 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 09-05-2026 View Document
3 SALE DEED 09-05-2026 ------
4 PHASING PLAN 09-05-2026 ------
5 DEMARCATION PLAN 20-05-2026 View Document
6 POWERLINE SHIFTING 11-05-2026 ------
7 AKS-SHIJRA 09-05-2026 ------
8 JAMABANDI 09-05-2026 ------
9 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 09-05-2026 View Document
10 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 09-05-2026 View Document
11 LOI 09-05-2026 ------
12 MUTATION 09-05-2026 ------
13 AAI 09-05-2026 ------
14 FOREST NOC 09-05-2026 ------
15 ASSURANCE FOR STORM WATER 09-05-2026 ------
16 LETTER OF PHASING PLAN 09-05-2026 ------
17 NEC 19-05-2026 ------
18 ZONING PLAN 20-05-2026 View Document
19 LC-IV 11-05-2026 ------
20 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 20-05-2026 View Document
21 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 19-05-2026 View Document
22 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 19-05-2026 View Document
23 SERVICE ESTIMATE PLAN RECEIVING 25-06-2026 ------
24 P 31 ORL TC-02_2ND TO 19TH FLOOR_COMPRESSED 26-06-2026 ------
25 P 07 ORL _LGF+BASEMENT-1 PLAN 26-06-2026 ------
26 P 30 ORL TC-01_GROUND & 1ST FLOOR 26-06-2026 ------
27 BANK UNDERTAKING 24-06-2026 ------
28 EC 25-06-2026 ------
29 FIRE SCHEME ACKNOWLEDGMENT 25-06-2026 ------
30 01 ORL SITE PLAN MAIN 26-06-2026 ------
31 ORL TOWER-C SECTION-1 & 2 26-06-2026 ------
32 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 24-06-2026 View Document
33 P 12 ORL BASEMENT-3 PLAN 26-06-2026 ------
34 ASSURANCE OF SEWERAGE CONNECTION 24-06-2026 ------
35 SUPERIMPOSED PLAN 25-06-2026 ------
36 P ORL BASEMENT-2 PLAN 26-06-2026 ------
37 TREE CUTTING PERMISSION 24-06-2026 ------
38 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 24-06-2026 View Document
39 TERRACE FLOOR & SERVICES 25-06-2026 ------
40 GROUND & 1ST FLOOR 25-06-2026 ------
41 P 85 ORL TOWER-C ELEVATION-2 & 4 26-06-2026 ------
42 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 24-06-2026 View Document
43 ELECTRICAL LOAD 24-06-2026 ------
44 P 08 ORL LGF+BASEMENT-1 PLAN SERVICES 26-06-2026 ------
45 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 24-06-2026 View Document
46 OVERALL PODIUM FLOOR 25-06-2026 ------
47 P 04 ORL SITE PLAN GREEN AREA CALCULATION 26-06-2026 ------
48 P 14 ORL BASEMENT-4 PLAN 26-06-2026 ------
49 20ND TO 26TH FLOOR 25-06-2026 ------
50 AFFIDAVIT 4(2)(L)(D) 25-06-2026 ------
51 ALLOTMENT LETTER TOWER C 25-06-2026 ------
52 LGF BASEMENT-1 PLAN 25-06-2026 ------
53 TOWER C NCZ 25-06-2026 ------
54 ORL TC-05_CARPET AREA CALCULATION 26-06-2026 ------
55 02 ORL SITE PLAN 26-06-2026 ------
56 33 ORL TC-04_TERRACE FLOOR & SERVICES_COMPRESSED 26-06-2026 ------
57 P 16 ORL BASEMENT-5 PLAN & AREA CALCULATION 26-06-2026 ------
58 BASEMENT-3 PLAN 26-06-2026 ------
59 P 32 ORL TC-03_20TH TO 26TH FLOOR 26-06-2026 ------
60 P 84 ORL TOWER-C ELEVATION-1 & 3 26-06-2026 ------
61 COD FINAL ORDER DATED 17062025 26-06-2026 ------