HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1150-2022
Submission Date : 03-09-2022 08:36:33 PM
Applicant Type : Company
Project Type: NEW




ADANI BRAHMA SYNERGY PRIVATE LIMITED
BLOCK-C, FLAT NO. 53 FLATTED FACTORY COMPLEX, JHANDEWALAN NEW DELHI CENTRAL DELHI DL 110055 IN
01242555155
9582376753 (Number Shared by Promoter in Public)
praveen.kumar8@adani.com
http://www.samsaragurgaon.com
XXXX275K
U45200DL2017PTC317052
 
 


 
 


 
 







SAMSARA AVASA
BLOCK-L, SECTOR-63, VILLAGE-ULLAHAWAS
BADSHAHPUR ST
GURUGRAM
01244941800
7838500568 (Number Shared by Promoter in Public)
compliance@brahmare.co.in
JITENDRA KUMAR
01244941800
7838500568 (Number Shared by Promoter in Public)
jitender.kumar@adani.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
190706408-06-2022289620INDUSIND BANKHRERA Gurugram
290706508-06-2022120025INDUSIND BANKHRERA Gurugram







1.2296 (Acre)
2.412
2.298
141.66875 (Acre)
NA
Yes







12894.87 Lakhs
2455.53 Lakhs
6322.55 Lakhs
0 Lakhs
4116.79 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.2296
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total1.2296




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA (ALREADY CONNECTED) Yes
WATER SUPPLYGMDA (ASSURANCE ALREADY TAKEN)Yes
ELECTRICITYDHBVN (REQUISITE LOAD FOR ENTIRE 141.66875 ACRES ALREADY SANCTIONED))Yes
SEWAGE DISPOSALGMDA (ASSURANCE ALREADY TAKEN)Yes
STORM WATER DRAINAGEGMDA (ASSURANCE ALREADY TAKEN)Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM0AS PER PROJECT REPORT
3STORM WATER DRAINAGE0AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL0AS PER PROJECT REPORT
6STREET LIGHTING0AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT


02-11-2016 (date)
25-04-2022 (date)
01-10-2022
31-12-2026
Plot Area(In Square Meter)Number of plots in the project
251.5761
251.5761
271.81
259.721
259.721
259.721
279.291
247.551
251.011
251.011
251.011
251.011
251.011
251.011
251.011
388.311
749.791


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings125.96641
Apartment/Shops/Other Buildings126.42341
Apartment/Shops/Other Buildings137.86441
Apartment/Shops/Other Buildings131.97941
Apartment/Shops/Other Buildings131.97941
Apartment/Shops/Other Buildings131.97941
Apartment/Shops/Other Buildings141.13241
Apartment/Shops/Other Buildings137.1141
Apartment/Shops/Other Buildings126.99641
Apartment/Shops/Other Buildings126.99641
Apartment/Shops/Other Buildings126.99641
Apartment/Shops/Other Buildings126.99641
Apartment/Shops/Other Buildings126.99641
Apartment/Shops/Other Buildings126.99641
Apartment/Shops/Other Buildings126.99641
Apartment/Shops/Other Buildings194.05941
Apartment/Shops/Other Buildings341.26841





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments2802.35
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0063.23
Shops000
Plots000
Land Cost2455.53
Miscelleanous Cost346.82

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments316.13316.13252.90474.19
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments474.19474.19474.19474.19
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments632.26632.26632.26474.19
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments316.13158.06158.060
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments000
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
No
INDUSIND BANK LTD., BLOCK-A, SUSHANT LOK, PHASE-1, TOWER-B, FIRST INDIA PLACE, GROUND FLOOR, MEHRAULI-GURGAON ROAD, GURUGRAM-122002
252525002550
INDB0000022
110234002
000022
Mr. Atul Jain, Adani House, Plot No. 83, Sec-32, Institutional Area, Gurugram (Haryana)-122001
Non-Default Certificate Uploaded











Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLAN APPROVALSALREADY BEEN OBTAINED25-04-2022
II. CONVEYANCE DEED (L-1,L-2,L-8)ALREADY BEEN OBTAINED13-01-2021
III. CONVEYANCE DEED (L-9,L-10,L-11,L-12)ALREADY BEEN OBTAINED14-01-2021
IV. RECTIFICATION DEED (L-13,L-22)ALREADY BEEN OBTAINED28-03-2022
V. RECTIFICATION DEED (L-14,L-15,L-16,L-17,L-18,L-19,L-20,L-21)ALREADY BEEN OBTAINED14-01-2021
VI. BR-III (L-1,L-2,L-8,L-9,L-10,L-11,L-12)ALREADY BEEN OBTAINED07-04-2022
VII. BR-III (L-13)ALREADY BEEN OBTAINED25-04-2022
VIII. BR-III (L-14, L-15, L-16)ALREADY BEEN OBTAINED12-04-2022
IX. BR-III (L-17)ALREADY BEEN OBTAINED13-04-2022
X. BR-III (L-18,L-19,L-20,L-21)ALREADY BEEN OBTAINED13-04-2022
XI. BR-III (L-22)ALREADY BEEN OBTAINED25-04-2022








Yes


Yes


As per RERA prescribed format







SAMSARA (PART-1), SECTOR-60, TEHSIL, WAZIRABAD, GURUGRAM
9832
66
22
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
857584508450
Cost of the apartments000
Cost of the infrastructure000
Others costs250026252625


13865 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2022
31-03-2022




SAMSARA (PART-3), SECTOR-60, TEHSIL, WAZIRABAD, GURUGRAM
10194
63
21
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
870087008700
Cost of the apartments000
Cost of the infrastructure000
Others costs262526252625


13871.62 Lakhs
15.64 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2022
31-03-2022




SAMSARA (PART-V), SECTOR-63, GURUGRAM
12243
172
43
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
22745227459304
Cost of the apartments000
Cost of the infrastructure000
Others costs592059205920


16217 Lakhs
1166 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2023
30-09-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED MARBLE/VITRIFIED TILES/CERAMIC TILES
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT
3KITCHEN DETAILSMODULAR KITCHEN WITH HOB
4BATHROOM FITTINGSJAQUAR OR EQUIVALENT
5WOOD WORK ETCN.A.
6DOORS AND WINDOS FRAMESALUMINIUM DOORS & WINDOWS
7GLASS WORKN.A.
8ELECTRIC FITTINGSMODULAR SWITCH & SOCKET
9CONDUCTING AND WIRING DETAILSPVC CONDUIT & COPPER WIRING
10CUPBOARD DETAILSN.A.
11WATER STORAGEOVERHEAD HDPE TANK
12LIFT DETAILS5/6 PASSENGERS
13EXTERNAL GLAZINGSCLEAR GLASS ALUMINIUM WINDOWS
13.1WINDOWS/GLAZINGSCLEAR GLASS ALUMINIUM WINDOWS
14DOORSWOODEN FLUSH DOOR WITH VENEER /LAMINATE ON BOTH SIDES AND HARDWARE
14.1MAIN DOORSWOODEN FLUSH DOOR WITH VENEER ON BOTH SIDES
14.2INTERNAL DOORSWOODEN FLUSH DOOR WITH LAMINATE ON BOTH SIDES AND HARDWARE
15AIR CONDITIONINGVRF AIRCONDITIONING IN LIVING/DINING & ALL BEDROOMS
16ELECTRICAL FITTINGSN.A.
17CNG PIPE LINE(COOKING GAS) PROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION OF WI-FI ENABLED HOTSPOT IN LOCALITY
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT
20INTERNAL FINISHINGEXTERNAL GRADE PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED MARBLE
1 . 2 WALLSCRYLIC EMULSION PAINT
1 . 3 CEILINGCRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSCRYLIC EMULSION PAINT
2 . 3 CEILINGCRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESN.A.
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED /CERAMIC TILES
3 . 2 WALLSCERAMIC TILES UPTO DOOR HEIGHT
3 . 3 CEILINGACRYLIC EMULSION PAINT
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGSJAQUAR OR EQUIVALENT
3 . 6 FITTING/FIXTURESJAQUAR OR EQUIVALENT
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESN.A.
5 . TOILET
5 . 1 FLOORVITRIFIED/CERAMIC TILES
5 . 2 WALLSCERAMIC TILES UPTO DOOR HEIGHT
5 . 3 CEILINGACRYLIC EMULSION PAINT
5 . 4 COUNTERSGRANITE
5 . 5 SANITARY WARE/CP FITTINGSJAQUAR OR EQUIVALENT
5 . 6 FIXTURESJAQUAR OR EQUIVALENT
6 . KITCHEN
6 . 1 FLOORCERAMIC/VITRIFIED TILES
6 . 2 WALLSCERAMIC TILES UPTO 2 FEET ABOVE COUNTER
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESJAQUAR OR EQUIVALENT
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN WITH HOB
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC/VITRIFIED TILES
7 . 2 WALLS & CEILINGOBD
7 . 3 TOILETCERAMIC TILES
7 . 4 BALCONYCERAMIC/VITRIFIED TILES
8 . SIT-OUTS
8 . 1 FLOORCERAMIC/VITRIFIED TILES
8 . 2 WALLS & CEILINGWEATHER PROOF PAINT
8 . 3 RAILINGSM.S. RAILING
8 . 4 FIXTURESJAQUAR OR EQUIVALENT












