HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1194-2022
Submission Date : 02-11-2022 05:29:22 PM
Applicant Type : Company
Project Type: NEW




ELAN AVENUE LIMITED (FORMERLY KNOWN AS AIRMID DEVELOPERS LIMITED)
15TH FLOOR ,TWO HORIZON CENTRE , DLF PHASE-V, GOLF COURSE ROAD, GURUGRAM 122002
1242323232
9810074167 (Number Shared by Promoter in Public)
kapoorselan@gmail.com
Https://elanlimited.com
XXXX601G
U45400HR2007PLC104996
 
 


 
 


 
 


 
 







ELAN THE PRESIDENTIAL
SITUATED IN SECTOR 106 IN THE REVENUE ESTATE OF VILLAGE PAWALA KHUSRUPUR TEHSIL KADIPUR DISTRICT GURUGRAM, HARYANA
KADIPUR ST
GURUGRAM
01244101100
9871838839 (Number Shared by Promoter in Public)
kapoorselan@gmail.com
ANIL GUPTA
9871838839 (Number Shared by Promoter in Public)
agupta@elanlimited.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
16128131-10-20224636000HDFC BANK HRERA Gurugram
26130714-11-202213121352HDFC BANK HRERA Gurugram







12.767 (Acre)
1.75
1.728
24.10 (Acre)
80 of 2012 dated 17/08/2012 valid till 16/08/2024
No
Address     15TH FLOOR ,TWO HORIZON CENTRE , DLF PHASE-V, GOLF COURSE ROAD, GURUGRAM-122002
Address     15TH FLOOR ,TWO HORIZON CENTRE , DLF PHASE-V, GOLF COURSE ROAD, GURUGRAM-122002
Address     15TH FLOOR ,TWO HORIZON CENTRE , DLF PHASE-V, GOLF COURSE ROAD, GURUGRAM-122002
Annexure-B- YES
BEFORE
Yes
CLAUSE NO. 9
No
Yes
Yes







201650.55 Lakhs
4249.57 Lakhs
109847.53 Lakhs
2439.25 Lakhs
85114.2 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.985
3CONSTRUCTION OF ROADS0.362
4PAVEMENTS0
5PARKS AND PLAYGROUNDS8.577
6GREEN BELTS0
7VEHICLE PARKINGS1.196
8ELECTRICITY SUB-STATION0.136
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.348
13COMMERCIAL UNIT 0.089
14RAIN WATER HARVESTING 0.074
Total12.767




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHAVANYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS30.79SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM65.95SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE54.91SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM200SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL15.33SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING12.00SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING67.5SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS186.82SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM24.00SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL133.37SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING
15PARKING OPEN 72.58SUBMITTED TO TOWN & COUNTRY PLANNING
16STP115.00SUBMITTED TO TOWN & COUNTRY PLANNING
17UNDER GROUND TANK 172.00SUBMITTED TO TOWN & COUNTRY PLANNING
18RAIN WATER HARVESTING 100.00SUBMITTED TO TOWN & COUNTRY PLANNING
19ELECTRIC SUB SATATION 1189.00SUBMITTED TO TOWN & COUNTRY PLANNING


26-10-2022 (date)
26-10-2022 (date)
01-01-2023
31-10-2027
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings291141
Apartment/Shops/Other Buildings116640.867288
Apartment/Shops/Other Buildings24841381





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1697.731697.731697.731697.73
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1697.734059.039141.5111728.01
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments11728.0111728.0111728.0111728.01
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9845.226079.636079.633718.32
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3795.49
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements006.16
Water Supply System013.1913.19
Sewerage treatment & garbage disposal003.83
Electricity Supply System000
Storm Water Drainage010.9810.98
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Rainwater Harvesting000
Renewable Energy000
Security and Fire Fighting06.756.75
Street Lighting000
Electrical Sub Station000
Underground Water Tank86860
Parking Open0014.52

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.166.166.166.16
Water Supply System13.1913.1913.190
Sewerage treatment & garbage disposal3.833.833.830
Electricity Supply System040.040.0040.00
Storm Water Drainage10.9810.9810.980
Parks and Playgrounds37.3637.3637.3637.36
Clubhouse/community centres0000
Shopping area0000
Other0000
Parking Open14.5214.5214.5214.52
Renewable Energy000
Street Lighting000
Security and Fire Fighting6.756.756.756.75
Underground Water Tank000
School26.6726.6726.67
Rainwater Harvesting000
STP28.7528.75
Electrical Sub Station0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System4040.0000
Storm Water Drainage0000
Parks and Playgrounds37.36000
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting6.756.756.756.75
STP28.7528.75
Electrical Sub Station297.25297.25297.25297.25
School26.6726.67
Rainwater Harvesting25.002525
Street Lighting06.006
Renewable Energy6.00666