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND01-09-2022 View Document
2SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN01-09-2022 View Document
3DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD01-09-2022 View Document
4CASH FLOW STATEMENT OF THE PROPOSED PROJECT01-09-2022 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN01-09-2022 View Document
6A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS01-09-2022 View Document
7MUTATION COPY03-10-2022 ------
8JAMABANDI COPY03-10-2022 ------
9AKS SIZRA03-10-2022 ------
10NON- ENCUMBRANCE CERTIFICATE03-10-2022 ------
11ENVIRONMENTAL CLEARANCE03-10-2022 ------
12APPROVAL OF ELECTRIFICATION PLAN03-10-2022 ------
13FOREST NOC03-10-2022 ------
14UNDERTAKING03-10-2022 ------
15ASSURANCE FOR SEWERAGE CONNECTION03-10-2022 ------
16ASSURANCE FOR SUPPLY OF WATER SUPPLY03-10-2022 ------
17IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN03-10-2022 View Document
18DEMARCATION PLAN03-10-2022 View Document
19ZONING PLAN03-10-2022 View Document
20PERT CHART03-10-2022 ------
21BR-III-103-10-2022 ------
22BR-III-203-10-2022 ------
23BR-III-303-10-2022 ------
24NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT03-10-2022 View Document
25CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT03-10-2022 View Document
26PROMOTER AFFIDAVIT03-10-2022 ------
27BANK UNDERTAKING03-10-2022 ------
28DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.03-10-2022 View Document
29L_1_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
30L_1_ SECTION & ELEVATION03-10-2022 ------
31L_2_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
32L_2_ SECTION & ELEVATION03-10-2022 ------
33L_8_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
34L_8_ SECTION & ELEVATION03-10-2022 ------
35L_9_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
36L_9_ SECTION & ELEVATION03-10-2022 ------
37L_10_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
38L_10_ SECTION & ELEVATION03-10-2022 ------
39L_11_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
40L_11_ SECTION & ELEVATION03-10-2022 ------
41L_12_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
42L_22_ ELEVATION & SECTION03-10-2022 ------
43L_12_ SECTION & ELEVATION03-10-2022 ------
44L_13_ ELEVATION & SECTION03-10-2022 ------
45L_13_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
46L_14_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
47L_14_ SECTION & ELEVATION03-10-2022 ------
48L_15_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
49L_15_ SECTION & ELEVATION03-10-2022 ------
50L_16_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
51L_16_ SECTION & ELEVATION03-10-2022 ------
52L_17_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
53L_17_ SECTION & ELEVATION03-10-2022 ------
54L_18_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
55L_18_ SECTION & ELEVATION03-10-2022 ------
56L_19_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
57L_19_ SECTION & ELEVATION03-10-2022 ------
58L_20_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
59L_20_ SECTION & ELEVATION03-10-2022 ------
60L_21_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
61L_21_ SECTION & ELEVATION03-10-2022 ------
62L_22_ FLOOR PLAN AREA DIAGRAMS03-10-2022 ------
63L_22_ TYPICAL TERRACE FLOOR PLAN AREA DIAGRAMS03-10-2022 ------