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Renewable Energy0
Rainwater Harvesting25.00
STP0
Street Lighting0












Yes
Yes
HDFC BANK LIMITED BRANCH - SECTOR -53, VATIKA ATRIUM, A BLOCK, GOLF COURSE ROAD, GURUGRAM , HARYANA
99909717924796
HDFC0000572
110240093
000572
MR. GAURAV KHANDELWAL 9582727222 Gaurav.khandelwal@elanlimited.com
YES











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLAN -MEMO. NO- ZP-1629/PA(DK)/2022/32388 ALREADY BEEN OBTAINED26-10-2022
II. FOREST NOCALREADY BEEN OBTAINED07-09-2022
III. WATER NOCALREADY BEEN OBTAINED01-09-2022
IV. SEWARAGE NOCALREADY BEEN OBTAINED08-09-2022
V. STROM WATER NOCALREADY BEEN OBTAINED09-09-2022
VI. AIRPORT CLEARANCE ALREADY BEEN OBTAINED05-07-2022
VII. ENVIRONMENT CLEARANCEAPPLIED FOR BUT YET TO RECEIVE08-10-2022
VIII. ELECTRICITY LOAD NOC APPLIED FOR BUT YET TO RECEIVE08-09-2022
IX. FIRE SCHEMEAPPLIED FOR BUT YET TO RECEIVE08-11-2022
X. SERVICE ESTIMATE PLANSAPPLIED FOR BUT YET TO RECEIVE10-11-2022








Yes


Yes


As per RERA Norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE, LAMINATE WOODEN FLOORING
2WALL FINISHING DETAILSPREMIUM ACRYLIC DISTEMPER
3KITCHEN DETAILSSINGLE LEVER COUNTER TOP
4BATHROOM FITTINGSCHINAWARE , SINGLE LEVER COUNTER TOP
5WOOD WORK ETCNO
6DOORS AND WINDOS FRAMESFULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS AND WOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES
7GLASS WORKFULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS
8ELECTRIC FITTINGSFAN AND ELECTRIC POINT
9CONDUCTING AND WIRING DETAILSHEAVY DUTY , MODULAR
10CUPBOARD DETAILSNA
11WATER STORAGEYES
12LIFT DETAILS4 LIFTS IN ONE TOWER
13EXTERNAL GLAZINGS12 MM TOUGHNED GLASS DOOR
13.1WINDOWS/GLAZINGSFULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS
14DOORSWOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
14.1MAIN DOORSWOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES
14.2INTERNAL DOORSWOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
15AIR CONDITIONINGVARIABLE RATE FLOW SYSTEM.
16ELECTRICAL FITTINGSHEAVY DUTY CONDUTING MODULAR SWITCHES, C CURVE MCB
17CNG PIPE LINEYES
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTRANL GRADE TEXTURE PAINT
20INTERNAL FINISHINGPREMIUM ACRYLIC DISTEMPER
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILE
1 . 2 WALLSPREMIUM ACRYLIC DISTEMPER
1 . 3 CEILINGPREMIUM ACRYLIC DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATE WOODEN FLOORING
2 . 2 WALLSPREMIUM ACRYLIC DISTEMPER
2 . 3 CEILINGPREMIUM ACRYLIC DISTEMPER
2 . 4 MODULAR WARDROBESNO
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILE
3 . 2 WALLSPREMIUM ACRYLIC DISTEMPER
3 . 3 CEILINGPREMIUM ACRYLIC DISTEMPER
3 . 4 COUNTERSSINGLE LEVER COUNTER TOP
3 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER COUNTER TOP
3 . 6 FITTING/FIXTURESSINGLE LEVER COUNTER TOP
4 . BED ROOMS
4 . 1 FLOORLAMINATE WOODEN FLOORING
4 . 2 WALLSPREMIUM ACRYLIC DISTEMPER
4 . 3 CEILINGPREMIUM ACRYLIC DISTEMPER
4 . 4 WARDROBESNO
5 . TOILET
5 . 1 FLOORVITRIFIED TILE
5 . 2 WALLSPREMIUM ACRYLIC DISTEMPER
5 . 3 CEILINGPREMIUM ACRYLIC DISTEMPER
5 . 4 COUNTERSSINGLE LEVER COUNTER TOP
5 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER COUNTER TOP
5 . 6 FIXTURESSINGLE LEVER COUNTER TOP
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE
6 . 2 WALLSPREMIUM ACRYLIC DISTEMPER
6 . 3 CEILINGPREMIUM ACRYLIC DISTEMPER
6 . 4 COUNTERSSINGLE LEVER COUNTER TOP
6 . 5 FIXTURESSINGLE LEVER COUNTER TOP
6 . 6 KITCHEN APPLIANCESSINGLE LEVER COUNTER TOP
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILE
7 . 2 WALLS & CEILINGPREMIUM ACRYLIC DISTEMPER
7 . 3 TOILETPREMIUM ACRYLIC DISTEMPER
7 . 4 BALCONYPREMIUM ACRYLIC DISTEMPER
8 . SIT-OUTS
8 . 1 FLOORVITRIFIED TILE
8 . 2 WALLS & CEILINGPREMIUM ACRYLIC DISTEMPER
8 . 3 RAILINGSALUMINIUM POWDER COATING
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND30-10-2022 View Document
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN30-10-2022 View Document
3IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN30-10-2022 View Document
4DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.30-10-2022 View Document
5SUPERIMPOSED SITE PLAN 30-10-2022 ------
6NON ENCUMBRANCE CERTIFICATE 30-10-2022 ------
7BALANCE SHEET 2021-2230-10-2022 ------
8BALANCE SHEET 2020-2130-10-2022 ------
9BALANCE SHEET 2019-2030-10-2022 ------
10PARKING PLANS 01-11-2022 ------
11WATER ASSURANCE 01-11-2022 ------
12SWERAGE ASSURANCE 01-11-2022 ------
13STROM ASSURANCE 01-11-2022 ------
14FOREST NOC01-11-2022 ------
15AIRPORT NOC01-11-2022 ------
16AKS SIJRA19-11-2022 ------
17NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT19-11-2022 View Document
18CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT19-11-2022 View Document
19CASH FLOW STATEMENT OF THE PROPOSED PROJECT19-11-2022 View Document
20DEMARCATION PLAN19-11-2022 View Document
21ZONING PLAN19-11-2022 View Document
22SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN19-11-2022 View Document
23FLOOR PLAN TOWER 1 & 219-11-2022 ------
24ELEVATION PLANS19-11-2022 ------
25FIRE SCHEME DRAWINGS19-11-2022 ------
26SECTION PLANS19-11-2022 ------
27APARTMENT PLAN TOWER 1 & 219-11-2022 ------
28SEWERAGE PLAN19-11-2022 ------
29APARTMENT PLAN TOWER 3, 4, 5 & 619-11-2022 ------
30APARTMENT PLAN TOWER 14 &15;19-11-2022 ------
31FLOOR PLAN EWS19-11-2022 ------
32FLOOR PLAN NURSERY SCHOOL19-11-2022 ------
33FLOOR PLAN T 14 &15;19-11-2022 ------
34FLOOR PLAN T-1419-11-2022 ------
35FLOOR PLAN TOWER 3,4,5& 619-11-2022 ------
36ELECTRICITY SUPPLY PLAN19-11-2022 ------
37FIRE FIGHTING PLAN19-11-2022 ------
38BIP PERMISSION21-11-2022 ------
39LAND SCAPE PLAN19-11-2022 ------
40ROAD PLAN19-11-2022 ------
41SERVICE ESTIMATES APPLIED19-11-2022 ------
42SOLID WASTE MANAGEMENT PLAN19-11-2022 ------
43STORM WATER PLAN19-11-2022 ------
44STREET LIGHT PLAN19-11-2022 ------
45WATER SUPPLY PLAN19-11-2022 ------
46STRUCTURE DRAWING T 1-619-11-2022 ------
47STRUCTURE DRAWING TOWER 1419-11-2022 ------
48STRUCTURE DRAWING TOWER 1519-11-2022 ------
49DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD21-11-2022 View Document
50BUILDING PLAN APPROVAL LETTER (BR-III)21-11-2022 ------